Title | Part 21 Report - Defective Relay Identified During PRE-INSTALLATION Testing |
Event Description | The following information was provided by NextEra Energy Point Beach, LLC (NextEra) via phone and email:
NextEra makes the following notification under 10 CFR 21.21(d)(3)(i) of a defect found in a Westinghouse relay, model NBFD31S, during pre-installation bench testing. Specifically, the relay was found to not function as required due to its internal plunger not operating properly. This malfunctioning caused the plunger to not fully extend and cause the normally open contacts to remain closed. Investigations completed by Westinghouse determined that the plunger would not function properly because its kickout spring was misaligned due to human error. This relay was procured from Westinghouse for safety related nuclear applications. NextEra has concluded that this defect constitutes a substantial safety hazard (SSH). A SSH exists because of the nature of the defect was such that the relay would not be able to perform its safety function if installed, and would result in a loss of redundancy in a safety related system, in this case, the reactor protection system. On September 17, 2024, the Point Beach Site Vice President was notified of the requirement to report this event under 10 CFR 21.21. This is a non-emergency notification required by 10 CFR 21.21(d)(3)(i). A written notification in accordance with 10 CFR 21.21(d)(3(ii) will be provided within 30 days. Since this defect was discovered prior to installation, in accordance with station requirements for bench testing, and the vendor has concluded that this event is an isolated case, there were no actual impacts on safety related equipment. The NRC Resident Inspector has been notified. The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: Responsible corporate officer: Michael Durbin Site Vice President (920) 755-7854 |
Where | |
---|---|
Point Beach Wisconsin (NRC Region 3) | |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+32.5 h1.354 days <br />0.193 weeks <br />0.0445 months <br />) | |
Opened: | Bob Murrell 13:30 Sep 18, 2024 |
NRC Officer: | Robert A. Thompson |
Last Updated: | Sep 18, 2024 |
57330 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57330\u003C/a\u003E - \u003Ca href=\"/Point_Beach\" title=\"Point Beach\"\u003EPoint Beach\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPart 21 Report - Defective Relay Identified During PRE-INSTALLATION Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57330 - Point Beach\n","link":"","lat":44.280972222222225,"lon":-87.53674444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (96 %) |
After | Power Operation (96 %) |