ML050120211

From kanterella
Jump to navigation Jump to search

Technical Specifications, Increase Flexibility in Mode Restraints
ML050120211
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/11/2005
From: Mozafari B
NRC/NRR/DLPM/LPD2
To:
mozafari B, NRR/DLPM, 415-2020
References
TAC MC1859, TAC MC1860
Download: ML050120211 (16)


Text

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions In the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO Is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) Is not required, unless otherwise stated.

LCO 3.0.3 When an LCO Is not met and the associated ACTIONS are not met, an associated ACTION Is not provided, or if directed by the associated ACTIONS, the unit shall be placed In a MODE or other specified condition In which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated In the individual Specifications.

Where corrective measures are completed that permit operation In accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 Is not required.

LCO 3.0.3 Is only applicable In MODES 1, 2, and 3.

LCO 3.0.4 When an LCO Is not met, entry Into a MODE or other specified condition In the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation In the MODE or other specified condition In the Applicability for an unlimited period of time; (continued)

Brunswick Unit 2 3.0-1 Amendment No. 260

  • . s LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing inoperable (continued) systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition In the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the Individual Specifications, or
c. When an allowance Is stated in the Individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions In the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared Inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate Its OPERABILITY or the OPERABILITY of other equipment. This Is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO Is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This Is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.5.11, Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry Into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

(continued)

Brunswick Unit 2 3.0-2 Amendment No. 260

SR Applicability 3.0 3.0 SR APPLICABILITY (continued)

SR 3.0.4 Entry into a MODE or other specified condition In the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry Into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry Into MODES or other specified conditions In the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

Brunswick Unit 2 3.0-5 Amendment No. 260

PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 The PAM Instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS NOI I c Separate Condition entry is allowed for each Fun, A_

I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions with A.1 Restore required channel to 30 days one required channel OPERABLE status.

Inoperable.

B. Required Action and B.1 Initiate action in accordance Immediately associated Completion Time with Specification 5.6.6.

of Condition A not met.

C. One or more Functions with C.1 Restore one required 7 days two required channels channel to OPERABLE Inoperable. status.

(continued)

Brunswick Unit 2 3.3-26 Amendment No. 260

Remote Shutdown Monitoring Instrumentation 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown Monitoring Instrumentation LCO 3.3.3.2 The Remote Shutdown Monitoring Instrumentation Functions shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS NOTE Separate Condition entry is allowed for each Function. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable. to OPERABLE status.

B. Required Action and B.1 Be In MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion lime not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.2.1 Perform CHANNEL CHECK for each required 31 days Instrumentation channel that Is normally energized.

(continued)

Brunswick Unit 2 3.3-30 Amendment No. 260

RCS Leakage Detection Instrumentation 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Leakage Detection Instrumentation LCO 3.4.5 The following RCS leakage detection instrumentation shall be OPERABLE:

a. Drywell floor drain sump flow monitoring system; and
b. One channel of either primary containment atmosphere particulate or atmosphere gaseous radioactivity monitoring system.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS _

CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell floor drain sump A.1 Restore drywell floor drain 30 days I

flow monitoring system sump flow monitoring inoperable. system to OPERABLE status.

(continued)

Brunswick Unit 2 3.4-9 Amendment No. 260

RCS Leakage Detection Instrumentation 3.4.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required primary B.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I containment atmosphere primary containment radioactivity monitoring atmosphere.

system inoperable.

AND B.2 Restore required primary 30 days containment atmosphere radioactivity monitoring system to OPERABLE status.

C. Required Action and C.1 Be In MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. All required leakage D.1 Enter LCO 3.0.3. Immediately detection systems inoperable.

Brunswick Unit 2 3.4-10 Amendment No. 260

RCS Specific Activity 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Specific Activity LCO 3.4.6 The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT 1-131 specific activity

  • 0.2 pCi/gm.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor coolant specific NOTE-activity > 0.2 pICVgm and LCO 3.0.4.c Isapplicable. I e 4.0 pCigm DOSE EQUIVALENT 1-131.

A.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limits.

B. Required Action and B.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion Time EQUIVALENT 1-131.

of Condition A not met.

AND OR B.2.1 Isolate all main steam lines. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Reactor coolant specific activity > 4.0 pCVgm DOSE OR EQUIVALENT 1-131.

(continued)

Brunswick Unit 2 3.4-12 Amendment No. 260

RHR Shutdown Cooling System-Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump In operation, at least one RHR shutdown cooling subsystem shall be In operation.

NOTES

1. Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be Inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.

APPLICABILITY: MODE 3, with reactor steam dome pressure less than the RHR shutdown cooling Isolation pressure.

ACTIONS a,I'dI LIr%1f-I n Separate Condition entry is allowed for each RHR shutdown cooling subsystem. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required RHR A.1 Initiate action to restore Immediately shutdown cooling required RHR shutdown subsystems inoperable. cooling subsystem(s) to OPERABLE status.

AND (continued)

Brunswick Unit 2 3.4-14 Amendment No. 260

ECCS-Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS-Operating LCO 3.5.1 Each ECCS Injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome pressure S 150 psig.

ACTIONS it a - NI I- -

LCO 3.0.4.b Is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days Injection/spray subsystem ECCS Injection/spray Inoperable. subsystem to OPERABLE status.

OR One low pressure coolant Injection (LPCI) pump in each subsystem Inoperable.

B. One LPCI pump Inoperable. B.1 Restore LPCI pump to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

AND OR One core spray (CS) subsystem inoperable. B.2 Restore CS subsystem to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

(continued)

Brunswick Unit 2 3.5-1 Amendment No. 260

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS NOTE LCO 3.0.4.b Is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System Inoperable. A.1 Verify by administrative Immediately means High Pressure Coolant Injection System Is OPERABLE.

AND A.2 Restore RCIC System to 14 days OPERABLE status.

B. Required Action and B.1 Be In MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND B.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to

  • 150 psig.

BrunsWick Unit 2 3.5-12 Amendment No. 260

RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2. and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I

A. One RHR suppression pool A.1 Restore RHR suppression 7 days cooling subsystem pool cooling subsystem to inoperable. OPERABLE status.

B. Two RHR suppression pool B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooling subsystems suppression pool cooling inoperable. subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> BrunsvVick Unit 2 3.6-24 Amendment No. 260

CAD System 3.6.3.2 3.6 CONTAINMENT SYSTEMS 3.6.3.2 Containment Atmosphere Dilution (CAD) System LCO 3.6.3.2 CAD System shall be OPERABLE.

APPLICABILITY: MODE 1 during the time period:

a. From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER Is > 15% RTP following startup, to
b. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to a scheduled reduction of THERMAL POWER to

< 15% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. CAD System Inoperable. A.1 Restore CAD System to 31 days I OPERABLE status.

B. Required Action and C.1 Be in MODE 2. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> associated Completion Time not met.

Brunswick Unit 2 3.6-27 Amendment No. 260

RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCO 3.7.1 Two RHRSW subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHRSW pump A.1 Restore RHRSW pump to 14 days I inoperable. OPERABLE status.

(continued)

Brunswick Unit 2 3.7-1. Amendment No. 260

RHRSW System 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One RHRSW subsystem B.1 NOTE -

Inoperable for reasons other Enter applicable Conditions than Condition A. and Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.

Restore RHRSW 7 days subsystem to OPERABLE status.

C. Both RHRSW subsystems C.1 NOTE--

Inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.7 for RHR shutdown cooling made inoperable by RHRSW System.

Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

(continued)

Brunswick Unit 2 3.7-2 Amendment No. 260

AC Sources-Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:

a. Two Unit 2 qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System;
b. Four diesel generators (DGs); and
c. Two Unit I qualified circuits between the offsite transmission network and the onsite Class IE AC Electrical Power Distribution System.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS

~~

LIhPW

[I I J Jl I I--

LCO 3.0.4.b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A. -NOTE A.1 Restore Unit I offslte circuit 45 days Only applicable when Unit 1 to OPERABLE status.

is In MODE 4 or 5.

One Unit I offsite circuit inoperable.

(continued) I Brunswick Unit 2 3.8-1 Amendment No. 260