Title | Part 21 Initial Report - Deviation Identified Loose Zinc Anodes Installed in Heat Exchangers for Diesel Generators |
Event Description | The following is a summary of the defect described in an initial report received from the vendor via facsimile:
The vendor notified the NRC of a defect involving two instances of loose or dislodged zinc anodes (P/N 1335BEM2P) supplied by the vendor. The anodes are installed in the cooling water enter and exit and return channels of the jacket water heat exchanger of the emergency diesel generator. Each heat exchanger contains eight zinc anode assemblies that consist of a zinc rod threaded into a steel pipe plug. The zinc acts as a sacrificial anode to protect the pressure boundary metals from degradation due to galvanic corrosion. In the case of a loose or dislodged zinc anode, the zinc rod may become foreign material that remains trapped in the vessel, potentially impacting and damaging the tube ends where they project from the tube sheet. Alternatively, an anode located in the exit channel may by carried away from the heat exchanger and potentially damage downstream components. The corrective action being recommended are as follows: It is recommended to perform an inspection to verify tightness at the zinc rod to pipe plug interface. The rod should be threaded into the pipe plug snug tight and, if required, may be tightened to a maximum of 15 ft-lbs. If desired, the zinc rod may be removed and eliminated from the assembly leaving only the steel pipe plug. Inclusion of the zinc anode is not required for the EDG heat exchanger application at TVA-Browns Ferry. This component was supplied to the Browns Ferry Nuclear Power Plant. Point of contact: Dan Roberts Quality Manager Engine Systems Inc. 175 Freight Rd. Rocky Mount, NC 27804 (252) 977-2720 |
Where | |
---|---|
Engine Systems, Inc Rocky Mt., North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1415.38 h58.974 days <br />8.425 weeks <br />1.939 months <br />) | |
Opened: | Dan Roberts 15:23 Jul 9, 2021 |
NRC Officer: | Brian P. Smith |
Last Updated: | Jul 9, 2021 |
55347 - NRC Website | |
Engine Systems, Inc with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 565382023-03-28T04:00:00028 March 2023 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Emergency Diesel Generator Governor ENS 556052021-11-09T17:00:0009 November 2021 17:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Hinge Pin Retainer Plug Defective on Diesel Check Valve ENS 555312021-08-20T16:00:00020 August 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Pressure Regulator Valve Failure ENS 553472021-05-11T16:00:00011 May 2021 16:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified Loose Zinc Anodes Installed in Heat Exchangers for Diesel Generators ENS 544672020-01-08T05:00:0008 January 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Inadequate Selenium Surge Suppressor Thread Modification ENS 543502019-09-06T04:00:0006 September 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emd Fuel Injectors Seized Plunger and Bushing ENS 542362019-08-22T04:00:00022 August 2019 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Cracked Spray Tip on Emd Fuel Injector ENS 537632018-11-30T05:00:00030 November 2018 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect En Revision Imported Date 12/24/2018 ENS 536002018-07-19T04:00:00019 July 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Motor Operated Potentiometer Defect ENS 533022018-02-01T04:00:0001 February 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Refurbished Pressure Regulator May Result in Emergency Diesel Generator Failure to Start ENS 527982017-06-08T04:00:0008 June 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Defective Motor Operated Potentiometer ENS 524662016-12-21T05:00:00021 December 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Issues Identified with the Enterprise Diesel Engine Subcover ENS 524772016-11-12T05:00:00012 November 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Seizure of Fuel Injector on Emergency Diesel Generator ENS 511292015-06-05T22:12:0005 June 2015 22:12:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ENS 489602013-04-19T04:00:00019 April 2013 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Esi Refurbished Emergency Diesel Generator Cylinder Heads May Have Valve Keeper Seals Missing ENS 485642012-12-06T05:00:0006 December 2012 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Esi Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port 2023-03-28T04:00:00 | |