IR 05000336/2023402 | 30 January 2024 | Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) | |
IR 05000336/2023440 | 11 January 2024 | Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) | |
IR 05000336/2023003 | 6 November 2023 | Integrated Inspection Report 05000336/2023003 and 05000423/2023003 | Boric Acid Ultimate heat sink Mission time Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Reserve Station Service Transformer Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Design basis earthquake Operability Determination Earthquake Fire Protection Program |
IR 05000336/2023420 | 4 October 2023 | Security Inspection Report 05000336/2023420 and 05000423/2023420 | Affidavit |
IR 05000245/2023001 | 19 September 2023 | Safstor Inspection Report 05000245/2023001 | Safe Shutdown Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Fire Protection Program |
IR 05000336/2023010 | 8 September 2023 | Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 | Commercial Grade Dedication Significance Determination Process |
IR 05000336/2023005 | 31 August 2023 | Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Fire Protection Program |
IR 05000336/2023002 | 9 August 2023 | Integrated Inspection Report 05000336/2023002 and 05000423/2023002 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Coatings Reserve Station Service Transformer Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Significance Determination Process Large early release frequency Operability Determination License Renewal COVID-19 Through-Wall Leak Fire Protection Program Dissimilar Metal Weld Scaffolding Power change Siren |
IR 05000336/2023401 | 17 July 2023 | Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) | Affidavit |
IR 07200047/2023401 | 8 June 2023 | NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 | |
IR 05000336/2023001 | 8 May 2023 | Integrated Inspection Report 05000336/2023001 and 05000423/2023001 | Safe Shutdown Boric Acid High winds Commercial Grade Dedication Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Control of Heavy Loads Through-Wall Leak Fire Protection Program Downpower Unidentified leakage |
IR 05000336/2023403 | 2 May 2023 | Public - Millstone Power Station, Units 2 and 3 Final Significance Determination of Green Finding; Inspection Report 05000336/2023403 and 05000423/2023403 | Affidavit |
IR 05000336/2023302 | 7 March 2023 | Operator Licensing Retake Examination Report 05000336/2023302 | |
IR 05000336/2022006 | 1 March 2023 | Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2022006 and 05000423/2022006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
IR 05000336/2022004 | 13 February 2023 | Integrated Inspection Report 05000336/2022004 and 05000423/2022004 | Boric Acid High winds Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Aging Management Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program Fire Watch |
IR 05000336/2022401 | 26 January 2023 | Security Baseline Inspection Report 05000336/2022401 and 05000423/2022401 and Preliminary Finding(S) of Greater than Very Low Significance and Apparent Violation(S) (Cover Letter Only) | Significance Determination Process Backfit Affidavit |
IR 05000245/2022001 | 9 January 2023 | Safstor Inspection Report 05000245/2022001 | Safe Shutdown Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Maintenance Rule Program Fire Protection Program |
IR 05000336/2022403 | 5 January 2023 | Cyber Security Inspection Report 05000336/2022403 and 05000423/2022403 | Cyber Security |
IR 05000336/2022501 | 14 December 2022 | Reissued Emergency Preparedness Biennial Exercise Inspection Report 05000336/2022501 and 05000423/2022501 | |
IR 05000336/2022301 | 22 November 2022 | Initial Operator Licensing Examination Report 05000336/2022301 | |
ML22325A104 | 21 November 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000336/2022501 and 05000423/2022501 | |
IR 05000336/2022003 | 14 November 2022 | Integrated Inspection Report 05000336/2022003 and 05000423/2022003 | High winds Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Flooding Focused Evaluation Through-Wall Leak Fire Protection Program Operability Assessment |
IR 05000336/2022010 | 1 November 2022 | Biennial Problem Identification and Resolution Inspection Report 05000336/2022010 and 05000423/2022010 | Probabilistic Risk Assessment Aging Management Significance Determination Process License Renewal |
IR 05000336/2022011 | 8 September 2022 | Triennial Fire Protection Inspection Report 05000336/2022011 and 05000423/2022011 | Safe Shutdown Fire Protection Program |
IR 05000336/2022005 | 31 August 2022 | Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2022005 and 05000423/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request COVID-19 COVID19 Fire Protection Program |
IR 05000336/2022002 | 11 August 2022 | Integrated Inspection Report 05000336/2022002 and 05000423/2022002 | Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area FLEX Significance Determination Process Operability Determination Moisture barrier Fire Protection Program Power change Operability Assessment |
IR 05000336/2022402 | 23 May 2022 | Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000336/2022402 and 05000423/2022402 | Cyber Security |
IR 05000336/2022001 | 10 May 2022 | Integrated Inspection Report 05000336/2022001 and 05000423/2022001 | Unanalyzed Condition High winds Enforcement Discretion Reserve Station Service Transformer Temporary Modification Functionality Assessment Operability Determination Severe Accident Management Guideline Fuel cladding Fire Protection Program Operability Assessment Measurement Uncertainty Recapture |
IR 05000423/2022302 | 7 March 2022 | Operator Licensing Retake Examination Report 05000423/2022302 | |
IR 05000336/2021006 | 2 March 2022 | Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2021006 and 05000423/2021006) | Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
IR 05000336/2021004 | 10 February 2022 | Integrated Inspection Report 05000336/2021004 and 05000423/2021004 | Unanalyzed Condition Boric Acid High Radiation Area Stroke time Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Incorporated by reference Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Thermoset Foreign Material Exclusion Large early release frequency Operability Determination Moisture barrier Maintenance Rule Program Fire Protection Program Dissimilar Metal Weld |
IR 05000336/2021011 | 20 January 2022 | Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000336/2021011 | Aging Management Significance Determination Process Moisture barrier License Renewal Fire Protection Program Operability Assessment |
IR 05000336/2021003 | 12 November 2021 | Integrated Inspection Report 05000336/2021003 and 05000423/2021003 | Boric Acid High winds High Radiation Area Probabilistic Risk Assessment Coatings Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Through-Wall Leak Fire Protection Program Substantial potential for an overexposure Overexposure |
IR 05000423/2021301 | 10 November 2021 | Initial Operator Licensing Examination Report 05000423/2021301 | |
IR 05000336/2021005 | 1 September 2021 | Updated Inspection Plan for the Millstone Power Station, Units 2 and 3 (Report 05000336/2021005 and 05000423/2021005) | Cyber Security License Renewal Exemption Request COVID-19 Fire Protection Program |
IR 05000336/2021002 | 9 August 2021 | Integrated Inspection Report 05000336/2021002 and 05000423/2021002 and Independent Spent Fuel Storage Installation Inspection Report 07200047/2021002 | Boric Acid High winds Stroke time Enforcement Discretion Probabilistic Risk Assessment Reserve Station Service Transformer Temporary Modification Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination Coronavirus COVID-19 Liquid penetrant Fire Protection Program Power change |
IR 05000245/2021001 | 26 July 2021 | Safe Storage Inspection Report 05000245/2021001 | |
IR 05000336/2021501 | 23 June 2021 | Emergency Preparedness Biennial Exercise Inspection Report 05000336/2021501 and 05000423/2021501 | Coronavirus COVID-19 |
IR 05000336/2021010 | 17 May 2021 | Design Bases Assurance Inspection (Teams) Inspection Report 05000336/2021010 and 05000423/2021010 | High winds Stroke time Commercial Grade Dedication Coatings FLEX Significance Determination Process Large early release frequency Coronavirus COVID-19 |
IR 05000336/2021001 | 29 April 2021 | Integrated Inspection Report 05000336/2021001 and 05000423/2021001 | Unanalyzed Condition Boric Acid High winds Ultimate heat sink Stroke time Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Aging Management Operability Determination Flooding Focused Evaluation Coronavirus COVID-19 Fire Protection Program Operability Assessment |
IR 05000336/2021401 | 25 March 2021 | Security Baseline Inspection Report 05000336/2021401 and 05000423/2021401 | Fitness for Duty Coronavirus COVID-19 |
IR 05000336/2021012 | 17 March 2021 | Temporary Instruction 2515/194 Inspection Report 05000336/2021012 and 05000423/2021012 | Probabilistic Risk Assessment Reserve Station Service Transformer Open Phase Condition Large early release frequency Coronavirus COVID-19 |
IR 05000336/2020006 | 3 March 2021 | Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2020006 and 05000423/2020006) | Fitness for Duty Enforcement Discretion Open Phase Condition License Renewal Exemption Request COVID-19 |
IR 05000336/2020004 | 1 February 2021 | Integrated Inspection Report 05000336/2020004 and 05000423/2020004 | Safe Shutdown Boric Acid High winds High Radiation Area Stroke time Enforcement Discretion Reserve Station Service Transformer Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Earthquake Coronavirus COVID-19 Liquid penetrant Through-Wall Leak Offsite Circuit Fire Protection Program |
IR 05000336/2020012 | 14 January 2021 | Biennial Problem Identification and Resolution Inspection Report 05000336/2020012 and 05000423/2020012 | Half scram Condition Adverse to Quality B.5.b Maintenance Rule Program Coronavirus COVID-19 |
IR 05000336/2020301 | 12 November 2020 | Initial Operator Licensing Examination Report 05000336/2020301 | Affidavit |
IR 05000336/2020003 | 2 November 2020 | Integrated Inspection Report 05000336/2020003 and 05000423/2020003 and Independent Spent Fuel Storage Installation Inspection Report 07200047/2020001 | Boric Acid Internal Flooding Enforcement Discretion Reserve Station Service Transformer Temporary Modification Functionality Assessment Aging Management Operability Determination License Renewal Coronavirus COVID-19 Liquid penetrant Fire Protection Program Downpower |
IR 05000336/2020401 | 14 October 2020 | Material Control and Accounting Program Inspection Report 05000336/2020401 and 05000423/2020401 (Cover Letter Only) | Affidavit |
IR 05000336/2020420 | 14 October 2020 | Security Inspection Report 05000336/2020420 and 05000423/2020420 | |
IR 05000336/2020005 | 31 August 2020 | Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Inspection Report 05000336/2020005 and 05000423/2020005) | Operator Manual Action Open Phase Condition License Renewal Exemption Request COVID-19 |