BSEP 07-0103, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair

From kanterella
Jump to navigation Jump to search

Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair
ML072700456
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/20/2007
From: Scarola J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 07-0103, TAC MD3305, TAC MD3306, TSC-2006-03
Download: ML072700456 (6)


Text

James Scarola Vice President Brunswick Nuclear Plant Septmber20, 007Progress Energy Carolinas, Inc.

September 20, 2007 SERIAL: BSEP 07-0103 10 CFR 50.90 TSC-2006-03 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos' 50-325 and 50-324/License Nos. DPR-71 and DPR-62 Supplement to Request for License Amendment Technical Specification 3.8.3, "Diesel Fuel Oil" Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair (NRC TAC Nos. MD3305 and MD3306)

Reference:

Letter from James Scarola (CP&L) to U.S. Nuclear Regulatory Commission (Serial: BSEP 06-0067), "Request for License Amendment, Technical Specification 3.8.3, "Diesel Fuel Oil," Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair," dated September 28, 2006 (ADAMS Accession Number ML062830043)

Ladies and Gentlemen:

By letter dated September 28, 2006, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., requested a license amendment to revise the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed license amendment revised Technical Specification 3.8.3, "Diesel Fuel Oil," to include a new Condition A with associated Required Action and Completion Time. The proposed Condition A allowed the main fuel oil storage tank to be inoperable for up to 14 days for the purpose of performing inspection, cleaning, or repair activities.

On September 18, 2007, the NRC informed CP&L that the proposed amendment could not, at this time, be issued as a permanent change. Therefore, in order to support the scheduled main fuel oil tank cleaning in October 2007, CP&L is revising the proposed license amendment from a permanent to a one-time extension of the completion time for the main fuel oil storage tank. The enclosure to this letter provides updated, typed Unit 1 and 2 TS pages which supersede those provided in the September 28, 2006, amendment request.

The revision from a permanent to a one-time extension of the completion time for the main fuel oil storage tank does not change the intent or the justification for the requested amendment. Rather, the revised request is more restrictive in nature. CP&L has determined that this supplement does not affect the bases for concluding that the proposed amendment does not involve a Significant Hazards Consideration. As such, the P.O.Box 10429 Southport, NC 28461 T> 910.457.3698 F> 910.457.2803

Document Control Desk BSEP 07-0103 / Page 2 10 CFR 50.92 Evaluation, provided in the September 28, 2006, submittal and published in the Federal Register (i.e., 72 FR 148, dated January 3, 2007) remains valid.

There are no regulatory commitments associated with this submittal. Please refer any questions regarding this submittal to Mr. Randy C. Ivey, Manager - Support Services, at (910) 457-2447.

I declare, under penalty of perjury, that the foregoing is true and correct. Executed on September 20, 2007.

Sincerely, JJames Scarola MAT/mat

Enclosure:

Typed Technical Specification Pages - Units 1 and 2

Document Control Desk BSEP 07-0103 / Page 3 cc (with enclosure):

U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Joseph D. Austin, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)

ATTN: Mr. Stewart N. Bailey (Mail Stop OWFN 8B1) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Ms. Beverly 0. Hall, Section Chief Radiation Protection Section, Division of Environmental Health North Carolina Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7221

BSEP 07-0103 Enclosure Typed Technical Specification Pages Units I and 2

Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil LCO 3.8.3 The stored diesel fuel oil shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS


NOTES

1. Separate Condition entry is allowed for each DG.
2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.

Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter. This Note expires upon completion of these activities, but no later than December 31, 2008.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DGs A.1 Restore required day fuel 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with fuel oil level in the oil storage tank level to associated day fuel oil within limit.

storage tank(s) < 22,650 gal per required DG and

_>17,000 gal per required DG.

AND Fuel oil level in the main fuel oil storage tank _> 20,850 gal per required DG.

(continued)

Brunswick Unit 1 3.8-20 Amendment No. I

Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil LCO 3.8.3 The stored diesel fuel oil shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS


NOTES ------------------------------

1. Separate Condition entry is allowed for each DG.
2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.

Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter. This Note expires upon completion of these activities, but no later than December 31, 2008.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DGs A.1 Restore required day fuel 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with fuel oil level in the oil storage tank level to associated day fuel oil within limit.

storage tank(s) < 22,650 gal per required DG and

> 17,000 gal per required DG.

AND Fuel oil level in the main fuel oil storage tank _> 20,850 gal per required DG.

(continued)

Brunswick Unit 2 3.8-20 Amendment No. I