The following is a summary of information received via email from Monticello Nuclear Generating Plant (
MNGP):
On March 9, 2021, GE Hitachi (GEH) issued Safety Communication SC 21-02 for PRC 21-02, Transfer of Information, Revision 0, pursuant to 10 CFR 21.21(b). Monticello Nuclear Generating Plant (MNGP) was listed as a potentially affected plant. This is a deviation from the Power Range Nuclear Monitor (PRNM) Licensing Topical Report, NEDC 32410P-A.
On May 5, 2021, MNGP completed an evaluation of this deviation and concluded this condition represents a substantial safety hazard in that the condition could result in an Average Power Range Monitoring (APRM) flux reading either below or above the Technical Specification (plus/minus) 2% band. The condition is a defect that is reportable pursuant to 10 CFR 21.21(d)(4).
The GEH NUMAC PRNMS was installed in 2009 with System Part No. 299X739NF.
Name and Address of the Individual or Individuals Informing the Commission:
Thomas A. Conboy,
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company - Minnesota
2807 West County Road 75
Monticello, MN 55362
The licensee notified the NRC Resident Inspector.