ML24032A0255 February 2024NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009
ML24031A61031 January 2024Cyber Security Inspection Report 05200026/2024401 - PublicCyber Security
IR 05000424/202440326 January 2024Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403
ML23312A35014 November 2023Integrated Inspection Report 05200026/2023003Safe Shutdown
High winds
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Fire Protection Program
ML23318A45814 November 2023Integrated Inspection Report 05200025/2023003Safe Shutdown
High winds
High Radiation Area
Offsite Dose Calculation Manual
Enforcement Discretion
Locked High Radiation Area
Residual transfer
Significance Determination Process
Maintenance Rule Program
Fire Protection Program
Scaffolding
Grace period
Unidentified leakage
IR 05000424/20234026 November 2023Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402Fitness for Duty
IR 05000424/202300327 October 2023Integrated Inspection Report 05000424/2023003 and 05000425/2023003Boric Acid
High Radiation Area
Enforcement Discretion
Nondestructive Examination
Functionality Assessment
Locked High Radiation Area
Operability Determination
Liquid penetrant
Fire Protection Program
ML23254A20313 September 2023Initial Test Program and Operational Programs Inspection Report 05200025/2023013Significance Determination Process
IR 05000424/20230915 September 2023Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091
ML23234A3001 September 2023NRC Integrated Inspection Report 05200026/2023003Non-Destructive Examination
Fire Barrier
Hydrostatic
Squib
VT-2
Liquid penetrant
IR 05000424/202300529 August 2023Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005Fitness for Duty
Cyber Security
License Renewal
ML23223A00214 August 2023(Vegp), Unit 3, Integrated Inspection Report 05200025/2023002Safe Shutdown
Ultimate heat sink
Time to boil
Commercial Grade Dedication
Enforcement Discretion
Emergency Lighting
Functionality Assessment
Significance Determination Process
Operability Determination
Earthquake
Maintenance Rule Program
Fire Protection Program
IR 05000424/202301111 August 2023Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011High Radiation Area
Missed surveillance
Significance Determination Process
Operability Determination
Maintenance Rule Program
ML23215A0824 August 2023(Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection ReportSignificance Determination Process
IR 05000424/202340131 July 2023Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter)Affidavit
ML23212B06131 July 2023Security Baseline Inspection Report 05200025/2023401
ML23216A09626 July 2023Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003Process Control Program
IR 05000424/202300224 July 2023Integrated Inspection Report 05000424/2023002 and 05000425/2023002Stroke time
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
ML23198A38019 July 2023NRC Integrated Inspection Report 05200026/2023002Shutdown Margin
Fire Barrier
Hydrostatic
Coatings
Nondestructive Examination
Squib
Emergency Lighting
Significance Determination Process
Earthquake
Liquid penetrant
ML23199A08918 July 2023(Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007Squib
Significance Determination Process
Flow Induced Vibration
IR 05000424/202330130 June 2023NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301
ML23128A29311 May 2023NRC Integrated Inspection Report 05200026/2023001Hydrostatic
Nondestructive Examination
Squib
Liquid penetrant
ML23129A02210 May 2023(Vegp), Unit 3 - Integrated Report 05200025/2023001Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Squib
VT-2
Functionality Assessment
Significance Determination Process
Fuel cladding
Fire Protection Program
ML23128A3499 May 2023(Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006Squib
Significance Determination Process
ML23121A3204 May 2023NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010Safe Shutdown
Fire impairment
Significance Determination Process
Fire Protection Program
IR 05000424/200402528 April 2023Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375
IR 05000424/202300126 April 2023Integrated Inspection Report 05000424/2023001 and 05000425/2023001Unanalyzed Condition
Boric Acid
Internal Flooding
Past operability
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
IR 05000424/202309030 March 2023NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent ViolationHigh Radiation Area
Significance Determination Process
ML23083B37024 March 2023Security Baseline Inspection Report 05200026/2023401
IR 05000424/20220061 March 2023Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
ML23044A39014 February 2023Integrated Inspection Report05200025 2022007Safe Shutdown
Enforcement Discretion
Squib
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Fire Protection Program
Scaffolding
ML23040A3619 February 2023NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008Squib
Significance Determination Process
ML23040A0429 February 2023NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008Significance Determination Process
ML23033A3977 February 2023NRC Integrated Inspection Report 05200026/2022007Safe Shutdown
Hydrostatic
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Significance Determination Process
Earthquake
Liquid penetrant
IR 05000424/202200423 January 2023Integrated Inspection Report 05000424/2022004 and 05000425/2022004Functionality Assessment
Operability Determination
Fire Protection Program
ML22356A29323 December 2022Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform InspectionCyber Security
IR 05000424/20220102 December 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000424/2022010 and 05000425/2022010Safe Shutdown
Boric Acid
Ultimate heat sink
Stroke time
Internal Flooding
Large early release frequency
Battery sizing
Power-Operated Valves
Scaffolding
Weak link
ML22327A05330 November 2022Security Baseline Inspection Report 05200026/2022401 Cover Letter
IR 05000424/202240328 November 2022Security Baseline Inspection Report 05000424/2022403 and 05000425/2022403 (Cover Letter)Affidavit
ML22314A07014 November 2022NRC Integrated Inspected Reports 05200025/2022005, 05200026/2022005Squib
Cyber Security
Loctite
ML22318A16014 November 2022Integrated Inspection Report 05200025/2022010Coatings
Functionality Assessment
Fire Protection Program
ML22304A1818 November 2022NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022011Offsite Dose Calculation Manual
Significance Determination Process
Process Control Program
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML22311A0068 November 2022NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022006Squib
Significance Determination Process
Job Performance Measure
Flow Induced Vibration
IR 05000424/202200327 October 2022Integrated Inspection Report 05000424/2022003 and 05000425/2022003Safe Shutdown
High Radiation Area
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Fire Watch
Overexposure
IR 05000424/202200524 August 2022Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2022005 and 05000425/2022005Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
ML22230C67022 August 2022NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022006Significance Determination Process
Job Performance Measure
ND-22-0655, ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511)12 August 2022ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511)
IR 05000424/202200211 August 2022Integrated Inspection Report 05000424/2022002 and 05000425/2022002High Radiation Area
Mission time
Stroke time
Internal Flooding
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Operability Determination
Fire Protection Program
Grace period
Overexposure
ML22220A1349 August 2022Review of the Refueling Outage 1R23 (Fall 2021) Steam Generator Tube Inspection Report