BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion

From kanterella
Jump to navigation Jump to search

Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion
ML18076A030
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/16/2018
From: William Gideon
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 18-0034
Download: ML18076A030 (6)


Text

(_~ DUKE William R. Gideon Vice President ENERGY Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 o: 910.832.3698 March 16, 2018 Serial: BSEP 18-0034 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion

Reference:

Letter from William R. Gideon (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Request for License Amendment Regarding Core Flow Operating Range Expansion, dated September 6, 2016, ADAMS Accession Number ML 16257A41 o Ladies and Gentlemen:

By letter dated September 6, 2016 (i.e., Reference), Duke Energy Progress, LLC (Duke Energy), submitted a license amendment request (LAA) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed amendment would expand the core power-flow operating range (i.e., Maximum Extended Load Line Limit Analysis Plus (MELLLA+)).

A discrepancy was identified with the date on the Framatome affidavit regarding withholding ANP-3108P, Revision 1, Applicability of AREVA BWR Methods to Brunswick Extended Power Flow Operating Domain (i.e., Enclosure 14 of Reference). The enclosure to this letter provides a corrected affidavit for Framatome report ANP-3108P, Revision 1.

No new regulatory commitments are contained in this letter.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 832-2487.

I declare, under penalty of perjury, that the foregoing is true and correct. Executed on March 16, 2018.

s~

William R. Gideon

U.S. Nuclear Regulatory Commission Page 2 of 2 SBY/sby

Enclosure:

Framatome Affidavit Regarding Withholding Framatome Report ANP-3108P, Revision 1, Applicability of AREVA BWR Methods to Brunswick Extended Power Flow Operating Domain, dated February 26, 2018 cc:

U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Mr. Gale Smith, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. W. Lee Cox, III, Section Chief (Electronic Copy Only)

Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov

BSEP 18-0034 Enclosure Framatome Affidavit Regarding Withholding Framatome Report ANP-3108P, Revision 1, Applicability of AREVA BWR Methods to Brunswick Extended Power Flow Operating Domain, dated February 26, 2018