Requests Extension of one-yr Requirement Up to Two Addl Months for Submittal of Rept Re Reactor Vessel Matl Irradiation Surveillance Capsule W-104 on or Before 911204
ML20079F422
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/01/1991
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B13937, NUDOCS 9110080153
Download: ML20079F422 (1)


Text

-_ ._

1 1

=

l NORTHEAST UTILITSES cenom cme, . s,ioen sireet. Beron connecticut 1 dei.,$,. .$'YN FO BOX 270 mm......."*" H AftT F ORD. CONNECTICUT 06141-0270 k L J Y[U Uis.$I-IC.I (203) 665MiOO October 1, 1991 Dock.at No. 50-JM BH931 Re: 10CFR50, App. H, Ill.A U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20505 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Reacto_r Vessel Material Irradiation Surveillance Caatute W-104 On October 4, 1990, Northeast Nuclear Energy Company (NNECO) removed surveillance eapsule W-104 from Millstone Unit No. 2's reactor vessel in accordance with the surveillance reouirement of Technical Specification 4.4.9.1.t. This capsule was then shipped to a vendor for examination. NNECO has received a draft report; however, neither we nor our vendor has completed verifying the results of this report and will not be able to submit this report within one year from withdrawal of the specimen per 10CFR, Appendix H requirement, in accordance with 10CFR50, Appendix H, Section Ill.A, NNECO respectfully requests an extension of the one-year requirement up to two additional months.

NNECO proposes to submit this report on or before December 4, 1991.

Please contact us if you have any questions specifically regarding this issue.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/ fee w E. J. .roczka Senior Vice President cc: T. Martin, Region 1 Administrator

5. Vissing, NRL Project Manager. Millstone Unit No. 2
. Habighorst, Resident Inspector, Millstone Unit No. 2 W. J. Raymond, Senior Resident inspector, Millstone Unit Nos. 1, 2, and 3 0

9110080153 911001 P (( h ADOCK 05000336 }[\