HBL-93-005, Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo
ML20128F034
Person / Time
Site: Humboldt Bay
Issue date: 01/19/1993
From: Gisclon J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128F038 List:
References
HBL-93-005, HBL-93-5, NUDOCS 9302110214
Download: ML20128F034 (3)


Text

_ _ . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

Pacific Gas and licetric Comparty + - - it i - i'-

l! -

,;;..w

c t:

y ,

Ir

( t. 4}'

p: .(

January 19, 1993 PGLE Letter No. HBL-93-005

~" " I U. S. Iluclear Regulatory Commission ATIN: Document Control Desk j.3 g Wai.hington, D.C. 20555 Re: Docket No. 50-133, OL-DPR-7 Humboldt Day Power Plant. Unit 3 Emergency Plan for SAFSTOR, Revision 2 Gentlemen:

In accordance with 10 CFR 50.4 and 10 CFR 50.54q, enclosed is Revision 2 to the Humboldt Bay Power Plant (HDPP) Unit 3 Emergency Plan for SAFSTOR (Enclosure 1). Because this Emergency Plan was incorporated into the HBPP Plant Manuals, it was numbered according to the current PG&E system for maintaining the Plant Manuals. Therefore, " Volume 3 Revision 20" appears at the top of each page of this revision.

Revision 0 of the proposed Emergency Plan for SAFS10R was submitted April 4, 1985. Revision 1 to the proposed Emergency Plan was submitted May 23, 1988. After Revision I was accepted by the NRC in a letter dated August 4,1988, it was incorporated into the HBPP Plant Manuals as Revision 0 of the Amroved Emergency Plan.

In february 1992, Revision 1 of the approved Emergency Plan was issued to all controlled copies of the HBPP Plant (1anual, including those for the NRC, Region V. However, Revision 1 was not submitted to the Document Control Desk as required by 10 CFR 50,4. The now superseded Revision 1 of the approved Emergency Plan is included as Enclosure 2 to this letter.

Page 5 of Attachment 9.1 of this update contains privacy / proprietary information and is bracketed in accordance with Generic letter 81-27.

These revisions to the approved Emergency Plan have not reduced the effectiveness of the Plan.

Sincerely, Y) &

J. M. Giscion cc: Lawrence C. Bell John B. Martin (2)

Peter E. Rigney ,

liumboldt Distribution (w/o enc.) '

t Enclosures e 5979S/85K/MWZ/1739 g6M ,-

I' 9302110214 930119 Y PDR ADOCK 05000133 F PDR

g i

PG&E Letter Ho, ilBL-93-005 January 19, 1993 i

i bcc w/o enc: JPDillon (333/A6022) i JAHays (77/1409)

RINelson (77/1459) l DAPeterson (llBPP)

PGRasinus sen (HBPP) i EVWaage (77/1403)

CJWarner (77/3011)

RBW111is (HBPP)

MWZirnmermann (333/A6091) ]

i )

, 59795/85K j 1

l 1

i 1

I I

l l

l b

, tA" H %

  1. p '

o

/ 5- UNITED STATES

s , 3 y,g 7 ' 'nj NUCLEAR REGULATORY COMMISSION 0, jli g W ASHINGTON. O C. 2%f4 I

\ , ,'[ , / February 2, 1993 i

50-133 Humtioldt P>ay Power Plant MEMORA!1DUM FOR Chief, Document Control Branch, IRM FROMt Director, Division of Freedom of Information and Publications Services, ADM SUBJECT REVIEW OF UTILITY EMERGEliCY PLM1 DOCUMEllTATIO!1 The Division of Freedom of Inferination and Publications Sorvicos

' han reviewed the attached document and has datormined that it may i now be mado publicly available, ch4tp h Donnie H. Grimsley, Dire or Divisjon of Freedom of Informq .lon l and Publications Services [p Office of Administration i

I l

2 l

i

! 030067 1

1 l

F-'*** *

  • w w w e on..

. .4 PG&E Letter No. " fat-93 005 ENCLOSURE 1 5979S/85K

~

n