B17160, Forwards Addendum 6 to Rev 10 to FSAR in Form of Replacement Pages & Addendum 8 to Annual Rept,Including Info Covering Changes Contained in Submittal

From kanterella
Jump to navigation Jump to search
Forwards Addendum 6 to Rev 10 to FSAR in Form of Replacement Pages & Addendum 8 to Annual Rept,Including Info Covering Changes Contained in Submittal
ML20217N542
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/31/1998
From: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217N544 List:
References
B17160, NUDOCS 9804090132
Download: ML20217N542 (3)


Text

g Rope Ferry Rd. (Route 156), Taterford, CT 06385 Meer Energy wiri, tone soci, r row, st.tioo Northeast Nuclear Eocrgy Company P.O. Box 128 Taterford, CT 06385-0128 (860) 447 1791 Faz (860) 444-4277 11* Northeaat Utilities System MAR 31 1998 Docket No. 50-423 B17160 Re: 10CFR50.71(e)

. 10CFR50.59 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Addendurr,6 to Revision 10 to the Final Safety Analysis Report And Addendum 8 to Annual Report Northeast Nuclear Energy Company (NNECO) hereby submits as Attachment 1, Addendum 6 to Revision 10 to the FSAR in the form of reolacement pages as required.

Revision 10 to the FSAR was submitted on July 1,1997,A ar;d Addendum 5 to Revision 10 was submitted on February 26,1998."

Pursuant to 10CFR50.71(e)(2)(i), I certify that this revision accurately presents changes completed since our previous sutmittal that are necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements, as of the previous submittal. NNECO has performed an extensive review of the Millstone Unit No. 3 design and licensing bases. The changes resulting from that review and presented herein represent those initiated through November 15,1997.

For planning purposes and to enable orderly review by the Commission of the expected changes to the FSAR resulting from the ongoing reviews, and as indicated in the letter submitted October 29,1997, NNECO intends to submit periodic addendums to FSAR Revision 10 and Revision 11, (if necessary) on an approximate quarterly frequency

,o m M. H. Brothers letter to U. S. Nuclear Regulatory Commission, " Millstone Nuclear Power gb #

Station, Unit No. 3, Revision 10 to the Final Safety Analysis Report and Addendum 2 to Annual Report, dated July 1,1097.

  • M.L. Bowling, Jr. leer to U. S. Nuclear Regulatory Commission, " Millstone Nuclear Power Station, Unit No. 3, Addendum 5 to Revision 10 to the Final Safety Analysis Report and Addendum 7 to Annual Report," dated February 26,1998.
  • M. H. Brothers letter to U. S. Nuclear Regulatory Commission,
  • Millstone Nuclear Power Station, Unit No. 3, Addendum 2 to Revision 10 to the Final Safety Analysis Report and l Addendum 4 to Annual Report," dated October 29,1997. h

~9804090132 98o331 PDR ADOCK 0500o4 3 K

U. S. Nuclear Regulatory Commission B17160\Page 2 l

until the Unit 3 FSAR reflects information current to the date the unit is restarted.

Subsequent to that, revisions to the Unit 3 FSAR will be submitted in accordance with the schedule provided in 10CFR50.71(e).

Pursuant to 10CFR50.71(e) and 10CFR50.4(b)(6), this transmittal consists of one original and ten copies. As stipulated in 10CFR50.71(e)(2)(ii): "This submittal shall include an identification of changes made under the provisions of Section 50.59 but not previously submitted to the Commission." Pursuant to Section 50.59(b) with the exception noted, such ir. formation is routinely submitted to the NRC as part of our annual reports, and is not included in this submittal. The most recent annual report ,

was submitted on February 28, 1997,") for the period January 1,1996 through {

December 31,1996. Please note that Attachment 2 includes information covering changes contained in this submittai but not included in the February 28,1997, letter, and is provided herein as Addendum 8 to that annual report.

I Commitments There are no commitments in this letter.

We trust that this information satisfies the requirements of 10CFR50.71(e). i if you have any questions, please contact Mr. J. S. Duddy at (860) 440-2082.

Very tru;y yours, NORTHEAST NUCLEAR ENERGY COMPANY Nb ~

M. L. Bowling, Jr. l/

Millstone Unit No. 2 - Recovery Officer cc: See Page 3

") M. H. Brothers letter to U. S. Nuclear Regulatory Commission, " Millstone Naclear Power Station, Unit No. 3, Annual Report," dated February 28,1997.

(

. l 0

U. S. Nuclear Regulatory Commission B17160nPage 3 cci H. J. Miller, Region i Administrator J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, Ph.D, Director, Special Projects Office i

l

. . .