MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] |
Text
.,
l O
~~~
~7 Entergy Operations, Inc. I
[ [gO 1449$ R 333 v R.mMe, AR 72901 Tel501850$000 December 1,1997 10CFR50.55a ICAN129701 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OPl-17 Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR 51 ANO 1 Third Ten Year IST Program Submittal Gentlemen:
Pursuant to the requirements of 10CFR50.55a Entergy Operation
- is required to submit the Third Ten Year IST Program for ANO Unit 1. Attachment I contains a description of the program and how it was developed. Attachment 2 contains program changes subsequent to the last program submittal made on September 21,1993 (ICAN099304). Attachment 3 contains the Third Ten Year IST Program Submittal.
Should you have any questions or comments, please call me at 501-858-4601.
Very tmly yours, ddgM. 'F7/M kJ '9 '
Dwight C. Mims ;
Director, Nuclear Safety \ '
DCM/mkg Attachments ,
y V 'o U b O 9712050279 071201 l!ll!Dil!il
- ' 11111lllI!!lllllllD!lll PDR ***
G ADOCK 05000313 PDP
1
- U. S. NRC December 1,1997 1CAN129701 cc: Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission
- Region IV
, 611 Ryan Plaza Drive, Suite 400 Arlington, TX 760118064
- ?!RC Senior Resident Inspector i Arkansas Nuclear One
, P.O. Box 310
, London, AR 72847 l Mr. George Kalman NRR Project Manager Region IV/ANO-1
- U. S. Nuclear Regulatory Commission NRR Mail Stop 13-II-3 One White Flint North
- 11555 Rockville Pike
- Rockville, MD 20852 i
i l
4 i
i
~
l c
d t
+-= , ,+-----my-- +rev-r- y~- w - w w -
l ATTACIIMENT 1 IST PROGRAM DEVELOPMENT PROCESS
l l
NITACIIMENT 2 1
IST PROGRAM CIIANGES l 4
This attachment provides a summary ofchanges to the ANO-1 IST program since the September 21,1993 program submittal.
CHANGE # AFFECTED DESCRIPTION BASIS FOR COMPONEN'IS OFCHANGE CHANGE 1 Generic- ReliefRequests/ Relief Requests 6,7,9,14,16, and 19 have been OMa-1988, Part 10 allows certain valve tests Refueling Outage converted to refueling outage justi6 cations I to be performed at refueling outage figuency i Justifications through 6. Appendix 5 lists refueling outage withjusfx:ation.
justifications.
2 Generic- ReliefRequests Relief Requests 1, 2, 3, 4,10, 32, and 3 were Due to changes in the Code and NUREG 1482 deleted. guidance allowed the:4 relief requests to be !
withdrawn. t 3 Generic- Relief Requests Relief Requests 26,28, and 30 were withdrawn. These relief requests were for non-Code components.
4 Generic- Relief Requests The remaining Relief Requests 8, 17, 22, 23, 25, Completeness and 34 were retained and renumbered I through 6.
Note: Relief Requests 5, I 1,12,13,15,18, 20, 21, 24, 27, 29, and 31 were withdra vn by 1CAN099304 :
5 Relief Request-7 Added new relief request for cold shuP~- Adl, Eniwwnent flow testing performed on HPI pumps _, L ,
6 Generic-Cold Shutdown Added Appendix 6 for Coy %.dm ' ' " . vtdown Justifications are beira Justifications Justifications. __.,' ir oo 3p NUREG 1482 guidr ; _ _ _
7 Generic- Valve Table Added references to cold shutdot % kit xs i ! omp, ter. ss.
and refueling outagejustifications. t t 8 Generic- Pump Table Deleted bearing temperature, suction prew , nd Not rec m pr . .aa-im, Fan 6. Tdk 2 f bearing oillevel. _j 9 ReliefValves Added relief requests 8, 9,10, I1,12, and 13. New coa -
meets.
I l; These are new relief requests that reflect the !
addition of new relief valves and the use of OM-1 l;l vs. PTC 25.3-1976. )
i i
Iof7 3
.- - - . - ~ - . . - . - - - - - - . - - - . - . - - - - - - - - - . - - - . - - - - - - - - ~ . - -
- i .
J' 1
i i
j CHANGE #. AFFECTED DESCRIP110N BASIS FOR
{. COMPONENTS OFCHANGE CHANGC 10 CS-1196, CS-Il98 : Added valves. Newly id,=m # ad requirennent, however, !
}. W of existing testire performeed e
satis 6es pmgram W l,
11 CV-2800, CV-2802 Change valve from passive to active (open Correction.
i CV-1000 direction and added croke test to " required tcsts" column (open direct;an). Note these valves were 2 being and m.iB continue to be stroke timed in the
! open and clomd h i 12 CV-2869, CV-2870, Deleted stroke test r@ -ee from " tests OMa-1988, Part 10, does not require l CV-3641, CV-3645, performed" #--- Note also d,4, sad fail safe exercising or fail safe testing for passive valves.
- i. CV-4 '90, CV-4446, test requirernent from " tests performed" column CV-4803, CV-4804, for CV-4400, CV4804, and CV-1667. i CV-5611, CV-5612, I j CV-1414, CV-1415,
! CV-1667, CV-1814, ;
- CV-1816 l
I 13 FW-10A, FW-10B Added a closed safety function for these valves _ C _ f - -- . the existing testing already con 6rms valve closure. !'
14 SW-II, SW-13 Changed FRP and DI in the " tests performed" Valves are fuE flow tested during outages thus j
- column to FR. 9-- * *j is not required. !
r
- 15 CS-293, CS-294 Changed DI to FR(NIT) in the " tests performed" The ability of the these valves to open is .l l column. con (sneed once per refueling cvcie by non- !
l intrusive :--:' '; : , thus % is not
[
l required. Reference Relierperpneer 4 16 SV-2613 Deleted fkl safe test from " required tests" and " test 1his valve fails closed. The safety Gamreiani for i I perfonned" columns this valve is open. 'Ihis valve has no fail-safe l Position i
! '. 7 MS-271, MS-272 Added that non-intrusive testing (NIT) is used to Compieseness. '
j conGrm valve closure.
, 18 FW-7A, FW-7B Deleted valves. No safety function associated with valves 1
] 2d7 i
9 - .- , . .. - _ . _ _ _ _ _ _ _ - _ _ _ _ _ _
CHANGE # AFFECTED DESCRIPTION BASIS FOR COMPONENTS OFCHANGE CHANGE 19 HV-139, HV-140, Changed valve type to gate. Correction.
HV-150, HV-151 20 CV-6601 A, CV-2619, Added valves. New Code requirement. OMa-1988, Part 10, CV-2676, SV-3812, require.s that Categery B passive valves have SV-3813, CV-2415, their remote position indication verified.
CV-2417, CV-2419, CV-2420 21" SG-5, SG-6, SG-7 Added closed safety fur.ction. Newly identdied safety function, however, these valves were already fum.tionally tested in this direction w/ exception of stroke timing.
- 22 CV-3812, CV-3813 Added stroke time requirement to " required tests Plarm change. Note: These valves were being column. Changed valves from passive to active stroke timed in open direction.
Changed normal position from open to closed 23 CV-3814, CV-3815 Changed actuator type from air operated to motor. Plant change.
Deleted fail safe test.
24 FO-10A, FO-10B Added valves. Newly identi6cd safety function to exercise these non-code valves based on EDG support system function.
25 CV-5218, CV-5233, Added closed safuy function and fail safe test Newly identdied safety function, however, CV-5237, CV-5239, (closed directen). documentation of existing testing perfm..d SV-5218, SV-5233, satis 6es program regium..csa.
SV-5237, SV-5239 26 FO-163, FO-164, Added valves. Newly .dertified safety function, however, FO-165, FO-166 documentation of existing testing performed satis 6es program reglim..caa.
27 SW-604A, SW-604B Added valves. Newly identi6ed safety function, however, documentation or existing testing peif*.-d .
satisfes program resp 41m. 6.
3 of7
r CHANGE # AFFECTED DESCRIPTION BASIS FOR COMPONENTS OFCHANGE CHANGE i 28 CF-1 A, CF-1B, DH-13A, Added requirement to verify closure for these check In the Second Ten Year IST Program, these DH-13B, DH-14A, valves. check vives were identi6ed as having an active ;
DH-14B, J'H-17, DH-18 open safety function and a passive closed safety l function. Per new NRC guidance a valve is i either active or passive hence the valves were i r ct===iGed as active in both directions !
29 Reactor Vessel Internal Added closed safety function. Also listed the valve Newly identified safety function, however, Vent Valves- 8 valves number for the individual valves. documentation of edsting testing performed
~
satisfies program requirements.
30 PSV-1000 Added fail safe test (cbsed direction) to " required Cornple"eness. Fail safe capability is l tests" and " tests performed" columns demonstrated by valve closure. t 31 SV-1077, SV-1079, Changed closed safety function of the valve from Per current NRC guidance a valve cannot be SV-1071, SV-1072, passive to active and added stroke test and fail safe passive in one direction and active in the other SV-1073, SV-1074, test requirement to " required tests" column. direction. Note these valves were being and will l SV-1081, SV-1082, continue to be stroke exercised in both the open !
SV-1083, SV-1084, and closed directions and fail safe tested. :
SV-1091, SV-1092, SV-1093, SV-1094 !
32 CV-1052, CV-1053, Chtged normal posnion from open/ closed to Changed valve from active to passive. !
CV-1054, CV-1065 closed Rect ===in e d valves as passive Deleted stroke test and fail safe test. Note: CV-1052 and '
CV-1065 had fail safe tests.
33 BW-2, BW-3 Added closed safety function. Newly M-wified safety function. Reference ;
BW-4A, BW-4B Inspection Repoi: 50-313/97-13; 50-308/97-13 34 CA-61, CA-62 Added closed safety function. Newly identi5ed safety function, however, documentation of existing testing performed r satisfies program requirernents.
t l
t 4 of 7 i
-- -_. - . . . - - - -- .- .. . . - - - - - - - - - -- -_= - - - _
t l
I i
CHANGE # AFFECTED DESCRIPTION BASIS FOR f COMPONENTS OFCHANGE CHANGE 35 CV-1276, CV-1277 Added closed safety function. Newly identified safety function, however, these [
valves were alreaty functionally tested in this I direction w/exceptini ofstroke timing. I 36 CV-1300, CV-1301, Deleted open safety function. No open safety fune. ion.
MU-22A, MU-22B, MU-22C ,
37 CZ-46 Added valve. Changed valve from passive to actrve. ;
38 PSV-5215, PSV-5216, Added valves. New Code requirement. [
PSV-5231, PSV-5232, !
i PSV-5237, PSV-5238,
[
PSV-5240. PSV-5241, j
PSV-1241, PSV-1242, PSV-1243, PSV-1403, PSV-1404, PSV-1405, i PSV-1406, PSV-1407, PSV-2415, PSV-2421 ,
39 CV-1404, CV-1405, Added closed safety function. Changed CV-1404 Newly identified safety function, however, these CV-1406 exercise test to cold shutdowns from quarterly. valves were already functionally tested in this direction w/ exception of stroke timing. CV- t 1404 exercise test moved to cold shutdowns due to hot short concerns. l 40 CV-1428, CV-1429 Reclassified valves as active and addei exercise Reclassified valves from passive to active. Note .
test to " required tests" column. these valves have been and will continue to be exercised in the open direction. ;
i 5of7
CHANGE # AFFECTED DESCRIPTION BASIS FOR COMPONENTS OFCHANGE CHANGE 41 CV-1432, CV-1433 Added open safety function, reclassified valves as Newly identified safety function-despite HSD v tive, and added open exercise requirement. licensing basis, ANO-1 has determined the decay heat removal operation important enough to warrant testing. Valv-s already functior. ally tested in this direction w/ exception of stroke timing.
42 CV-1434, CV-1435 Changed closed safety function from passive to Per new NRC guidance a valve cannot be active. passive in one direction and active in another direction. Note these vahrs have been and will continue to be stroke exercised in both the open and closed directions.
43 N2-47 Added valve. Valve added to Appendix J program.
44 IA-775, IA-767, IA-771 Added valves. Locumentation ofsafety function.
Valves deleted from Appendix J r upsn.
45 SF-43, SF-44 Deleted valves.
47 CV-1845 Changed normal valve position from open/ closed Changed valve from acthe to passive to just closed. Reclassified vahe as passive and deleted stroke test and fail safe test requirements.
48 CV-7470, CV-7471, Deleted dampers. These dampers were deleted since dampers are CV-7472, CV-7473 outside the scope of OMa-1988, Part 10.
49 CV-7443, CV-7447 Deleted valves. Plant change. Vahes removed from plant.
50 CV-7445, CV-7449 Deleted remote position indication test Plant change. Valve is de-energized.
requirement.
51 SV-7510, SV-7512 Changed valve from passive to active and added Changed valve from passive to acthr. Note:
stroke time and fail safe requirements. valves have been and will continue to be stroke time and fail safe tested.
6 of 7
CHANGE # AFFEC1ED DESCRIPTION BASIS Nl COMPONENTS OFCHANGE CHANGE i
52 SV-7457, SV-7459, Ganged closed safety function from passive to Per new NRC guidance a valve cannot be SV-7467, SV-7469 active. passive in one direction and active in ancther direction. Note these valves have been and win continue to be stroke exercised in both the open and closed drections d
7 of 7
. . .