Regarding High Pressure Coolant Injection System Inoperable
ML16279A359
Person / Time
Site: Hope Creek 
Issue date: 10/05/2016
From: Casulli E
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N16-0178 LER 16-002-00
Download: ML16279A359 (6)


LER-2016-002, Regarding High Pressure Coolant Injection System Inoperable
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3542016002R00 - NRC Website

text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 t>SI~<i LR-N16-0178 OCT U5 2016 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Hope Creek Generating Station Unit 1 Renewed Facility Operating License No. NPF-57 Docket No. 50-354 Nuclear LLC 10CFR50.73

Subject:

Licensee Event Report 2016-002-00, High Pressure Coolant Injection System Inoperable.

In accordance with the requirements of 10 CFR 50.73(a)(2)(v)(D), and 10 CFR 50.73 (a)(2)(i)(B), PSEG Nuclear LLC is submitting the enclosed Licensee Event Report (LER)

Number 2016-002-00, High Pressure Coolant Injection System Inoperable.

If you have any questions or require additional information, please contact Mr. Thomas MacEwen at (856) 339-1097.

There are no regulatory commitments contained in this letter.

Sincerely, Edward T Casulli Plant Manager Hope Creek Generating Station ttm Attachment: Licensee Event Report 2016-002-00

LR-N16-0178 Page 2 Document Control Desk cc:

Mr. Daniel Dorman, Regional Administrator-Region I, NRC Ms. Carleen Parker, Project Manager-US NRC 10CFR50.73 Mr. Justin Hawkins, NRC Senior Resident Inspector-Hope Creek (X24)

Mr. Patrick Mulligan, Manager IV, NJBNE Mr. Thomas MacEwen, Hope Creek Commitment Tracking Coordinator (H02)

Mr. Lee Marabella-Corporate Commitment Tracking Coordinator (N21)

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 01/31/2017 (02-2014)

~At!~~"\\

, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

6. LERNUMBER I

SEQUENTIAL NUMBER YEAR 2016

  • 002 I

REVISION NUMBER

. 000

3. PAGE 4 OF4 The insulation around the turbine bearings had been repositioned to reduce the possibility of moisture intrusion in to the HPCI control oil.

Other corrective actions may be developed as a result of the cause evaluation.

COMMITMENTS

This LER contains no regulatory commitments.