| Title | Initial Part 21 Report - Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors |
| Event Description | The following information was provided by Paragon Energy Solutions, LLC via email:
Pursuant to 10 CFR 21.21(d)(3)(i), Paragon Energy Solutions, LLC is providing this initial notification of a potential defect with Eaton/Cutler Hammer size 4 and 5 freedom series contactors that have been modified to include either a special coil and/or to improve the securing of shading coils. These contactors may have been supplied integral to a motor control center (MCC) cubicle or as spare parts. This condition, if left uncorrected, could potentially cause a substantial safety hazard. Paragon completed an initial evaluation of a failure of a size 4 freedom series contactor (PN: NLI-CN15NN3A-T16-MOD-M) supplied to Perry Nuclear Power Plant. The reported failure occurred 26 days following installation into its associated MCC Cubicle. Perry identified the screws holding the contact bar to the push bars had fallen out and were laying in the bottom of the molded base. This allowed the movable contact bar to sit on the stationary contacts and significantly degrade due to arcing and then fail in the energized position. This condition could prevent the contactor from performing its safety function to either energize or de-energize the attached load. The loose hardware is most likely a workmanship error since the contactor must be disassembled to complete the special coil and RTV modifications to the shading coils. In the fully re-assembled condition, inspection of this hardware for tightness is not possible. Affected plants: North Anna, Turkey Point, Harris, and Perry.
Paragon Energy Solutions submitted their final report in accordance with 10 CFR 21.21(d)(4). Paragon reported completion of corrective actions including revising the test inspection procedure to ensure hardware tightness during contactor reassembly, identifying all projects containing the affected contactors and verifying appropriate inspections have been completed, restricted use of test inspection procedures issued prior to 8/2/2023 until a formal review is completed, and issued a technical bulletin (TB-Starter-2023-01 Rev 0) for use by affected clients. Paragon recommends affected licensees perform the steps contained in Technical Bulletin TB-Starter-2023-01 Rev 0 to verify this condition is not present as part of their next routine maintenance outage associated with the affected in use equipment, and at the earliest opportunity for stock spares. Affected plants: North Anna, Turkey Point, Harris, and Perry. Notified R2DO ( Miller), R3DO (Skokowski), and Part 21/50.55 Group via email. |
| Where | |
|---|---|
| Paragon Energy Solutions (NRC Region 2) | |
| Organization: | Paragon Energy Solutions |
| Reporting | |
| 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
| Time - Person (Reporting Time:+17.08 h0.712 days <br />0.102 weeks <br />0.0234 months <br />) | |
| Opened: | Richard Knott 17:05 Aug 3, 2023 |
| NRC Officer: | Bill Gott |
| Last Updated: | Aug 25, 2023 |
| 56653 - NRC Website | |
Paragon Energy Solutions with 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component, 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 579812025-10-09T05:00:0009 October 2025 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ≪Br≫≪Br≫ ENS 571432024-05-09T04:00:0009 May 2024 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect with Emergency Diesel Generator Voltage Regulator ENS 570792024-02-15T05:00:00015 February 2024 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Initial Part 21 Report - Potential Defect with Circuit Breaker ENS 568992023-12-18T06:00:00018 December 2023 06:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Initial Part 21 Report - Deficient Fuel Injectors ENS 566532023-08-03T00:00:0003 August 2023 00:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Initial Part 21 Report - Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors ENS 565572023-04-05T04:00:0005 April 2023 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Relay Card Potential Defect ENS 563872023-01-29T06:00:00029 January 2023 06:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Automatic Transfer Switch ENS 554972021-09-03T05:00:0003 September 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Deviation in DC-DC Converter Rectifiers in Inverter Assemblies ENS 553002021-06-08T05:00:0008 June 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified in Bolting Utilized to Maintain Seismic Qualification: ENS 551622021-03-30T21:50:00030 March 2021 21:50:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Failure of Size 1 and 2 Freedom Series Fvr Starters ENS 552232021-03-29T05:00:00029 March 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Failure of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ENS 547342020-06-01T05:00:0001 June 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failure of Size 1 and 2 Freedom Series Auxiliary Contacts ENS 547602020-06-01T05:00:0001 June 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect ENS 530022017-10-06T04:00:0006 October 2017 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Interim Report - Switch with Unacceptable Chatter 2025-10-09T05:00:00 | |