B15809, Informs That RA Cox Has Completed 1995 Annual Operating Test & Is Currently Enrolled in 1996 Licensed Operator Requalification Training Program

From kanterella
Jump to navigation Jump to search
Informs That RA Cox Has Completed 1995 Annual Operating Test & Is Currently Enrolled in 1996 Licensed Operator Requalification Training Program
ML20117K070
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/29/1996
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
B15809, NUDOCS 9609110118
Download: ML20117K070 (2)


Text

' 107 sem street, se1hn, cr o6037 ff) .N:rtheast cow Utilities System 3.e m P.O. Box 270

!!artford, CT 06141-0270 (203) 665-5000 August 29, 1996

-Docket No. 50-336

,B15809 Re: 10CFR55.59 Hubert J. Miller, Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Millstone Nuclear Power Station, Unit No. 2 Licensee Completion of Annual Operating Test In the letter of January 16, 1996, Northeast Nuclear Energy Cox, Company (NNECO) notified the Staff that Mr. Richard A.

License No. OP-10670-1, Docket No. 55-61040, had not completed the 1995 Annual Operating Test in accordance with the Licensed Operator Requalification Program. The program requirements were not completed due to corrective surgery that Mr. Cox underwent in the last quarter of 1995.

The purpose of this letter is to inform you that Mr. Cox successfully completed the 1995 Annual Operating Test on June 25, 1996, and is currently enrolled in the 1996 Licensed Operator Requalification Training Program. In addition, the current NRC Form 396 for Mr. Cox has been reviewed and determined to be correct.

After successfully completing the 1995 Annual Operating Test, Mr.

Cox was returned to licensed duties on the week of July 7, 1996.

If you have any questions, please contact Mr. Michael D. Ehredt at (860)440-2142.

Letter from D. B. Miller to T. T. Martin, " Millstone Nuclear Power Station, Unit No. 2, Licensee Failure to Complete Annual Operating Test", dated January 16, 1996. ,

/

9609110118 960829

- O PDR ADOCK 05000336 V PDR

I

~

U.S.' Nuclear Regulatory Commission B15809/Page 2 Very truly yours,--

NORTHEAST NUCLEAR ENERGY COMPANY. -

v

/

ro## - j S. S. Scac6 )

Vice President j cc: D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 P. D. Swetland, Senior Resident Inspector, Millstone-Unit No. 2 U. S. Nuclear' Regulatory Commission Document Control Desk  ;

Washington, DC 20555

_ _