ENS 56899
ENS Event | |
---|---|
06:00 Dec 18, 2023 | |
Title | Initial Part 21 Report - Deficient Fuel Injectors |
Event Description | The following is a synopsis of information was provided by the licensee via phone and email:
Pursuant to 10 CFR 21.21(d)(3)(i), Paragon provided initial notification of a defect associated with the auxiliary feedwater pump diesel engine fuel injectors supplied to Constellation. The injectors were provided to Paragon for refurbishment. Constellation provided Paragon with root cause report # 4703982 on November 12, 2023. The associated failure analysis report documented potential defects with some fuel injectors supplied to Braidwood. These reported deficiencies allowed excessive fuel oil leakage which resulted in diesel lubricating oil system contamination above specified limits. Paragon concluded their evaluation on December 18, 2023, which determined that this condition, if left uncorrected, could contribute to a substantial safety hazard and is reportable in accordance with 10 CFR Part 21. The extent of condition is limited to the Constellation Braidwood and Byron plants. Paragon has entered this condition in their corrective action program. Affected injectors at Braidwood have been removed from service and returned to Paragon. Paragon is coordinating with Byron on recommended actions and will follow up with a final notification on or before 1/17/2024.
Paragon Energy Solutions submitted a final report for this event. Notified R3DO (Orlikowski), R4DO (Josey), and Part 21 (email). |
Where | |
---|---|
Paragon Energy Solutions Fort Worth, Texas (NRC Region 3) | |
Organization: | Paragon Energy Solutions |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+35.57 h1.482 days <br />0.212 weeks <br />0.0487 months <br />) | |
Opened: | Richard Knott 17:34 Dec 19, 2023 |
NRC Officer: | Natalie Starfish |
Last Updated: | Jan 17, 2024 |
56899 - NRC Website | |
Paragon Energy Solutions with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 571432024-05-09T04:00:0009 May 2024 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect with Emergency Diesel Generator Voltage Regulator ENS 568992023-12-18T06:00:00018 December 2023 06:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Initial Part 21 Report - Deficient Fuel Injectors ENS 566532023-08-03T00:00:0003 August 2023 00:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Initial Part 21 Report - Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors ENS 563872023-01-29T06:00:00029 January 2023 06:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Automatic Transfer Switch ENS 554972021-09-03T05:00:0003 September 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Deviation in DC-DC Converter Rectifiers in Inverter Assemblies ENS 553002021-06-08T05:00:0008 June 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified in Bolting Utilized to Maintain Seismic Qualification: ENS 552232021-03-29T05:00:00029 March 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Failure of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ENS 547342020-06-01T05:00:0001 June 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failure of Size 1 and 2 Freedom Series Auxiliary Contacts ENS 547602020-06-01T05:00:0001 June 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect 2024-05-09T04:00:00 | |