10 CFR 70.50(b)(3)
From kanterella
Jump to navigation
Jump to search
v
t
e
Reporting criterion
10 CFR 70.50#b3
(
24 hours
1 days <br />0.143 weeks <br />0.0329 months <br />
)
10 CFR 50.72
10 CFR 50.72(a)(1)(i), Emergency Class Declaration
10 CFR 50.72(b)(1), 50.54(x) TS Deviation
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
10 CFR 50.72(b)(2)(iv)(A), ECCS System Actuation
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge
10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition
10 CFR 50.72(b)(3)(iv)(A), System Actuation
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor
10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
10 CFR 50.72(b)(3)(v), Loss of Safety Function
10 CFR 50.72(b)(3)(xii), Transport of a Contaminated Person Offsite
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
10 CFR 50.73
10 CFR 50.73(a)(1), Submit an LER
10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown
10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
10 CFR 50.73(a)(2)(i)(C), 50.54(x) TS Deviation
10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded
10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
10 CFR 50.73(a)(2)(iv)(A), System Actuation
10 CFR 50.73(a)(2)(iv), System Actuation
10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System
10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor
10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat
10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material
10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
10 CFR 50.73(a)(2)(v), Loss of Safety Function
10 CFR 50.73(a)(2)(vii), Common Cause Inoperability
10 CFR 72
10 CFR 72.75(b)(2), Offsite Notification
10 CFR 72.75(c)(1), ISFSI Defect
10 CFR 72.75(c)(2), ISFSI Degradation
10 CFR 72.75(d)(1), ISFSI Safety System Functional Failure
10 CFR 73
10 CFR 73.71(b)(1), Safeguards Event
10 CFR 73.77, Cyber security event notifications
Fitness for Duty
10 CFR 26.719, Reporting requirements
Blind Performance Test
10 CFR 26.719(c)(2)
, false positive
10 CFR 26.719(c)(3)
, false negative
10 CFR 26.719(c)(1)
, 30 day report
Other
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
10 CFR 70.50(a)
, SNM protective actions prevented
10 CFR 70.50(b)(1)
, SNM unplanned contamination
10 CFR 70.50(b)(2)
, SNM equipment failure
10 CFR 70.50(b)(3)
, SNM medical treatment
10 CFR 70.50(b)(4)
, SNM fire or explosion
All reporting criteria
WEEK
MONTH
YEAR
ENS 57152
2024-05-30T08:30:00
0
Start date
: 30 May 2024 08:30:00
Site
:
Westinghouse Electric Corporation
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 55634
2021-12-08T15:45:00
0
Start date
: 8 December 2021 15:45:00
Site
:
Framatome ANP Richland
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 55412
2021-08-17T06:30:00
0
Start date
: 17 August 2021 06:30:00
Site
:
Westinghouse Electric Corporation
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 54901
2020-09-15T13:00:00
0
Start date
: 15 September 2020 13:00:00
Site
:
Westinghouse Electric Corporation
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 54801
2020-07-25T15:00:00
0
Start date
: 25 July 2020 15:00:00
Site
:
Westinghouse Electric Corporation
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 53746
2018-11-19T05:00:00
0
Start date
: 19 November 2018 05:00:00
Site
:
Westinghouse Electric Corporation
Reporting criterion
:
Part 70 App A (C)
,
10 CFR 70.50(b)(3)
ENS 50912
2015-03-20T16:30:00
0
Start date
: 20 March 2015 16:30:00
Site
:
Nuclear Fuel Services Inc.
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 50260
2013-10-17T16:15:00
0
Start date
: 17 October 2013 16:15:00
Site
:
Nuclear Fuel Services Inc.
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 47861
2012-04-24T02:00:00
0
Start date
: 24 April 2012 02:00:00
Site
:
Westinghouse Electric Corporation
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 47620
2012-01-23T15:40:00
0
Start date
: 23 January 2012 15:40:00
Site
:
Nuclear Fuel Services Inc.
Reporting criterion
:
10 CFR 70.50(b)(3)
ENS 44848
2009-02-12T17:15:00
0
Start date
: 12 February 2009 17:15:00
Site
:
Nuclear Fuel Services Inc.
Reporting criterion
:
10 CFR 70.50(b)(3)
[Table view]
NUREG-1022, Event Reporting Guidelines for 10 CFR 50.72 and 10 CFR 50.73
Category
:
Reporting criterion
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties