Title | Inadequate Design Inputs into Safety Injection Piping Stress Calculation |
Description | A non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, was identified involving the failure to implement appropriate design control measures associated with a safety-related pipe stress calculation. Specifically, several unverified and potentially non-conservative inputs were identified associated with Calculation FC07240 used to analyze stresses on a pipe reduction tee in the safety injection system. The licensee entered this issue into the corrective action program as Condition Report 2014-09098 and initiated action to update Calculation FC07240. This performance deficiency was more than minor, and therefore a finding, because it affected the design control attribute of the Mitigating Systems Cornerstone objective to ensure the availability, reliability, and capability of components that respond to initiating events. The NRC performed an initial screening of the finding in accordance with NRC Manual Chapter IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, dated July 1, 2012, this finding is of very low safety significance (Green) because it: (1) was not a deficiency affecting the design or qualification of a mitigating system; (2) did not represent a loss of system and/or function; (3) did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) does not represent an actual loss of function of one or more nontechnical specification trains of equipment designated as high safety-significant in accordance with the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This finding has a cross-cutting aspect in the area of human performance in that the licensee failed to apply the appropriate rigor when evaluating the overstressed pipe union tee. |
Site: | Fort Calhoun ![]() |
---|---|
Report | IR 05000285/2014009 Section 4OA2 |
Date counted | Sep 30, 2014 (2014Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Vegel B Davis B Hagar C Henderson C Smith D Holman E Coffman G Khouri G Warnick I Anchondo J Groom J Mateychick M Williams W Deschaine |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |