Forwards LER 98-005-01 Re Violation of Tech Spec 3.6.5.3,due to Inoperability of Condenser Inlet Doors,Caused by Ice/ Frost Buildup Restricting Door Movement.Ler Has Been Revised to Perform More Limited Direct Visual Insp
ML20207F481
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 03/02/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207F485 List:
References
NUDOCS 9903110256
Download: ML20207F481 (2)


LER-2098-005, Forwards LER 98-005-01 Re Violation of Tech Spec 3.6.5.3,due to Inoperability of Condenser Inlet Doors,Caused by Ice/ Frost Buildup Restricting Door Movement.Ler Has Been Revised to Perform More Limited Direct Visual Insp
Event date:
Report date:
4142098005R00 - NRC Website

text

, , i. e a -

Gt ba N I a Sta 4800 Concord Road York, SC 29745 Gary R. Itierson .

(803) 8314251 mm na ggg,, , (803) 831-3426 Mx March 2, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation Catawba Nuclear Station, Unit 2 Docket No. 50-414 Licensee Event Report 414/98-005, Revision 1  ;

Please find attached Revision 1 to Licensee Event Report 414/98-005 concerning violation of Technical Specificatie." 3.6.5.3 due to the inoperability of the ice condenser inlet doors caused by ice / frost buildup restricting door movement.

The original LER contained a commitment to perform a remote visual inspection of the Unit 1 beam coolers to verify no  ;

detrimental ice / frost buildup. This inspection was to be done  !

prior to the upcoming Unit 1 End of Cycle 11 (1EOC11) refueling outage. As part of the pre-inspection planning, it was determined that a meaningful inspection, to accurately assess the extent of any ice / frost buildup on the beam coolers and whether ,

any observed ice / frost would actually interfere with ice l condenser lower inlet door opening, could not be done remotely. i Accordingly, the LER has been revised to perform a more limited direct visual inspection.

If there are questions on this revised report, contact G. A. Copp at (803) 831-3622.

This event is considered to be of no significance with respect to the health and safety of the public.

Sincerely, t

  1. N ,

Gary Peterson

/

Attachment Q-9903110256 990302 PDR ADOCK 05000414 '$

IT '

b S PDR ;;.

B

U.S. Nuclocr Regulatory Commission March 2, 1999 Page 2 cc: Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303 Mr..P. S. Tam U.S.. Nuclear. Regulatory Commission Mail Stop O-14 H25 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Darrell Roberts NRC Senior Resident Inspector '

Catawba Nuclear Station r

INPO Records Center 700 Galleria Place. i Atlanta, GA 30339-5957 Marsh & McLennan Inc.

l Mr._Kenneth W. Gannaway l

100 N. Tryon Street 3

l Charlotte, NC 28202 >

1

'l>

I l

I I L

L q

l 1

l 1

f l

i I

.