Informs of Extension of Completion Date for Changing Abnormal Operating Procedures & Emergency Operating Procedures to Resolve Containment Penetration M-3 Potential Leak Path Issue,Per 910306 LER 91-003
ML20073P868
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/10/1991
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-91-161R, NUDOCS 9105230232
Download: ML20073P868 (1)


LER-2091-003, Informs of Extension of Completion Date for Changing Abnormal Operating Procedures & Emergency Operating Procedures to Resolve Containment Penetration M-3 Potential Leak Path Issue,Per 910306 LER 91-003
Event date:
Report date:
2852091003R00 - NRC Website

text

- - .. -. . - . . - - _ . . . - . . ... . . . - - .s- , , = = - _

'<ff[f ,' ,'

N'

~

, . ' .  ;. ' _A .' ;,'- I . ' ' - .'. I(l' . lf,

~

p. . . .

Omaha Public Power District May 10, 1991 444 South 16th Street Mall LiC-91-161R Omah1 Nebraska 68102 2247 402/63Cr2000 U. S. Nuclear Regulatory Commission Attn: Document Control Desk i* ail Station Pl-137 Washington, DC 20555

References:

1. Docket No. 50-285
2. LER 91-003 dated March 6, 1991 (LIC-91-0009)

Gentlemen:

SUBJECT:

Extension of Completion Date for Changing Abnormal Operating Procedures (AOPs) and Emergency Operating Procedures (E0Ps) to Resolve Containment Penetration M-3 Potential Leak Path Issue In Reference 2, Omaha Public Power District (0 PPD) notified the NRC that containment penetration M-3 was outside the design basis specified in a Safety Evaluation Report which allowed exclusion from Type C testing required by 10 CFR 50 Appendix J. One of the commitments OPPD made to resolve this issue was to change the appropriate A0Ps and E0Ps by May 15, 1991. However, it has been determined that additional engineering analyses must be performed in support of the 10 CFR 50.59 safe +y evaluation before the A0P/E0P changes can be completed, i

These additional analyses include an evaluation by ABB Combustion Engineering l of the impact of the proposed changes on the loss-of-Coolant Accident (LOCA) analysis. OPPD anticipates that the additional engineering analyses will be completed by May 31, 1991. Therefore, OPPD must extend the completior, date to July 15, 1991 to incorperate results from the analyses and complete the verification, validation and procedure issuance processes.

I l If you should have any questions, please contact me.

1 Sincerely,

b. N ?&