Forwards LER 96-016-00 Re Discovery of as-found Lift Pressure for Unit 2 Pressurizer Safety Valve 2RC-434 Which Exceeded Max Lift Pressure Allowed by ASME Code.Delay in Submittal of LER Due to Failure of Administrative Processes
ML20217K720
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/24/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K722 List:
References
NPL-97-0684, NPL-97-684, NUDOCS 9710290092
Download: ML20217K720 (2)


LER-2096-016, Forwards LER 96-016-00 Re Discovery of as-found Lift Pressure for Unit 2 Pressurizer Safety Valve 2RC-434 Which Exceeded Max Lift Pressure Allowed by ASME Code.Delay in Submittal of LER Due to Failure of Administrative Processes
Event date:
Report date:
2662096016R00 - NRC Website

text

l Wisconsin

' Electnc.

POWER COMPANY Point Booch Nuclear Pkant (92o) 755-2321 6610 Nuclear Rd., Two Rtvers, WI $4241 NPL 97-0684 October 24,1997 Document Control Desk U.S. NUCLEAlt REGULATORY COMMISSION ,

Mail Station PI-137 Washington, D. C. 20555 Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 LICENSEE EVENT REPORT 96-016-00 PRESSURIZER SAFETY VALVE LIFT SETPOINT OUT OF TOLERANCE DUE TO TEMPERATURE EFFECTS POINT BEACH NUCLEAR PL ANT. UNITS 1 AND 2 Enclosed is Licensee Event Report (LER) 96-016-00 for Point Beach Nuclear Plant, Units I and 2.

This report is provided in accordance with 10 CFR 50.73(a)(2)(ii)(B),"a condition that was outside the design basis of the plant." This report describes the discovery that the as-found lift pressure for Unit 2 pressurizer safety valve 2RC-434 exceeded the maximum lift pressure allowed by the ASME Code due in part to ambient temperature errors imposed during testing. The Code allows a maximum as-found lift setting of 103 percent of the nominal pressure setting. The as-found value represented approximately 103.2 percent of the nominal pressure setting. Therefore,2RC-434 was considered inoperable per the A 9ME criterion. These ambient temperature errors were also applied to the Unit I pressurizer safety valves.

This LER was not submitted within the 30-day requirement of 10 CFR 50.73 due to a failure of our administrative processes which evaluate and assign potentially-reportable issues. We will be evaluating these administrative processes and implementing programmatic improvements as necessary.

gw

.c 0101' >

fi 9710290092 971024 PDR ADOCK 05000266 S PDR UH@iR!allIR.sg

- -->na,-

Y. ,.

_,- * .* p-

  • - _- NPL 97-684 Pcge 2, _

l New commitments within the repon are indicated in italles.-

Please contact us if you require additional information.

-s l '

Sincerely, l .. -

' T (__n_

nQ .

D. F. Johnson - ,

Manager: .

-Regniatory Services & Licensing GDA/ lad '

' Enclosure cc: NRC Resident inspector i

NRC Regional Administrator PSCW.

INPO Support Services 9

4 2-J a

o i

i '

T 5 :.

s

.