ML080180087

From kanterella
Jump to navigation Jump to search

Technical Specifications
ML080180087
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/08/2008
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Bailey S , NRR/DORL,415-1321
Shared Package
ML080180038 List:
References
TAC MD6340, TAC MD6341
Download: ML080180087 (3)


Text

(2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 245, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.

(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

ACTION:

a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.A. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> and in COLD SHUTDOWN within the following 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.

(3) Deleted by Amendment No. 206.

D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which.contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0,"

submitted by letter dated September 30, 2004.

Renewed License No. DPR- 71 Amendment No. 245

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.12 Primary Containment Leakage Rate Testinq Prog ram (continued)

a. The visual examination of concrete surfaces intended to fulfill the requirements of 10 CFR 50, Appendix J, Option B testing, will be performed in accordance with the requirements of and frequency specified by the ASME Section XI Code, Subsection IWL, except where relief has been authorized by the NRC.
b. The visual examination of the metallic shell, penetrations, and appurtenances intended to fulfill the requirements of 10 CFR 50, Appendix J, Option B, will be performed in accordance with the requirements of and frequency specified by the ASME Section XI Code, Subsection IWE, except where relief has been authorized by the NRC.
c. Following air lock door seal replacement, performance of door seal leakage rate testing with the gap between the door seals pressurized to 10 psig instead of air lock testing at Pa as specified in Nuclear Energy Institute Guideline 94-01, Revision 0;
d. Reduced duration Type A tests may be performed using the criteria and Total Time method specified in Bechtel Topical Report BN-TOP-1, Revision 1.
e. Performance of Type C leak rate testing of the hydrogen and oxygen monitor isolation valves is not required; and
f. Performance of Type C leak rate testing of the main steam isolation valves at a pressure less than Pa instead of leak rate testing at Pa as specified in ANSI/ANS 56.8-1994.

The peak calculated primary containment internal pressure for the design basis loss of coolant accident, Pa, is 49 psig.

The maximum allowable primary containment leakage rate, La, shall be 0.5% of-primary containment air weight per day at Pa.

Leakage rate acceptance criteria are:

a. Primary containment leakage rate acceptance criterion is _<1.0 La.

During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are < 0.60 La for Type B and C tests and < 0.75 La for Type A tests.

(continued)

Brunswick Unit 1 5.0-16 Amendment No. 245 I

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.12 Primary Containment Leakage Rate Testing Program (continued)

b. Air lock testing acceptance criteria are:
1) Overall'air lock leakage rate is _*0.05 La when tested at _ Pa.
2) For each air lock door, leakage rate is < 5 scfh when the gap between the door seals is pressurized to >_10 psig.

The provisions of SR 3.0.3 are applicable to the Primary Containment Leakage Rate Testing Program frequencies.

Brunswick Unit 1 5.0-17 Amendment No. 245 1