Letter Sequence Response to RAI |
---|
EPID:L-2018-LLR-0001, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations (Open) |
|
|
|
---|
Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-21-0275, Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License Application2021-10-25025 October 2021 Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License Application RA-21-0262, Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping2021-10-0404 October 2021 Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-20-0364, 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process2020-11-24024 November 2020 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process RA-20-0324, Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements2020-10-27027 October 2020 Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements RA-19-0380, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-10-17017 October 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0295, Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2019-07-25025 July 2019 Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-19-0241, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-06-18018 June 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-05-29029 May 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0217, Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ...2019-05-16016 May 2019 Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ... RA-19-0152, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors.2019-04-0808 April 2019 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors. RA-19-0150, Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation2019-04-0303 April 2019 Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation RA-19-0010, Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2019-02-13013 February 2019 Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure...2019-02-0808 February 2019 Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure... RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature ..2018-12-11011 December 2018 Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ...2018-11-0202 November 2018 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ... RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies2018-10-11011 October 2018 Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report2018-09-27027 September 2018 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-09-27027 September 2018 Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion ML18075A3302018-03-0101 March 2018 Response to Request for Additional Information SNPB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865) BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)2017-08-0909 August 2017 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) BSEP 17-0048, Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States..2017-05-24024 May 2017 Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States.. BSEP 17-0029, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-04-0606 April 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0026, Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A.2017-03-25025 March 2017 Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A. BSEP 17-0019, Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2017-03-0101 March 2017 Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 an ML17087A2632017-03-0101 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance... BSEP 16-0113, High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-12-15015 December 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident BSEP 16-0104, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident2016-12-15015 December 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident BSEP 16-0112, (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ...2016-12-15015 December 2016 (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ... BSEP 16-0109, Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee-2016-11-17017 November 2016 Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee- BSEP 16-0101, Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion2016-11-0909 November 2016 Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion ML16330A5052016-11-0909 November 2016 Response to Request for Supplemental Information in Support of MELLLA + LAR, Non-Proprietary Information - Class I (Public) BSEP 16-0100, Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-11-0101 November 2016 Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation2016-10-0303 October 2016 Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation BSEP 16-0070, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-08-15015 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program BSEP 16-0072, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-08-0404 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program 2023-08-18
[Table view] |
Text
fa DUKE Brunswick Nuclear Plant P.O. Box 10429
~ ENERGY Southport, NC 28461 April 24, 2018 Serial: BSEP 18-0054 10 CFR 50.55a(z)(1)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 In Accordance With 10 CFR 50.55a(z)(1)
Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations
References:
- 1. Letter from Bryan B. Wooten (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Inservice Inspection Program Proposed Alternative ISI-09 In Accordance With 10 CFR 50.55a(z)(1)
Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations, dated January 23, 2018, ADAMS Accession Number ML18023A134
- 2. NRC E-mail Capture, Brunswick Unit 1 and Unit 2 - Request for Additional Information by the Reactor Systems Branch, Relief Request for Examination of Reactor Vessel Shell Welds for Brunswick Steam Electric Plant, Units 1 and 2, Duke Energy Progress, LLC, Docket Number 50-235 and 50-324, (EPID L-2018-LLR-0001), dated March 27, 2018 Ladies and Gentlemen:
By letter dated January 23, 2018 (i.e., Reference 1), Duke Energy Progress, LLC (Duke Energy), submitted a relief request (i.e., ISI-09) for the Brunswick Steam Electric Plant (BSEP),
Unit Nos. 1 and 2. The request proposed an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 2001 Edition through 2003 Addenda. Specifically, to Table IWB-2500-1, Category B-A, Item B1.11 for examination of reactor pressure vessel (RPV) circumferential shell welds.
On March 27, 2018, by electronic mail (i.e., Reference 2), the NRC provided a request for additional information (RAI) regarding the ISI-09 relief request. Duke Energy's response to the RAI is provided in the Enclosure.
No regulatory commitments are contained in this letter.
U.S. Nuclear Regulatory Commission Page 2 of 2 Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 832-2487.
01-P Jt/~
Sincerely, Bryan 8. Wooten Director - Organizational Effectiveness Brunswick Steam Electric Plant BBW/mkb
Enclosure:
Response to Request for Additional Information cc:
U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Gale Smith, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. Cliff Dautrich, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
BSEP 18-0054 Enclosure Page 1 of 3 Response to Request for Additional Information By letter dated January 23, 2018, Duke Energy Progress, LLC (Duke Energy), submitted a relief request (i.e., ISI-09) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The request proposed an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 2001 Edition through 2003 Addenda. Specifically, to Table IWB-2500-1, Category B-A, Item B1.11 for examination of reactor pressure vessel (RPV) circumferential shell welds.
On March 27, 2018, by electronic mail, the NRC provided a request for additional information (RAI) regarding the ISI-09 relief request. Those questions, and Duke Energy's responses, are provided below.
SRXB-RAI 1 In the Enclosure to Reference 1, the second paragraph under the heading "Review of Low Pressure Injection Sources" states:
For the low pressure make-up systems, the Core Spray and Residual Heat Removal systems, these system's pumps have a shutoff head of approximately 313 psig and 250 psig, respectively. The BSEP pressure-temperature limit curves for hydrostatic testing allow pressures up to 313 psig at a temperature of 70°F.
The above information is inconsistent with the BSEP Units 1 and 2 TS Section 3.4.9, Pressure-Temperature (P-T) limits, Figures 3.4.9-3 and 3.4.9-4, and 3.4.9-5 for hydrostatic and leak tests.
The RPV beltline curves in these figures allows a maximum pressure of 283 psig in the RCS temperature range of 70°F and 110°F. In addition, the RPV beltline curve in TS Figure 3.4.9-1 for the RPV heatup/cooldown also requires to operate below 283 psig pressure in the RCS temperature range of 70°F to 110°F.
a) Justify the inconsistency between the above Reference 1 statement, which states 313 psig as the allowed pressure limit, and the TS Figures 3.4.9-1, 3.4.9-3, 3.4.9-4, and 3.4.9-5 which shows the maximum pressure limit of 283 psig.
b) Justify the inconsistency between the above Reference 1 statement, which states Core Spray (CS) pump shutoff head of 313 psig, and UFSAR Figure 6-49 which shows the CS pump shutoff head as approximately 790 ft (342 psig approximately based on water density of 62.4 lb/ft3).
c) As per UFSAR Table 6-19, the pressure at which CS injection valve opens is 395 psig.
On an inadvertent initiation of the CS system, with its pump shutoff head of approximately 342 psig (considering UFSAR Figure 6-49 is correct), the system would inject water into the RPV at a significantly high flow rate (2 pump minimum rated flow of approximately 8,200 gpm). In this situation, explain how a cold overpressre of the RCS will be prevented during RPV normal heatup/cooldown (TS Figure 3.4.9-1), and during RPV hydrostatic test (TS Figure 3.4.9-3, 3.4.9-4, and 3.4.9-5) so that the RCS pressure remains below the TS limiting pressure of 283 psig.
BSEP 18-0054 Enclosure Page 2 of 3 References
- 1. Letter from Duke Energy to NRC dated January 23, 2018, "Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Inservice Inspection Program Proposed Alternative ISI-09 In Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations," (ADAMS Accession No. ML18023A134)
Response to SRXB-RAI 1 a) During development of the revised relief request ISI-09 for the period of extended operation, the stated 313 psig value was incorrectly transposed from the original submittal. The allowed pressure limit of 283 psig in Technical Specifications (TS)
Figures 3.4.9-1, 3.4.9-3, 3.4.9-4 and 3.4.9-5 is correct. The 313 psig value in Reference 1 was originally submitted in the June 21, 2000, relief request and was updated in 2002 as part of extended power uprate (EPU) activities. At this time, the existing set of pressure-temperature (P-T) curves using 313 psig as the allowed pressure limit and valid through 19 Effective Full Power Years (EFPY) were replaced with a new set of curves using 283 psig as the allowed pressure limit to bound EPU to 32 EFPY. The new P-T curves compensated for pressure and temperature instrument uncertainties by conservatively reducing the allowed pressure limit from 313 psig to 283 psig.
b) During development of the revised relief request ISI-09 for the period of extended operation, the stated 313 psig value was incorrectly transposed from the original submittal. Updated Final Safety Analysis Report (UFSAR) Figure 6-49 showing the Core Spray (CS) pump shutoff head as 790 feet is correct. BSEP Strategic Engineering has verified that the UFSAR Figure 6-49, CS pump characteristic curve, is the original and correct curve. It is unknown why the original submittal stated the incorrect value of 313 psig as the CS pump shutoff head, as 790 feet is the correct value and has been unchanged since plant startup.
As the pump shutoff head has been confirmed to be 790 feet (i.e., approximately 342 psig with assumed water density of 62.4 lb/ft3), BSEP acknowledges the CS pumps are capable of providing head pressure in excess of the 283 psig allowed pressure limit found in TS Figures 3.4.9-1, 3.4.9-3, 3.4.9-4 and 3.4.9-5.
Per NRC Report, "Final Safety Evaluation of the BWR Vessel and Internals Project BWRVIP-05 Report (TAC No M93925), Appendix C, Section C.1.4 Low Pressure Core Injection and/or Core Spray Injection, the safety evaluation acknowledges that while some facilities low pressure injection systems have the potential to provide greater pressures than the allowed pressure limit, the Low Pressure Coolant Injection (LPCI) and CS systems do not represent a significant challenge to the RPV based on the normal shutoff heads of the low pressure pumps. However, the high flow rates of the
BSEP 18-0054 Enclosure Page 3 of 3 systems are capable of quickly increasing the RPV water level and will affect time available for operator/system recovery.
In addition, the same Final Safety Evaluation, Appendix C, Section C.1.8 Cold Over Pressurization Condition, discusses the December 1997 BWRVIP RAI response that concluded several actions would have to take place for a low temperature over-pressure (LTOP) event to occur, including operators violating the P-T curves, ignoring water level instrumentation, isolating the vessel, and continual injection via Control Rod Drive (CRD) flow for an extended period of time. The BWRVIP concluded that these actions are extremely unlikely to occur and cause a LTOP event. The NRC staff and BWRVIP estimates of the frequency of LTOP events are nearly equivalent.
In order to use NRC Generic Letter 98-05, licensees must have implemented operator training and established procedures that limit the frequency of LTOP events to the amount specified in the above Final Safety Evaluation. BSEP has met this basis by implementing periodic operator training on brittle fracture limits, compliance with P-T curves and procedural requirements. Operators are directed by multiple procedure steps to maintain the RPV pressure and temperature in accordance with the applicable TS P-T figure.
c) As stated in the response to (b), BSEP acknowledges that the CS pumps, with the pump shutoff head of approximately 342 psig, are capable of providing pressure in excess of the 283 psig pressure limit under certain temperatures per TS Figures 3.4.9-1, 3.4.9-3, 3.4.9-4, 3.4.9-5. BSEP also acknowledges that the conditions under which RPV temperatures are in the region of 283 psig allowed pressure exist primarily during startup from cold shutdown, and during the ASME Section XI required RPV pressure test after vessel maintenance. During these online and startup conditions, operator action will prevent exceeding the 283 psig allowed pressure limit. Level bands exist to prevent the RPV from a water-solid condition, and during startup the main steam isolation valves (MSIVs) are open to provide a greater system volume than the RPV alone. The greater system volume provides operators a longer response time to an inadvertent initiation of the CS system. Prior to performance of the ASME Section XI pressure test, operators are instructed on the requirements to maintain Reactor Coolant System (RCS) conditions within the boundaries of the applicable TS P-T curves.
Through compliance with plant operating procedures, continuing training on brittle fracture limits and LTOP events, and timely operator action, the risk of pressurization of the RCS above the boundaries of the TS P-T curve limits is minimized due to an inadvertent initiation of the CS system.