ENS 54350
ENS Event | |
---|---|
04:00 Sep 6, 2019 | |
Title | Part 21 - Emd Fuel Injectors Seized Plunger and Bushing |
Event Description | The following is a summary of information that was received via facsimile:
Engine Systems, Inc. (ESI) was notified by a nuclear customer that three of 20 recently installed fuel injectors seized after a short amount of engine run time. Examination of the plunger and bushing (P&B) from each injector identified particles consistent with the base material of the P&B embedded in the scar marks associated with seizures. The root cause of the seizures is attributed to residual machining debris from the manufacturing process. This batch of injectors had been refurbished in 2013 and the P&Bs were replaced as part of the rework activity. These part number mechanical unit fuel injectors are used on various model EMD 645 diesel engines. The engine utilizes one injector per cylinder; therefore, failure of one injector will render the associated cylinder inoperable. An EMD 645 engine will typically tolerate one inoperable cylinder and maintain rated load; however, multiple inoperable cylinders (as in the case of multiple fuel injectors) will further decrease engine output and likely prevent the engine from carrying out its required load. This adversely affects the ability of the emergency diesel generator set to perform its safety-related function. This issue only applies to injectors in inventory that have not been installed, which should be returned to ESI. For injectors that have been installed in an engine and have accumulated more than two hours of run time, then the injector is not susceptible to seizure from this type of issue and no further action is required. It has been shown that P&B seizures related to foreign material occur within the first two hours of engine operation. The affected part numbers are 40084714, 40084715, 40084720, 40084724, 40084725, 40099335, 5228895-RR, 5229250-RR, 5229315-RR, 5229325-RR, 40084714-RR, 40084720-RR, 40084723-RR, 40084724-RR, 40099335-RR. A list of affected customers by injector part number is contained in Appendix A of the Part 21 report, which include Crystal River, Turkey Point, Exelon Generation Company, Beaver Valley, Watts Bar, Clinton, Saint Lucie, Sequoyah, Cooper, Southern California Edison, Davis-Besse, Oconee, Point Beach, Kewaunee, Dresden, Surry, GE Company, Browns Ferry, Energy Northwest, Oyster Creek, Arkansas Nuclear One, Monticello, Nine Mile Point, Entergy Operations Inc., Tennessee Valley Authority, LaSalle, Perry, Quad Cities, Fitzpatrick, and River Bend. |
Where | |
---|---|
Engine Systems, Inc Rocky Mount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1165.07 h48.545 days <br />6.935 weeks <br />1.596 months <br />) | |
Opened: | Dan Roberts 17:04 Oct 24, 2019 |
NRC Officer: | Caty Nolan |
Last Updated: | Oct 24, 2019 |
54350 - NRC Website | |
Engine Systems, Inc with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 565382023-03-28T04:00:00028 March 2023 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Emergency Diesel Generator Governor ENS 556052021-11-09T17:00:0009 November 2021 17:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Hinge Pin Retainer Plug Defective on Diesel Check Valve ENS 555312021-08-20T16:00:00020 August 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Pressure Regulator Valve Failure ENS 553472021-05-11T16:00:00011 May 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified Loose Zinc Anodes Installed in Heat Exchangers for Diesel Generators ENS 544672020-01-08T05:00:0008 January 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Inadequate Selenium Surge Suppressor Thread Modification ENS 543502019-09-06T04:00:0006 September 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emd Fuel Injectors Seized Plunger and Bushing ENS 542362019-08-22T04:00:00022 August 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Cracked Spray Tip on Emd Fuel Injector ENS 537632018-11-30T05:00:00030 November 2018 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect En Revision Imported Date 12/24/2018 ENS 536002018-07-19T04:00:00019 July 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Motor Operated Potentiometer Defect ENS 533022018-02-01T04:00:0001 February 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Refurbished Pressure Regulator May Result in Emergency Diesel Generator Failure to Start ENS 527982017-06-08T04:00:0008 June 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Defective Motor Operated Potentiometer ENS 524662016-12-21T05:00:00021 December 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Issues Identified with the Enterprise Diesel Engine Subcover ENS 524772016-11-12T05:00:00012 November 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Seizure of Fuel Injector on Emergency Diesel Generator ENS 511292015-06-05T22:12:0005 June 2015 22:12:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ENS 489602013-04-19T04:00:00019 April 2013 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Esi Refurbished Emergency Diesel Generator Cylinder Heads May Have Valve Keeper Seals Missing ENS 485642012-12-06T05:00:0006 December 2012 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Esi Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port 2023-03-28T04:00:00 | |