05000260/LER-1982-010, Corrected LER 82-010/03L-0 on 811021,during Full Power,Avg Power Range Monitor Output Signal Calibr Was Not Performed within Required Frequency During 811014-28.Caused by Personnel Error.Personnel Instructed to Be More Careful

From kanterella
Jump to navigation Jump to search
Corrected LER 82-010/03L-0 on 811021,during Full Power,Avg Power Range Monitor Output Signal Calibr Was Not Performed within Required Frequency During 811014-28.Caused by Personnel Error.Personnel Instructed to Be More Careful
ML20063C329
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/04/1982
From: Little G
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20063C288 List:
References
LER-82-010-03L-03, LER-82-10-3L-3, NUDOCS 8205040687
Download: ML20063C329 (2)


LER-2082-010, Corrected LER 82-010/03L-0 on 811021,during Full Power,Avg Power Range Monitor Output Signal Calibr Was Not Performed within Required Frequency During 811014-28.Caused by Personnel Error.Personnel Instructed to Be More Careful
Event date:
Report date:
2602082010R00 - NRC Website

text

--

'l>

,. LICENSEE EVENT REPORT

, ~.

CoNinot atoCx: 1 1

] l 1 l l 6

l@ (PLEASE PRINT OR TYPE ALL REQUtnED INFORMATION) ilil 8l f?Al LlUCENSEE Bl RlCOOE Fl 2lh! n l n ! ! n UCENGh l n l n**W.*JtR

! n l n ! _ l0 lL 0 fh a l1 2G l1 l1 11 !hlS i. CA! T tdl@

LICEf.5E T YPE #J i4 15 O*;* T el8I 68 5N'E60d lOl5}.0l0l0l216IOl@l1 6: DOCK ET NUSEH Gd lnI9 11 I a 11 l@l013lO!418 l 2'l@

69 E% ENT D ATE F4 15 REPCrtT D t.TE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h RT li 1 R 9 (nveraee Dower rnnen I sl2l l_Durine normn1 oger. uith unie ? ne full n nu ai-g ; monitor output signal calibration) was not performed withit3Jhe _ reauired_ frequency.,J ,

1 o I 41 1 (Tech Spec Table 4.1.B) during the period 10/14/81 to 10/28/81. There l

1 3ps) l vas no eff ect on the health or safety of the public because APRM gains 1

3 lc i 1 are monitored and recorded every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and log review indicates l

O } i j l no APRM gains were out of tolerance. The test was satisf actorily per-l O;4j [ formed on 10/14 and 10/28. See attachment for previous similar events. 50 CAUSE Co?.'P vALyr SYSTEtt CAUSE SUSCODE SUBCODE CODE COOE 'JUSCODE COMPONENT CODE oIel ,

i 11 Al h [bj h [Cd h 12i, i2 i3

!Z !2 12 l2 I2 lh [1]h [Zj h is i, 20

. io A EVISIO*4 SEQUE N TI AL OCCun9ENCC FtEFOR T REPORT NO. COOE TYPE NO.

tgp gg EVENT YE AR h,aggr _ 231812] 22 l-I 23 1011101 24 26 Ld 27 10 13 i 28 23 Lt_.1 3J L-J 31 101 32 ATTACHMENT NPRO 4 PRi?.'E CO'.'P. COMPONENT ACTION FUTURE EF5ECT SHUTDOWN SUBMIT T ED FOHf t hud. SUPPUER MANUFACTURER T A A E T. AC TION ONPLANT VETHOU HOURS u LZ_]h Io 10 Io Io I LvJ@ IN l@ {Z_j@ lZ l9 l 9 I 947 l(

LnJ@l 3J 34 n ih I Z lh 35 30 31 40 4i 42 43 44 cAUSE DESCR:PTION AND CORRECTIVE ACTIONS h l

1 10ll Personnel error. Personnel involved were instructed to be more enrefn1 I

1 Iij lwhen scheduline. Derformine. and routine surveillance instrucefons in

! [ > i .. ; I the future. The existing surveillance program is fully adeauate -

)

lilli i considering the few occurrences and the number of SI's performed I

li 1 1 l (approximately 14,000/yr) and no further recurrence control is planned. 80 1 8 u OTHEH STATUS DISCO Y DISCOVEHY DESCRIPTION STA ". POWER l1 I5j lElh l0l9l9lhl NA l lAlhl Plant Services Observation l

' CO TENT A Yt'll T Y LOCATION CF RELE ASE AEt EASED OF nELC ASE AMOUNT OF ACTIVITY NA I I i l8> l [_Zj h l Z l@l NA l l PE nzNsEl E wustSEs t;UU51E H OCSCRIPitON l

' l il l Ol 0l OjhlTYPEZ lhl NA d3 PEH M NNELINJU5 IES w mEH oEscRiPfioNh '

I NA i' l -l l 0l Ol Ol@l 1 n

't it il dO Ia~ f. Uf GH Of *J AGE 10 f Acatt rv .

'spt GE % 8 417,804 I i l'l [2]hl

, 4 , io NA 60

'# ""C"3 0*Y .

inut SEsCn4PnONh I?li[Jfbl '

NA l 63 69 l!!l!l!IIIIII 80 8205040687 850326 PnoNE: (205) 729-8100 PDR ADOCK 05000260 Cf1 herr v. 1.4relo - -

S PDR

7.-[' ' -TGnnessee Valley Authority Form BF 17 -

Browns Ferry Nuclear Plant BF 15.2 2/17/82 LER SUPPLEMENTAL INFORMATION BFRO 260 / 82010 Technical Specification Involved Table 4.1.B' Reported Under Technical Specification 6.7.2.b. (3)

  • Date Due NRC 03/10/82 b

Event Narrative:

During normal operation with units 1 & 2 at approximately full power and unit 3 in refueling outage, SI 4.1.B.2 for unit 2 was not performed from 10/14/81 to

~ 10/28/81. Technical Specification Table 4.1.B requires this SI to be performed once every seven days.

There was no effect on public health and safety. APRM gains are constantly monitored by the nuclear engineers and recorded once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Surveillance Instruction 4.1.B.2 for unit 2 was performed on 10/14/81 and 10/28/81. Maintenance personnel were instructed to be more careful when

_ scheduling SI's in the future.

Regarding the actual missed performance of the SI, no further recurrence control is required as described in the LER. However, we are investigating the reason p for the delay in recognizing that the SI was missed, and will take necessary L,1 actions to correct the situation.

p-

!l

  • Previous Similar Events:

'J LER No. - 259/79023, 259/79029, 259/80009, 259/80057, 259/80068, 296/80017 and

, 260/81010 J

U J

\~

t i t J

Retention: /criod - Lifetime; Responsibility - Document Control Supervisor

~

  • Revision: hM 7-

,