ML051540314

From kanterella
Jump to navigation Jump to search

Technical Specification Pages Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency
ML051540314
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/31/2005
From:
NRC/NRR/DLPM/LPD2
To:
Mozafari B,NRR/DLPM, 415-2020
Shared Package
ML051460520 List:
References
TAC MC5865, TAC MC5866
Download: ML051540314 (1)


Text

Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.42 Verify, for a representative sample, each tested control 200 days I.

rod scram time Is within the limits of Table 3.1.4-1 with cumulative reactor steam dome pressure 2 800 psig. operation In MODE 1 SR 3.1.4.3 Verify each affected control rod scram time Is within Prior to declaring the limits of Table 3.1.4-1 with any reactor steam dome control rod pressure. OPERABLE after work on control rod or CRD System that could affect scram time SR 3.1.4.4 Verify each affected control rod scram time is within Prior to exceeding the limits of Table 3.1.4-1 with reactor steam dome 40% RTP after fuel pressure 2 800 psig. movement within the affected core cell AND Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time Brunswick Unit 2 3.1-13 Amendment No. 264 l