L-19-010, Twentieth Refueling Outage Inservice Inspection Summary Report

From kanterella
(Redirected from ML19031B557)
Jump to navigation Jump to search
Twentieth Refueling Outage Inservice Inspection Summary Report
ML19031B557
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 01/31/2019
From: Bologna R
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-19-010
Download: ML19031B557 (4)


Text

FENOC ~

Beaver Valley Power Station P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Richard D. Bologna 724-682-5234 Site Vice President Fax: 724-643-8069 January 31, 2019 L-19-010 10 CFR 50.55a(g)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Twentieth Refueling Outage lnservice Inspection Summary Report In accordance with 10 CFR 50.55a, "Codes and standards," and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Inspection Summary Report Preparation and Submission, Section XI, Division 1,"

enclosed please find the inservice inspection owner's activity report for examinations performed prior to and during the twentieth refueling outage at Beaver Valley Power Station, Unit No. 2 (BVPS-2).

lnservice inspection activities addressed in the report were performed during the third period of the third ten-year interval and first period of the fourth ten-year interval in accordance with Section XI of the ASME Code, 2001 Edition, 2003 Addenda for third interval activities, and 2013 Edition for fourth interval activities. The inservice inspection term at BVPS-2 covered by this report includes the period from May 22, 2017 to November 14, 2018.

There are no regulatory commitments included in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Acting Manager - Nuclear Licensing and Regulatory Affairs, at (330) 315-6808.

Richard D. Bologna

Enclosure:

Beaver Valley Power Station, Unit No. 2, Twentieth Refueling Outage lnservice Inspection Owner's Activity Report cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative

Enclosure L-19-010 Beaver Valley Power Station, Unit No. 2 Twentieth Refueling Outage lnservice Inspection Owner's Activity Report (2 pages follow)

FENOC...

Beaver Valley Power Station Unit 2 Report No. BV2-OAR 1-2R20 lnservice Inspection Program 2R20 Owner's Adivity Report 1 of2 FORM OAR-1 OWNER'S ACTNIJY REPORT Report Number BV2-0AR1-2R20 Plant Beaver Valley Power Station Unit No. --=-2_ _ _ _ Commercial Service Date November 17, 1987 Refueling Outage No. _2R2___0____

(if applicable)

Current Inspection Interval 3rd and 4111 (4th interval start date was August 29, 2018)

(1 11, 2nd, 3n1, 41h, other)

Current Inspection Period 3rd and 1st (1 st period started with the 4th interval)

(1 11, 2nd, 3M) 2001 Edition/ 2003 Addenda (3rd interval)

Edition and Addenda of Section XI applicable to the inspection plan and 2013 Edition (4th interval)

Date and Revision of inspection plans 4/23/18, ADM-2039 1 Rev 17 (3n1 Interval); 8/29/18, ADM-2039, Rev. 18 (4th interval)

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans .....aa.Sam=

e'-------

CodeCaseUsed: N-532-5, N-722-1, N-729-4, N-770-2, and N-716-1 (if applicable, including cases modified by Case N-S32 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2R20 conform to the requirements of Section XI. (refueling outage number)

Signed d~ .Seaman, --ISi Program Engineer Date I I la,~ I/,1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler of Hartford, have inspected the items described in the Inspection and Insurance Connedicut Company Owner's Activity Report, and state that, to the best ofmy knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liab~an ner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/ ~

Inspector's Signature P. Bolbrich Commission ,N? NB 15908 NI (National Board Number and Endorsement)

Date _/_/_,;i___~__./_J..fJ_1___7_

FENOC...

Beaver Valley Power Station Unit 2 Report No. BV2-OAR1-2R20 lnservice Inspection Program 2R20 Owner's Activity Report 2of2 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number None N/A NIA TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Date Repair/Replacement Class Item Description Description of Work Completed (1) Plan Number Reactor Head Control 1 Rod Drive Mechanism Weld overlay repair applied per approved relief request 2-TYP-4-RV-04 12/12/2018 4131 Nozzle Number 27 Notes:

(1) "Date Completed is the date that the Repair Replacement Plan final signature was applied. This date may 0

be after the end of the reporting period for work that was physically completed within the reporting period.

(2) Steam Generator activities are reported under separate correspondence in Technical Specification required reports.