B16665, Forwards Corrected Page 2 of 2 to Rev 19,section 8.0 of Northeast Utilities QA Program Topical Rept

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page 2 of 2 to Rev 19,section 8.0 of Northeast Utilities QA Program Topical Rept
ML20210J211
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/07/1997
From: Kenyon B
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210J215 List:
References
B16665, NUDOCS 9708150235
Download: ML20210J211 (3)


Text

. ' Nordicast ""F % " N "' ****d"* "

  • _ Nuclear Energy uasione suae r ro.er sintion Northennt Nudcar Energy Company P.O. Ilos 128 Weierford, CT 0633>-0128 (860) 447 1791 Fas (860) 444 4277

- %c Northeast Utiliiic System -

AUS-71997 Docket Nos. 50-245 50-336 50-423 B16665 i

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Units 1,2, and 3 Annual Reporting of Changes to the Quality Assurance Program l l Correction to Proposed Revision 19 to the Northeast Utilities l

Quality Assurance Proaram Topical Report - Millstone Nuclear Power Station

Reference:

(1) B.D. Kenyon letter to the NRC, " Annual Reporting of Changes to the Quality Assurance Program, Proposed Revision 19 to the Northeast Utilities Quality Assurance Program Topical Report - Millstone Nuclear Power Station," dated June 3,1997.

In accordance with 10 CFR 50.54 (a) (3), on June 3,1997, Northeast Nuclear Energy Company (NNECO) transmitted Revision 19 of the Northeast Utilities Quality Assurance Program (NUQAP) Topical Report for your review and approval. Upon subsequent review of the documentation submitted to the NRC, we discovered that a portion of text contained in Section 8.0 of the NUQAP was inadvertently omitted. This letter provides )

the corrected NUQAP, Revision 19, Section 8.0, page 2 of 2 as an attachment.

The omitted section of a sentence from Section 8.0 stated that [ Nuclear} " Oversight performs audits, surveillances, and inspections, as appropriate, of onsite vendor activities in this area". The omission of this ctstement is administrative in nature and not considered an intent issue. Additionally, this Nuclear Oversight function is stated elsewhere in the NUQAP. The Quality Assurance (QA) group reviewed the NUQAP, Revision 19, documentation and there were no additional omissions. We regret any inconvenience this omission may have caused.

3QY

,_ . ,x , _

lilll I.El.lllE. IE 9708150235 970007 PDR ADOCK 05000245 P pog _ _ _ _ _ _ _ _ _

4  :.

{

f  ;

F U.S. Nuclear Regulatory Commission  ;

L B16665\Page 2 i

! Should the Staff have any questions regarding this submittal, please contact Mr. W. J.  ;

y

. Temple at (860) 437-5904. -

.' ]

Very truly yours,  !

4 NORTHEAST NUCLEAR ENERGY

- COMPANY  :

4

.I T, p- ,

~_ / /) max B. D.' Kenyon - 4 '

President and CEO:

S y

l Attachments: .

As stated '

F ,

cc: H. J. Miller, Region l Administrator W. D. Travers, Ph.D., Director, Special Projects Office

P. F. McKee, Deputy Director, Licensing and Oversight, Special Projects Office

'. S. Dembek, NRC Project Manager, Millstone Unit 1-T.AJ Easlick, Senior Resident Inspector, Millstone Unit 1l D.G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit 2 -

D.P. Beaulieu, Senior Resident inspector, Millstone Unit 2 J.W. Andersen, NRC Project Manager, Millstone Unit 3 4

A.C. Cerne, Senior Resident inspector, Millstone Unit 3 i'

i I

i i.

w a

.y-- T T- + -,rr .- , ,- , - - -,,, , .', , 5.., ,, , ,- w w-, % ...., y ..m 'ww-_-

y-

Docket Nos 50-245 - 5 50-336'-

50-423 B199.6.k i

4

-t' a

4 e

j

! 'l r

4 .

! Attachment 1 9 Millstone Nuclear Power Station, Unit Nos.1,2, and 3  !

i Annual Reporting of Changes to the Quality Assurance Program . _

: Correction to Proposed Revision 19 to the Northeast Utilities -

7 Quality Assurance Program Topical Report - Millstone Nuclear' Power Station .

L i

E.

') ' .4 r

t-

. r n

i.

1 August 1997 2

.. _. . . . . _ _ . _ - . _ _ . _ _ __ . . _ _-- . _ _ - . - - - - .