IR 05000336/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000336/2021401 and 05000423/2021401
ML21084A080
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/25/2021
From: Fred Bower
Plant Support Branch 1
To: Stoddard D
Dominion Energy
Bower F
References
IR 2021401
Download: ML21084A080 (10)


Text

March 25, 2021

SUBJECT:

MILLSTONE POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000336/2021401 AND 05000423/2021401

Dear Mr. Stoddard:

On March 18, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Millstone Power Station, Units 2 and 3 and discussed the results of this inspection with Mr. Guy Blackburn, Acting Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report. Remote inspections were completed on March 8-12, 2021, and on-site inspections were completed on January 11-14 and March 15-18, 2021.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, X /RA/

Signed by: Fred L. Bower

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000336 and 05000423

License Numbers:

DPR-65 and NPF-49

Report Numbers:

05000336/2021401 and 05000423/2021401

Enterprise Identifier: I-2021-401-0048

Licensee:

Dominion Energy, Inc.

Facility:

Millstone Power Station, Units 2 and 3

Location:

Waterford, CT

Inspection Dates:

January 11, 2021 to March 18, 2021

Inspectors:

D. Caron, Senior Physical Security Inspector

K. Hussar, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

J. Rey, Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Millstone Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection, unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program through completion of the following

===inspection elements:

Access Authorization===

1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.05 a, b, 02.06 a - c, 02.08 a)
  • Tier III: 4 Requirements (02.09, 02.10, 02.11 a, b)

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 10 Requirements (02.06 a - d, 02.07 a, 02.08 a - d, i)
  • Tier III: 2 Requirements (02.09, 02.10 a)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment performance, testing, and maintenance program through completion of the following inspection elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: 4 requirements (02.02 a, 02.11 b, d, 02.13 a)
  • Tier III: 2 requirements (02.14, 02.15 a)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===inspection elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.05 a - d, 02.06 a, 02.07 a, 02.09 a - b)
  • Tier III: 7 Requirements (02.10, 02.11 a, 02.12 a - b, 02.13 a - c)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program through completion of the following

===inspection elements:

Fitness For Duty Program===

(1)

  • Tier I: All Requirements
  • Tier II: 26 Requirements (02.05 a - l, 02.06 a - g, 02.07, 02.08, 02.09 a - e)
  • Tier III: 6 Requirements (02.10, 02.11, 02.12, 02.13 a - c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===inspection elements:

Security Plan Changes===

(1) Since the last NRC inspection of this program area, Security Plan Revision 35 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan change continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan.

However, this review does not constitute formal NRC approval of the changes.

Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17)

=

The inspectors verified licensee performance indicator submittals listed below:

(1) January 1, 2020 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 18, 2021, the inspectors presented the security baseline inspection results to Mr. Guy Blackburn, Acting Plant Manager and other members of the licensee staff.
  • On January 14, 2021, the inspectors presented the Access Authorization and Fitness for Duty Corporate Debrief inspection results to Mr. Richard Hanson, Dominion Security Director and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Procedures

SY-AA-115

Personnel Processing and Access to Station Facilities

Revision 6

SY-AA-UAA-101

Unescorted Access Authorization Program

Revision 4

SY-AA-UAA-102

Personally Identifiable Information Breach Incident Response

Plan

Revision 1

71130.02

Procedures

SY-AA-115

Personnel Processing and Access to Station Facilities

Revision 7

SY-AA-117

Search Programs

Revision 2

SY-AA-118

Owner Controlled Area Access Control

Revision 1

SY-AA-119

Protected Area Access Control

Revision 1

SY-AA-SCPIP-

20

Insider Threat

Revision 0

71130.04

Corrective Action

Documents

CR1132839

CR1141863

CR1144708

CR1145409

CR1148158

CR1148775

CR1151386

CR1152291

CR1138820

CR1146533

CR1148398

CR1154154

CR1157251

CR1156193

CR1154282

CR1154579

CR1142929

CR1143607

CR1140816

CR1137310

CR1161432

Procedures

C IC 401

Microwave Preventative Maintenance

Revision 2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C IC 402

Infrared Preventative Maintenance R0

Revision 0

C IC 404

E-Field Preventative Maintenance

Revision 1

C IC 409

Delta Gate TT212H Preventative Maintenance

Revision 2

C IC 410

X-Field Preventative Maintenance

Revision 1

C IC 412

Entry Scan 4 Preventative Maintenance

Revision 5

C IC 414

Intelli-Field System Maintenance

Revision 2

C IC 415

LightLoc Express Processor Unit Smartgrate Plus

Revision 2

C IC 417

Tamper and Supervisory Alarm Testing

Revision 0

C IC 420

Gemini Model 420 X-Ray Machine Preventative Maintenance Revision 0

SP2654E

Security Emergency Diesel Generator Loaded Run

Revision 010

SP2654S

MP2 Security Automatic Transfer Switch Tests

Revision 002

SY-AA-116

Maintenance Testing, and Calibration

Revision 3

SY-AA-120

Operability Testing

Revision 7

SY-AA-122

Security Officer Equipment

Revision 1

SY-AA-TR-102

Weapons Accountability, Testing, and Maintenance

Revision 10

Work Orders

203237162

203237182

203251234

203252267

203252322

203252398

203253291

203253540

203253900

203254682

203255491

203256021

203291060

203291603

203291677

71130.07

Miscellaneous

Fleet Annual Exam Test 1 & 2

Revision 2

Millstone Security Training and Qualification Plan

Revision 35

Trimester Firearms Familiarization 2019

Revision 2

Quarterly Firearms Familiarization 2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CT 31

Tactical Course LP

Revision 3

Procedures

SY-AA-TR-101

Nuclear Security Training Program

Revision 15

SY-AA-TR-102

Weapons Accountability, Testing, and Maintenance

Revision 10

SY-AA-TR-205

Task Performance Evaluation Forms

Revision 0

71130.08

Corrective Action

Documents

Resulting from

Inspection

CR1164033

CR1164011

CR1163793

CR1163798

CR1167738

CR1168033

Procedures

SY-AA-FFD-101

FFD Program

Revision 13

SY-AA-FFD-102

FFD Program Administration

Revision 12

SY-AA-FFD-103

Drug and Alcohol Collection

Revision 14

SY-AA-FFD-104

Drug and Alcohol Testing Program Administration

Revision 5

SY-AA-FFD-105

FFD On-Site Testing

Revision 3

SY-AA-FFD-106

FFD Testing Blind Proficiency Sample Processing

Revision 2

71151

Procedures

SY-AA-126

Regulatory Assessment Performance Indicator Data

Reporting

Revision 1