Letter Sequence Request |
---|
TAC:MD6912, Changes to Reflect Revision of 10 CFR 50.55A (Open) |
|
MONTHYEARBSEP 07-0081, Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 02007-09-26026 September 2007 Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 0 Project stage: Request BSEP 07-0136, Revision of Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479.2007-12-0707 December 2007 Revision of Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479. Project stage: Request 2007-12-07
[Table View] |
|
---|
Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0239, Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-12-0202 December 2021 Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-11-0101 November 2021 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2021-04-26026 April 2021 Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0101 April 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-21-0009, Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume2021-02-23023 February 2021 Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume RA-20-0361, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A0912020-11-17017 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A091 RA-20-0165, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RA-20-0127, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22020-07-27027 July 2020 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 RA-20-0142, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2020-07-21021 July 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems RA-19-0437, Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process2020-07-0909 July 2020 Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR2020-03-0909 March 2020 Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR ML20073F1862020-03-0606 March 2020 Issuance of Amendment Nos. 299 and 327 to Revise Technical Specification 5.6.5b to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2018-LLA-0273) (Redacted) RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0015, Request for License Amendment: Surveillance Requirements for Safety Relief Valves2019-03-0404 March 2019 Request for License Amendment: Surveillance Requirements for Safety Relief Valves RA-18-0148, License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2019-02-27027 February 2019 License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-18-0234, (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves.2018-12-14014 December 2018 (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves. ML18291A6282018-10-18018 October 2018 Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation RA-18-0135, Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System2018-08-30030 August 2018 Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System RA-18-0073, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-06-28028 June 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17088A3962017-06-0707 June 2017 Issuance of Amendments Regarding Revisions of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs BSEP 17-0020, Supplement - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2017-02-27027 February 2017 Supplement - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program BSEP 16-0083, Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs.2016-11-18018 November 2016 Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs. BSEP 16-0082, Transmittal of Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2016-10-27027 October 2016 Transmittal of Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. BSEP 16-0087, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A.2016-09-28028 September 2016 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A. RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. BSEP 16-0078, Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit2016-09-26026 September 2016 Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit BSEP 16-0014, Request for License Amendment-Reactor Protection System(Rps) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 and 3.3.8.2.32016-04-13013 April 2016 Request for License Amendment-Reactor Protection System(Rps) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 and 3.3.8.2.3 RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress BSEP 15-0101, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2015-12-21021 December 2015 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML15175A4392015-06-24024 June 2015 Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 1 of 6 RA-15-0009, Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-03-0404 March 2015 Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 BSEP 15-0007, Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 12015-02-19019 February 2015 Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 2023-08-17
[Table view] Category:Technical Specifications
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML21067A2242021-04-30030 April 2021 Issuance of Amendment Nos. 305 and 333 to Revise License Conditions to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2021-04-26026 April 2021 Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative ML20069J6312020-03-19019 March 2020 Correction to Amendment No. 304 Regarding Request to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML19346C7922020-02-0606 February 2020 Issuance of Amendments Nos. 298 and 326 to Modify Technical Specification to Extend Containment Leakage Test Intervals BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 ML17180A5962017-08-29029 August 2017 Issuance of Amendments to Adopt TSTF-423 Technical Specifications End States, NEDC-32988-A ML17130A7802017-07-12012 July 2017 Issuance of Amendments Regarding Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16019A0292016-02-0909 February 2016 Issuance of Amendments Regarding the Adoption of Topical Report ANP-10298P-A, Revision 1 ML15344A1532016-01-0808 January 2016 Issuance of Amendments Regarding Emergency Action Level Scheme Upgrade BSEP 15-0007, Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 12015-02-19019 February 2015 Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security BSEP 12-0050, Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating2012-06-19019 June 2012 Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating BSEP 09-0019, Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 22009-10-27027 October 2009 Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 2 ML0923702842009-08-18018 August 2009 Units, 1 and 2, Request for License Amendments to Revise Local Power Range Monitor Calibration Frequency BSEP-09-0026, Request for License Amendment - Technical Specification 3.6.1.6, Suppression Chamber-to-Drywell Vacuum Breakers.2009-03-0909 March 2009 Request for License Amendment - Technical Specification 3.6.1.6, Suppression Chamber-to-Drywell Vacuum Breakers. BSEP 08-0156, Request for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control2008-11-24024 November 2008 Request for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control ML0817503332008-07-25025 July 2008 Technical Specifications, Adopted TSTF-448, Revision 3, Control Room Habitability (Tac Nos. MD6336 and MD6337) ML0819801252008-07-0909 July 2008 Submittal of Updated Technical Specifications Pages Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process BSEP 08-0037, Progress Energy Carolinas' Submittal of Revision to Technical Specification 3.2.3, Linear Heat Generation Rate as Part of License Amendments for the Brunswick Steam Electric Plant Units 1 & 22008-03-0505 March 2008 Progress Energy Carolinas' Submittal of Revision to Technical Specification 3.2.3, Linear Heat Generation Rate as Part of License Amendments for the Brunswick Steam Electric Plant Units 1 & 2 BSEP 07-0139, Response to Request for Additional Information Regarding Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 32008-02-27027 February 2008 Response to Request for Additional Information Regarding Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 ML0801800872008-02-0808 February 2008 Technical Specifications ML0801800952008-02-0808 February 2008 Technical Specifications ML0733203672007-11-27027 November 2007 Technical Specifications, Issuance of Amendment Storage of Areva Np Fuel BSEP 07-0081, Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 02007-09-26026 September 2007 Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 0 BSEP 07-0103, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair2007-09-20020 September 2007 Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair BSEP 07-0058, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-07-17017 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0704705612007-02-15015 February 2007 Tech Spec Pages for Amendments 241 and 269 to Adopt TSTF-372 BSEP 06-0136, Request for License Amendment, Technical Specification 3.4.1, Recirculation Loops Operating Recirculation Loop Operating Requirements.2006-12-21021 December 2006 Request for License Amendment, Technical Specification 3.4.1, Recirculation Loops Operating Recirculation Loop Operating Requirements. BSEP 06-0067, Request for License Amendment, Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair2006-09-28028 September 2006 Request for License Amendment, Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair ML0521703612005-08-0505 August 2005 Technical Specifications, Correct Omitted Page BSEP 05-0076, Submittal of Updated Technical Specification Pages, Technical Specification 3.4.5, RCS Leakage Detection Instrumentation2005-06-0909 June 2005 Submittal of Updated Technical Specification Pages, Technical Specification 3.4.5, RCS Leakage Detection Instrumentation ML0515403142005-05-31031 May 2005 Technical Specification Pages Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0515403132005-05-31031 May 2005 Technical Specification Pages Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0516800952005-05-23023 May 2005 E-mail Brunswick Cooling Tower Information BSEP 05-0060, Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.2005-05-17017 May 2005 Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation. ML0506601502005-03-0404 March 2005 Technical Specification Pages, Amendment on Addition of Tracg Methodology for Determining Core Operating Limits (Tac No. MC4385) ML0503905032005-02-0202 February 2005 Tech Spec Pages for Amendment No. 261 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0504002762005-02-0202 February 2005 Tech Spec Pages for Amendment No. 234 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0501202082005-01-11011 January 2005 Technical Specifications, Increase Flexibility in Mode Restraints ML0501202112005-01-11011 January 2005 Technical Specifications, Increase Flexibility in Mode Restraints BSEP 04-0124, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-09-0303 September 2004 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0408906732004-03-26026 March 2004 Technical Specification Pages 2.0-1 and 5.0-20, Amendment No. 231 Re. Minimum Critical Power Ratio Safety Limit ML0336001152003-12-19019 December 2003 Application for Technical Specification Change Re Mode Change Limitations Using Consolidated Line Item Improvement Process BSEP 03-0148, Request for License Amendment Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ration Safety Limits and Revision to References in Technical Specification 5.6.5, Core Operating Limits Report2003-10-31031 October 2003 Request for License Amendment Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ration Safety Limits and Revision to References in Technical Specification 5.6.5, Core Operating Limits Report BSEP-03-0003, Radioactive Effluent Release Report for 2002, Index, Section 6 Through Appendix H2003-04-28028 April 2003 Radioactive Effluent Release Report for 2002, Index, Section 6 Through Appendix H ML0308706642003-03-25025 March 2003 Technical Specification Page for Amendment 254 to License DPR-62, Revising Safety Limit Minimum Critical Power Ratio Values from 1.09 to 1.11 2023-08-29
[Table view] |
Text
James Scarola Vice President Brunswick Nuclear Plant SEP 2 6 2007 Progress Energy Carolinas, Inc.
SERIAL: BSEP 07-0081 10 CFR 50.90 TSC-2007-05 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. I and 2 Docket Nos. 50-325 and 50-324/License Nos. DPR-71 and DPR-62 Request for License Amendments to Revise Technical Specification 5.5.6, "Inservice Testing Program," to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 0 Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc.,
is requesting a revision to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. I and 2. The proposed license amendments implement Technical Specification Task Force (TSTF) Change TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a." TSTF-479 revises the TS Administrative Controls section pertaining to requirements for the Inservice Testing Program, for consistency with the requirements of 10 CFR 50.55a(f)(4) for pumps and valves which are classified as American Society of Mechanical Engineers (ASME) Code Class 1, Class 2, and Class 3.
Revision 3.1 of NUREG-1433, "Standard Technical Specifications General Electric Plants, BWR/4," incorporated TSTF-479, Revision 0. The NRC issued a letter to the TSTF on December 6, 2005, indicating the acceptability of TSTF-479, Revision 0. An evaluation of the proposed license amendments is provided in Enclosure 1.
CP&L has evaluated the proposed change in accordance with 10 CFR 50.9 1(a)(1), using the criteria in 10 CFR 50.92(c), and determined that this change involves no significant hazards considerations.
CP&L is providing, in accordance with 10 CFR 50.91(b), a copy of the proposed license amendment to the designated representative for the State of North Carolina.
The fourth 10-year inservice testing interval for BSEP, Units I and 2 will begin on May 11, 2008. Accordingly, in order to support implementation activities associated with the Inservice Testing Program changes required by 10 CFR 50.55a, CP&L requests approval of the proposed amendments by April 1, 2008, and that once approved, the amendments shall be implemented within 60 days.
P.O.Box 10429 Southport, NC 28461 T> 910.457.3698 F> 910.457.2803
Document Control Desk BSEP 07-0081 / Page 2 There are no regulatory commitments associated with this submittal. Please refer any questions regarding this submittal to Mr. Randy C. Ivey, Manager - Support Services, at (910) 457-2447.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on September 26, 2007.
Sincerely, James Scarola WRM/wrm
Enclosures:
- 1. Evaluation of Proposed License Amendment Requests
- 2. Marked-up Technical Specification Pages - Unit I
- 3. Typed Technical Specification Pages - Unit 1
- 4. Typed Technical Specification Pages - Unit 2
- 5. Marked-up Technical Specification Bases Pages - Unit I (For Information Only)
Document Control Desk BSEP 07-0081 / Page 3 cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Joseph D. Austin, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mr. Stewart N. Bailey (Mail Stop OWFN 8BI) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Ms. Beverly 0. Hall, Section Chief Radiation Protection Section, Division of Environmental Health North Carolina Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7221 Mr. Jack Given, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
BSEP 07-0081 Enclosure I Page I of 8 Evaluation of Proposed License Amendment Requests
Subject:
Request for License Amendments to Revise Technical Specification 5.5.6, "Inservice Testing Program," to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 0 1.0 Description This letter is a request by Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., to amend the Technical Specifications (TS) of Renewed Facility Operating Licenses DPR-71 and DPR-62 for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.
The proposed license amendments implement Technical Specification Task Force (TSTF)
Change TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a." TSTF-479 revises the Improved Technical Specifications (ITS) Administrative Controls, TS 5.5.7,.
"Inservice Testing Program," for consistency with the requirements of 10 CFR 50.55a(f)(4) for pumps and valves which are classified as American Society of Mechanical Engineers (ASME) Code Class 1, Class 2, and Class 3. Revision 3.1 of NUREG-1433,:
"Standard Technical Specifications General Electric Plants, BWR/4," incorporated TSTF-479, Revision 0. The NRC issued a letter to the TSTF on December 6, 2005, indicating the acceptability of TSTF-479, Revision 0. CP&L is not proposing any variations or deviations from the TS changes described in TSTF-479, Revision 0.
2.0 Proposed Changes ITS 5.5.7 corresponds to TS 5.5.6, "Inservice Testing Program," for BSEP, Units I and 2.
Brunswick TS 5.5.6 is being revised as shown below. The specific changes to Technical Specification 5.5.6 are shown in bold typeface.
Existing Requirement Proposed Requirement 5.5.6 Inservice Testing Program 5.5.6 Inservice Testing Program This program provides controls for inservice This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps testing of ASME Code Class 1,2, and 3 and valves. pumps and valves.
- a. Testing Frequencies specified in Section XI a. Testing Frequencies applicable to the of the ASME Boiler and Pressure Vessel ASME Code for Operations and
BSEP 07-0081 Enclosure 1 Page 2 of 8 Existing Requirement Proposed Requirement Code and applicable Addenda are as Maintenance of Nuclear Power Plants follows: (ASME OM Code) and applicable Addenda as follows:
ASME Boiler and Pressure ASME OM Vessel Code and Required Code and Required applicable Addenda Frequencies applicable Addenda Frequencies terminology for for performing terminology for for performing inservice testing inservice inservice testing inservice activities testing activities activities testing activities Weekly At least once per Weekly At least once per 7 days 7 days Monthly At least once per Monthly At least once per 31 days 31 days Quarterly or every At least once per Quarterly or every At least once per 3 months 92 days 3 months 92 days Semiannually or At least once per Semiannually or At least once per every 6 months 184 days every 6 months 184 days Every 9 months At least once per Every 9 months At least once per 276 days 276 days Yearly or annually At least once per Yearly or annually At least once per 366 days 366 days Biennially or every At least once per Biennially or every At least once per 2 years 731 days 2 years 731 days
- b. The provisions of SR 3.0.2 are applicable to b. The provisions of SR 3.0.2 are applicable the above required Frequencies for to the above required Frequencies and performing inservice testing activities. other normal accelerated Frequencies specified in the Inservice Testing
- c. The provisions of SR 3.0.3 are applicable to Program for performing inservice testing inservice testing activities. activities.
- d. Nothing in the ASME Boiler and Pressure c. The provisions of SR 3.0.3 are applicable Vessel Code shall be construed to supersede to inservice testing activities.
the requirements of any TS.
- d. Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.
TS 5.5.6, "Inservice Testing Program," is being revised to delete references to Section XI of the ASME Boiler and Pressure Vessel Code and incorporate references to the ASME Code for Operation and Maintenance of Nuclear Power Plants (i.e., the ASME OM Code).
TS 5.5.6.b is also being revised to address the applicability of Surveillance Requirement (SR) 3.0.2 to other normal and accelerated Frequencies specified in the Inservice Testing (IST)
Program.
BSEP 07-0081 Enclosure 1 Page 3 of 8 contains a marked-up version of the Unit 1 Technical Specifications showing the proposed changes. Since the affected Technical Specification Section (i.e., TS 5.5.6 for Unit I and Unit 2) is identical, only the mark-up for Unit I is provided. Enclosures 3 and 4 provide typed versions of the affected Unit I and Unit 2 Technical Specification pages, respectively. These typed Technical Specification pages are to be used for issuance of the proposed amendments.
CP&L will make supporting changes to the Technical Specification Bases in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program." Enclosure 5 provides a markup of the affected Technical Specification Bases pages for Unit 1. These pages are being submitted for information only and do not require issuance by the NRC.
3.0 Background In 1990, the ASME published the initial edition of the ASME OM Code, which provides rules for inservice testing of pumps and valves. The ASME OM Code replaced Section XI of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves. The 1995 edition of the ASMiE OM Code was incorporated by reference into 10 CFR 50.55a on September 22, 1999. Since 10 CFR 50.55a(f)(4)(ii) requires that inservice testing during successive 10-year intervals comply with the requirements of the latest edition and addenda of the Code incorporated into 10 CFR 50.55a(b), TS 5.5.6 must be revised to reference the ASMIE OM Code.
4.0 Technical AnalysisSection XI of the ASME Code has been revised, on a continuing basis, to provide updated requirements for the inservice inspection and inservice testing of components. Until 1990, the ASME Code requirements addressing the inservice testing of pumps and valves were contained in Section XI, Subsections TWP (i.e., for pumps) and IWV (i.e., for valves).
In 1990, the ASME published the initial edition of the OM Code, which provides the rules for the inservice testing of pumps and valves. Since the establishment of the 1990 Edition of the OM Code, the rules for inservice testing are no longer being updated in Section XI. As identified in NRC SECY-99-017 dated January 13, 1999, the NRC has generally considered the evolution of the ASME Code to result in a net improvement in the measures for inspecting piping and components and testing pumps and valves.
By Final Rule issued on September 22, 1999 (i.e., 64 FR 51370), the NRC amended 10 CFR 50.55a(f)(4)(ii) to require licensees to update their IST Program to the latest approved edition of the ASME OM Code incorporated by reference into 10 CFR 50.55a(b).
TS 5.5.6 currently references the ASME Boiler and Pressure Vessel Code,Section XI, as the
BSEP 07-0081 Enclosure 1 Page 4 of 8 source of the IST Program requirements for ASME Code Class 1, Class 2, and Class 3 components.
The third 10-year inservice testing interval for BSEP, Units 1 and 2 began May 11, 1998, and will conclude on May 10, 2008. The Code of record for the third 10-year inservice testing interval has been the 1989 Edition of ASME Code,Section XI, with no addenda. The fourth 10-year inservice testing interval for BSEP, Units I and 2 will begin May 11, 2008, and the Code of record for the interval will be the 2001 Edition of the ASMIE OM Code with 2003 Addenda. The proposed changes to TS 5.5.6 are necessary to achieve consistency with the inservice testing requirements of 10 CFR 50.55a, beginning with the fourth inservice testing interval.
Additionally, TS 5.5.6 is being revised to indicate the provisions of SR 3.0.2 are applicable to other inservice testing Frequencies that are not specifically listed in the testing frequencies that are identified in TS 5.5.6. The IST Program may have frequencies for testing that are based on risk or other factors and do not conform to the standard testing Frequencies specified in TS 5.5.6. The Frequency of the Surveillance may be determined through a mix of risk-informed and performance-based means in accordance with the IST Program.
Application of SR 3.0.2 to other inservice testing frequencies is consistent with the guidance contained in NUREG-1482, Revision 1, "Guidelines for Inservice Testing at Nuclear Power Plants," January 2005, which indicates that the 25 percent extension of the interval specified in the Frequency would apply to increased frequencies the same way that it applies to regular frequencies. If a test interval is specified in 10 CFR 50.55a, the TS SR 3.0.2 Bases indicates that the requirements of the regulation take precedence over the TS.
5.0 Regulatory Safety Analysis 5.1 No Significant Hazards Consideration Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is submitting proposed amendments to implement Technical Specification Task Force (TSTF) Change TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a." TSTF-479 revises the Improved Technical Specifications (ITS)
Administrative Controls, TS 5.5.7, "Inservice Testing Program," for consistency with the requirements of 10 CFR 50.55a(f)(4) for pumps and valves which are classified as American Society of Mechanical Engineers (ASME) Code Class 1, Class 2, and Class 3. Revision 3.1 of NUREG-1433, "Standard Technical Specifications General Electric Plants, BWR/4,"
incorporated TSTF-479, Revision 0. The NRC issued a letter to the TSTF on December 6, 2005, indicating the acceptability of TSTF-479, Revision 0.
BSEP 07-0081 Enclosure 1 Page 5 of 8 CP&L has evaluated whether or not a significant hazards consideration is involved with the proposed amendments by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change revises TS 5.5.6, "Inservice Testing Program," for consistency with the requirements of 10 CFR 50.55a(f)(4) regarding the inservice testing of pumps and valves which are classified as ASME Code Class 1, Class 2, and Class 3. The proposed change incorporates revisions to the ASME Code that result in a net improvement in the measures for testing pumps and valves.
The proposed change does not impact any accident initiators or analyzed events or assumed mitigation of accident or transient events. The proposed change does not involve the addition or removal of any equipment, or any design changes to the facility.
Therefore, this proposed change does not involve an increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change revises TS 5.5.6, "Inservice Testing Program," for consistency with the requirements of 10 CFR 50.55a(f)(4) regarding the inservice testing of pumps and valves which are classified as ASME Code Class 1, Class 2, and Class 3. The proposed change incorporates revisions to the ASME Code that result in a net improvement in the measures for testing pumps and valves.
The proposed change does not involve a modification to the physical configuration of the plant (i.e., no new equipment will be installed) or involve a change in the methods governing normal plant operation. The proposed change will not impose any new or different requirements or introduce a new accident initiator, accident precursor, or malfunction mechanism. Additionally, there is no change in the types or increases in the amounts of any effluent that may be released offsite and there is no increase in individual or cumulative occupational exposure. Therefore, the proposed change does not create the possibility of an accident of a different kind than previously evaluated.
BSEP 07-0081 Enclosure I Page 6 of 8
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed change revises TS 5.5.6, "Inservice Testing Program," for consistency with the requirements of 10 CFR 50.55a(f)(4) regarding the inservice testing of pumps and valves which are classified as ASMIE Code Class 1, Class 2, and Class 3. The proposed change does not involve a modification to the physical configuration of the plant (i.e., no new equipment will be installed) or change the methods governing normal plant operation. The proposed change incorporates revisions to the ASMIE Code that result in a net improvement in the measures for testing pumps and valves.
The safety function of the affected pumps and valves will be maintained. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, CP&L concludes that the proposed amendments present no significant hazards consideration Linder the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria NRC regulation, 10 CFR 50.55a, defines the requirements for applying industry codes to each licensed nuclear power facility. The regulations require that during successive 120-month intervals, inservice inspection and inservice testing programs be developed using the latest edition and addenda of the ASMIE Code incorporated into paragraph (b) of 10 CFR 50.55a on the date 12 months prior to the start of the 120-month interval, subject to the limitations and modifications identified in paragraph (b).
The proposed amendments do not:
(1) Alter the design or function of any system; (2) Result in any change in the qualifications of any component; and (3) Result in the reclassification of any component's status in the areas of shared, safety-related, independent, redundant, and physically or electrically separated.
As such, there are no changes being proposed such that compliance with any of the regulatory requirements of 10 CFR 50.55a would come into question. Based on these considerations, discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
BSEP 07-0081 Enclosure 1 Page 7 of 8 6.0 Environmental Considerations CP&L has evaluated the proposed amendments for environmental considerations. A review has determined that the proposed amendments would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendments do not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendments meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendments.
7.0 References
- 1. ASME Code for Operation and Maintenance of Nuclear Power Plants, 2001 Edition through 2003 Addenda.
- 2. 10 CFR 50.55a, "Codes and standards"
- 3. NUREG-1482, Revision 1, "Guidelines for Inservice Testing at Nuclear Power Plants,"
January 2005.
- 4. Federal Register, Volume 64, No. 183, page 51370, "Final Rule, Industry Codes and Standards; Amended Requirements."
- 5. Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a."
8.0 Precedents
- 1. Watts Bar Nuclear Plant, Unit 1, "Issuance of Amendment Regarding the Inservice Testing Program (TAC No. MD2380) (TS-06-04)," December 18, 2006, ADAMS Accession Numbers ML063190441 and ML063550029.
- 2. Cooper Nuclear Station, "Issuance of Amendment Re: Technical Specification (TS)
Changes Associated With Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals (TAC No. MD0335)," September 6, 2006, ADAMS Accession Numbers ML061440049 and ML062500301.
BSEP 07-0081 Enclosure I Page 8 of 8
- 3. Wolf Creek Generating Station, "Issuance of Amendment Re: Revision to Technical Specification 5.5.8 on the Inservice Testing Program (TAC No. MC9726)" November 15, 2006, ADAMS Accession Numbers ML062980233 and ML062980235.
- 4. Diablo Canyon Power Plant, Unit Nos. 1 and 2, "Issuance of Amendments Re: Administrative Changes to the Technical Specification 5.5.8, 'Inservice Testing Program' (TAC Nos. MD3975 and MD3976)," June 25, 2007, ADAMS Accession Numbers ML070990057 and ML070990074.
BSEP 07-0081 Enclosure 2 Markup of Technical Specification Pages - Unit 1
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program (continued)
- h. Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary shall be limited to the following:
- 1. For noble gases: less than or equal to a dose rate of 500 mrems/yr to the total body and less than or equal to a dose rate of 3000 mrems/yr to the skin, and
- 2. For iodine-131, iodine-133, tritium, and for all radionuclides in particulate form with half lives > 8 days: less than or equal to a dose rate of 1500 mrems/yr to any organ; Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;
- j. Limitations on the annual and quarterly doses to a member of the public from iodine-131, iodine-133, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and
- k. Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.
5.5.5 Component Cyclic or Transient Limit This program provides controls to track the UFSAR Table 5.3.3-2, cyclic and transient occurrences to ensure that components are maintained within the design limits.
5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves.
- a. Testing Frequiencieses sp cif'ie*,-n S--ct-io7XIthe , Ml£oilHAenrdmn oAd Tssl vse odý nd applicable Addenda are as follows:(cniud Brunswick Unit 1 5-9Amendment No.G-ýOO
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Inservice Testing Program (continued)
AS E r J: s M*
2§f~ de and applicable Addenda terminology for Required Frequencies inservice testing for performing inservice activities testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every At least once per 92 days 3 months Semiannually or At least once per 184 days every 6 months lo~rfloA and Every 9 months At least once per 276 days accelerckted Yearly or annually At least once per 366 days Frequeneies srecified in Biennially or every At least once per 731 days
+he Inservice- 2 years Test Prosrcarn- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the ASME anilZ
ýP ssre ode shall be construed to supersede the requirements of any TS.
5.5.7 Ventilation Filter Testincg Program (VFTP)
The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems.
Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter bank or charcoal adsorber filter bank; after any structural maintenance on the HEPA filter or charcoal adsorber housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system.
(continued)
Brunswick Uni t 1 5.0-10 Amendment No.1
BSEP 07-0081 Enclosure 3 Typed Technical Specification Pages - Unit 1
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program (continued)
- h. Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary shall be limited to the following:
- 1. For noble gases: less than or equal to a dose rate of 500 mrems/yr to the total body and less than or equal to a dose rate of 3000 mrems/yr to the skin, and
- 2. For iodine-131, iodine-133, tritium, and for all radionuclides in particulate form with half lives > 8 days: less than or equal to a dose rate of 1500 mrems/yr to any organ; Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;
- j. Limitations on the annual and quarterly doses to a member of the public from iodine-131, iodine-1 33, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and
- k. Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.
5.5.5 Component Cyclic or Transient Limit This program provides controls to track the UFSAR Table 5.3.3-2, cyclic and transient occurrences to ensure that components are maintained within the design limits.
5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves.
- a. Testing Frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda are as follows:
(continued)
Brunswick Unit 1 5.0-9 Amendment No. I
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Inservice Testinq Program (continued)
ASME OM Code and applicable Required Frequencies Addenda terminology for for performing inservice inservice testing activities testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every At least once per 92 days 3 months Semiannually or At least once per 184 days every 6 months Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every At least once per 731 days 2 years
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal accelerated Frequencies specified in the Inservice Testing Program for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the ASME OM Code shall be construed to supersede the I requirements of any TS.
5.5.7 Ventilation Filter Testinq Program (VFTP)
The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems.
Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter bank or charcoal adsorber filter bank; after any structural maintenance on the HEPA filter or charcoal adsorber housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system.
(continued)
Brunswick Unit 1 5.0-10 Amendment No. I
BSEP 07-0081 Enclosure 4 Typed Technical Specification Pages - Unit 2
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Progqram (continued)
- h. Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary shall be limited to the following:
- 1. For noble gases: less than or equal to a dose rate of 500 mrems/yr to the total body and less than or equal to a dose rate of 3000 mrems/yr to the skin, and
- 2. For iodine-1 31, iodine-1 33, tritium, and for all radionuclides in particulate form with half lives > 8 days: less than or equal to a dose rate of 1500 mrems/yr to any organ; Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;
- j. Limitations on the annual and quarterly doses to a member of the public from iodine-1 31, iodine-133, tritium, and all radionuclides in particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and
- k. Limitations on the annual dose or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.
5.5.5 Component Cyclic or Transient Limit This program provides controls to track the UFSAR Table 5.3.3-2, cyclic and transient occurrences to ensure that components are maintained within the design limits.
5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves.
- a. Testing Frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda are as follows:
(continued)
Brunswick Unit 2 5.0-9 Amendment No. I
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Inservice Testing Program (continued)
ASME OM Code and I applicable Addenda terminology for Required Frequencies inservice testing for performing inservice activities testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every At least once per 92 days 3 months Semiannually or At least once per 184 days every 6 months Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every At least once per 731 days 2 years
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal accelerated Frequencies specified in the Inservice Testing Program for performing inservice testing activities; I
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the ASME OM Code shall be construed to supersede the I requirements of any TS.
5.5.7 Ventilation Filter Testing Program (VFTP)
The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems.
Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter bank or charcoal adsorber filter bank; after any structural maintenance on the HEPA filter or charcoal adsorber housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system.
(continued)
Brunswick Unit 2 5.0-10 Amendment No. I
4.
BSEP 07-0081 Enclosure 5 Marked-up Technical Specification Bases Pages - Unit 1 (For Information Only)
SRVs B 3.4.3 BASES SURVEILLANCE SR 3.4.3.2 (continued)
REQUIREMENTS the turbine control valves or bypass valves, by a change in the measured steam flow, or by any other method suitable to verify steam flow.
Adequate reactor steam dome pressure must be available to perform this test to avoid damaging the valve. Sufficient time is therefore allowed after the required pressure is achieved to perform this test. Adequate pressure at which this test is to be performed, to avoid damaging the valve, is 945 psig. Plant startup is allowed prior to performing this test because valve OPERABILITY and the setpoints for overpressure protection are verified, per ASME Code requirements, prior to valve installation.
Therefore, this SR is modified by a Note that states the Surveillance is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test. The 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowed for manual actuation after the required pressure is reached is sufficient to achieve stable conditions for testing and provides a reasonable time to complete the SR.
If a valve fails to actuate due only to the failure of the solenoid but is capable of opening on overpressure, the safety function of the SRV is considered OPERABLE.
The 24 month Frequency was developed based on the SRV tests required by the ASMEil a-d Fe)rurjVe s on (Ref. 5). Operating experience has demonstrated that these components will usually pass the Surveillance when performed at the 24 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
REFERENCES 1. UFSAR, Section 5.2.2.2.
- 2. NEDC-32466P, Power Uprate Safety Analysis Report for Brunswick Steam Electric Plant Units 1 and 2, Supplement 1, March 1996.
- 3. UFSAR, Chapter 15.
- 4. 10 CFR 50.36(c)(2)(ii).
Of5.
- Bolear Poner Pren+si Brunswick Unit 1 B 3.4.3-4 Revision No.D I
ECCS-Operating B 3.5.1 BASES SURVEILLANCE SR 3.5.1.5 (continued)
REQUIREMENTS 92 days, but is considered acceptable due to the demonstrated reliability of these valves. If the valve is inoperable and in the open position, the associated LPCI subsystem must be declared inoperable.
SR 3.5.1.6, SR 3.5.1.7, and SR 3.5.1.8 The performance requirements of the low pressure ECCS pumps are determined through application of the 10 CFR 50, Appendix K criteria (Ref. 7). This periodic Surveillance is performed (in accordance with the ASME Codq, e ,requirements for the ECCS pumps) to verify that the ECCS pumps will develop the flow rates required by the respective analyses. The low pressure ECCS pump flow rates ensure that adequate core cooling is provided to satisfy the acceptance criteria of Reference 9.
The pump flow rates are verified against a system head equivalent to the RPV pressure expected during a LOCA. The test includes starting the
'associated low pressure ECCS pump from the control room. The total system pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and RPV pressure present during a LOCA. For the test that verifies the combined flow rate of both LPCI pumps in a LPCI subsystem, the flow is verified by monitoring the flow through the common loop discharge header.
The flow tests for the HPCI System are performed at two different pressure ranges such that system capability to provide rated flow is tested at both the higher and lower operating ranges of the system.
Reactor steam pressure must be >_945 psig to perform SR 3.5.1.7 and>
150 psig to perform SR 3.5.1.8. Therefore, sufficient time is allowed after adequate pressure is achieved to perform these tests. Reactor startup is allowed prior to performing the low pressure Surveillance test because the reactor pressure is low and the time allowed to satisfactorily perform the Surveillance test is relatively short. Reactor pressure is allowed to be increased to normal operating pressure since it is assumed that the low pressure HPCI test has been satisfactorily completed and there is no indication or reason to believe that the HPCI System is inoperable.
(continued)
Brunswick Unit 1 B 3.5.1-13 Revision No.- I
RHR Suppression Pool Cooling B 3.6.2.3 BASES SURVEILLANCE SR 3.6.2.3.2 REQUIREMENTS (contiinued) Verifying that each RHR pump develops a flow rate _>7700 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that the primary containment pressure and temperature can be maintained below the design limits during a DBA Ref. 2). The normal test of centrifugal pump performance Srequiredby A ECod X (Ref. 4) is covered by the requirements of LCO 3.5.1, "ECCS-Operating." This test confirms one point on the pump design curve, and the results are indicative of overall performance. Such tests confirm component OPERABILITY, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is 92 days.
REFERENCES 1. UFSAR, Section 6.2.1.1.3.2.
- 2. NEDC-32466P, Power Uprate Safety Analysis Report for Brunswick Steam Electric Plant Units 1 and 2, September 1995.
- 3. 10 CFR 50.36(c)(2)(ii).
4r W*kuLdc*r WAeC~L(X Power ower Plctn*s.