05000413/LER-1999-005, Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429

From kanterella
Jump to navigation Jump to search
Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429
ML20205Q382
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 04/15/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205Q386 List:
References
NUDOCS 9904210194
Download: ML20205Q382 (2)


LER-2099-005, Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429
Event date:
Report date:
4132099005R00 - NRC Website

text

I l

  • Duks En::rgy C:rpor;tlin ,

F# Energy. Catawba Nudear Station 4800 concora noaa York, SC 29745 l

Gary R. Pderson (803) 831-4231 omcE l

Vice 1%ident (803) 831-3426 Mx }

ll April 15, 1999 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Duke Energy Corporation Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414 Licensee Event Report 413/1999-005-00 Attached please find Licensee Event Repor.t 413/1999-005-00 entitled Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing Technical Specification Non-compliance. The root cause and long term corrective actions for this occurrence are being finalized and will be reported in a supplement to this report. The expected submittal date for the supplemental report is April I 29, 1999.

L Questions regarding this Licensee Event Report should be /j directed to M. H. Chernoff at (803) 831-3414. l

/f j l i Sin ly, i

^

/

fM.

G. Peterson l '31/

Attachment

~

9904210194 990415 PDR ADOCK 05000413 S PDR -

20U00

f.

l

g. .

, U.S. Nuclear Regulatory Commission l April 15,4 1999 l Page 2 l

l xc:

l L. A. Reyes U. S. Nuclear Regulatory Commission Regional Administrator, Region II l Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 4

l P. S. Tam NRC Senior Project Manager (CNS)

U. S. Nuclear Regulatory Commission Mail Stop O-14H25 Washington, DC 20555-0001 D. J. Roberts Senior Resident Inspector (CNS)

U. S. Nuclear Regulatory Commission !

Catawba Nuclear Site 1

l 1

l .

! 2 l

l l