WEEKMONTHYEARENS 573702024-10-08T21:53:000Start date: 8 October 2024 21:53:00 Site: North Anna Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 573302024-09-17T05:00:000Start date: 17 September 2024 05:00:00 Site: Point Beach Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 573042024-09-04T23:09:000Start date: 4 September 2024 23:09:00 Site: Westinghouse Electric Company Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 572712024-08-13T07:00:000Start date: 13 August 2024 07:00:00 Site: Diablo Canyon Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 573632024-08-09T04:00:000Start date: 9 August 2024 04:00:00 Site: Mpr Associates, Inc. Engineers Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 572452024-07-23T18:00:000Start date: 23 July 2024 18:00:00 Site: Browns Ferry Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 572432024-07-23T04:00:000Start date: 23 July 2024 04:00:00 Site: Rssc Dba Marmon Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 571862024-06-21T04:00:000Start date: 21 June 2024 04:00:00 Site: Framatome Anp Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 571672024-06-07T04:00:000Start date: 7 June 2024 04:00:00 Site: Flowserve Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 571432024-05-09T04:00:000Start date: 9 May 2024 04:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 570882024-04-22T04:00:000Start date: 22 April 2024 04:00:00 Site: Ge-Hitachi Nuclear Energy Americas, Llc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 570722024-02-22T04:00:000Start date: 22 February 2024 04:00:00 Site: FitzPatrick Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 571172024-02-22T04:00:000Start date: 22 February 2024 04:00:00 Site: FitzPatrick Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 570342024-02-16T07:00:000Start date: 16 February 2024 07:00:00 Site: Alpha- Omega Services Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569932023-12-23T06:00:000Start date: 23 December 2023 06:00:00 Site: Fairbanks Morse Engine Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569922023-12-22T06:00:000Start date: 22 December 2023 06:00:00 Site: Fairbanks Morse Engine Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569052023-12-21T16:23:000Start date: 21 December 2023 16:23:00 Site: Vc Summer Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 568992023-12-18T06:00:000Start date: 18 December 2023 06:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569582023-12-13T00:00:000Start date: 13 December 2023 00:00:00 Site: Ametek Solidstate Controls Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component ENS 568882023-12-11T18:32:000Start date: 11 December 2023 18:32:00 Site: Sequoyah Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569132023-11-27T05:00:000Start date: 27 November 2023 05:00:00 Site: Engine Systems, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569072023-10-23T06:00:000Start date: 23 October 2023 06:00:00 Site: Valcor Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 567202023-09-05T04:00:000Start date: 5 September 2023 04:00:00 Site: Paragon Energy Solutions, Llc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 566532023-08-03T00:00:000Start date: 3 August 2023 00:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component ENS 566412023-07-18T20:14:000Start date: 18 July 2023 20:14:00 Site: River Bend Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 566792023-07-05T05:00:000Start date: 5 July 2023 05:00:00 Site: Cooper Nuclear Power Plant Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 566032023-05-17T04:00:000Start date: 17 May 2023 04:00:00 Site: Engine Systems, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 566122023-05-11T16:50:000Start date: 11 May 2023 16:50:00 Site: Summer Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 564692023-04-12T04:00:000Start date: 12 April 2023 04:00:00 Site: United Controls International Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 564572023-04-06T04:00:000Start date: 6 April 2023 04:00:00 Site: Framatome Anp Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 565382023-03-28T04:00:000Start date: 28 March 2023 04:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 564202023-03-17T22:07:000Start date: 17 March 2023 22:07:00 Site: Trillium Valves Usa Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 563872023-01-29T06:00:000Start date: 29 January 2023 06:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 561962022-10-31T05:00:000Start date: 31 October 2022 05:00:00 Site: Nutherm International, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 562002022-10-27T05:00:000Start date: 27 October 2022 05:00:00 Site: Fairbanks Morse Engine Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 562692022-10-13T22:48:000Start date: 13 October 2022 22:48:00 Site: Wolf Creek Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 562192022-09-11T04:00:000Start date: 11 September 2022 04:00:00 Site: Flowserve Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 560852022-08-31T16:00:000Start date: 31 August 2022 16:00:00 Site: Diversified Machine Components, Llc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 570012022-08-27T05:00:000Start date: 27 August 2022 05:00:00 Site: Cooper Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 559502022-06-16T05:00:000Start date: 16 June 2022 05:00:00 Site: Nutherm International, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 563222022-05-23T05:00:000Start date: 23 May 2022 05:00:00 Site: Sequoyah Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 559992022-05-19T04:00:000Start date: 19 May 2022 04:00:00 Site: Valcor Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component ENS 559932022-05-02T04:00:000Start date: 2 May 2022 04:00:00 Site: Framatome Anp Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 558362022-04-06T04:00:000Start date: 6 April 2022 04:00:00 Site: Westinghouse Electric Company Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 558272022-02-07T04:00:000Start date: 7 February 2022 04:00:00 Site: Tennessee Valley Authority Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 559742022-02-02T04:00:000Start date: 2 February 2022 04:00:00 Site: Flowserve Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 558072022-01-27T04:00:000Start date: 27 January 2022 04:00:00 Site: Engine Systems, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 557842022-01-12T06:00:000Start date: 12 January 2022 06:00:00 Site: Ultra Energy Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 556202021-12-01T06:00:000Start date: 1 December 2021 06:00:00 Site: Ameren Ue Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569192021-11-12T05:00:000Start date: 12 November 2021 05:00:00 Site: Summer Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 556052021-11-09T17:00:000Start date: 9 November 2021 17:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 554902021-09-24T05:00:000Start date: 24 September 2021 05:00:00 Site: Farley Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 554532021-09-09T04:00:000Start date: 9 September 2021 04:00:00 Site: Ametek Solidstate Controls Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 554972021-09-03T05:00:000Start date: 3 September 2021 05:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 555312021-08-20T16:00:000Start date: 20 August 2021 16:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 555052021-08-04T04:00:000Start date: 4 August 2021 04:00:00 Site: Flowserve Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 554632021-07-23T04:00:000Start date: 23 July 2021 04:00:00 Site: Te Connectivity Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 561782021-07-21T04:00:000Start date: 21 July 2021 04:00:00 Site: Tioga Pipe Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 558082021-06-22T05:00:000Start date: 22 June 2021 05:00:00 Site: Summer Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 555512021-06-18T04:00:000Start date: 18 June 2021 04:00:00 Site: United Controls International Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 553002021-06-08T05:00:000Start date: 8 June 2021 05:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 552822021-05-28T04:00:000Start date: 28 May 2021 04:00:00 Site: Framatome Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 553472021-05-11T16:00:000Start date: 11 May 2021 16:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 569202021-05-05T05:00:000Start date: 5 May 2021 05:00:00 Site: Summer Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 552442021-05-05T05:00:000Start date: 5 May 2021 05:00:00 Site: Monticello Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 551672021-04-01T04:00:000Start date: 1 April 2021 04:00:00 Site: Ametek Solidstate Controls Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component ENS 552232021-03-29T05:00:000Start date: 29 March 2021 05:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 561922021-02-22T05:00:000Start date: 22 February 2021 05:00:00 Site: Grand Gulf Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 553142021-02-18T04:00:000Start date: 18 February 2021 04:00:00 Site: Ge Hitachi Nuclear Energy Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 551262021-01-06T06:00:000Start date: 6 January 2021 06:00:00 Site: Crane Nuclear, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 550272020-10-20T05:00:000Start date: 20 October 2020 05:00:00 Site: Engine Systems Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 549142020-09-25T05:00:000Start date: 25 September 2020 05:00:00 Site: Nutherm International, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 549982020-08-26T04:00:000Start date: 26 August 2020 04:00:00 Site: Qualtech Np Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 548272020-08-03T21:59:000Start date: 3 August 2020 21:59:00 Site: Waterford Steam Electric Station Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 547602020-06-01T05:00:000Start date: 1 June 2020 05:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 547342020-06-01T05:00:000Start date: 1 June 2020 05:00:00 Site: Paragon Energy Solutions Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 547212020-05-18T18:57:000Start date: 18 May 2020 18:57:00 Site: Diablo Canyon Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 547582020-05-01T04:00:000Start date: 1 May 2020 04:00:00 Site: United Controls International Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 547562020-04-28T04:00:000Start date: 28 April 2020 04:00:00 Site: Ge Hitachi Nuclear Energy Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 546742020-04-20T06:00:000Start date: 20 April 2020 06:00:00 Site: Curtiss Wright Flow Control Co. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 546212020-03-19T07:00:000Start date: 19 March 2020 07:00:00 Site: Palo Verde Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 545882020-03-19T04:00:000Start date: 19 March 2020 04:00:00 Site: Engine Systems, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 546642020-03-12T04:00:000Start date: 12 March 2020 04:00:00 Site: Schulz Electric Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 548742020-03-06T04:00:000Start date: 6 March 2020 04:00:00 Site: Nine Mile Point Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 545192020-02-03T05:00:000Start date: 3 February 2020 05:00:00 Site: C&D Technologies, Inc. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 545062020-01-31T06:00:000Start date: 31 January 2020 06:00:00 Site: Fairbanks Morse Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 544852020-01-21T05:00:000Start date: 21 January 2020 05:00:00 Site: Curtiss Wright Flow Control Co. Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 544672020-01-08T05:00:000Start date: 8 January 2020 05:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 547672020-01-01T04:00:000Start date: 1 January 2020 04:00:00 Site: Piezotech, Llc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 544762019-12-27T05:00:000Start date: 27 December 2019 05:00:00 Site: United Controls International Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 544402019-12-12T05:00:000Start date: 12 December 2019 05:00:00 Site: Westinghouse Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 544352019-10-17T08:00:000Start date: 17 October 2019 08:00:00 Site: General Atomics Electromagnetic Systems Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 543062019-10-01T21:30:000Start date: 1 October 2019 21:30:00 Site: Curtis Wright Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 543012019-09-30T04:00:000Start date: 30 September 2019 04:00:00 Site: Flowserve Us Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 543502019-09-06T04:00:000Start date: 6 September 2019 04:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 543452019-09-04T05:00:000Start date: 4 September 2019 05:00:00 Site: Curtiss-Wright Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 542382019-08-23T05:00:000Start date: 23 August 2019 05:00:00 Site: Fisher Controls International Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 542362019-08-22T04:00:000Start date: 22 August 2019 04:00:00 Site: Engine Systems, Inc Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 542152019-08-12T04:00:000Start date: 12 August 2019 04:00:00 Site: Flowserve Flow Control Division Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 542062019-08-05T22:19:000Start date: 5 August 2019 22:19:00 Site: Spectrum Technologies Reporting criterion: 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
[Table view] |