ML20197D437

From kanterella
Jump to navigation Jump to search
/03L-0 on 781029:during Refueling,While Reloading Fuel in Vessel W/All Rods inserted,2 IRM Channels Were Inoperable in Same Trip Sys.Irm F Signal Cable Was Sheared by CRD Repair Platform IRM H Signal Cable Disconnected
ML20197D437
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/15/1978
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18024A541 List:
References
LER-78-029-03L, LER-78-29-3L, NUDOCS 7811280298
Download: ML20197D437 (2)


Text

l NRC FORM 366 U. S. NUCLE AR REGULATORY COMMISSION

{7J7)

) -s'

  • LICENSEE EVENT REPORT i 1

CONTROL BLOCK: l l l l l l (PLE ASE PRINT OR TYPE ALL REOUIREO INFORMATION)

Io l18 l9 l A LICENSEE 7

l L l BCODE 'l R lF l 3 l@l0 !O l-UCENSE 14 16 l0 l0 l0 l0 l0 l- l02510 l@l4l1l1l1l1l@l NUMBER 26 LICENSE TYPE JO I

'a i CAI SH l@ ,

CON'T i l

10111 7 8

[n] lL60@l015 l0 l0 l0 l2 l9 l6 @ l1 10EVENT 61 DOCKET NUMBER 68 09 12DATE l9 l7 18 @l11111l5l7l8l@

74 75 REPORT DATE 80 EVE NT DESCRIPTION AND PROB ABLE CONSEOUENCES h 1ol21 lDuring refueling while reloading fuel in the vessel with n11 rods innnrred. two IRM l J

l o l a 1 tchannels were inoperable in the same trip system exceeding the limits of table 3.1. A of j l j

[o l4 l lthe technical specification. Redundant neutron monitoring systems were available and i o g g, ; l operating in the noncoincidence mode. There was no hazard to the public health or l loIsl l safety. l l

lo l7 l 1 Io la I l _.d )

CODE '#"Y C0D SUBCODE COMPONENT CODE SUB ODE $ E lol9l l Il Al@ l Al@ l C l@ [I lN lS lT lR lU l@ y@ y @

10 13 18 19 70 7 8 9 11 11 SEQUENTI AL OCCURRENCI REFORT fiE VIS'ON g g p no EVENT YE AR REPORT NO. CODE 7YPE NO

@ yy R l7l8l 21 22 l-l TJ 10l219l 24 26 l/l 21 10 i3 l 28 29 lLl 30

[--J 31 d

l?

TAK N ACT ON ON PL A T ETH HOURS S B IT FOR b B. S PPLt MA. r .T Uit E ll lA_j@lZl@

33 34 l35Z l@ W@

36 l0l0l0l0l 31 40 W@ lN l@ lN l@ lC1018l0l@

di 42 43 44 di CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h I i l o l IIRM F signal cable was sheared by the CRD reDair platform. IRM H signal cable con- I li 111 Inector became disconnected during maintenance. R3fueline onerations vern halted imH1 l

1 i7j lthe cables were repaired and reconnected. I 1
131 l I

!i l41g gl l l Ho 7

STA  % POWER OTHER ST ATUS OlSCO R DISCOVERY DESCRIPTION j IRM downscale indication y Q @ l0l0l0j@l NA l l A l@l l ACTIVITY CO TENT RflE ASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE j i l 8sj9 { @ W@l t 10 11 NA 44 l l 45 NA HO l

PE RSONNEL ('XPOSURES NUMBER TYPE DE SCRIPTION i y l0 l0 l0 j@lZ l @ l NA _

l

' ' ' ,ERSO~Na'lN;uZt3 l NaMgE R DESCRIP TION NA fiTii'l8 10 7 9 l010 i@l ti 12 80 l

I l

LOSS OF OR DAMAGE TO F ACILt TY TYPE DESCRIPTION li l 91 (Z j@l NA l l 7 89_ 10 Un 2 o d ISSUE @lDE NACHIPTION _.

l l l l l l l l l l l l l l {;

7 8 9 10 68 69 11 0 .

o l N AMF f)b PRFP ARFn PHONE:  % l 7811280a93 _

Form BF-17

.,_ f S* RF 15.2 tv.9/78 j l

LER SUPPLEMENTAL INFORitATION 1 BFRO 296 / 7829 Technical Specification Involved rable 31^ _ _.

l Reported Under Technical Specification 6. 7. 2. b (4) __ j Date of Occurrence 10/29/78 Time of Occurrence 2023 Unit 3 ,

Identification and Description of Occurrence: l During refueling while reloading fuel in the vessel with all rods inserted, two IRM channels were operable in the same trip system.

Conditions Prior to Occurrence:

Loading fuel in the vessel.

Action specified in the Tcchnical Specification Surveillance Requirements met due to inoperable equipment.

i 'es cribe .

The fuel loading was stopped.

Apparent Cause of Occurrence: ,

One IRM was inoperable due to movement of the service platf orm; the second IRM became inoperable by personnel inadvertently damaging the cable while working

! under the reactor pressure veasel.

Analysis of Occurrence:

None Corrective Action:

Repaired cables and reconnected connectors. Refueling resumed af ter a minimum number of IRM channels were returned to service.

Failure Data:

None Tennessee Valley Authority - Br wns Ferry Nuclear Plant