Category:Letter type:DCL
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) 2024-09-09
[Table view] Category:License-Operator
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test 2024-08-02
[Table view] |
Text
Samuel Z. WilliamsDiablo Canyon Power Plant Director Mail code 104/5/503 Nuclear Training and P.O. Box 56 Accreditation Avila Beach, CA 93424
805.545.3431 Samuel.Williams@pge.com
PG&E Letter DCL 079
Mr. Kelly D. Clayton, Senior Operations Engineer 10 CFR 55.40 U.S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
Docket No. 50- 275, OL-DPR-80 Docket No. 50- 323, OL-DPR-82 Diablo Canyon Units 1 and 2 - Initial Operator Licensing Examination:
Postexamination Materials
Dear Mr. Clayton:
Revision 12 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, ES -4.4, Section B.7, provides for the submittal of a n operator licensing postexamination package containing the following:
(1) the graded written examinations (i.e., each applicants original ans wer and examination cover sheets) plus a clean copy of each applicants answer sheet (2) the master written examinations and answer keys, annotated to indicate any changes made while administering and grading the examinations (3) any questions asked by the applicants and the answers given to the applicants during the written examination (ES -4.3)
(4) all examination administration or postexamination review comments made by the facility licensee and the applicants after the written examination and operating tests (ES -4.3)
(5) the seating chart for the written examination (ES -4.3)
(6) documentation (through a cover letter or other correspondence) of facility licensee management or supervisor concurrence [satisfies ES-4.4, Section A.1, third bullet]
(7) the results of any performance a nalysis for the written examination, with recommended substantive changes (8) Form 1.3-1, Examination Security Agreement, with a pre-and post-examination signature by every individual who had detailed knowledge of any part of the operating tests or written examinations before they were administered
A member of the STARS Alliance
Callaway
With respect to the operator licensing examinations administered in July and August 2024, Pacific Gas and Electric Company (PG&E) confirms that the above items have been provided in electronic format. This completes the postexamination package submittal.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99- 04) in this letter.
If you have any questions, please contact Mr. Abdul Kadir, Operations Training Manager, at ( 805) 545-4 200.
Sincerely,
Samuel Z. Williams _________________
Director, Nuclear Training and Accreditation Date
jmsp/51178743-13 cc: Mahdi O. Hayes, NRC Senior Resident Inspector Abdul W. Kadir, Operations Training Manager Daniel J. McBride, Nuclear Operations Services Director Adam S. Peck, Site Vice President and Acting Chief Nuclear Officer Justin E. Rogers, DCPP Station Director
A member of the STARS Alliance
Callaway
- Wolf Creek 2024DCPP NRC Exam Administered August2, 2024 RO Final Written Examination Analysis
The threshold for determination of questions to be analyzed was a percentage of greater than 50% incorrect responses. We also analyzed other questions based on applicant feedback following the examination. Based on the results of this exam analysis, training needs will be tracked under notification 51178743 task 15.
- 33 9/16 total applicants incorrect ( 56%)
Nine chose B. The correct answer is D.
This question asks how to parallel offsite power to a bus supplied by a DG. The correct answer D states to ensure the synchroscope is rotating slowly in the counterclockwise (SLOW) direction. Distractor B states to ensure the synchroscope is rotating slowly in the clockwise (FAST) direction. This would only be true if paralleling a DG to a bus that is supplied by offsite power. No change to the key was made. The question is technically correct as written, with no construction problems.
- 53 11/1 6 total applicants incorrect (69 %)
Eleven chose A. The correct answer is B.
This question asks based on instrument air header pressure lowering to 99 psig, how many air compressors will be running. The correct answer B states only compressors 0- 1 through 0- 5 will be running. Distractor A states all air compressors will be running. This would only be true in this configuration if instrument air pressure lowered to 93 psig. No change to the key was made. The question is technically correct as written, with no construction problems.
2024DCPP NRC Exam Administered August2, 2024 SRO Final Written Examination Analysis
The threshold for determination of questions to be analyzed was a percentage of greater than 50% incorrect responses. We also analyzed other questions based on applicant feedback following the examination. Based on the results of this exam analysis, training needs will be tracked under notification 51178743 task 15.
- 84 7/10 SRO applicants incorrect (70.0%)
Six chose A, one chose D. The correct answer is B.
This question asks what procedure is used during a loss of offsite power with all EDGs supplying their bus in order to restore power to non-vital 4kV Bus D and if the supply breakers to the bus must be manually opened or automatically opened. The correct answer B reflects the guidance in EOP E- 0.1, Reactor Trip Response step 9b RNO which states to IMPLEMENT OP AP-26, Loss of Offsite power to restore power to non-vital buses. IAW OP AP-26, Loss of Offsite power, the supply breakers to 4 kV Bus D are manually opened prior to restoring power.
Distractor A implements the correct procedure (OP AP-26) but states the supply breakers automatically open, however this is not true since they must be manually opened. Distractor D states to use EOP ECA- 0.3, but this is not correct since this procedure is used to restore power to vital 4kV buses, not non-vital buses. No change to the key was made. The question is technically correct as written, with no construction problems.
- 89 6/10 SRO applicants incorrect (60.0%)
Five chose B, one chose C. The correct answer is D.
This question asks what the overload interlock limit is on the manipulator crane and the purpose it serves. The correct answer D is 2180 lbs to prevent damage to the fuel. Distractor B is 1200 lbs which is not correct since this interlock is only active when the gripper is disengaged. Distractor C has the correct load limit of 2180 lbs but states the purpose is to prevent damage to the manipulator crane. This is not true since the manipulator crane is load tested at a higher load than 2180 lbs. No change to the key was made. The question is technically correct as written, with no construction problems.
- 100 5/10 SRO applicants incorrect (50.0%)
Four chose C, one chose A. The correct answer is B.
This question asks the priority for procedure implementation during EOP FR -C.2 after all ECCS accumulators have injected, CSF for Core Cooling is Yellow, now a red path exists on RCS integrity. The correct answer is to complete EOP FR -C.2 since exiting now could lead to a red path on core cooling. This fact is reflected in a caution in EOP FR -C.2. Distractor C states to go to EOP FR-P.1 since a red path is a higher priority however this goes against the guidance in the caution in EOP FR-C.2. Distractor A states to stay in EOP FR -C.2 which is correct but the reason to remain in the procedure states because the CSFs are not addressed until a defined procedure exit is reached which is not incorrect for implementing EOP FR-C.2. This reason is only applicable for EOP ECA-0.0, or red or magenta path. EOP FR-C.2 is a yellow path procedure. No change to the key was made. The question is technically correct as written, with no construction problems.
L232 Student Exam Review
8-Confusion if valve if valve failed to the open position or failed to open. Suggest adding a sentence or statement stating the valve is currently closed.
41-Confusion on what the white button is. Suggest giving a symbol or providing a picture to clarify what the white button is.
70- several minutes is vague. Is this during the boration or after the boration? Suggest making it clear that question is asking after the boration.
84-suggest changing supply breakers to aux feeder breakers to be more clear that it is not asking the load side breakers.