Withdraws 900328 Proposed Changes Related to Surveillance Requirements 4.8.1.1.2.a.6 & 4.8.1.1.2.g.7,in Ref to TS Section 3/4.8 for Emergency Diesel Generator Reliability & Availability,Per 911028 Conference Call.Revised TS Encl
ML20086E304
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/22/1991
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086E306 List:
References
B13960, TAC-M76644, NUDOCS 9111270173
Download: ML20086E304 (2)


Text

-

s . .

NORTHEAST UTILITIES c.c.n a Ono, . s,.n sne.oem comenu 1 2 f,,$1 ' $ [ ~ $(( P O BOX 270

, ywe**. v" H AhTI ORD CONNI.CitCUT 00,141-0270 k L J U .7 b . i ' ".2 (?Uh 605 Sb00 November 22, 1991 Docket Npm EQ M 3 iME0 Re: 10CfR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Reference:

E. J. Mroczka letter to the U.S. Nuclear Regulatory Commission, Proposed Revision to Technical Specifications Electrical power Systems--AC Sources, dated March 28, 1990.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specification Electrical Power Systems-4CJoyrces (TACJg22M4R By letter dated March 28,1990 (reference), Northeast Nuclear Energy Company (NNECO) submitted an amendment request to the NRC Staff which would revise the technical specifications of Millstone Unit No. 3. The proposed changes would revise Technical Specification Section 3/4.8 for the emergency diesel genera-tor reliability and availability, in the referenced letter, among other changes, it was pecposed that Survell-lance Requirement 4.8.1.1.2.a.6 (a monthly surveillance test) be modified to specify error bands in loading the diesel generator in lieu of the existing requirement to load the diesel generator greater than or equal to a given value. In addition, in the referenced letter, it was proposed that Surveil-lance Requirement 4.8.1.1.2.g.7 (a 24-hour run test) be modified to specify an indicated target value in lieu of existing requirement to load the diesel generator greater than or equal to a given value.

The purpose of this letter is to withdtaw the a changes discussed above as we agreed to in our conference call with the Staf f on October 28, 1991, lhere-fore, as agreed, the proposed changes related to Surveillance Require-ments 4.8.1.1.2.a.6 (loading of diesel generator during a 31-day surveillance) and 4.8.1.1.2.g 7 (loading of diesel generator during a 24-hour rur.) are being withdrawn at this time. NNECO intends to resubmit these changes at a later date. The proposed technical specification changes transmitted via the referenced letter have been revised to reflect the above discussion and are included herein as Attachment 1.

We believe the above information, coupled with the information provided in the referenced letter, provide a complete basis for approval of the requested

_ t' /*/ ,

91 ) y y I

[;1112701/3 h ADOCh OMnQ3 g Pos

(

i L

L I' '

U.S. Nuclear Regulatory Commission B16C?/Page 2 November 22, 1991 amendment.- Of course, should 'the Staff have any additional questions NNECO -

will be available to discuss the Staff's concerns.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY  !

FOR: J. f. Opeka Executive Vice President

-f2dLO W BY: CT f. Sears Vice President cc: T. T. Martin, Region 1 Administrator V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,-2, and 3 STATE Of CONNECTICU1)

) ss. Berlin COUNTY Of HARTFORD )

Then personally appeared before me, C. f. Sears, who being duly sworn,- did state that he is Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensee herein, and that the statements contained in said information are true and correct to the best of his knowledge and belief.

Jjr,,1 / D1. ht t ' t (ILaq NotaryPu)ilic