ML052170361

From kanterella
Jump to navigation Jump to search

Technical Specifications, Correct Omitted Page
ML052170361
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/05/2005
From: Mozafari B
NRC/NRR/DLPM/LPD2
To:
Mozafari B,NRR/DLPM, 415-2020
Shared Package
ML052170258 List:
References
TAC MA3739
Download: ML052170361 (1)


Text

Distribution Systems-Shutdown 3.8.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.3 Initiate action to suspend Immediately operations with a potential for draining the reactor vessel.

AND A.2.4 Initiate actions to restore Immediately required AC and DC electrical power distribution subsystems to OPERABLE status.

AND A.2.5 Declare associated Immediately required shutdown cooling subsystem(s) inoperable and not in operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct breaker alignments and indicated power 7 days availability to required AC and DC electrical power distribution subsystems.

Brunswick Unit 2 3.8-39 Amendment No. 235 l