energy harbor John J. Grabnar Site Vice President, Beaver Valley Nuclear May 5, 2022 L-22-100 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 180-Day Steam Generator Tube Inspection Report Energy Harbor Nuclear Corp.

Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 724-682-5234 In accordance with Beaver Valley Power Station, Unit No. 2, Technical Specification 5.6.6.2, "Unit 2 SG [Steam Generator] Tube Inspection Report," Energy Harbor Nuclear Corp. hereby submits the steam generator tube inspection results obtained during inspections conducted during the fall 2021 refueling outage (2R22).

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.

Sincerely,

Enclosure:

Unit #2 - 2R22 Steam Generator 180 Day Report cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative

Enclosure L-22-100 Unit #2 - 2R22 Steam Generator 180 Day Report (95 pages follow)

ENERGY HARBOR NUCLEAR Programs Engineering Unit Beaver Valley Power Station Unit #2 - 2R22 Steam Generator 180 Day Report Prepared by: -.-

~

\\: 1!\\crth SC\\:btt\\C,\\

Steam G~nerator ProgramOwner Reviewed by:

Date: L{-L/-~

Approved by:

Date: l( -, - CL Manager, Strategic Engineerin

Unit #2 - 2R22 Steam Generator 180 Day Report Page 2 of 15 Information Required by Technical Specification (TS) 5.6.6.2.1 Technical Specification 5.6.6.2.1 requires that a report be submitted to the Nuclear Regulatory Commission (NRC) within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Technical Specification 5.5.5.2, Unit 2 Steam Generator Program. For the fall 2021 refueling outage (2R22), the initial entry into MODE 4 occurred on November 10, 2021.

NOTE: Refer to the Definitions of Abbreviations, Codes and Reporting Terminology section (Page 14) for abbreviations, 3 letter codes and other nomenclature used throughout this report.

Per Technical Specification 5.6.6.2.1.a through 5.6.6.2.1.h, the following information is to be submitted to the NRC:

TS 5.6.6.2.1.a The scope of inspections performed on each SG:

Primary Side:

Bobbin Coil Probe (0.720 inch diameter probe utilized unless stated otherwise) 100 percent of the inservice tubes, full length, tube end to tube end, (except Row 1 through 4 U-bend regions as noted below) in non-sleeved tubes per Generic Letter (GL) 95-05, "Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking," dated August 3, 1995 100 percent of the inservice tubes, from the hot leg tube end to the 8th hot leg TSP (straight length) in non-sleeved tubes in Rows 1 through 4 100 percent of the inservice tubes, from the cold leg tube end to the 8th cold leg TSP (straight length) in sleeved and non-sleeved tubes in Rows 1 through 4 100 percent of the inservice tubes, from the cold leg tube end to the top of the tubesheet sleeve on the hot leg side in sleeved tubes Rows 5 and higher 100 percent of the inservice tubes, from the top hot leg TSP (8th) to the top cold TSP (8th) in Row 3 and 4 U-bend regions using a 0.700 inch probe 100 percent of the hot leg sleeved tubes in Rows 3 and 4 from the top of the sleeve to the 8th hot leg TSP using a 0.630 inch wide groove probe

+Point Probe (unless stated otherwise) 100 percent of Row 1 and 2 U-bend regions 100 percent of the hot leg TTS (from 6 inches above the TTS to 3 inches below the TTS) in non-sleeved tubes NOTE 1 100 percent of TSP DSI/DNI indications with a bobbin coil voltage > 2.0 volts 100 percent of TSP DSI indications with a bobbin coil voltage > 1.0 volt 100 percent of TSP mix residual signals < 55 degrees and > 1.25 volts 100 percent of TSP mix residual signals > 2.0 volts 100 percent of dented hot and cold leg TSP's > 5.0 volts 100 percent of dents > 2.0 but < 5.0 volts at the 1st, 2nd, 3rd and 4th hot leg TSP's 100 percent of dents located at AVB intersections (+/- 1 inch of AVB centerline) 100 percent of new AVB wear signals plus any previous wear with cycle growth > 6 percent 100 percent of freespan dings (All reported voltages) 100 percent of Row 3 through 10 U-bend regions in SG C

Unit #2 - 2R22 Steam Generator 180 Day Report Page 3 of 15 100 percent of BLG and EXP signals in the hot leg tubesheet below the F* distance but above the tubesheet neutral axis 100 percent of BLG and EXP signals above the cold leg TTS 100 percent of bobbin "I-codes", such as freespan differential signals meeting the change criteria (Change criteria: phase rotation > 10 degrees and/or voltage amplitude > 0.5 volts) 100 percent of freespan signals not resolved as MBMs or without a historical review 100 percent of Westinghouse Alloy 800 hot leg tubesheet sleeves 100 percent of nickel banded region in lower tubesheet joints of Westinghouse Alloy 800 hot leg tubesheet sleeves using a Ghent Version 2 probe 100 percent of DSI indications < 2.0 volts previously confirmed to contain axial ODSCC 25 percent of dents > 2.0 volts but < 5.0 volts at the 5th, 6th, 7th and 8th hot leg TSP's 25 percent of Row 3 through 10 U-bend regions in SG A and SG B 25 percent of TSP mix residual signals > 1.5 volts but < 2.0 volts 20 percent of the cold leg TTS from 6 inches above to 3 inches below the TTS (SG C) NOTE 1 Bounding of historical plugged tubes due to foreign object wear at the TTS and newly reported PLP signals In accordance with the guidance provided by GL 95-05, the 2R22 inspection consisted of a 100 percent full length bobbin probe examination of the in-service non-sleeved tubes in all three SGs.

All hot and cold leg TSP intersections were inspected using a 0.720 inch diameter bobbin probe.

The only exception to the use of the 0.720 inch diameter bobbin probe for GL 95-05 applications is the straight length section above the Alloy 800 hot leg tubesheet sleeves in Rows 3 and 4. Due to the thickness of the hot leg tubesheet sleeve wall (0.048 inch) which reduces the inside diameter of the sleeve and the inability of a 0.720 inch diameter bobbin probe to traverse the U-bend region of Rows 3 and 4, a 0.630 inch diameter wide groove bobbin probe was used to inspect the straight length section of the Row 3 and 4 tubes above the hot leg tubesheet sleeve including the TSP intersections.

GL 95-05 states that smaller or larger diameter probes can be used to inspect tubes when it is impractical to utilize a nominal-size probe provided that the probes and procedures have been demonstrated to give an equivalent voltage response and detection capability when compared to the nominal (in this case 0.720 inch) probe. Probe equivalency testing between the nominal 0.720 inch bobbin probe and 0.630 inch wide-groove bobbin probe was performed during 2R21. It was successfully demonstrated that the 0.630 inch wide-groove probe met the equivalency requirements of Appendix H of the EPRI Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8.

Currently, there are thirty-three in-service tubes in Rows 3 and 4 with hot leg tubesheet sleeves installed. The straight length section of these tubes above the tubesheet sleeve will be examined with 0.630 inch wide groove bobbin probe in future outages when applying GL 95-05 requirements.

+Point is a trademark or registered trademark of Zetec, Inc.

NOTE 1 - For those tube locations where the expansion (EXP) transition is located deeper into the tubesheet, the inspection distance into the tubesheet was adjusted to 5 inches below the top of the tubesheet to ensure adequate inspection coverage of the F* distance.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 4 of 15 Primary Side Visual Examinations Tube Plugs - 100 percent of the tube plugs are visually examined (as-found and as-left condition) each time the primary side is opened for a scheduled inspection. This visual examination is to document the condition of the hot and cold leg tube plugs. This process also includes tube plug accountability. During 2R22, as well as in prior outages, the examinations verified that the correct number of tube plugs were present and in the proper tube locations. Installed tube plugs were examined and determined to be acceptable. No signs of degradation were observed.

Westinghouse Plug-in-Plug (PIP) - There are 9 hot leg and 9 cold leg tube locations (SG A - 4; SG B - 2; SG C - 3) which contain Alloy 600 plugs repaired with the Westinghouse PIP technique.

These locations are visually examined each outage to assess the condition of the tack weld which holds the PIP in place. No sign of cracking was reported in any of the eighteen PIP tack welds.

All tube plugs were accounted for and all were verified to be in their proper location.

Westinghouse Nuclear Safety Advisory Letter (NSAL) 12-1 (Revision 1) - A remote visual inspection of the area around the channelhead drain line was performed in each hot and cold leg channelhead to meet the requirements of Westinghouse NSAL 12-1 (R1), "Steam Generator Channel Head Degradation". Included in this examination was (a) the divider plate to stub runner weld, (b) the tubesheet to stub runner weld, (c) the divider plate to channelhead weld (d) channelhead to tubesheet weld and (e) the entire clad surface of the channelhead bowl. This inspection looked for evidence of gross defects such as indications in welds, missing weld filler material, a breach in the weld metal, and unusual discoloration of the weld metal and/or cladding imperfections. All inspections were determined to be acceptable. No sign of cladding breach, cracking, missing filler metal was observed. During 2R20, in the cold leg of SG C, a small area of discoloration (non-rust color) was observed approximately 1 foot from the divider plate.

Subsequent review of previous channelhead videos showed no change in this area of discoloration. The visual examination of this area in 2R22 showed no changes in appearance from that reported in 2R20 and 2R21. This area will continue to be visually examined each outage the primary manway covers are removed for an inspection.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 5 of 15 Secondary Side Visual Examinations:

Foreign Object Search and Retrieval (FOSAR) - A visual inspection of the secondary side tubesheet face, annulus and tube lane was performed during 2R22 in all three steam generators.

2RCS-SG21A - An object described as a metal rod with approximate dimensions of 18 inches in length and 0.125 inches in diameter was identified on the cold leg tubesheet between tube rows 11-12 and columns 45-49. No tube wear was associated with this object through a bounding eddy current program. The object was unable to be retrieved and remains in the steam generator. An assessment was performed which determined the maximum dent size and tube wear that would be produced by the object given its size, location, and assumed material properties. The assessment concluded it is acceptable for the object to remain in the steam generator until next refueling outage when it will be inspected again. Six small wire bristles were also identified on the tubesheet at various locations and unable to be retrieved. The bristles were within the maximum allowable object size justified to leave in the steam generator. A legacy wire that was identified in 2R20 was successfully retrieved during 2R22. No tube wear was detected as a result of these objects.

2RCS-SG21B - No foreign material was observed.

2RCS-SG21C - One small wire bristle was identified on the tubesheet and unable to be retrieved.

The bristle was within the maximum allowable object size justified to leave in the steam generator. No tube wear was detected as a result of this object.

The foreign material left in the steam generators will be re-inspected during 2R23.

Possible Loose Part Indications - For those tube locations where possible loose part indications were reported during the 2R22 eddy current examinations and no visual inspections were performed at those particular tube locations, the +Point probe was used to verify that no degradation or tube wall wear was present. These tubes remained in service.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 6 of 15 TS 5.6.6.2.1.b Degradation mechanisms found:

The following degradation mechanisms were reported during 2R22:

Axial ODSCC at non-dented TSP intersections Axial ODSCC in the hot leg sludge pile freespan regions Axial ODSCC at the expansion transition regions Circumferential ODSCC at the hot leg TTS expansion transitions Circumferential ODSCC at free-span dings Axial PWSCC at the hot leg TTS Wear at AVB intersections Wear at 1st TSP (Flow distribution baffle)

Wear at TSPs Historical foreign object induced wear Historical freespan volumetric indications Circumferential signals at the lower tubesheet sleeve hard roll joint Cold Leg Thinning TS 5.6.6.2.1.c Nondestructive examination techniques utilized for each degradation mechanism:

For the degradation mechanisms observed during 2R22, the bobbin coil probe was used as the primary method of detection except at or below TTS and in Row 1 and 2 U-bends where the bobbin probe is not qualified. In these areas, the +Point probe was employed. The +Point probe is also used to re-examine any ambiguous bobbin coil signals (I-codes) that were reported.

The 2R22 examination techniques were qualified, for detection and sizing (as applicable) of the existing and potential degradation mechanisms listed in the 2R22 degradation assessment. This qualification was in accordance with Appendices H and I of the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines:

Revision 8".

Site-specific ETSS's are developed prior to each steam generator inspection for each existing and potential degradation mechanism identified in the 2R22 degradation assessment. The site-specific ETSS's are developed in accordance with Appendices H and I of the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8."

The examination techniques utilized during 2R22 are considered "Site Validated" as defined in the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8," for each existing and potential degradation mechanism listed in the 2R22 degradation assessment.

Axial ODSCC in the U-bend region is limited to Row 3 through Row 9 due to the bending technique used for those tube locations.

The Ghent Version 2 probe, which includes a +Point probe in the design, was used to inspect 100 percent of the hot leg tubesheet sleeves.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 7 of 15 2R22 Examination Techniques Used for Degradation Detection/Sizing Degradation Mode Tube Location Probe EPRI ETSS*

Existing Degradation Mechanisms Circumferential ODSCC Tubesheet expansion transitions 3 Coil +Point 21410.1 Axial ODSCC Sludge pile, expansion transitions 0.720 Bobbin I28413 3 Coil +Point I28424 Non-dented and dented TSP's Bobbin < 5 volts, +Point > 5 volts 0.720 Bobbin I28411 3 Coil +Point 22401.1 Freespan dings < 5 volts 0.720 Bobbin 24013.1 Freespan dings > 5 volts 3 Coil +Point 22401.1 Row 3 through 9 U-bends (SG C) 0.720 Bobbin I28413 Single Coil +Point I28424 HL Freespan (> TSH +6"), CL above sludge pile, at non-ding locations 0.720 Bobbin I28412 Axial PWSCC Tubesheet & expansion transitions 3 Coil +Point 20511.1 Circumferential PWSCC Tubesheet & expansion transitions 3 Coil +Point 20510.1 Axial PWSCC Dented TSP's < 2 volts 0.720 Bobbin Dented TSP's > 2 volts 3 Coil +Point 96703.1 Circumferential ODSCC Freespan dings 3 Coil +Point 21410.1 Oblique Circ PWSCC Row 3 through 10 U-bends (SG C)

Single Coil +Point 96511.2 Tube Wear AVB locations 0.720 Bobbin I96041.1 TSP Intersections 0.720 Bobbin I96042.1 Volumetric Entire tube length 0.720 Bobbin I28412 Expansion transitions 3 Coil +Point 21998.1 Thinning CL TSPs 0.720 Bobbin 96001.1 Potential Degradation Mechanisms Axial PWSCC Row 3 through 10 U-bends Single Coil +Point 96511.2 Axial ODSCC Dented AVB locations Single Coil +Point 22401.1 Oblique/Circumferential PWSCC Row 3 through 10 U-bends (SG A and B)

Single Coil +Point 96511.2 Axial/Circumferential PWSCC Row 1 and 2 U-bends Mid-range +Point 96511.2 High freq +Point 99997.1 Axial ODSCC Row 3 through 9 U-bends (SG A and B) 0.720 Bobbin I28413 Single Coil +Point I28424 Loose Part Wear TTS, periphery, and tube lane 0.720 Bobbin 27091.1 3 Coil +Point 21998.1 Pitting Sludge pile 0.720 Bobbin 96005.2 3 Coil +Point 21998.1

  • The applicable EPRI Examination Technique Specification Sheet (ETSS) is listed for reference only.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 8 of 15 TS 5.6.6.2.1.d Location, orientation (if linear), and measured sizes (if available) of service-induced indications:

The 2R22 SG Examination Results section (Page 15) lists information that includes the location, orientation and measured sizes of service-induced indications. Further explanation of the information provided in the results section is given below:

Bobbin probe indications reported as "I-codes" (DNI, DSI, DTI or NQI) were re-inspected with the

+Point probe.

Bobbin probe indications reported as PSI were re-inspected with the +Point probe. If the +Point probe indicated a possible TSP ligament breach existed (CSI), it was further evaluated by the original equipment manufacturer (OEM) engineering group. All ligament breach extents were found to be acceptable for continued plant operation.

New AVB indications reported from the bobbin probe listed as PCT were inspected with the

+Point probe. If the +Point probe indicated no crack-like flaws were present within the wear scar, a wear call (WAR) was assigned to the +Point report.

+Point indications reported as "I-codes" (SAI, SCI, MAI or MCI) were either (a) removed from service via plugging, (b) left in service by installing hot leg tubesheet sleeves or (c) left in service if the indications qualified under the requirements of GL 95-05.

For hot leg top of tubesheet circumferential indications that could not be sleeved, a stabilizer was installed prior to plug installation.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 9 of 15 TS 5.6.6.2.1.e Number of tubes plugged or repaired during the inspection outage for each degradation mechanism:

The following tables list the number of tubes plugged or repaired for each existing degradation mechanism reported during 2R22. This is the seventh consecutive outage where the alternate repair criteria of GL 95-05 have been implemented.

For the following Tables:

During 2R22, circumferential indications were observed by the +Point probe in four Alloy 800 nickel banded mechanical tubesheet sleeves. It was determined that these signals were not flaws; however, the affected tubes were proactively plugged during the outage. The signals were located at the lower tubesheet hard roll joint at the lower expansion transition below the nickel band region, approximately 0.6 inch from the bottom of the sleeve. It is noted that the nickel band starts at approximately 0.75 inch from the bottom of the sleeve. Three of the sleeves were installed in 2R20 (2018) and were inservice for two cycles. One sleeve was installed in 2R21 (2020) and was inservice for 1-cycle. One of the sleeves installed in 2R20 had a circumferential signal after sleeve installation and prior to be being placed inservice.

The circumferential extents of the signals ranged from 50.8 degrees to 84.6 degrees.

Preliminary assessments made during the inspection suggested that the signals could have been circumferential ODSCC originating on the outer surface of the parent tube, although OD parent tube flaws at this location are not likely due to the full depth hard roll condition of the parent tube. Since one of the circumferential signals had a precursor signal during the post sleeve installation inspection, the signals may be fabrication related and not service induced.

The Ghent Version 2 probe is a magnetically biased probe designed to suppress the effects of the nickel band in the lower sleeve joint. In the absence of nickel, the Ghent Version 2 probe provides an independent diagnostic test for the detection of flaws similar to the standard Ghent probe techniques qualified through approved EPRI ETSSs. At the location of the circumferential signals below the nickel band, the Ghent Version 2 probe did not exhibit the signals reported by the +Point coil and did not detect any flaw-like responses, thereby further demonstrating that the signals are not flaws. The affected tubes were proactively plugged based upon this assessment.

During 2R22, a tube recovery program was conducted in 2RCS-SG21A and 2RCS-SG21B to improve the thermal performance of the SGs. A total of 52 tubes were de-plugged and returned to service. Many of these tubes were originally plugged for top of tubesheet indications, which can now be repaired with the sleeving process. There were also several tubes that were returned to service by application of the Generic Letter 95-05 Alternate Repair Criteria.

The first occurrence of cold leg thinning (CLT) at BVPS Unit 2 occurred in the prior inspection, 2R21. The flaw was measured at 2R21 with a depth of 25% TW using bobbin coil sizing technique of ETSS 96001.1 and an axial and circumferential extents of 0.29 inch and 0.52 inch, respectively. The indication was re-inspected at 2R22 and showed no change in depth (25% TW) and had small increases in length and width. A second CLT indication was reported at 2R22 and was measured at 0% TW depth due to its phase angle. A 10% TW depth was conservatively assigned. Data history reviews showed precursor indications in prior inspections, thus indicating low growth progression.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 10 of 15 Degradation Mechanism 2RCS-SG21A Plug Sleeve Total Circumferential ODSCC at TSH and Sludge Pile 14 40 54 Axial ODSCC at TSH and Sludge Pile 1

2 3

Circumferential ODSCC at Freespan Dings 2

0 2

Circumferential Parent Tube / Sleeve Indication at Lower Joint 1

0 1

Total Repairs in In-service Tubes 18 42 60 De-Plugged Tube with TTS Indication - Returned to Service with Sleeve 26 Notes for 2RCS-SG21A:

1) 68 tubes were repaired with Alloy 800 hot leg tubesheet sleeves and 18 tubes were plugged. Of the 68 tubes that were sleeved, 26 of those were de-plugged tubes containing top of tubesheet indications that were returned to service using the sleeving process.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 11 of 15 Mechanism 2RCS-SG21B Plug Sleeve Total Circumferential ODSCC at TSH and Sludge Pile 0

22 22 Axial ODSCC at TSH and Sludge Pile 0

2 2

Axial PWSCC at TSH 0

1 1

AVB Wear 1

0 1

Circumferential Parent Tube / Sleeve Indication at Lower Joint 3

0 3

Total Repairs in Inservice Tubes 4

25 29 De-Plugged Tube with TTS Indication - Returned to Service with Sleeve 24 De-Plugged Tube with TSP Indication - Returned to Service with Application of GL 95-05.

2 Notes for 2RCS-SG21B:

1) 49 tubes were repaired with Alloy 800 hot leg tubesheet sleeves and 4 tubes were plugged. Of the 49 tubes that were sleeved, 24 of those were de-plugged tubes containing top of tubesheet indications that were returned to service using the sleeving process. Two tubes were de-plugged and returned to service with application of GL 95-
05.

Mechanism 2RCS-SG21C Plug Sleeve Total Circumferential ODSCC at TSH and Sludge Pile 1

2 3

Preventative - Parent Tube Indication in Sleeved Tube 1

0 1

Total Repairs in Inservice Tubes 2

2 4

Notes for 2RCS-SG21C:

1)

Two tubes were repaired with Alloy 800 hot leg tubesheet sleeves and two tubes were plugged. One of the plugged tubes, which was previously sleeved, had indications located above the lower sleeve joint in the non-pressure boundary portion of the parent tube. These indications were located on the parent tube ID. This tube was preventatively plugged due to the proximity of the indications to the hard roll of the lower joint.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 12 of 15 TS 5.6.6.2.1.f The number and percentage of tubes plugged or repaired to date, and the effective plugging percentage in each steam generator:

The following table lists the required information for each steam generator as of the end of 2R22:

SG Tubes Plugged 2R22 Tubes De-Plugged 2R22 Total Plugged Tubes Percent Plugged Sleeves Inservice Plug/Sleeve Equivalency Effective Plugging %

2RCS-SG21A 18 26 356 10.545 357 14.69 10.980 2RCS-SG21B 4

26 304 9.005 236 9.71 9.292 2RCS-SG21C 2

0 288 8.531 87 3.58 8.637 TOTAL 24 52 948 9.360 680 27.98 9.636 TS 5.6.6.2.1.g The results of condition monitoring, including the results of tube pulls and in-situ testing:

Condition Monitoring All tubes were shown to satisfy the structural and leakage integrity performance criteria at 2R22.

The relative severity levels of the degradation observed during 2R22 were judged to be consistent with or bounded by the levels associated with previous outage inspection results. Based on the indications observed during 2R22, the SG tubing is expected to meet all operational, structural and leakage integrity requirements at End-of Cycle 23. None of the indications reported during 2R22 represented a leakage potential at postulated main steam line break conditions.

Tube Pulls No tubes were pulled (removed) from the SGs during 2R22.

In-Situ Pressure Testing No in-situ pressure testing was conducted during 2R22.

Unit #2 - 2R22 Steam Generator 180 Day Report Page 13 of 15 TS 5.6.6.2.1.h Repair method utilized and the number of tubes repaired by each repair method:

Westinghouse Alloy 800 leak limiting sleeves A total of 119 hot leg tubesheet sleeves were installed in 119 tubes remaining inservice for degradation reported at the hot leg top of tubesheet during 2R22. It is noted that 50 of the tubes that were sleeved, were de-plugged and inspected prior to returning the tube to service with the sleeving process. During the 2R22, six tubes that were sleeved in previous refueling outages were taken out of service by plugging resulting in the following total number of sleeves inservice following 2R22:

SG Sleeves Installed and Placed Inservice in 2R22 Inservice Sleeves Plugged in 2R22 Total # of Sleeves Inservice Prior to 2R22 Total # of Sleeves Inservice Following 2R22 2RCS-SG21A 68 2

291 357 2RCS-SG21B 49 3

190 236 2RCS-SG21C 2

1 86 87 TOTAL 119 6

567 680

Unit #2 - 2R22 Steam Generator 180 Day Report Page 14 of 15 Definitions of Abbreviations, Codes, and Reporting Terminology 3 Letter Code Definitions Term Bobbin Coil Probe BLG Bulge DNI Dent/Ding with a Possible Indication DSI Distorted Tube Support Plate Signal with Possible Indication DTI Distorted Tubesheet Signal with Possible Indication EXP Tubesheet Expansion MBM Manufacturer's Burnish Mark NQI Non-Quantifiable Indication PCT Percent Through Wall PSI Possible Tube Support Plate Indication (Ligament Breach)

TSP Tube Support Plate Term

+Point Probe CSI Confirmed Tube Support Plate Indication (Ligament Breach)

DIS Distance Between Hydraulic Expansions Not Met HAI Historical Axial Indication HCI Historical Circumferential Indication MAI Multiple Axial Indications MCI Multiple Circumferential Indications NDF No Degradation Found SAI Single Axial Indication SCI Single Circumferential Indication VOL Volumetric Indication WAR Wear Additional Definitions Term Definition AVB Anti-Vibration Bar CL Cold Leg (Outlet)

DENT Observed within a Tube Support Plate DING Observed in Free-Span Region of the Tubing EPRI Electric Power Research Institute SG Steam Generator HL Hot Leg (Inlet)

NSAL Nuclear Safety Advisory Letter ODSCC Outside Diameter Stress Corrosion Cracking PLP Possible Loose Part PWSCC Primary Water Stress Corrosion Cracking TSP Tube Support Plate TTS Top of Tubesheet

Unit #2 - 2R22 Steam Generator 180 Day Report Page 15 of 15 2R22 SG Examination Results Attachments A, B, and C provide the examination results for tubes with service-induced indications in the Beaver Valley Power Station, Unit No. 2 SGs.

NOTE: The majority of the data contained in the Attachments comes from the production analysis process however, some data has been re-sized or re-profiled to address structural integrity concerns.

Therefore, variations in the dimensions of a given indication (length, angular extent, voltage) may exist between this document and any documents previously submitted to the NRC in support of the Fall 2021 outage (2R22). Regardless of the source of the data being provided, tubes that exceeded the plugging or repair limit were properly dispositioned prior to returning the SGs to service (MODE 4).

Refer to the following tables for a description of terms used in these attachments.

Description of Column Headings and Data Abbreviations Used in Steam Generator Examination Results Report Header Definitions Term Definition ROW/COL Row & column designation of tube location IND Type of indication LOC Location of nearest support structure INCH Indication distance from nearest support structure

%TW Measured percent through wall of an indication LENGTH Field measured length of an indication ANGLE Measured angular extent of an indication around the tube WIDTH Measured width of an indication VOLTS Measured voltage amplitude of an indication PHASE Measured angular rotation of an indication CHAN Recording channel of an indication FROM Starting point of examination TO End point of examination Examination Extent Definitions (FROM - TO)

Term Definition 01C 1st Tube Support Plate on Cold Leg Side 01H 1st Tube Support Plate on Hot Leg Side AVB1 1st Anti-Vibration Bar (Numbered Hot Leg to Cold Leg)

SBH Bottom of Sleeve - Hot Leg STH Top of Sleeve - Hot leg TEC Tube End - Cold Leg TEH Tube End - Hot Leg TSC Cold Leg Tubesheet (Secondary Face)

TSH Hot Leg Tubesheet (Secondary Face)

Unit #2 - 2R22 Steam Generator 180 Day Report Attachment A BEAVER VALLEY UNIT #2 2R22 SG EXAMINATION RESULTS 2RCS-SG21A TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 1

3 DNI 04H 0.00 1.52 25 P1 08H TEH 1

3 PSI 07H 0.38 14.59 164 P5 08H TEH 1

73 SCI TSH -0.07 0.13 74 0.56 0.13 91 P2 TSH TSH 2

24 DSI 07H 0.00 0.29 159 P1 08H TEH 2

45 SCI TSH -0.05 0.19 78 0.60 0.13 76 P2 TSH TSH 2

50 SCI TSH -0.10 0.17 237 1.81 0.19 83 P2 TSH TSH 2

87 DNI 05H 0.03 1.81 47 P1 08H TEH 2

88 DSI 02H 0.01 0.20 121 P1 08H TEH 2

88 DNI 06H 0.01 1.72 43 P1 08H TEH 2

89 DNI 08C -0.05 1.43 31 P1 08C TEC 2

92 DSI 03H -0.07 0.29 119 P1 08H TEH 2

93 DSI 03H -0.03 0.47 134 P1 08H TEH 3

2 PSI 02H 0.40 14.84 160 P5 08H TEH 3

14 DNI 08C -0.02 1.30 49 P1 08C TEC 3

15 DNI 07H 0.00 1.35 49 P1 08H TEH 3

15 DSI 03H 0.07 0.54 104 P1 08H TEH 3

17 DNI 03C 0.00 1.28 25 P1 08C TEC 3

24 DNI 07C 0.00 1.43 46 P1 08C TEC 3

26 DNI 03H 0.10 2.42 47 P1 08H TEH 3

45 DNI 03H -0.01 2.52 21 P1 08H TEH 3

59 DSI 02H 0.01 0.62 146 P1 08H TEH 3

63 DSI 05C 0.05 0.38 119 P1 08C TEC 3

64 DSI 05C 0.00 0.48 111 P1 08C TEC 3

64 DNI 04H -0.01 1.39 55 P1 08H TEH 3

65 DSI 07C 0.00 0.50 105 P1 08C TEC 3

65 DSI 07H -0.01 0.61 74 P1 08H TEH 3

71 DNI 08H 0.00 1.38 52 P1 08H TEH 3

77 DSI 08H 0.00 0.49 43 P1 08H TEH 3

77 SAI 08H -0.03 0.25 32 0.25 0.14 118 6

08H 08H 3

79 DSI 07H -0.23 0.35 118 P1 08H TEH 3

81 DNI 07H 0.06 1.61 55 P1 08H TEH 3

81 DSI 03H 0.01 0.65 115 P1 08H TEH 3

81 DNI 08C 0.00 1.52 43 P1 08C TEC 3

84 DSI 03H 0.00 0.74 94 P1 08H TEH 3

85 DSI 04H 0.07 0.66 74 P1 08H TEH 3

89 SCI TSH -0.03 0.13 185 1.41 0.24 122 P2 TSH TSH 3

91 DNI 04H 0.00 1.39 51 P1 08H TEH 3

92 DSI 02H 0.10 0.34 160 P1 08H TEH 4

9 DNI 08H -0.16 1.27 47 P1 08H TEH 4

9 DSI 04H 0.06 0.31 58 P1 08H TEH 4

9 DSI 03H 0.00 0.43 76 P1 08H TEH Page 1 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 4

9 DNI 07C 0.00 1.85 39 P1 08C TEC 4

9 DNI 06C 0.00 1.68 33 P1 08C TEC 4

16 SCI TSH -0.06 0.20 225 1.72 0.18 111 P2 TSH TSH 4

18 DSI 05H -0.13 0.17 126 P1 08H TEH 4

21 DSI 03H 0.00 0.44 85 P1 08H TEH 4

22 DNI 07H -0.01 1.51 54 P1 08H TEH 4

24 DSI 02H 0.00 0.35 106 P1 08H TEH 4

26 DNI 08C 0.00 1.25 38 P1 08C TEC 4

26 DNI 03H 0.16 1.54 32 P1 08H TEH 4

26 DSI 02H 0.00 0.24 82 P1 08H TEH 4

28 DSI 03H 0.01 0.30 63 P1 08H TEH 4

34 DNI 08H 0.00 1.52 42 P1 08H TEH 4

34 DNI 07H 0.01 1.35 49 P1 08H TEH 4

34 DSI 03H -0.31 0.33 95 P1 08H TEH 4

39 DSI 02H 0.01 0.08 32 P1 08H TEH 4

47 SCI TSH -0.08 1.01 105 0.80 0.06 100 P2 TSH TSH 4

50 DSI 04H 0.04 0.45 38 P1 08H TEH 4

50 DSI 03H 0.03 0.37 50 P1 08H TEH 4

50 DSI 02H 0.09 0.18 46 P1 08H TEH 4

54 DNI 04C -0.02 1.28 41 P1 08C TEC 4

54 DNI 08C 0.00 1.51 44 P1 08C TEC 4

54 DSI 04H 0.09 0.21 72 P1 08H TEH 4

54 DSI 02H -0.27 0.57 72 P1 08H TEH 4

54 DSI 05H 0.00 0.36 90 P1 08H TEH 4

60 DSI 06H 0.06 0.36 36 P1 08H TEH 4

60 DSI 02H 0.06 0.33 125 P1 08H TEH 4

62 DNI 05H 0.15 1.57 32 P1 08H TEH 4

62 DNI 04H 0.18 1.45 19 P1 08H TEH 4

62 DNI 03H 0.01 1.95 46 P1 08H TEH 4

62 DNI 02H 0.00 1.64 49 P1 08H TEH 4

63 DSI 02H -0.06 0.21 62 P1 08H TEH 4

70 DSI 03H 0.03 0.16 53 P1 08H TEH 4

70 DNI 05H 0.00 1.28 53 P1 08H TEH 4

72 DNI 08H 0.01 1.45 52 P1 08H TEH 4

72 DNI 08C -0.02 1.50 44 P1 08C TEC 4

78 DSI 05H 0.01 0.22 115 P1 08H TEH 4

80 DSI 08C 0.02 0.32 27 P1 08C TEC 4

83 PSI 03H 0.37 14.82 156 P5 08H TEH 4

85 DSI 08C 0.02 0.12 125 P1 08C TEC 4

86 DSI 03H 0.04 0.16 121 P1 08H TEH 5

3 DNI 07H -0.02 1.39 50 P1 TEH TEC Page 2 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

4 DNI 07H 0.00 1.42 45 P1 TEH TEC 5

4 DNI 06H 0.00 1.32 53 P1 TEH TEC 5

7 DNI 08H 0.00 1.28 38 P1 TEH TEC 5

7 DNI 02C 0.02 1.25 25 P1 TEH TEC 5

7 DNI 06H 0.02 1.44 54 P1 TEH TEC 5

10 DSI 03H -0.02 0.54 102 P1 TEH TEC 5

10 DSI 04H 0.00 0.47 98 P1 TEH TEC 5

10 DSI 02H 0.02 1.00 90 P1 TEH TEC 5

11 DSI 04H 0.05 0.21 61 P1 TEH TEC 5

12 DNI 08H 0.00 1.68 40 P1 TEH TEC 5

12 DNI 08C 0.00 1.67 40 P1 TEH TEC 5

13 DNI 06H 0.00 1.79 20 P1 08H TEH 5

18 SAI 06H -0.09 0.28 37 0.28 0.12 102 P4 06H 06H 5

18 SAI 06H 0.00 0.24 34 0.26 0.16 102 6

06H 06H 5

18 DNI 07H 0.00 1.30 44 P1 TEH TEC 5

18 DSI 06H -0.10 0.60 39 P1 TEH TEC 5

18 DNI 08H 0.00 1.62 35 P1 TEH TEC 5

18 DNI 08C 0.00 1.28 43 P1 TEH TEC 5

20 DSI 08C 0.00 0.21 109 P1 08C TEC 5

24 DSI 07H -0.05 0.26 78 P1 TEH TEC 5

25 DNI 06C 0.00 1.67 30 P1 08C TEC 5

25 DNI 08H 0.00 1.49 45 P1 08H TEH 5

25 DSI 05H 0.07 0.51 105 P1 08H TEH 5

25 DNI 06H 0.01 1.95 40 P1 08H TEH 5

26 DSI 03H -0.03 0.61 111 P1 08H TEH 5

26 DNI 07H 0.00 1.34 54 P1 08H TEH 5

26 DSI 02H 0.01 0.72 139 P1 08H TEH 5

28 DNI 04H -0.01 2.16 53 P1 08H TEH 5

29 SAI 02H -0.26 0.10 46 0.35 0.18 112 2

02H 02H 5

29 SAI 02H -0.14 0.34 49 0.38 0.18 66 2

02H 02H 5

29 DSI 02H -0.12 1.19 106 P1 STH TEC 5

30 DSI 03H 0.03 0.23 20 P1 08H TEH 5

53 DNI 07H 0.00 1.47 44 P1 TEH TEC 5

53 DNI 04H 0.02 1.40 53 P1 TEH TEC 5

53 DSI 02H 0.02 0.11 74 P1 TEH TEC 5

55 SCI TSH -0.01 0.00 29 0.22 0.11 77 P2 TSH TSH 5

57 DSI 04H 0.02 0.15 16 P1 TEH TEC 5

59 DNI 06C -0.07 1.26 30 P1 STH TEC 5

60 DSI 04H -0.02 0.17 25 P1 TEH TEC 5

61 PSI 07H -0.46 7.60 254 8

TEH TEC 5

65 DNI 07H 0.00 1.34 55 P1 TEH TEC Page 3 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

71 DNI 07C -0.02 1.33 46 P1 TEH TEC 5

71 DNI 08H 0.02 1.66 45 P1 TEH TEC 5

79 DNI 07C 0.00 1.26 42 P1 TEH TEC 5

80 DSI 05H 0.12 0.18 103 P1 TEH TEC 5

82 DSI 03H -0.02 0.28 131 P1 TEH TEC 6

6 DNI 08H 0.00 1.54 34 P1 TEH TEC 6

11 DNI 06H 0.02 1.51 41 P1 TEH TEC 6

12 DNI 07H 0.00 1.49 44 P1 TEH TEC 6

14 DNI 05H 0.00 1.26 53 P1 TEH TEC 6

14 DNI 06H 0.00 1.30 50 P1 TEH TEC 6

15 DNI 08H 0.00 1.47 38 P1 STH TEC 6

15 DSI 02H 0.05 0.39 135 P1 STH TEC 6

17 DNI 04H 0.15 1.29 51 P1 TEH TEC 6

20 DSI 04H -0.02 0.36 69 P1 TEH TEC 6

20 DNI 08H 0.00 1.37 51 P1 TEH TEC 6

27 DNI 05C -0.02 1.50 34 P1 TEH TEC 6

27 DNI 07H 0.00 2.23 33 P1 TEH TEC 6

27 DSI 06H 0.00 0.55 83 P1 TEH TEC 6

30 DNI 06C 0.07 1.25 30 P1 TEH TEC 6

32 DSI 02H 0.00 0.25 157 P1 TEH TEC 6

34 DNI 08H -0.02 1.72 40 P1 TEH TEC 6

34 DSI 02H 0.02 0.35 166 P1 TEH TEC 6

35 SAI 02H -0.17 0.10 43 0.33 0.12 133 2

02H 02H 6

35 DSI 03H -0.05 0.36 95 P1 STH TEC 6

35 DSI 02H -0.13 1.01 105 P1 STH TEC 6

35 DSI 08H -0.05 0.04 50 P1 STH TEC 6

35 DSI 05H -0.07 0.33 92 P1 STH TEC 6

35 DSI 04H 0.02 0.52 80 P1 STH TEC 6

36 DNI 08H 0.00 1.62 44 P1 TEH TEC 6

36 DNI 07H 0.02 1.27 54 P1 TEH TEC 6

37 DNI 04C -0.07 1.58 27 P1 TEH TEC 6

38 SCI TSH -0.02 0.13 72 0.55 2.70 96 P2 TSH TSH 6

40 DNI 07C 0.00 1.59 39 P1 TEH TEC 6

40 DNI 02C -0.15 1.36 20 P1 TEH TEC 6

40 DSI 04H 0.02 0.28 147 P1 TEH TEC 6

40 DSI 03H -0.05 0.19 138 P1 TEH TEC 6

41 SAI 08H 0.02 0.30 49 0.38 0.09 77 2

08H 08H 6

41 DSI 08H -0.02 0.21 145 P1 STH TEC 6

43 DNI 06H 0.05 1.27 46 P1 TEH TEC 6

43 DNI 07H 0.00 1.31 55 P1 TEH TEC 6

43 DSI 02H -0.02 0.23 77 P1 TEH TEC Page 4 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 6

55 SCI TSH -0.06 0.00 32 0.25 0.11 87 P2 TSH TSH 6

56 SCI TSH -0.10 0.14 57 0.43 0.24 76 P2 TSH TSH 6

63 DNI 08H -0.07 1.36 48 P1 TEH TEC 6

68 DNI 07H -0.02 1.75 46 P1 TEH TEC 7

4 DNI 06H 0.02 1.61 55 P1 TEH TEC 7

4 DSI 04H 0.12 0.27 93 P1 TEH TEC 7

4 SAI 04H 0.20 0.34 72 0.55 0.09 109 P4 04H 04H 7

4 DNI 07C -0.05 1.30 44 P1 TEH TEC 7

4 DNI 07H 0.00 1.42 52 P1 TEH TEC 7

5 DNI 06H 0.00 1.30 54 P1 TEH TEC 7

6 DNI 04H -0.02 1.93 50 P1 TEH TEC 7

6 DNI 04C 0.00 1.31 30 P1 TEH TEC 7

14 DSI 03H 0.15 0.28 106 P1 TEH TEC 7

18 DNI 06C -0.02 1.45 38 P1 TEH TEC 7

18 DSI 03H -0.02 1.29 96 P1 TEH TEC 7

18 DSI 05H -0.07 0.38 133 P1 TEH TEC 7

18 DSI 02H -0.05 1.68 97 P1 TEH TEC 7

19 DSI 03H 0.07 1.28 79 P1 TEH TEC 7

19 DNI 07H 0.00 1.44 53 P1 TEH TEC 7

19 DSI 02H 0.00 0.44 128 P1 TEH TEC 7

27 DSI 05H 0.10 0.41 159 P1 TEH TEC 7

31 DNI 03H 0.24 1.52 12 P1 TEH TEC 7

31 DNI 04H 0.05 1.18 45 P1 TEH TEC 7

31 DNI 07C -0.17 1.36 30 P1 TEH TEC 7

31 DNI 05C 0.10 1.89 13 P1 TEH TEC 7

31 DNI 07H -0.02 1.72 39 P1 TEH TEC 7

47 DNI 04H -0.02 1.33 10 P1 TEH TEC 7

49 DNI 05H 0.10 1.29 28 P1 TEH TEC 7

49 DNI 07H 0.00 1.30 44 P1 TEH TEC 7

49 DNI 08C 0.20 2.19 14 P1 TEH TEC 7

49 DNI 02C 0.07 1.50 16 P1 TEH TEC 7

49 DSI 02H 0.02 0.14 118 P1 TEH TEC 7

51 DSI 02H -0.02 0.17 32 P1 STH TEC 7

51 DSI 05H 0.02 0.38 102 P1 STH TEC 7

51 DNI 08C -0.02 1.26 37 P1 STH TEC 7

57 DNI 04H 0.15 1.37 27 P1 STH TEC 7

57 DNI 05H 0.05 1.75 30 P1 STH TEC 7

57 DNI 07H 0.02 1.46 28 P1 STH TEC 7

59 SCI TSH -0.05 2.34 83 0.63 0.22 69 P2 TSH TSH 7

60 DNI 03H -0.05 1.27 23 P1 TEH TEC 7

72 DNI 06H 0.02 1.27 46 P1 TEH TEC Page 5 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 7

72 DNI 04H 0.05 1.51 44 P1 TEH TEC 7

78 SCI TSH 0.05 0.13 142 1.08 0.21 63 P2 TSH TSH 7

82 DNI 07C 0.02 1.31 47 P1 TEH TEC 7

83 DNI 08H 0.05 1.33 52 P1 TEH TEC 7

83 DNI 07C 0.00 1.33 51 P1 TEH TEC 7

87 DNI 07H 0.00 1.49 51 P1 TEH TEC 7

88 DNI 07H 0.00 1.28 53 P1 TEH TEC 7

94 DSI 02H 0.05 0.22 168 P1 TEH TEC 8

2 DNI 05H 0.00 1.56 52 P1 TEH TEC 8

6 DNI 04H 0.15 1.40 36 P1 TEH TEC 8

16 DSI 05H -0.07 0.18 91 P1 STH TEC 8

19 DSI 02H -0.05 0.45 132 P1 TEH TEC 8

28 DSI 02H -0.05 0.28 88 P1 STH TEC 8

28 DNI 08H 0.00 1.38 44 P1 STH TEC 8

29 DSI 02H -0.02 0.24 148 P1 STH TEC 8

32 SAI 05H 0.00 0.28 34 0.26 0.12 138 6

05H 05H 8

32 DSI 05H 0.05 0.82 24 P1 TEH TEC 8

32 DNI 07H 0.15 1.49 19 P1 TEH TEC 8

32 DNI 08H 0.12 1.49 17 P1 TEH TEC 8

32 DSI 03H -0.07 0.35 96 P1 TEH TEC 8

34 DSI 03H -0.27 0.77 51 P1 TEH TEC 8

35 SAI 05H 0.00 0.23 51 0.39 0.09 66 2

04H 05H 8

35 SAI 04H -0.12 0.20 48 0.36 0.10 61 2

04H 05H 8

35 DSI 04H 0.00 0.18 134 P1 STH TEC 8

35 DSI 05H 0.05 0.18 105 P1 STH TEC 8

40 DNI 05C 0.00 1.40 30 P1 STH TEC 8

41 MCI TSH -0.29 0.27 185 1.41 0.18 73 P2 TSH TSH 8

41 HAI TSH 0.38 0.29 40 0.31 0.14 97 3

TSH TSH 8

42 DSI 02H 0.00 0.15 111 P1 STH TEC 8

49 SCI TSH -0.08 0.16 52 0.40 0.10 106 P2 TSH TSH 8

56 DNI 08H 0.05 1.28 46 P1 STH TEC 8

58 SCI TSH -0.04 0.14 37 0.28 0.14 124 P2 TSH TSH 8

59 DNI 08H 0.00 1.32 53 P1 TEH TEC 8

65 DSI 03H 0.02 0.32 142 P1 TEH TEC 8

65 DNI 07H 0.02 1.43 54 P1 TEH TEC 8

65 DNI 07C -0.02 1.41 43 P1 TEH TEC 8

66 DNI 06H 0.10 1.32 46 P1 TEH TEC 8

66 DNI 08H 0.00 1.47 47 P1 TEH TEC 8

67 DSI 02H 0.02 0.31 134 P1 TEH TEC 8

69 DSI 02H 0.00 0.34 146 P1 TEH TEC 8

74 DNI 07H 0.00 1.45 44 P1 TEH TEC Page 6 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 8

74 DNI 08H 0.02 1.35 44 P1 TEH TEC 8

74 DNI 03H 0.00 1.46 50 P1 TEH TEC 8

76 DSI 05H 0.02 0.15 113 P1 TEH TEC 8

85 DSI 02H 0.00 0.06 167 P1 TEH TEC 8

89 DSI 05H -0.02 0.24 67 P1 TEH TEC 8

91 DSI 04H -0.02 0.44 122 P1 TEH TEC 8

93 DSI 03H -0.02 0.46 94 P1 TEH TEC 9

3 DNI 05H 0.00 1.36 47 P1 TEH TEC 9

3 DNI 06H 0.00 1.29 50 P1 TEH TEC 9

5 DNI 08H 0.00 1.25 48 P1 TEH TEC 9

7 DNI 06H 0.02 1.27 54 P1 TEH TEC 9

7 DNI 07H 0.00 1.40 48 P1 TEH TEC 9

7 SAI 02H -0.08 0.33 42 0.32 0.11 108 P4 02H 02H 9

7 DSI 02H 0.05 0.22 121 P1 TEH TEC 9

7 DNI 08H 0.02 1.52 39 P1 TEH TEC 9

10 DNI 05H 0.02 1.45 52 P1 TEH TEC 9

10 DSI 02H -0.10 1.13 106 P1 TEH TEC 9

10 DNI 06H 0.00 1.53 51 P1 TEH TEC 9

12 DNI 06H 0.02 1.42 46 P1 TEH TEC 9

12 DNI 07H 0.02 1.32 46 P1 TEH TEC 9

13 DNI 08H 0.02 1.40 45 P1 TEH TEC 9

13 DSI 02H -0.07 0.21 118 P1 TEH TEC 9

14 DSI 03H 0.00 0.17 98 P1 TEH TEC 9

14 DNI 07H -0.02 1.40 46 P1 TEH TEC 9

16 DSI 02H -0.02 0.45 148 P1 TEH TEC 9

16 DSI 03H 0.07 0.74 67 P1 TEH TEC 9

16 DSI 04H 0.00 0.53 144 P1 TEH TEC 9

18 DNI 06H 0.00 1.26 53 P1 TEH TEC 9

18 DSI 05H -0.07 0.28 111 P1 TEH TEC 9

25 DNI 05C -0.02 1.27 39 P1 TEH TEC 9

28 DNI 07H 0.00 1.38 55 P1 TEH TEC 9

28 DNI 07C 0.02 1.27 44 P1 TEH TEC 9

28 DNI 08C 0.00 1.58 37 P1 TEH TEC 9

29 DNI 06H 0.10 1.47 49 P1 TEH TEC 9

30 DNI 08H 0.00 1.25 54 P1 TEH TEC 9

34 SAI 02H -0.27 0.12 51 0.39 0.13 135 6

02H 02H 9

34 SCI TSH -0.08 0.35 142 1.08 0.08 101 P2 TSH TSH 9

34 DNI 06C -0.02 1.26 35 P1 TEH TEC 9

34 DSI 02H 0.07 0.19 140 P1 TEH TEC 9

35 DSI 02H -0.02 0.30 140 P1 STH TEC 9

35 DNI 06C -0.02 1.39 22 P1 STH TEC Page 7 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 9

37 DNI 05H 0.00 1.32 26 P1 TEH TEC 9

37 DNI 04H 0.00 1.68 31 P1 TEH TEC 9

37 DNI 08H 0.02 1.57 32 P1 TEH TEC 9

37 DNI 06H -0.02 1.66 33 P1 TEH TEC 9

37 DNI 02C -0.10 1.53 9

P1 TEH TEC 9

37 DNI 07H -0.20 1.68 17 P1 TEH TEC 9

38 DSI 05H 0.00 0.44 169 P1 TEH TEC 9

38 DNI 08C 0.25 1.42 13 P1 TEH TEC 9

40 SCI TSH -0.21 0.22 151 1.15 0.13 131 P2 TSH TSH 9

40 DSI 03H 0.00 0.37 102 P1 TEH TEC 9

40 DNI 07H 0.02 1.44 42 P1 TEH TEC 9

42 VOL TSC 0.00 0.40 65 0.49 0.51 29 6

TSC TSC 9

42 PCT TSC

-0.04 32 0.37 124 6

TSC TSC 9

49 DNI 08H 0.02 1.57 42 P1 TEH TEC 9

51 SAI 04H -0.10 0.21 55 0.42 0.11 97 2

04H 04H 9

51 DSI 04H -0.10 0.46 94 P1 STH TEC 9

56 DSI 04H 0.02 0.21 84 P1 TEH TEC 9

56 DSI 02H -0.02 0.20 77 P1 TEH TEC 9

57 DSI 02H 0.05 0.22 152 P1 TEH TEC 9

57 DSI 03H -0.07 0.27 77 P1 TEH TEC 9

59 SCI TSH -0.15 0.21 40 0.31 0.12 132 P2 TSH TSH 9

59 DNI 07H 0.00 1.36 53 P1 TEH TEC 9

62 DNI 08H 0.00 1.37 51 P1 TEH TEC 9

64 SCI TSH -0.02 0.00 26 0.20 0.14 76 P2 TSH TSH 9

65 DNI 07C 0.00 1.34 44 P1 TEH TEC 9

65 DNI 04C 0.17 1.33 24 P1 TEH TEC 9

73 SCI TSH -0.08 0.16 198 1.52 0.28 47 P2 TSH TSH 9

74 DSI 03H -0.02 0.21 153 P1 TEH TEC 9

79 SCI TSH -0.03 0.18 228 1.74 0.15 115 P2 TSH TSH 9

79 PCT AV1 0.00 16 0.30 0

P4 08C 08H 9

83 PSI 04H 0.25 8.43 78 8

TEH TEC 9

86 DNI 05C 0.24 1.26 22 P1 TEH TEC 9

93 DNI 02C 0.05 1.08 4

P1 TEH TEC 10 4

DNI 06H 0.00 1.41 54 P1 TEH TEC 10 7

DNI 06H 0.00 1.55 51 P1 TEH TEC 10 7

DSI 02H -0.07 0.29 89 P1 TEH TEC 10 7

DSI 03H -0.02 0.28 136 P1 TEH TEC 10 8

DSI 03H -0.02 0.28 84 P1 TEH TEC 10 10 DNI 07H 0.00 1.53 45 P1 TEH TEC 10 12 DNI 08H 0.00 1.49 20 P1 TEH TEC 10 12 DNI 06H 0.00 1.48 22 P1 TEH TEC Page 8 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 10 12 DNI 07H 0.02 1.61 20 P1 TEH TEC 10 15 DNI 07H 0.00 1.48 50 P1 TEH TEC 10 15 DNI 05H 0.00 1.39 54 P1 TEH TEC 10 18 DNI 06H 0.00 1.32 41 P1 TEH TEC 10 19 DSI 04H -0.02 0.31 84 P1 TEH TEC 10 29 DNI 07H -0.15 1.75 18 P1 TEH TEC 10 32 SCI TSH 0.00 0.13 69 0.53 0.18 63 P2 TSH TSH 10 32 DNI 08C -0.02 1.94 16 P1 TEH TEC 10 32 DNI 05H 0.02 1.45 22 P1 TEH TEC 10 34 SAI 04H -0.05 0.20 45 0.34 0.11 119 2

04H 04H 10 34 DSI 04H 0.02 0.92 16 P1 STH TEC 10 37 DSI 03H -0.02 0.14 144 P1 TEH TEC 10 38 DSI 04H -0.02 0.12 56 P1 STH TEC 10 47 DNI 04H 0.02 1.34 49 P1 TEH TEC 10 47 DNI 05H 0.00 1.41 38 P1 TEH TEC 10 47 DNI 07H -0.17 1.42 20 P1 TEH TEC 10 47 DNI 07C -0.15 1.28 26 P1 TEH TEC 10 47 DNI 06H 0.00 1.70 25 P1 TEH TEC 10 49 DNI 08C -0.05 1.39 38 P1 STH TEC 10 49 DNI 08H -0.02 1.28 52 P1 STH TEC 10 49 DNI 07C -0.02 1.45 46 P1 STH TEC 10 57 DNI 02H -0.22 1.59 22 P1 TEH TEC 10 57 DNI 08H -0.15 1.39 28 P1 TEH TEC 10 57 DNI 03H 0.00 1.34 39 P1 TEH TEC 10 57 DNI 04H 0.00 1.61 34 P1 TEH TEC 10 57 DNI 07H 0.00 1.92 35 P1 TEH TEC 10 57 DNI 06H -0.07 1.38 25 P1 TEH TEC 10 57 DNI 05H -0.02 2.04 23 P1 TEH TEC 10 58 DNI 07C 0.19 1.83 17 P1 TEH TEC 10 58 DSI 04H -0.02 0.12 48 P1 TEH TEC 10 64 DNI 05C -0.02 1.27 21 P1 TEH TEC 10 64 DNI 02H 0.05 1.69 7

P1 TEH TEC 10 69 DNI 04H 0.02 2.43 11 P1 TEH TEC 10 69 DNI 06C 0.02 1.55 9

P1 TEH TEC 10 69 SCI TSH -0.11 0.21 146 1.12 0.13 121 P2 TSH TSH 10 71 DNI 08C -0.02 1.40 16 P1 TEH TEC 10 72 DNI 07C -0.02 1.40 21 P1 TEH TEC 10 75 DNI 08H 0.15 1.33 30 P1 TEH TEC 10 76 DSI 05H 0.10 0.44 100 P1 TEH TEC 10 83 DNI 04C -0.10 1.47 19 P1 TEH TEC 10 86 DNI 08C -0.02 1.37 39 P1 TEH TEC Page 9 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 10 89 DNI 05H 0.29 2.02 11 P1 TEH TEC 10 89 DNI 08C -0.15 1.41 26 P1 TEH TEC 10 89 DNI 06H 0.00 2.28 26 P1 TEH TEC 10 89 DNI 07H -0.05 1.57 39 P1 TEH TEC 11 2

DSI 03H 0.05 0.56 106 P1 TEH TEC 11 3

DNI 07H 0.02 1.48 50 P1 TEH TEC 11 3

DNI 04H 0.00 2.24 43 P1 TEH TEC 11 3

DNI 05H -0.02 1.74 48 P1 TEH TEC 11 5

DNI 04H 0.00 2.04 47 P1 TEH TEC 11 5

DNI 07H 0.00 1.39 52 P1 TEH TEC 11 5

DNI 05H 0.00 1.93 45 P1 TEH TEC 11 12 DNI 05H 0.00 1.58 49 P1 STH TEC 11 12 DNI 07H 0.00 1.31 49 P1 STH TEC 11 12 DNI 08H 0.00 1.59 42 P1 STH TEC 11 12 DNI 02C 0.00 1.45 17 P1 STH TEC 11 20 DNI 08C 0.00 1.33 43 P1 TEH TEC 11 20 DNI 07H 0.02 1.31 48 P1 TEH TEC 11 20 DNI 06H 0.02 1.45 47 P1 TEH TEC 11 29 DNI 08C 0.05 1.27 28 P1 TEH TEC 11 29 DNI 06H 0.02 1.27 14 P1 TEH TEC 11 48 DNI 03C 0.02 1.57 23 P1 STH TEC 11 48 DNI 04C 0.02 1.98 26 P1 STH TEC 11 48 DSI 02H 0.02 1.16 55 P1 STH TEC 11 48 DNI 07H 0.00 2.24 37 P1 STH TEC 11 48 DNI 05C 0.00 1.83 23 P1 STH TEC 11 48 DNI 02C 0.00 1.32 22 P1 STH TEC 11 48 DSI 08H 0.07 0.43 53 P1 STH TEC 11 48 DNI 06H -0.07 1.99 50 P1 STH TEC 11 56 SCI TSH -0.12 0.18 43 0.33 0.12 89 P2 TSH TSH 11 64 SCI TSH 0.00 0.10 25 0.19 0.10 94 P2 TSH TSH 11 74 DNI 07H 0.00 1.57 54 P1 TEH TEC 11 76 PSI 03C 0.51 15.98 165 P5 TEH TEC 11 76 DNI 03H 0.02 1.28 51 P1 TEH TEC 11 77 DSI 05H 0.02 0.35 79 P1 TEH TEC 11 78 DSI 05H 0.05 0.18 76 P1 TEH TEC 11 78 DSI 06H -0.02 0.16 24 P1 TEH TEC 11 79 DNI 07C 0.00 1.25 44 P1 TEH TEC 11 80 DNI 03C -0.02 1.29 19 P1 TEH TEC 11 80 DNI 06H 0.00 1.37 55 P1 TEH TEC 12 6

DNI AV4 7.01 0.26 113 5

TEH TEC 12 7

DNI 03H 0.00 1.40 12 P1 TEH TEC Page 10 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 7

DNI 06H 0.15 1.33 12 P1 TEH TEC 12 7

DNI 04C 0.20 1.37 10 P1 TEH TEC 12 16 SAI 02H -0.26 0.25 55 0.42 0.14 102 P4 02H 03H 12 16 DNI 08H 0.00 1.34 43 P1 TEH TEC 12 16 DNI 07H 0.00 1.45 48 P1 TEH TEC 12 16 DSI 02H -0.17 0.72 122 P1 TEH TEC 12 19 DNI 08H 0.00 1.29 28 P1 TEH TEC 12 19 DNI 06C -0.27 1.48 12 P1 TEH TEC 12 19 DNI 05C 0.00 1.78 19 P1 TEH TEC 12 19 DNI 07H 0.10 1.35 15 P1 TEH TEC 12 20 DNI 05H 0.00 1.53 48 P1 TEH TEC 12 23 DNI 02C 0.39 1.75 15 P1 TEH TEC 12 26 DNI 05H 0.00 1.38 10 P1 TEH TEC 12 27 DNI 05H 0.00 1.52 15 P1 TEH TEC 12 34 DSI 02H 0.00 0.33 81 P1 TEH TEC 12 34 DNI 06H 0.00 2.12 38 P1 TEH TEC 12 48 DSI 05H 0.00 0.22 63 P1 TEH TEC 12 62 DSI 07C -0.10 0.27 107 P1 TEH TEC 12 64 DNI 03C -0.02 1.32 12 P1 TEH TEC 12 64 DNI 04H 0.00 1.85 48 P1 TEH TEC 12 64 DNI 07H 0.00 1.72 53 P1 TEH TEC 12 64 DNI 08C -0.02 1.36 50 P1 TEH TEC 12 67 DNI 08C 0.00 1.31 45 P1 TEH TEC 12 69 DNI 08C -0.02 1.38 40 P1 TEH TEC 12 69 DSI 02H 0.00 0.40 90 P1 TEH TEC 12 69 DSI 03H -0.02 0.24 99 P1 TEH TEC 12 70 DSI 03H 0.02 0.25 132 P1 TEH TEC 12 71 DNI 06C 0.00 1.72 37 P1 TEH TEC 12 71 DNI 08H 0.02 1.77 38 P1 TEH TEC 12 71 DNI 07C 0.00 1.29 46 P1 TEH TEC 12 72 DNI 08H 0.00 1.66 46 P1 TEH TEC 12 72 DNI 05H 0.00 1.76 48 P1 TEH TEC 12 72 DSI 02H -0.02 0.24 144 P1 TEH TEC 12 73 DSI 05H 0.07 0.19 121 P1 TEH TEC 12 73 DNI 07H 0.00 1.61 50 P1 TEH TEC 12 74 DSI 02H 0.05 0.49 155 P1 TEH TEC 12 74 DNI 07C 0.00 1.42 42 P1 TEH TEC 12 74 DNI 07H 0.00 1.49 51 P1 TEH TEC 12 74 DSI 03H -0.02 0.47 67 P1 TEH TEC 12 75 DNI 04C 0.10 1.79 15 P1 TEH TEC 12 75 DNI 02H 0.00 2.03 45 P1 TEH TEC Page 11 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 75 DNI 03H 0.00 1.65 49 P1 TEH TEC 12 75 DNI 04H 0.27 1.65 12 P1 TEH TEC 12 75 DNI 05C 0.00 1.29 43 P1 TEH TEC 12 75 DNI 05H 0.15 1.56 35 P1 TEH TEC 12 75 DNI 06H 0.00 1.37 54 P1 TEH TEC 12 75 DNI 06C -0.02 1.53 40 P1 TEH TEC 12 78 DNI 06C 0.00 1.51 29 P1 TEH TEC 12 80 DSI 05H 0.10 0.14 76 P1 TEH TEC 12 89 DNI 07C 0.00 1.33 44 P1 TEH TEC 12 89 DNI 08C 0.00 1.30 51 P1 TEH TEC 13 4

DNI 05H 0.00 1.26 50 P1 TEH TEC 13 4

DNI 03H 0.05 1.92 38 P1 TEH TEC 13 4

DNI 06H 0.00 1.34 49 P1 TEH TEC 13 4

DNI 07H 0.00 1.45 39 P1 TEH TEC 13 13 DNI 07H 0.00 1.41 34 P1 TEH TEC 13 21 DNI 04H 0.02 1.39 40 P1 TEH TEC 13 22 DNI 06H -0.02 1.72 44 P1 TEH TEC 13 22 DNI 07H 0.00 1.99 36 P1 TEH TEC 13 29 DNI 05H -0.02 1.47 37 P1 TEH TEC 13 29 DNI 06H 0.02 1.54 36 P1 TEH TEC 13 32 DSI 02H -0.02 0.09 135 P1 TEH TEC 13 41 DNI 03H 0.00 1.28 16 P1 TEH TEC 13 41 DNI 07H 0.02 1.49 24 P1 TEH TEC 13 41 DNI 08H -0.02 1.27 16 P1 TEH TEC 13 46 DNI 08C 0.02 1.33 17 P1 TEH TEC 13 47 DNI 04C 0.10 1.59 16 P1 TEH TEC 13 47 DNI 07C 0.00 1.35 39 P1 TEH TEC 13 49 DSI 04H 0.05 0.06 88 P1 TEH TEC 13 56 SCI SBH 0.60 0.18 80 0.61 3.13 118 P3 SBH STH 13 57 DNI 07H 0.00 1.50 43 P1 TEH TEC 13 60 DSI 02H 0.05 0.36 172 P1 TEH TEC 13 65 DSI 06C 0.02 0.12 104 P1 TEH TEC 13 66 DNI 05C -0.12 1.25 18 P1 TEH TEC 13 67 DSI 06C 0.00 0.31 77 P1 TEH TEC 13 67 DNI 08H -0.02 1.27 55 P1 TEH TEC 13 70 DNI 08H 0.00 1.47 37 P1 TEH TEC 13 71 DSI 04H 0.00 0.23 19 P1 TEH TEC 13 80 DNI 02C -0.37 1.50 12 P1 TEH TEC 13 80 DNI 06C 0.00 2.10 26 P1 TEH TEC 13 80 DNI 07C -0.02 1.73 36 P1 TEH TEC 13 80 DNI 08H 0.02 1.42 49 P1 TEH TEC Page 12 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 13 80 DSI 03H 0.07 0.42 98 P1 TEH TEC 13 80 DNI 03C -0.34 1.35 13 P1 TEH TEC 13 83 DNI 07H 0.02 2.05 46 P1 TEH TEC 13 83 DNI 06H 0.02 1.87 49 P1 TEH TEC 13 84 DNI 02C 0.37 1.37 10 P1 TEH TEC 13 84 DSI 02H -0.05 0.48 80 P1 TEH TEC 13 85 DNI 03C -0.05 1.55 17 P1 TEH TEC 13 85 DNI 05C -0.02 1.70 27 P1 TEH TEC 13 85 DNI 07C -0.02 1.87 32 P1 TEH TEC 13 85 DNI 08C 0.00 1.44 38 P1 TEH TEC 13 85 DSI 02H 0.02 0.34 77 P1 TEH TEC 13 86 DNI 08C 0.00 1.26 49 P1 TEH TEC 13 86 DNI 08H 0.00 1.78 46 P1 TEH TEC 13 86 DNI 05C 0.00 1.91 29 P1 TEH TEC 13 86 DNI 07H 0.02 1.77 48 P1 TEH TEC 13 86 DSI 03H 0.02 0.25 115 P1 TEH TEC 13 87 DNI 08C -0.05 1.99 31 P1 TEH TEC 13 87 DNI 07C -0.02 2.11 32 P1 TEH TEC 13 87 DNI 03C 0.12 1.37 13 P1 TEH TEC 13 87 DNI 05C 0.00 1.89 28 P1 TEH TEC 13 87 DNI 06C 0.00 2.05 27 P1 TEH TEC 13 91 DSI 05C -0.02 0.19 72 P1 TEH TEC 13 91 DSI 05H 0.07 0.69 105 P1 TEH TEC 13 92 DSI 04H -0.02 0.46 109 P1 TEH TEC 14 3

DNI 06H 0.00 1.33 39 P1 TEH TEC 14 6

DNI 03H 0.20 2.35 11 P1 TEH TEC 14 15 DNI 03H 0.07 1.60 20 P1 TEH TEC 14 15 DSI 04H 0.10 0.10 144 P1 TEH TEC 14 20 DSI 03H -0.02 0.15 52 P1 TEH TEC 14 20 DNI 06H 0.00 1.49 42 P1 TEH TEC 14 20 DNI 05H -0.05 1.28 21 P1 TEH TEC 14 20 DNI 08C 0.00 1.38 32 P1 TEH TEC 14 20 DNI 04C 0.00 1.91 16 P1 TEH TEC 14 21 DNI 07H 0.00 1.50 35 P1 TEH TEC 14 21 DNI 06H 0.02 1.36 50 P1 TEH TEC 14 24 DNI 07H 0.00 1.47 41 P1 TEH TEC 14 24 DNI 06H 0.00 1.45 49 P1 TEH TEC 14 24 DNI 05H 0.00 1.38 54 P1 TEH TEC 14 25 DSI 05H 0.05 0.25 121 P1 TEH TEC 14 27 DSI 05H 0.12 0.15 91 P1 TEH TEC 14 31 DSI 05H 0.00 0.13 142 P1 TEH TEC Page 13 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 31 DSI 02H 0.00 0.10 21 P1 TEH TEC 14 32 SCI TSH 0.00 0.13 95 0.73 0.21 128 P2 TSH TSH 14 37 DNI 08H 0.20 1.40 13 P1 TEH TEC 14 37 DNI 07C 0.02 1.35 16 P1 TEH TEC 14 37 DNI 08C -0.15 1.35 12 P1 TEH TEC 14 39 DNI 06H 0.00 1.31 49 P1 TEH TEC 14 40 SAI 05H 0.00 0.11 32 0.25 0.12 112 6

05H 05H 14 40 DSI 05H 0.00 0.21 29 P1 TEH TEC 14 41 DNI 05H 0.00 1.27 38 P1 TEH TEC 14 46 DSI 02H -0.14 0.35 113 P1 TEH TEC 14 47 DSI 02H 0.02 0.18 65 P1 TEH TEC 14 47 DSI 04H 0.00 0.18 69 P1 TEH TEC 14 48 DSI 05H -0.02 0.47 151 P1 TEH TEC 14 48 DNI 08H 0.00 1.37 53 P1 TEH TEC 14 49 DNI 07C 0.02 1.38 42 P1 TEH TEC 14 49 DNI 08H 0.00 1.44 46 P1 TEH TEC 14 49 DNI 08C 0.00 1.43 38 P1 TEH TEC 14 49 DNI 06H 0.00 1.30 49 P1 TEH TEC 14 49 DNI 07H 0.00 1.40 54 P1 TEH TEC 14 49 DNI 05C 0.00 1.52 37 P1 TEH TEC 14 49 DNI 06C 0.00 1.39 40 P1 TEH TEC 14 50 DNI 03C -0.34 1.69 11 P1 TEH TEC 14 50 DNI 07C -0.02 1.35 38 P1 TEH TEC 14 50 DNI 08H 0.00 1.40 52 P1 TEH TEC 14 50 DSI 03H 0.00 0.19 129 P1 TEH TEC 14 53 DSI 02H -0.02 0.08 69 P1 TEH TEC 14 53 DNI 08H 0.00 1.29 53 P1 TEH TEC 14 54 DNI 06H -0.10 1.76 48 P1 TEH TEC 14 54 DSI 02H 0.05 0.26 45 P1 TEH TEC 14 54 DNI 07H 0.02 1.40 55 P1 TEH TEC 14 55 DNI 05H 0.00 1.34 41 P1 TEH TEC 14 55 DNI 06H 0.00 1.43 39 P1 TEH TEC 14 58 DNI 06C 0.00 1.73 34 P1 TEH TEC 14 58 DSI 02H 0.07 0.55 152 P1 TEH TEC 14 58 DNI 08H 0.00 1.36 48 P1 TEH TEC 14 58 DNI 02C -0.15 1.82 16 P1 TEH TEC 14 59 DNI 04C -0.17 1.26 23 P1 TEH TEC 14 59 DNI 07C 0.00 1.35 47 P1 TEH TEC 14 59 DSI 03H 0.05 0.17 71 P1 TEH TEC 14 59 DSI 06H 0.12 0.50 144 P1 TEH TEC 14 59 DSI 02H 0.02 0.22 133 P1 TEH TEC Page 14 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 59 DNI 08C 0.00 1.62 40 P1 TEH TEC 14 59 DNI 08H 0.00 1.95 37 P1 TEH TEC 14 60 DNI 08H 0.00 1.59 51 P1 TEH TEC 14 61 DNI 08H 0.00 1.46 48 P1 TEH TEC 14 61 DNI 08C -0.05 1.30 44 P1 TEH TEC 14 61 DNI 06H -0.02 1.70 52 P1 TEH TEC 14 61 DNI 06C 0.00 1.51 32 P1 TEH TEC 14 61 DNI 07C 0.00 1.59 31 P1 TEH TEC 14 64 DNI 02C 0.10 2.14 14 P1 TEH TEC 14 64 DNI 04H 0.02 2.26 52 P1 TEH TEC 14 64 DNI 06C 0.05 1.41 28 P1 TEH TEC 14 64 DNI 07C -0.02 1.88 33 P1 TEH TEC 14 65 DNI 04C -0.15 1.65 17 P1 TEH TEC 14 65 DNI 02H 0.00 2.88 47 P1 TEH TEC 14 65 DSI 03H -0.05 0.25 89 P1 TEH TEC 14 66 DNI 08H 0.00 1.48 48 P1 TEH TEC 14 66 DNI 06H 0.00 1.31 55 P1 TEH TEC 14 67 DNI 07H 0.00 1.42 55 P1 TEH TEC 14 67 DNI 06C 0.15 1.47 26 P1 TEH TEC 14 68 DSI 02H 0.00 0.26 27 P1 TEH TEC 14 70 DNI 04C 0.39 1.64 12 P1 TEH TEC 14 70 DSI 02H 0.02 0.51 71 P1 TEH TEC 14 70 DNI 07H -0.02 1.51 52 P1 TEH TEC 14 70 DSI 03H -0.05 0.78 154 P1 TEH TEC 14 71 DNI 08H 0.00 1.25 51 P1 TEH TEC 14 71 DSI 04H 0.00 0.12 50 P1 TEH TEC 14 71 DSI 03H 0.05 0.21 128 P1 TEH TEC 14 71 DSI 02H 0.00 0.10 77 P1 TEH TEC 14 72 DSI 06H 0.07 0.10 14 P1 TEH TEC 14 73 DNI 07H 0.02 1.99 36 P1 TEH TEC 14 73 DNI 06H 0.02 1.74 45 P1 TEH TEC 14 73 DNI 06C -0.02 2.15 27 P1 TEH TEC 14 73 DNI 02C 0.37 2.99 12 P1 TEH TEC 14 77 DNI 07C -0.02 1.37 45 P1 TEH TEC 14 77 DNI 08H 0.00 1.48 49 P1 TEH TEC 14 77 DSI 02H 0.00 0.15 160 P1 TEH TEC 14 80 DSI 03H 0.00 0.20 131 P1 TEH TEC 14 80 DNI 08H 0.00 1.37 41 P1 TEH TEC 14 80 DNI 07H 0.00 1.26 54 P1 TEH TEC 14 86 DSI 04H 0.05 0.30 39 P1 TEH TEC 14 87 DNI 07H 0.00 1.27 50 P1 TEH TEC Page 15 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 15 27 DSI 05H -0.05 0.12 91 P1 TEH TEC 15 31 SAI 04H 0.04 0.23 54 0.41 0.31 63 2

04H 05H 15 31 DSI 04H 0.07 0.28 51 P1 STH TEC 15 35 DNI 06H 0.02 1.48 40 P1 TEH TEC 15 40 DNI 07H 0.00 1.28 43 P1 TEH TEC 15 40 DNI 08H -0.02 1.55 33 P1 TEH TEC 15 47 DNI 05H 0.15 1.54 13 P1 TEH TEC 15 50 DNI 08H 0.00 1.33 47 P1 TEH TEC 15 54 DNI 04H -0.02 1.39 43 P1 TEH TEC 15 63 DNI 06H 0.07 1.66 39 P1 TEH TEC 15 63 DSI 02H 0.02 0.12 72 P1 TEH TEC 15 64 DNI 08H 0.00 1.27 49 P1 TEH TEC 15 65 DNI 03H 0.02 1.55 50 P1 TEH TEC 15 66 DNI 03H 0.00 1.49 53 P1 TEH TEC 15 67 DSI 03H -0.02 0.21 72 P1 TEH TEC 15 67 DSI 02H -0.02 0.23 32 P1 TEH TEC 15 70 DNI 03H 0.00 1.54 46 P1 TEH TEC 15 71 DSI 02H 0.00 0.10 104 P1 TEH TEC 15 72 DSI 02H 0.00 0.17 109 P1 TEH TEC 15 73 DSI 03H -0.02 0.58 107 P1 TEH TEC 15 73 DSI 05H 0.02 0.20 88 P1 TEH TEC 15 73 DNI 06C 0.00 1.30 55 P1 TEH TEC 15 74 DNI 06H 0.02 1.51 55 P1 TEH TEC 15 74 DSI 03H -0.02 0.37 48 P1 TEH TEC 15 74 DNI 05H 0.00 1.64 53 P1 TEH TEC 15 74 DNI 08H 0.02 1.93 42 P1 TEH TEC 15 74 DNI 07H 0.00 1.82 47 P1 TEH TEC 15 75 DNI 02C 0.10 1.53 11 P1 TEH TEC 15 75 DSI 07H -0.02 0.19 142 P1 TEH TEC 15 75 DSI 02H 0.00 0.62 149 P1 TEH TEC 15 75 DNI 07C -0.02 1.81 35 P1 TEH TEC 15 75 DSI 08H 0.05 0.44 169 P1 TEH TEC 15 75 SAI 08H 0.00 0.25 18 0.14 0.09 126 6

08H 08H 15 76 DNI 07H 0.00 1.42 54 P1 TEH TEC 15 76 DNI 07C 0.00 1.26 38 P1 TEH TEC 15 76 DNI 08H -0.05 1.42 45 P1 TEH TEC 15 78 DNI 05C 0.02 1.60 29 P1 TEH TEC 15 80 DNI 02H 0.07 2.04 49 P1 TEH TEC 15 80 DNI 04H 0.02 2.17 48 P1 TEH TEC 15 80 DNI 05H 0.02 1.91 49 P1 TEH TEC 15 80 DNI 07H -0.17 1.89 43 P1 TEH TEC Page 16 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 15 80 DNI 08H 0.00 1.99 39 P1 TEH TEC 15 80 DNI 07C 0.00 1.57 36 P1 TEH TEC 15 82 DNI 07H 0.00 1.59 48 P1 TEH TEC 15 82 DNI 03H 0.00 1.50 52 P1 TEH TEC 15 82 DNI 06H 0.02 1.36 55 P1 TEH TEC 15 82 DNI 08H 0.00 1.36 52 P1 TEH TEC 15 86 NQI 05H 20.00 0.17 103 3

TEH TEC 15 91 DNI 05C 0.07 1.65 8

P1 TEH TEC 16 11 SAI 05H 0.00 0.16 75 0.58 0.13 71 6

05H 06H 16 11 DSI 05H 0.00 0.21 133 P1 TEH TEC 16 18 DNI 04H 0.12 1.52 16 P1 TEH TEC 16 23 MAI TSH 0.04 0.13 151 1.15 0.19 74 6

TSH TSH 16 32 DNI 05H 0.00 1.25 51 P1 TEH TEC 16 35 SAI TSH -0.02 0.11 45 0.34 0.11 47 6

TSH TSH 16 38 DNI 07C -0.02 1.69 10 P1 STH TEC 16 39 DNI 04H -0.05 1.64 8

P1 TEH TEC 16 40 DNI 03H 0.02 1.33 53 P1 TEH TEC 16 40 DNI 06H 0.02 1.34 46 P1 TEH TEC 16 40 DNI 08C -0.02 1.31 34 P1 TEH TEC 16 40 DNI 05H 0.05 1.34 42 P1 TEH TEC 16 44 DNI 05H 0.02 1.31 48 P1 STH TEC 16 50 DSI 05C 0.00 0.28 162 P1 TEH TEC 16 52 DNI 02C 0.32 1.75 15 P1 TEH TEC 16 52 DNI 04C -0.02 1.41 20 P1 TEH TEC 16 52 DNI 07C 0.27 1.26 13 P1 TEH TEC 16 52 DNI 07H 0.00 1.66 50 P1 TEH TEC 16 52 DSI 02H 0.10 0.54 153 P1 TEH TEC 16 52 DNI 08H 0.00 1.29 53 P1 TEH TEC 16 53 DSI 03H 0.00 0.21 34 P1 TEH TEC 16 54 DNI 07C 0.00 2.16 31 P1 TEH TEC 16 54 DNI 08H 0.00 1.50 50 P1 TEH TEC 16 55 DNI 03H 0.00 1.55 53 P1 TEH TEC 16 56 DNI 08H 0.00 1.37 50 P1 TEH TEC 16 56 DNI 07H 0.00 1.74 43 P1 TEH TEC 16 57 DNI 06H 0.00 1.67 51 P1 TEH TEC 16 57 DNI 08H 0.00 2.14 38 P1 TEH TEC 16 57 DNI 08C 0.00 1.53 44 P1 TEH TEC 16 57 DNI 07C 0.00 1.31 44 P1 TEH TEC 16 59 DNI 07H 0.00 1.83 43 P1 TEH TEC 16 59 DNI 03H 0.00 2.25 52 P1 TEH TEC 16 59 DNI 06C 0.00 2.03 27 P1 TEH TEC Page 17 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 16 59 DNI 07C 0.00 1.28 45 P1 TEH TEC 16 59 DNI 08C 0.00 1.41 18 P1 TEH TEC 16 60 DSI 02H -0.05 0.25 146 P1 TEH TEC 16 62 DSI 08H -0.02 0.05 78 P1 TEH TEC 16 66 DSI 03H 0.02 0.21 36 P1 TEH TEC 16 66 DNI 07C 0.00 1.36 39 P1 TEH TEC 16 70 DSI 03H -0.07 0.13 92 P1 TEH TEC 16 72 DNI 05H 0.02 1.77 49 P1 TEH TEC 16 72 DSI 02H 0.00 0.14 120 P1 TEH TEC 16 76 DSI 02H 0.02 0.22 94 P1 TEH TEC 16 76 DNI 06H 0.00 1.33 46 P1 TEH TEC 16 77 DSI 05H 0.00 0.14 141 P1 TEH TEC 16 84 DNI 07H 0.00 1.65 48 P1 TEH TEC 16 84 DNI 08H -0.02 1.35 53 P1 TEH TEC 16 86 DNI 02C 0.00 1.71 12 P1 STH TEC 17 6

DNI 02H 0.20 1.36 18 P1 TEH TEC 17 10 DSI 03H -0.02 0.34 168 P1 TEH TEC 17 12 DNI 04H 0.17 1.73 16 P1 TEH TEC 17 21 SAI TSH 0.07 0.18 52 0.40 0.15 49 6

TSH TSH 17 23 DNI 07C 0.07 1.45 11 P1 STH TEC 17 27 DSI 04H 0.05 0.13 60 P1 TEH TEC 17 31 DNI 04H -0.05 1.30 18 P1 TEH TEC 17 32 DSI 05H 0.02 0.26 21 P1 TEH TEC 17 35 DNI 06H 0.05 1.40 28 P1 TEH TEC 17 39 DNI 05H 0.24 1.35 17 P1 TEH TEC 17 47 SCI 02H 8.37 0.15 29 0.22 1.01 164 P2 02H 03H 17 49 DNI 04C -0.05 1.51 16 P1 TEH TEC 17 49 DNI 05C 0.00 1.78 29 P1 TEH TEC 17 49 DNI 06C 0.10 1.59 25 P1 TEH TEC 17 49 DNI 08C 0.00 1.26 42 P1 TEH TEC 17 51 DNI 05H 0.00 1.35 51 P1 TEH TEC 17 51 DNI 08H 0.00 1.82 42 P1 TEH TEC 17 51 DNI 07H 0.00 1.26 53 P1 TEH TEC 17 51 DNI 07C -0.02 1.34 44 P1 TEH TEC 17 53 DNI 08C 0.00 1.63 38 P1 TEH TEC 17 54 DSI 03H 0.02 0.19 73 P1 TEH TEC 17 54 DNI 08H 0.00 1.85 43 P1 TEH TEC 17 54 DNI 08C -0.02 1.39 37 P1 TEH TEC 17 54 DNI 03C -0.32 1.60 13 P1 TEH TEC 17 54 DNI 06C -0.02 1.97 27 P1 TEH TEC 17 54 DNI 07C 0.00 2.16 29 P1 TEH TEC Page 18 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 17 58 DNI 07H 0.00 1.26 53 P1 TEH TEC 17 59 DSI 02H 0.07 0.28 151 P1 TEH TEC 17 59 DSI 05H 0.05 0.20 127 P1 TEH TEC 17 66 DNI 03H 0.02 1.63 55 P1 TEH TEC 17 67 DNI 04H 0.00 1.28 47 P1 TEH TEC 17 76 DNI 05C 0.37 1.72 15 P1 TEH TEC 17 76 DNI 07H 0.00 1.85 47 P1 TEH TEC 17 76 DNI 03H 0.00 1.86 42 P1 TEH TEC 17 76 DSI 02H 0.02 0.45 45 P1 TEH TEC 17 81 DSI 04H -0.07 0.12 70 P1 TEH TEC 17 81 DSI 03H 0.00 0.13 144 P1 TEH TEC 17 81 DNI 07C 0.00 1.31 22 P1 TEH TEC 17 81 DNI 07H 0.02 1.25 34 P1 TEH TEC 17 83 DNI AV2 5.73 0.19 124 5

TEH TEC 17 84 DSI 03H 0.02 0.11 75 P1 TEH TEC 17 85 DNI 05H 0.00 1.39 52 P1 TEH TEC 17 86 DNI 08H 0.00 1.25 48 P1 TEH TEC 17 90 DNI 05H -0.02 1.31 42 P1 TEH TEC 18 7

DNI 08H 0.00 1.53 42 P1 TEH TEC 18 7

DNI 07H 0.07 1.25 50 P1 TEH TEC 18 7

DSI 04H 0.00 0.33 143 P1 TEH TEC 18 10 DSI 03H 0.00 0.55 169 P1 TEH TEC 18 10 DSI 04H 0.05 0.24 154 P1 TEH TEC 18 14 DSI 04H 0.00 0.39 20 P1 TEH TEC 18 15 DNI 08H 0.02 1.75 18 P1 TEH TEC 18 17 DNI 04H -0.02 1.47 19 P1 TEH TEC 18 27 DSI 07H 0.00 0.12 31 P1 STH TEC 18 30 DSI 04H 0.02 0.06 37 P1 TEH TEC 18 32 DNI 07H 0.02 1.44 50 P1 TEH TEC 18 32 DNI 08H 0.00 1.30 48 P1 TEH TEC 18 43 DNI 07H 0.05 1.52 37 P1 TEH TEC 18 43 DNI 06H 0.05 1.25 54 P1 TEH TEC 18 43 DNI 05H 0.02 1.37 48 P1 TEH TEC 18 47 DSI 02H 0.02 0.16 101 P1 TEH TEC 18 47 DSI 05H 0.02 0.40 82 P1 TEH TEC 18 47 DNI 06H 0.02 1.32 55 P1 TEH TEC 18 48 DSI 02H 0.05 0.21 126 P1 TEH TEC 18 48 DNI 07H 0.02 1.85 43 P1 TEH TEC 18 48 DNI 08H 0.00 1.99 37 P1 TEH TEC 18 52 DNI 05C 0.00 2.18 24 P1 TEH TEC 18 52 DNI 04C 0.00 1.32 20 P1 TEH TEC Page 19 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 52 DNI 06C 0.00 2.23 28 P1 TEH TEC 18 55 DNI 06C 0.00 1.68 31 P1 TEH TEC 18 55 DNI 05H 0.00 2.34 45 P1 TEH TEC 18 55 DNI 06H 0.00 1.76 48 P1 TEH TEC 18 55 DNI 07C 0.00 1.62 35 P1 TEH TEC 18 55 DNI 08C 0.00 1.59 37 P1 TEH TEC 18 56 DNI 07H 0.00 1.61 51 P1 TEH TEC 18 56 DNI 08H 0.00 1.40 50 P1 TEH TEC 18 57 DNI 05C 0.00 1.69 31 P1 TEH TEC 18 57 DNI 08H 0.00 1.69 43 P1 TEH TEC 18 57 DNI 06H 0.00 1.79 53 P1 TEH TEC 18 57 DNI 07H 0.00 1.97 45 P1 TEH TEC 18 57 DSI 02H 0.05 0.52 72 P1 TEH TEC 18 57 DNI 04H 0.05 1.71 54 P1 TEH TEC 18 57 DNI 05H 0.00 1.86 54 P1 TEH TEC 18 58 DSI 02H 0.00 0.55 98 P1 TEH TEC 18 74 SCI TSH -0.07 0.16 157 1.20 0.27 112 P2 TSH TSH 18 88 DSI 05H 0.00 0.10 94 P1 TEH TEC 19 7

SAI 03H 0.00 0.21 57 0.43 0.14 96 6

02H 03H 19 7

DSI 02H -0.02 0.42 124 P1 TEH TEC 19 7

DSI 03H 0.00 0.31 78 P1 TEH TEC 19 8

DNI 04H 0.00 1.40 51 P1 TEH TEC 19 8

DSI 03H -0.10 0.27 126 P1 TEH TEC 19 13 DNI 04H 0.12 1.37 18 P1 TEH TEC 19 15 DSI 03H -0.05 0.17 140 P1 TEH TEC 19 15 DSI 04H -0.02 0.16 126 P1 TEH TEC 19 20 DNI 08H 0.00 1.29 48 P1 TEH TEC 19 23 HCI TSH -0.11 0.16 126 0.96 0.58 66 P2 TSH TSH 19 48 DNI 07H 0.00 1.33 45 P1 TEH TEC 19 49 DNI 08C -0.20 1.26 23 P1 TEH TEC 19 54 DNI 04H 0.22 1.29 14 P1 TEH TEC 19 54 DNI 03H 0.00 1.31 20 P1 TEH TEC 19 56 DNI 06H 0.02 1.49 47 P1 TEH TEC 19 56 DNI 07H 0.00 1.39 47 P1 TEH TEC 19 56 DNI 08H -0.02 1.29 41 P1 TEH TEC 19 56 DSI 03H 0.05 0.38 157 P1 TEH TEC 19 57 DSI 02H 0.02 0.45 165 P1 TEH TEC 19 57 DNI 08H 0.00 1.59 45 P1 TEH TEC 19 57 DSI 04H 0.02 0.24 145 P1 TEH TEC 19 59 DNI 04H 0.00 3.01 37 P1 TEH TEC 19 59 DNI 03H 0.00 2.35 40 P1 TEH TEC Page 20 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 19 59 DNI 05H 0.02 1.70 21 P1 TEH TEC 19 59 DNI 06C 0.02 1.29 31 P1 TEH TEC 19 59 DNI 05C 0.29 2.31 16 P1 TEH TEC 19 59 DNI 02H 0.00 2.33 54 P1 TEH TEC 19 60 DNI 07H 0.00 1.33 51 P1 TEH TEC 19 60 DNI 03H 0.00 1.65 51 P1 TEH TEC 19 60 DSI 02H 0.07 0.20 48 P1 TEH TEC 19 66 DNI 07H 0.00 1.25 45 P1 TEH TEC 19 70 DNI 06H 0.00 1.25 37 P1 TEH TEC 20 7

DSI 08C -0.05 0.22 15 P1 TEH TEC 20 9

DSI 03H 0.02 0.15 114 P1 TEH TEC 20 10 DSI 04H -0.02 0.25 83 P1 TEH TEC 20 12 DSI 02H 0.00 0.10 127 P1 TEH TEC 20 15 DNI 07H 0.05 1.45 38 P1 TEH TEC 20 20 SCI TSH -0.14 0.11 65 0.49 0.22 63 P2 TSH TSH 20 22 DSI 02H -0.15 0.75 147 P1 TEH TEC 20 22 DSI 03H 0.00 0.26 98 P1 TEH TEC 20 22 DSI 08H 0.02 0.37 36 P1 TEH TEC 20 24 DNI 06H 0.05 1.57 16 P1 TEH TEC 20 25 DNI 07H 0.00 1.34 44 P1 TEH TEC 20 30 DNI 05H 0.00 1.42 51 P1 TEH TEC 20 32 HCI TSH -0.14 0.16 131 1.00 0.45 86 P2 TSH TSH 20 36 DNI 06H 0.02 1.38 54 P1 TEH TEC 20 44 DSI 02H 0.00 0.12 102 P1 TEH TEC 20 57 DNI 07C 0.02 1.25 43 P1 STH TEC 20 57 DNI 06C -0.02 1.93 20 P1 STH TEC 20 57 DSI 02H 0.00 0.13 127 P1 STH TEC 20 58 DNI 08C -0.07 1.67 19 P1 TEH TEC 20 60 DNI 07H -0.02 1.27 43 P1 TEH TEC 20 60 DNI 08H 0.00 1.31 43 P1 TEH TEC 20 61 DNI 07H 0.00 1.25 54 P1 TEH TEC 20 61 DNI 08H 0.00 1.62 43 P1 TEH TEC 20 62 DSI 05H -0.05 0.31 139 P1 TEH TEC 20 64 PCT AV3 0.19 19 0.99 18 P2 TEH TEC 20 64 PCT AV1 0.24 17 0.76 21 P2 TEH TEC 20 64 PCT AV2 0.21 18 0.92 17 P2 TEH TEC 20 68 DNI 06C 0.10 1.48 11 P1 TEH TEC 20 71 DNI 05C 0.12 1.37 14 P1 TEH TEC 20 72 DNI 07C -0.15 1.39 17 P1 TEH TEC 20 75 DSI 05H 0.02 0.26 163 P1 TEH TEC 20 75 DNI 08C -0.17 1.34 20 P1 TEH TEC Page 21 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 20 78 DNI 08H 0.02 1.41 43 P1 TEH TEC 20 78 DSI 04H 0.05 0.16 144 P1 TEH TEC 20 81 DNI 05C 0.00 1.74 18 P1 TEH TEC 20 83 SCI TSH -0.04 0.08 51 0.39 0.14 121 P2 TSH TSH 20 85 DSI 03H 0.00 0.24 161 P1 TEH TEC 21 10 DNI 05H 0.02 1.26 51 P1 TEH TEC 21 10 DNI 06H 0.00 1.27 54 P1 TEH TEC 21 12 DNI 07H 0.00 1.96 28 P1 TEH TEC 21 13 DNI 05H 0.00 1.35 35 P1 TEH TEC 21 18 DSI 04H 0.00 0.55 170 P1 TEH TEC 21 21 DNI 05H 0.05 1.50 23 P1 TEH TEC 21 21 DNI 07H -0.07 1.62 16 P1 TEH TEC 21 25 DSI 03H 0.05 0.14 77 P1 TEH TEC 21 26 DSI 05H -0.05 0.44 116 P1 TEH TEC 21 34 DSI 02H 0.02 0.42 156 P1 TEH TEC 21 40 DNI 07H 0.00 1.57 40 P1 TEH TEC 21 43 DSI 02H 0.05 0.29 158 P1 TEH TEC 21 43 DNI 05H 0.05 1.20 53 P1 TEH TEC 21 45 DNI 07H 0.00 1.28 47 P1 TEH TEC 21 46 DSI 02H -0.07 0.12 84 P1 TEH TEC 21 48 DNI 06H 0.00 1.51 39 P1 TEH TEC 21 48 DNI 05H -0.02 2.01 26 P1 TEH TEC 21 48 DSI 04H -0.05 0.58 18 P1 TEH TEC 21 48 DNI 03H -0.15 1.26 24 P1 TEH TEC 21 48 DNI 02H 0.02 1.34 39 P1 TEH TEC 21 48 DNI 08H 0.10 1.48 21 P1 TEH TEC 21 48 DNI 08C -0.02 1.51 22 P1 TEH TEC 21 51 DNI 05C -0.12 1.47 15 P1 TEH TEC 21 51 DNI 06H 0.22 1.46 8

P1 TEH TEC 21 51 DNI 03H -0.07 1.41 16 P1 TEH TEC 21 55 DSI 02H 0.07 0.06 159 P1 TEH TEC 21 60 DNI 08H 0.02 1.55 34 P1 TEH TEC 21 60 DNI 05H -0.02 1.51 34 P1 TEH TEC 21 60 DNI 04H 0.00 1.25 41 P1 TEH TEC 21 60 DNI 07H 0.00 1.37 38 P1 TEH TEC 21 61 DSI 08H 0.05 0.28 148 P1 TEH TEC 21 72 DSI 03H -0.22 0.21 91 P1 TEH TEC 21 73 DNI 02C 0.00 1.43 17 P1 TEH TEC 21 73 DNI 08C 0.00 1.49 31 P1 TEH TEC 21 73 DNI 07H -0.22 1.65 8

P1 TEH TEC 21 73 DSI 03H -0.07 0.33 37 P1 TEH TEC Page 22 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 21 73 DNI 05H 0.10 1.59 31 P1 TEH TEC 21 74 SCI TSH -0.12 0.00 51 0.39 0.07 69 P2 TSH TSH 21 75 DNI 08C 0.00 1.46 29 P1 TEH TEC 21 77 DNI 06H 0.00 1.25 23 P1 TEH TEC 21 77 DNI 03H -0.05 1.29 13 P1 TEH TEC 21 78 DSI 08H 0.02 0.19 154 P1 TEH TEC 21 80 DNI 08H 0.00 1.34 44 P1 TEH TEC 21 83 DNI 03C -0.10 1.56 12 P1 TEH TEC 21 87 DSI 08C 0.00 0.11 94 P1 TEH TEC 22 7

DSI 02H 0.07 0.29 138 P1 TEH TEC 22 10 DNI 08C 0.00 1.28 18 P1 TEH TEC 22 18 DNI 08C 0.00 1.70 23 P1 STH TEC 22 21 DSI 03H 0.00 0.37 156 P1 TEH TEC 22 21 DSI 02H 0.02 0.26 31 P1 TEH TEC 22 23 DNI 08H 0.00 1.68 10 P1 TEH TEC 22 23 DSI 02H -0.07 0.29 165 P1 TEH TEC 22 24 DSI 02H 0.05 0.29 128 P1 TEH TEC 22 25 SCI TSH 0.00 0.15 23 0.18 0.08 73 P2 TSH TSH 22 25 DSI 02H 0.05 0.41 129 P1 TEH TEC 22 36 DNI 06H 0.00 1.48 53 P1 TEH TEC 22 51 DNI 08C -0.02 2.29 27 P1 TEH TEC 22 51 DNI 07H 0.00 1.46 53 P1 TEH TEC 22 53 DNI 06H 0.02 1.36 31 P1 TEH TEC 22 53 DNI 04H -0.05 1.83 18 P1 TEH TEC 22 53 DNI 03H -0.07 1.48 16 P1 TEH TEC 22 59 DNI 05C -0.05 1.31 15 P1 TEH TEC 22 59 DNI 05H 0.00 1.32 41 P1 TEH TEC 22 60 PSI 03H -0.54 15.90 165 P5 TEH TEC 22 65 DNI 07H 0.10 1.31 21 P1 TEH TEC 22 65 DNI 05C -0.07 1.93 15 P1 TEH TEC 22 66 DNI 03H 0.10 1.37 30 P1 TEH TEC 22 66 DNI 06H -0.05 1.34 29 P1 TEH TEC 22 74 DNI 04H -0.12 1.90 13 P1 TEH TEC 22 74 DNI 08H -0.20 2.21 12 P1 TEH TEC 22 76 DNI 05H 0.25 1.52 18 P1 TEH TEC 23 10 DNI 07H 0.00 1.52 24 P1 TEH TEC 23 11 DSI 02H -0.07 0.34 25 P1 TEH TEC 23 11 DNI 08H 0.00 1.34 37 P1 TEH TEC 23 11 DSI 03H -0.02 0.15 110 P1 TEH TEC 23 16 DNI 06H 0.22 1.53 13 P1 TEH TEC 23 18 DNI 05H 0.00 1.30 44 P1 STH TEC Page 23 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 23 19 DSI 02H -0.05 0.47 42 P1 TEH TEC 23 19 DNI 04H 0.00 1.56 46 P1 TEH TEC 23 19 DNI 03H 0.00 1.62 40 P1 TEH TEC 23 19 DNI 05H 0.00 1.25 41 P1 TEH TEC 23 19 SAI 05H 0.01 0.23 55 0.42 0.16 66 6

05H 05H 23 20 DSI 02H -0.07 0.23 147 P1 TEH TEC 23 21 DNI 07H 0.15 1.26 19 P1 TEH TEC 23 21 DSI 03H 0.00 0.13 110 P1 TEH TEC 23 25 DSI 03H -0.07 0.29 111 P1 TSC TEH 23 25 HCI TSH -0.13 0.13 75 0.58 0.36 78 P2 TSH TSH 23 26 DNI 07H -0.02 1.28 55 P1 TEH TEC 23 26 DNI 05C 0.00 1.25 39 P1 TEH TEC 23 27 PSI 08H 0.62 18.39 344 P5 STH TEC 23 30 DNI 07H 0.20 1.33 21 P1 TEH TEC 23 32 DNI 08C 0.00 1.32 39 P1 TEH TEC 23 33 DNI 07H 0.00 1.41 43 P1 TEH TEC 23 40 DNI 08H 0.00 1.26 51 P1 TEH TEC 23 42 DNI 05H 0.02 1.26 55 P1 TEH TEC 23 46 DNI 08C 0.02 1.37 34 P1 TEH TEC 23 46 DNI 07H 0.00 1.65 35 P1 TEH TEC 23 46 DNI 06H 0.00 2.08 34 P1 TEH TEC 23 46 DNI 03H 0.00 1.46 43 P1 TEH TEC 23 49 DNI 06C 0.19 2.46 9

P1 TEH TEC 23 52 DSI 03H 0.02 0.24 43 P1 TEH TEC 23 53 DSI 02H 0.02 0.18 24 P1 TEH TEC 23 53 DSI 04H 0.02 0.23 27 P1 TEH TEC 23 53 SAI 02H 0.00 0.18 52 0.40 0.10 67 6

02H 02H 23 59 DNI 06H 0.00 1.28 22 P1 TEH TEC 23 66 DNI 07H 0.02 1.31 26 P1 TEH TEC 23 66 DNI 08H -0.02 1.41 24 P1 TEH TEC 23 76 SCI TSH -0.08 2.15 57 0.43 0.11 126 P2 TSH TSH 23 80 DNI 07H 0.00 1.62 18 P1 TEH TEC 23 80 DNI 08H 0.00 1.37 35 P1 TEH TEC 23 81 DNI 04H 0.00 1.53 50 P1 TEH TEC 23 87 DSI 04H 0.12 0.46 113 P1 TEH TEC 24 16 DSI 02H 0.12 0.68 165 P1 TEH TEC 24 16 DSI 03H 0.05 0.08 105 P1 TEH TEC 24 17 DNI 05H 0.02 1.42 48 P1 TEH TEC 24 23 DSI 05H -0.07 0.67 16 P1 TEH TEC 24 24 DNI 05H -0.12 1.49 28 P1 TEH TEC 24 24 DSI 02H -0.05 0.19 158 P1 TEH TEC Page 24 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 24 26 HCI TSH -0.07 0.13 155 1.19 0.36 105 P2 TSH TSH 24 29 DNI 07H -0.05 1.48 29 P1 TEH TEC 24 29 DNI 08H -0.02 1.55 29 P1 TEH TEC 24 33 DSI 03H 0.00 0.19 58 P1 TEH TEC 24 36 DNI 08H 0.02 1.25 49 P1 TEH TEC 24 37 DNI 07H 0.00 1.28 38 P1 TEH TEC 24 39 DSI 02H -0.02 0.21 97 P1 TEH TEC 24 40 DNI 05H 0.00 1.47 51 P1 TEH TEC 24 40 DNI 06H 0.07 1.45 45 P1 TEH TEC 24 47 DNI 06C 0.17 1.65 11 P1 TEH TEC 24 52 DSI 02H 0.02 0.21 126 P1 TEH TEC 24 59 DNI 04H -0.12 1.39 16 P1 TEH TEC 24 63 DSI 05H 0.05 0.34 165 P1 TEH TEC 24 69 DNI 04C 0.17 1.15 10 P1 TEH TEC 24 80 DNI 05H 0.02 1.40 53 P1 TEH TEC 24 80 DSI 03H -0.02 0.14 125 P1 TEH TEC 24 85 DNI 05H -0.15 1.26 15 P1 TEH TEC 25 15 DNI 05H 0.00 1.29 15 P1 TEH TEC 25 16 DSI 04H 0.07 0.48 164 P1 TEH TEC 25 20 SCI TSH -0.14 0.13 85 0.65 0.21 109 P2 TSH TSH 25 21 DSI 02H 0.07 0.08 144 P1 TEH TEC 25 22 DSI 02H -0.05 0.25 41 P1 TEH TEC 25 27 HCI TSH -0.12 0.16 86 0.66 0.22 83 P2 TSH TSH 25 30 DSI 06H 0.02 0.12 121 P1 TEH TEC 25 30 DSI 04H 0.05 0.38 61 P1 TEH TEC 25 38 SCI TSH -0.08 0.12 106 0.81 0.10 105 P2 TSH TSH 25 39 DNI 08C -0.12 1.27 16 P1 TEH TEC 25 39 DNI 07C 0.12 1.35 14 P1 TEH TEC 25 48 DNI 06H 0.00 1.27 44 P1 TEH TEC 25 50 DSI 08H 0.00 0.13 48 P1 TEH TEC 25 53 DNI 06H 0.02 1.55 19 P1 TEH TEC 25 53 DNI 08H 0.00 1.28 22 P1 TEH TEC 25 61 SCI TSH 0.00 0.13 35 0.27 0.08 86 P2 TSH TSH 25 65 DNI 06H 0.00 1.35 55 P1 TEH TEC 25 67 SCI TSH -0.04 0.09 66 0.51 0.14 104 P2 TSH TSH 26 15 DSI 03H 0.02 0.13 116 P1 TEH TEC 26 17 DNI 08H 0.00 1.26 46 P1 TEH TEC 26 19 DSI 04H -0.02 0.10 106 P1 TEH TEC 26 28 DNI 08H 0.05 1.25 38 P1 STH TEC 26 34 HCI TSH 0.01 0.13 52 0.40 0.37 99 P2 TSH TSH 26 36 DNI 04H -0.05 1.60 37 P1 TEH TEC Page 25 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 26 36 DNI 02C -0.02 1.25 11 P1 TEH TEC 26 36 DNI 05C 0.00 1.35 22 P1 TEH TEC 26 36 DNI 03H 0.05 1.51 45 P1 TEH TEC 26 36 DNI 08H 0.00 1.30 37 P1 TEH TEC 26 36 DNI 06H 0.00 1.42 45 P1 TEH TEC 26 37 NQI 06H 17.14 0.31 94 3

STH TEC 26 42 DSI 02H 0.00 0.15 113 P1 TEH TEC 26 43 DNI 05H 0.00 1.36 40 P1 STH TEC 26 45 DNI 05H -0.05 1.47 48 P1 TEH TEC 26 60 DNI 06H 0.00 1.27 33 P1 TEH TEC 26 62 SCI TSH -0.02 0.00 29 0.22 0.12 55 P2 TSH TSH 26 62 DNI 04H 0.15 1.37 21 P1 TEH TEC 26 64 DSI 02H 0.00 0.13 103 P1 STH TEC 26 67 DNI 04H -0.15 1.34 21 P1 TEH TEC 26 80 DSI 05H 0.00 0.10 78 P1 TEH TEC 27 16 DNI 08H 0.00 1.29 35 P1 TEH TEC 27 32 DSI 02H -0.02 0.15 64 P1 TEH TEC 27 33 DSI 03H -0.20 0.40 57 P1 TEH TEC 27 34 DSI 05H 0.00 0.15 109 P1 TEH TEC 27 34 DNI 06H 0.00 1.40 52 P1 TEH TEC 27 34 DNI 07H 0.00 1.33 50 P1 TEH TEC 27 34 DSI 04H 0.00 0.19 102 P1 TEH TEC 27 39 HCI TSH -0.07 0.14 35 0.27 0.32 102 P2 TSH TSH 27 42 SAI 04H 0.01 0.09 45 0.34 0.11 93 6

04H 04H 27 42 DSI 05H -0.05 0.12 67 P1 TEH TEC 27 42 DSI 04H 0.02 0.22 117 P1 TEH TEC 27 47 DSI 02H -0.02 0.37 110 P1 TEH TEC 27 55 DSI 03H 0.02 0.19 93 P1 TEH TEC 27 55 DSI 04H 0.00 0.16 117 P1 TEH TEC 27 58 WAR AV2 0.45 0.49 127 2

08H AV2 27 58 DNI 07C -0.19 2.20 9

P1 TEH TEC 27 58 PCT AV2 0.45 18 1.33 129 P2 TEH TEC 27 64 DNI 07H 0.00 1.34 41 P1 TEH TEC 27 64 DSI 02H 0.07 0.09 30 P1 TEH TEC 27 66 SCI TSH -0.02 0.00 60 0.46 0.18 82 P2 TSH TSH 27 71 PCT AV2 0.24 21 1.42 222 P2 TEH TEC 27 71 PCT AV3 -0.15 21 1.41 34 P2 TEH TEC 27 71 PCT AV4 -0.22 18 1.07 21 P2 TEH TEC 27 74 MCI TSH 0.00 0.00 106 0.81 0.10 77 P2 TSH TSH 27 75 PCT AV3 0.00 15 0.75 32 P2 TEH TEC 27 75 DSI 05H 0.02 0.26 146 P1 TEH TEC Page 26 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 27 76 SCI TSH -0.01 0.00 38 0.29 0.10 77 P2 TSH TSH 27 78 SCI TSH -0.07 0.00 69 0.53 0.15 59 P2 TSH TSH 28 13 DSI 03H 0.02 0.36 162 P1 TEH TEC 28 26 DSI 04H 0.07 0.81 67 P1 TEH TEC 28 27 DNI 08C -0.02 1.39 11 P1 STH TEC 28 27 PSI 05H -0.46 15.44 155 P5 STH TEC 28 27 PSI 08H 0.62 16.87 342 P5 STH TEC 28 28 HAI TSH -0.05 0.16 55 0.42 0.28 62 6

TSH TSH 28 28 SCI TSH -0.12 0.21 83 0.63 0.31 79 P2 TSH TSH 28 30 DNI 08H 0.02 1.46 10 P1 TEH TEC 28 41 DNI 06H 0.00 1.44 48 P1 TEH TEC 28 41 DNI 05H 0.00 1.56 48 P1 TEH TEC 28 41 DSI 02H 0.02 0.27 92 P1 TEH TEC 28 41 DNI 07H 0.00 1.49 45 P1 TEH TEC 28 42 DNI 05H -0.02 1.42 53 P1 TEH TEC 28 42 DSI 03H -0.17 0.35 51 P1 TEH TEC 28 42 DNI 06H 0.00 1.35 53 P1 TEH TEC 28 42 DNI 07H 0.00 1.29 50 P1 TEH TEC 28 44 DNI 05H 0.00 1.55 53 P1 TEH TEC 28 44 DNI 08H 0.00 1.35 49 P1 TEH TEC 28 44 DNI 07H 0.00 1.25 51 P1 TEH TEC 28 45 DSI 02H 0.00 0.43 99 P1 TEH TEC 28 46 DSI 03H -0.07 0.13 90 P1 STH TEC 28 54 DSI 02H -0.05 0.26 122 P1 TEH TEC 28 56 DNI 06H 0.07 1.65 47 P1 TEH TEC 28 56 DNI 05H 0.00 1.56 55 P1 TEH TEC 28 56 DSI 03H 0.02 0.53 146 P1 TEH TEC 28 66 DSI 04H 0.00 0.26 150 P1 TEH TEC 28 66 SAI 04H -0.12 0.26 25 0.19 0.12 124 6

04H 04H 28 75 WAR AV3 0.00 0.34 131 2

08C AV3 28 75 PCT AV3 0.00 18 1.05 95 P2 TEH TEC 28 78 SCI TSH 0.00 0.16 31 0.23 0.08 112 P2 TSH TSH 29 13 DNI 08H 0.00 1.34 43 P1 TEH TEC 29 16 DNI 06H 0.00 1.69 44 P1 TEH TEC 29 16 DNI 07H -0.02 1.43 46 P1 TEH TEC 29 18 DNI 05H 0.00 1.45 55 P1 TEH TEC 29 19 DNI 08H -0.02 1.65 23 P1 TEH TEC 29 24 DNI 07H 0.00 1.41 53 P1 TEH TEC 29 24 DNI 06H 0.02 1.31 55 P1 TEH TEC 29 24 DSI 04H 0.02 0.22 48 P1 TEH TEC 29 24 DSI 02H 0.02 0.26 122 P1 TEH TEC Page 27 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 29 24 DNI 08H 0.02 1.63 38 P1 TEH TEC 29 29 DNI 03H -0.17 1.85 15 P1 TEH TEC 29 30 DSI 05H 0.02 0.38 18 P1 TEH TEC 29 33 DNI 08H 0.00 1.28 33 P1 TEH TEC 29 48 DSI 04H 0.02 0.16 138 P1 TEH TEC 29 54 DSI 03H 0.05 0.28 72 P1 TEH TEC 29 54 SAI 03H 0.02 0.39 45 0.34 0.17 91 6

03H 03H 29 54 SAI 03H -0.07 0.31 37 0.28 0.13 106 6

03H 03H 29 54 SAI 03H -0.08 0.23 55 0.42 0.12 135 6

03H 03H 29 56 DNI 06H 0.22 1.38 11 P1 STH TEC 29 62 DNI 02H 0.00 1.34 54 P1 TEH TEC 29 64 DNI 08H -0.02 1.27 35 P1 TEH TEC 29 65 DSI 02H -0.02 0.05 16 P1 TEH TEC 29 66 SCI TSH -0.13 0.10 42 0.32 0.08 117 P2 TSH TSH 29 72 PCT AV1 0.32 17 1.00 331 P2 TEH TEC 29 76 DNI 08H 0.11 1.43 10 P1 TEH TEC 29 81 DSI 05H -0.07 0.24 151 P1 TEH TEC 30 20 DNI 08H 0.00 1.43 35 P1 TEH TEC 30 21 DNI 06H 0.05 1.35 46 P1 TEH TEC 30 22 DSI 02H -0.02 0.22 63 P1 TEH TEC 30 25 DNI 05H -0.22 1.34 9

P1 STH TEC 30 28 DSI 03H 0.02 0.20 156 P1 TEH TEC 30 36 DNI 03H 0.00 1.27 25 P1 TEH TEC 30 38 DNI 06H 0.00 1.46 23 P1 TEH TEC 30 38 DSI 02H -0.02 0.19 157 P1 TEH TEC 30 48 DSI 06H 0.02 0.14 153 P1 STH TEC 30 48 DSI 04H -0.02 0.37 39 P1 STH TEC 30 50 DSI 05C 0.00 0.15 137 P1 TEH TEC 30 51 DSI 08C -0.02 0.30 58 P1 TEH TEC 30 51 DNI 04C -0.22 1.26 13 P1 TEH TEC 30 52 DNI 07C -0.12 1.27 13 P1 STH TEC 30 53 SCI TSH -0.02 0.00 82 0.62 0.12 75 P2 TSH TSH 30 54 DSI 04H -0.05 0.16 32 P1 TEH TEC 30 58 DSI 04H -0.02 0.09 10 P1 TEH TEC 30 62 SCI TSH -0.01 0.00 45 0.34 0.11 53 P2 TSH TSH 30 63 DSI 08H 0.05 0.16 137 P1 STH TEC 30 68 DSI 02H -0.02 0.22 30 P1 TEH TEC 31 14 DSI 04H 0.08 0.34 166 P1 TEH TEC 31 16 DNI 07H 0.00 1.27 50 P1 TEH TEC 31 18 DSI 02H -0.02 0.62 59 P1 TEH TEC 31 18 DSI 03H 0.02 0.37 46 P1 TEH TEC Page 28 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 31 18 DSI 07H -0.07 0.36 144 P1 TEH TEC 31 23 DNI 06H 0.00 1.38 54 P1 TEH TEC 31 24 DNI 08H -0.15 1.50 14 P1 TEH TEC 31 24 DNI 02H 0.02 1.51 12 P1 TEH TEC 31 30 DNI 07H 0.12 1.71 12 P1 STH TEC 31 35 DNI 06H 0.02 1.34 14 P1 TEH TEC 31 35 DNI 07H -0.02 1.72 11 P1 TEH TEC 31 37 HCI TSH -0.12 0.00 108 0.82 0.32 97 P2 TSH TSH 31 39 DNI 05H 0.02 1.35 41 P1 TEH TEC 31 65 SCI TSH -0.05 0.15 166 1.27 0.12 94 P2 TSH TSH 31 68 PCT AV3 0.32 26 2.16 23 P2 TEH TEC 31 68 PCT AV2 0.21 22 1.56 29 P2 TEH TEC 31 68 DNI 05C 0.00 1.76 14 P1 TEH TEC 31 69 PCT AV3 -0.28 11 0.71 0

P2 STH TEC 31 74 DSI 02H 0.12 0.38 135 P1 TEH TEC 31 74 SAI 02H 0.00 0.13 54 0.41 0.40 89 6

01H 02H 32 22 DSI 02H -0.02 0.17 85 P1 TEH TEC 32 27 DSI 03H -0.02 0.20 38 P1 TEH TEC 32 28 HAI TSH 0.00 0.13 55 0.42 0.43 71 6

TSH TSH 32 35 DSI 06H 0.00 0.10 92 P1 TEH TEC 32 36 DNI 02C 0.02 1.68 12 P1 TEH TEC 32 36 DNI 04H 0.02 1.29 33 P1 TEH TEC 32 38 DSI 02H 0.05 0.16 80 P1 STH TEC 32 38 DSI 03H -0.10 0.20 81 P1 STH TEC 32 44 PCT 01C 0.74 13 0.24 57 0.43 0.07 108 P4 01C 02C 32 44 VOL 01C 0.69 0.09 98 6

01C 02C 32 44 SCI TSH -0.06 0.00 54 0.41 0.09 68 P2 TSH TSH 32 45 DSI 02H 0.02 0.28 53 P1 TEH TEC 32 48 VOL 01C 0.67 0.21 111 6

01C 01C 32 48 PCT 01C 0.69 17 0.22 52 0.40 0.18 104 3

01C 01C 32 51 DSI 05H 0.02 0.16 109 P1 TEH TEC 32 53 DSI 03H -0.02 0.23 36 P1 TEH TEC 32 58 HCI TSH 0.01 0.16 40 0.31 0.20 79 P2 TSH TSH 32 59 DSI 05H 0.05 0.26 94 P1 STH TEC 32 64 PCT AV3 -0.18 18 1.06 76 P2 TEH TEC 32 64 WAR AV3 -0.18 0.22 124 2

08C AV3 32 69 NQI 01C 3.79 0.23 123 3

STH TEC 32 71 SCI TSH -0.04 0.00 34 0.26 0.07 123 P2 TSH TSH 32 75 NQI 04C 19.25 2.09 84 6

TEH TEC 33 16 DNI 05H -0.15 1.25 23 P1 TEH TEC 33 18 DSI 03H 0.05 0.28 30 P1 TEH TEC Page 29 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 33 18 DSI 02H 0.00 0.10 135 P1 TEH TEC 33 22 DSI 02H -0.02 0.27 146 P1 TEH TEC 33 22 DNI 07H 0.00 1.29 47 P1 TEH TEC 33 22 DNI 06H 0.00 1.40 54 P1 TEH TEC 33 27 DSI 06H -0.07 0.29 119 P1 STH TEC 33 27 DNI 07H 0.00 1.31 46 P1 STH TEC 33 28 DNI 07H 0.00 1.30 49 P1 TEH TEC 33 29 HAI TSH -0.02 0.13 65 0.49 0.20 125 6

TSH TSH 33 29 HAI TSH -0.04 0.11 52 0.40 0.14 66 6

TSH TSH 33 35 HCI TSH -0.04 0.13 34 0.26 0.25 53 P2 TSH TSH 33 42 DSI 05H 0.02 0.22 109 P1 TEH TEC 33 44 PCT 01C 0.78 13 0.29 63 0.48 0.07 98 P4 01C 02C 33 44 VOL 01C 0.75 0.17 156 6

01C 02C 33 45 SCI 04C 4.20 0.13 22 0.16 0.18 71 P2 04C 05C 33 45 DSI 07H -0.07 0.33 86 P1 STH TEC 33 49 SCI TSH 0.00 0.13 71 0.54 0.18 104 P2 TSH TSH 33 51 HCI TSH -0.15 0.16 35 0.27 0.78 78 P2 TSH TSH 33 54 DSI 06H -0.07 0.23 124 P1 STH TEC 33 54 NQI 01H -5.50 0.17 62 P1 STH TEC 33 54 NQI 01H -5.98 0.35 89 P1 STH TEC 33 54 NQI 01H -6.64 0.43 110 3

STH TEC 33 55 HCI TSH 0.00 0.16 102 0.78 0.37 71 P2 TSH TSH 33 57 DSI 04H -0.02 0.27 18 P1 TEH TEC 33 63 DNI 06H 0.00 1.34 55 P1 STH TEC 33 66 DSI 02H 0.00 0.21 13 P1 TEH TEC 33 69 PCT AV3 -0.05 15 0.83 69 P2 TEH TEC 33 69 PCT AV2 0.00 11 0.58 313 P2 TEH TEC 33 70 DSI 05H 0.02 0.08 53 P1 TEH TEC 33 70 PCT AV1 0.07 21 1.36 101 P2 TEH TEC 33 74 PCT AV1 0.10 15 0.79 17 P2 TEH TEC 34 24 DSI 03H -0.02 0.12 106 P1 TEH TEC 34 26 DNI 04H 0.07 1.37 24 P1 TEH TEC 34 27 SCI TSH -0.03 0.19 235 1.80 0.23 70 P2 TSH TSH 34 33 DNI 02H 0.83 1.59 6

P1 TEH TEC 34 33 DNI 03H 0.10 1.54 25 P1 TEH TEC 34 33 DNI 04H -0.05 1.42 52 P1 TEH TEC 34 38 DNI 06H 0.00 1.51 14 P1 TEH TEC 34 40 DSI 03H 0.07 0.15 98 P1 TEH TEC 34 41 DNI 04H 0.00 1.41 34 P1 TEH TEC 34 46 PSI 03H 0.58 17.95 341 P5 TEH TEC 34 47 HCI TSH 0.05 0.18 106 0.81 0.33 68 P2 TSH TSH Page 30 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 34 48 PCT AV2 0.23 17 1.14 194 P2 TEH TEC 34 48 PCT AV3 -0.15 16 1.02 311 P2 TEH TEC 34 48 PCT AV3 0.00 32 3.52 207 P2 TEH TEC 34 52 PSI 03H -0.53 17.51 160 P5 STH TEC 34 52 DSI 02H 0.07 0.09 154 P1 STH TEC 34 53 DSI 02H 0.05 0.22 90 P1 STH TEC 34 56 DSI 05H 0.00 0.32 26 P1 TEH TEC 34 60 DSI 02H 0.02 0.19 75 P1 TSC TEH 34 60 NQI TSH 0.50 0.31 32 P1 TSC TEH 34 60 HAI TSH 0.48 1.50 78 0.60 0.23 89 6

TSH TSH 34 62 NQI TSH 0.42 0.25 98 P1 TSC TEH 34 62 HAI TSH 0.46 0.13 42 0.32 0.36 48 6

TSH TSH 34 71 DNI 07C -0.02 1.65 13 P1 TEH TEC 34 71 SCI TSH -0.02 0.08 49 0.38 0.10 124 P2 TSH TSH 35 32 DNI 07H 0.07 1.26 14 P1 TEH TEC 35 36 HAI TSH -0.02 0.11 74 0.56 0.29 71 6

TSH TSH 35 36 DSI 03H -0.27 0.24 89 P1 TSC TEH 35 37 DNI 03H 0.20 1.41 10 P1 TEH TEC 35 42 DNI 08H 0.12 1.90 16 P1 TEH TEC 35 45 DSI 02H -0.19 0.90 129 P1 TEH TEC 35 45 DNI 06H 0.00 1.72 38 P1 TEH TEC 35 45 DNI 04H 0.10 1.50 33 P1 TEH TEC 35 45 DNI 05H 0.00 1.66 40 P1 TEH TEC 35 45 DNI 07H 0.00 2.09 30 P1 TEH TEC 35 45 DNI 08H 0.00 1.52 21 P1 TEH TEC 35 45 SCI TSH -0.04 0.13 191 1.46 0.28 108 P2 TSH TSH 35 54 CSI 07H -0.17 0.76 92 0.70 65.22 84 10 07H 07H 35 54 PSI 07H 0.66 7.84 74 8

TEH TEC 35 57 HAI TSH 0.41 0.19 72 0.55 0.20 71 6

TSH TSH 35 59 NQI TSH 0.50 0.35 110 P1 TSC TEH 35 59 HAI TSH 0.53 0.16 63 0.48 0.20 71 6

TSH TSH 35 64 PCT AV4 0.29 20 1.23 19 P2 TEH TEC 35 64 PCT AV3 0.13 19 1.21 201 P2 TEH TEC 35 64 WAR AV4 0.25 0.57 326 2

08C AV3 35 64 WAR AV3 0.13 0.24 115 2

08C AV3 35 70 PCT AV3 -0.28 19 1.18 140 P2 TEH TEC 35 70 WAR AV3 -0.28 0.44 130 2

08C AV3 35 72 PCT AV3 -0.38 21 1.37 200 P2 TEH TEC 35 72 PCT AV1 0.39 23 1.62 231 P2 TEH TEC 36 18 DNI 06C -0.32 1.64 10 P1 TEH TEC 36 23 DSI 08C 0.00 0.20 106 P1 TEH TEC Page 31 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 36 23 DNI 06H -0.12 1.64 22 P1 TEH TEC 36 28 DSI 03H -0.05 0.25 92 P1 TEH TEC 36 28 DSI 04H 0.12 0.13 121 P1 TEH TEC 36 28 DNI 07H 0.00 1.28 48 P1 TEH TEC 36 31 DNI 06H 0.20 1.50 20 P1 TEH TEC 36 37 DNI 03H 0.00 1.42 38 P1 TEH TEC 36 37 DNI 02H 0.12 1.56 16 P1 TEH TEC 36 44 DSI 03H -0.07 0.19 84 P1 TEH TEC 36 46 DNI 08H 0.02 1.25 52 P1 TEH TEC 36 46 DSI 06H 0.02 0.26 82 P1 TEH TEC 36 46 DNI 07H 0.00 1.37 50 P1 TEH TEC 36 49 DNI 07H 0.00 1.39 54 P1 TEH TEC 36 53 PCT AV3 0.21 22 1.87 0

P2 TEH TEC 36 56 DSI 07C 0.05 0.17 72 P1 TEH TEC 36 57 DNI 08H 0.00 1.27 55 P1 TEH TEC 36 69 SCI TSH -0.07 0.13 45 0.34 0.23 66 P2 TSH TSH 37 26 DNI 07H 0.02 1.45 16 P1 TEH TEC 37 30 DSI 08H 0.02 0.17 31 P1 TEH TEC 37 39 DSI 03H -0.05 0.29 96 P1 TEH TEC 37 39 DSI 02H -0.02 0.18 129 P1 TEH TEC 37 42 DSI 03H 0.00 0.31 60 P1 TEH TEC 37 43 PCT AV1 0.00 15 1.16 206 P2 TEH TEC 37 43 DNI 03H 0.00 1.70 40 P1 TEH TEC 37 43 DNI 07H 0.00 1.36 44 P1 TEH TEC 37 43 DNI 06H 0.12 1.54 23 P1 TEH TEC 37 48 DSI 04H 0.00 0.18 57 P1 TEH TEC 37 49 HAI TSH 0.43 0.11 46 0.35 0.15 87 6

TSH TSH 37 53 DNI 07H 0.00 1.30 24 P1 TEH TEC 37 53 DNI 06H 0.22 1.49 13 P1 TEH TEC 37 54 DNI 06H 0.00 1.29 52 P1 TEH TEC 37 54 DNI 04H 0.00 1.29 52 P1 TEH TEC 37 54 DSI 05H 0.00 0.16 124 P1 TEH TEC 37 56 DSI 03H 0.02 0.46 68 P1 TEH TEC 37 56 DSI 02H -0.05 0.20 51 P1 TEH TEC 37 60 DNI 07C -0.22 1.68 15 P1 TEH TEC 38 26 DNI 05H 0.17 1.65 16 P1 TEH TEC 38 37 DNI 03H 0.00 1.70 28 P1 TEH TEC 38 37 DNI 04H 0.00 1.87 37 P1 TEH TEC 38 37 DNI 07H 0.00 1.34 39 P1 TEH TEC 38 40 DSI 05H 0.05 0.55 120 P1 TEH TEC 38 44 DSI 02H 0.00 0.22 41 P1 TEH TEC Page 32 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 38 45 DNI 06H 0.02 1.39 42 P1 TEH TEC 38 45 DNI 07H 0.00 1.53 40 P1 TEH TEC 38 48 DNI 03H 0.05 1.62 15 P1 TEH TEC 38 48 DNI 05H -0.10 1.52 11 P1 TEH TEC 38 48 DNI 07H -0.02 1.31 13 P1 TEH TEC 38 49 NQI TSH 0.47 0.23 74 P1 TSC TEH 38 49 HAI TSH 0.51 0.13 52 0.40 0.12 52 6

TSH TSH 38 52 DNI 03H 0.00 1.75 17 P1 TEH TEC 38 52 DNI 06H -0.22 1.30 18 P1 TEH TEC 38 52 DNI 08H -0.15 1.36 23 P1 TEH TEC 38 52 DNI 07H -0.10 1.80 23 P1 TEH TEC 38 54 NQI TSH 0.99 0.30 120 P1 TSC TEH 38 64 PCT AV3 0.00 25 2.00 215 P2 TEH TEC 38 64 PCT AV2 0.24 23 1.62 241 P2 TEH TEC 38 72 PCT AV2 0.20 18 1.07 80 P2 TEH TEC 38 72 PCT AV1 0.20 13 0.66 41 P2 TEH TEC 39 23 DSI 02H 0.02 1.10 13 P1 TEH TEC 39 31 DNI 04H 0.22 1.44 18 P1 TEH TEC 39 38 PCT AV3 -0.10 15 0.78 16 P2 TEH TEC 39 39 DNI 04H 0.00 1.45 48 P1 TEH TEC 39 39 DNI 05H 0.02 1.31 46 P1 TEH TEC 39 39 DNI 06H 0.00 1.28 44 P1 TEH TEC 39 39 DNI 07H -0.02 1.46 37 P1 TEH TEC 39 39 DNI 08H 0.00 1.33 38 P1 TEH TEC 39 42 DSI 02H -0.05 0.31 49 P1 TEH TEC 39 46 DSI 02H -0.02 0.39 166 P1 TEH TEC 39 47 DSI 02H 0.02 0.35 151 P1 TEH TEC 39 50 DSI 04H 0.02 0.19 145 P1 TEH TEC 39 58 DNI 07H 0.00 1.27 47 P1 TEH TEC 39 58 SCI TSH 0.00 0.18 32 0.25 0.16 40 P2 TSH TSH 39 66 DNI 08H 0.00 1.33 42 P1 TEH TEC 39 68 PCT AV1 -0.11 15 0.82 333 P2 TEH TEC 39 68 WAR AV1 -0.11 0.26 125 2

08C 08H 40 29 DSI 02H -0.10 0.18 99 P1 TEH TEC 40 33 DNI 08H 0.00 1.48 27 P1 TEH TEC 40 37 DSI 03H 0.02 0.94 86 P1 TEH TEC 40 39 DNI 07H 0.00 1.51 10 P1 TEH TEC 40 44 DSI 06C -0.02 0.14 116 P1 TEH TEC 40 44 DNI 05H 0.00 1.44 39 P1 TEH TEC 40 51 DNI 04H 0.00 1.49 53 P1 TEH TEC 40 54 DNI 08C 0.00 1.27 19 P1 TEH TEC Page 33 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 40 54 DNI 04H -0.02 1.49 49 P1 TEH TEC 40 56 DNI 07H 0.00 1.28 32 P1 TEH TEC 40 65 PCT AV3 0.00 24 1.91 133 P2 TEH TEC 40 66 PCT AV3 0.19 21 1.33 147 P2 TEH TEC 40 66 PCT AV1 0.90 21 1.39 34 P2 TEH TEC 40 66 WAR AV3 0.21 0.25 168 2

08C AV3 40 69 PCT 03C -0.24 10 0.35 145 P1 TEH TEC 40 69 PCT AV2 0.00 19 1.27 128 P2 TEH TEC 40 69 PCT AV4 0.00 30 2.95 69 P2 TEH TEC 40 69 PCT AV3 0.00 23 1.70 40 P2 TEH TEC 40 69 VOL 03C -0.32 0.19 29 0.22 0.20 124 6

03C 04C 40 71 PCT 02C -0.15 25 0.84 126 P1 TEH TEC 40 71 VOL 02C -0.04 0.16 28 0.21 0.43 95 6

02C 02C 41 27 DSI 03H -0.05 0.23 154 P1 TEH TEC 41 32 DNI 05H -0.05 1.34 21 P1 TEH TEC 41 33 DNI 06H 0.25 1.30 19 P1 TEH TEC 41 33 DNI 05H 0.22 1.66 18 P1 TEH TEC 41 52 DNI 04H 0.00 1.49 45 P1 TEH TEC 41 52 DNI 03H 0.00 1.65 53 P1 TEH TEC 41 53 PCT AV1 0.00 14 1.00 0

P2 TEH TEC 41 53 DNI 03H 0.00 1.49 51 P1 TEH TEC 41 55 SCI TSH -0.02 0.23 131 1.00 0.09 113 P2 TSH TSH 41 68 PCT AV2 0.19 15 0.82 219 P2 TEH TEC 42 37 PCT AV3 0.00 15 1.13 35 P2 TEH TEC 42 55 PSI 07H -0.52 16.31 161 P5 TEH TEC 42 64 DSI 04H 0.05 0.33 68 P1 TEH TEC 43 42 PCT AV1 0.22 20 1.24 33 P2 TEH TEC 43 44 DNI 04H 0.00 1.26 52 P1 TEH TEC 43 45 DNI 04H 0.00 1.38 6

P1 TEH TEC 43 50 DNI 03H -0.05 1.57 20 P1 TEH TEC 43 54 DNI 04H -0.10 1.26 24 P1 TEH TEC 43 56 PCT AV3 0.07 17 1.16 58 P2 TEH TEC 43 57 PCT AV1 0.02 15 1.07 0

P2 TEH TEC 43 57 DNI 02H 0.02 1.30 10 P1 TEH TEC 44 35 DSI 03H -0.02 0.23 143 P1 TEH TEC 44 40 DSI 05C 0.10 0.18 141 P1 TEH TEC 44 42 PCT AV1 0.00 20 1.72 320 P2 TEH TEC 44 42 PCT AV2 0.00 19 1.59 132 P2 TEH TEC 44 48 PCT AV2 -0.52 14 0.81 19 P2 TEH TEC 44 48 PCT AV1 0.13 15 0.89 76 P2 TEH TEC 44 55 WAR AV3 -0.06 0.42 118 2

08C AV3 Page 34 of 35

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 44 55 PCT AV4 -0.41 28 2.77 0

P2 TEH TEC 44 55 WAR AV4 0.00 0.22 123 2

08C AV3 44 55 WAR AV4 0.41 0.54 306 2

08C AV3 44 55 PCT AV3 0.15 24 2.18 0

P2 TEH TEC 44 58 DSI 06H -0.07 0.06 112 P1 TEH TEC 45 37 PCT AV1 0.25 21 1.39 217 P2 TEH TEC 45 40 PCT AV1 0.35 37 4.73 228 P2 TEH TEC 45 48 DSI 08C 0.07 0.19 61 P1 TEH TEC 45 50 DNI 03C 0.17 1.36 11 P1 TEH TEC 46 52 DSI 06H 0.00 0.28 60 P1 TEH TEC Page 35 of 35

Unit #2 - 2R22 Steam Generator 180 Day Report Attachment B BEAVER VALLEY UNIT #2 2R22 SG EXAMINATION RESULTS 2RCS-SG21B TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 1

43 DSI 02H

-0.04 0.48 118 P1 08H TEH 1

45 DNI 08H

-0.01 1.62 46 P1 08H TEH 1

46 DNI 04H

-0.01 1.36 53 P1 08H TEH 1

52 DSI 02H

-0.07 0.23 100 P1 08H TEH 1

56 DSI 02H 0.04 0.18 36 P1 08H TEH 1

57 DSI 04H

-0.04 0.29 37 P1 08H TEH 1

81 DSI 02H

-0.06 0.19 120 P1 08H TEH 2

12 DNI 08C 0.00 1.94 30 P1 08C TEC 2

15 DSI 03H 0.00 0.67 104 P1 08H TEH 2

15 DSI 02H 0.00 1.22 99 P1 08H TEH 2

15 SAI 03H

-0.04 0.22 78 0.60 0.17 118 6

03H 03H 2

27 DNI 08C 0.00 1.77 37 P1 08C TEC 2

28 DSI 02H 0.00 0.21 60 P1 08H TEH 2

33 DSI 03H 0.00 0.14 36 P1 08H TEH 2

54 DSI 04H 0.03 0.11 41 P1 08H TEH 2

63 DSI 04H 0.00 0.17 50 P1 08H TEH 2

65 DSI 03H 0.04 0.43 77 P1 08H TEH 2

65 DNI 04H 0.07 1.57 55 P1 08H TEH 2

67 DSI 06H 0.07 0.22 96 P1 08H TEH 2

69 DSI 05H

-0.03 0.09 75 P1 08H TEH 2

70 DSI 05H 0.15 0.71 61 P1 08H TEH 2

73 DSI 04H 0.06 0.16 48 P1 08H TEH 2

73 DSI 05H 0.00 0.16 83 P1 08H TEH 2

73 DSI 03H 0.01 0.42 136 P1 08H TEH 2

75 DSI 02H 0.01 0.11 37 P1 08H TEH 2

93 DNI 08C 0.17 1.54 54 P1 08C TEC 2

94 DSI 04H

-0.09 0.23 60 P1 08H TEH 3

31 DSI 02H 0.00 0.66 138 P1 08H TEH 3

32 DSI 03H 0.00 0.29 145 P1 08H TEH 3

37 PSI 06H 0.39 15.75 173 P5 08H TEH 3

41 DNI 07H

-0.01 1.26 19 P1 08H TEH 3

42 DNI 06H

-0.01 1.29 24 P1 08H TEH 3

42 DNI 07C 0.07 1.76 13 P1 08C TEC 3

43 SAI 02H 0.01 0.35 60 0.46 0.15 98 6

02H 02H 3

43 DSI 02H

-0.01 0.47 101 P1 08H TEH 3

49 DSI 04C 0.02 0.57 146 P1 08C TEC 3

54 DSI 02H

-0.03 0.43 115 P1 08H TEH 3

55 DSI 02H

-0.21 0.86 121 P1 08H TEH 3

55 SCI TSH

-0.12 0.16 235 1.80 0.21 71 P2 TSH TSH 3

55 DSI 04H 0.00 0.19 104 P1 08H TEH 3

58 DSI 03H

-0.07 0.23 106 P1 08H TEH Page 1 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 3

58 SAI TSH

-0.04 0.16 65 0.49 0.68 34 6

TSH TSH 3

60 DSI 02H 0.00 0.47 101 P1 08H TEH 3

60 DSI 03H 0.03 0.49 101 P1 08H TEH 3

61 DSI 06H 0.01 0.27 128 P1 08H TEH 3

61 DNI 08H 0.01 1.83 27 P1 08H TEH 3

61 DNI 02H

-0.01 1.26 42 P1 08H TEH 3

62 DSI 04H 0.00 0.15 99 P1 08H TEH 3

62 DSI 03H

-0.01 0.39 35 P1 08H TEH 3

63 DSI 03H 0.00 0.50 67 P1 08H TEH 3

63 DSI 02H

-0.03 0.42 49 P1 08H TEH 3

65 SAI 03H 0.17 0.10 52 0.40 0.07 87 2

03H 03H 3

65 DSI 03H

-0.10 0.69 90 P1 08H TEH 3

72 DSI 03H 0.00 0.36 65 P1 08H TEH 3

88 DSI 04H 0.03 0.38 48 P1 08H TEH 3

89 DSI 04H 0.04 0.36 48 P1 08H TEH 4

3 PSI 06H 0.34 14.47 171 P5 08H TEH 4

23 DSI 02H 0.00 0.37 166 P1 08H TEH 4

23 DSI 06H

-0.06 0.29 157 P1 08H TEH 4

29 DSI 02H 0.06 0.48 72 P1 08H TEH 4

32 DSI 03H 0.03 0.24 162 P1 08H TEH 4

36 SAI 04H 0.00 0.24 58 0.45 0.16 113 2

03H 04H 4

36 DSI 04H

-0.09 0.69 132 P1 08H TEH 4

41 DSI 04H 0.00 0.13 98 P1 08H TEH 4

41 DSI 02H 0.01 0.32 111 P1 08H TEH 4

41 DNI 06C 0.00 1.28 27 P1 08C TEC 4

43 DSI 02H 0.00 0.19 19 P1 08H TEH 4

44 DSI 02H

-0.04 0.18 48 P1 08H TEH 4

48 DSI 03H

-0.04 0.63 53 P1 08H TEH 4

51 DSI 05C 0.10 0.48 85 P1 08C TEC 4

52 DSI 03H 0.06 0.56 62 P1 08H TEH 4

54 DSI 02H

-0.07 0.90 100 P1 08H TEH 4

56 DSI 04H 0.01 0.32 159 P1 08H TEH 4

57 DSI 04H 0.00 0.29 150 P1 08H TEH 4

57 DSI 02H 0.10 0.26 129 P1 08H TEH 4

58 DSI 02H

-0.04 0.56 137 P1 08H TEH 4

58 DSI 02C 0.00 0.40 146 P1 08C TEC 4

59 DSI 02H

-0.09 0.47 88 P1 08H TEH 4

59 DSI 03H 0.09 0.50 64 P1 08H TEH 4

62 DSI 07H

-0.03 0.27 10 P1 08H TEH 4

62 DSI 03H 0.03 0.21 62 P1 08H TEH 4

63 DSI 04H

-0.03 0.28 36 P1 08H TEH Page 2 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 4

68 DSI 02H 0.01 0.29 96 P1 08H TEH 4

71 SCI TSH

-0.11 0.16 37 0.28 0.08 104 P2 TSH TSH 4

88 DSI 04H

-0.03 0.30 29 P1 08H TEH 5

7 DNI 08H

-0.05 1.41 27 P1 TEH TEC 5

8 DNI 08H 0.10 1.28 21 P1 TEH TEC 5

10 DSI 02H

-0.05 0.40 107 P1 TEH TEC 5

12 DSI 03H 0.00 0.16 83 P1 TEH TEC 5

13 DNI 08H 0.00 1.38 36 P1 TEH TEC 5

14 DSI 03H

-0.02 0.38 74 P1 TEH TEC 5

16 DNI 08H 0.03 1.41 12 P1 TEH TEC 5

17 DNI 08H 0.00 1.38 36 P1 TEH TEC 5

20 DSI 03H

-0.02 0.36 118 P1 TEH TEC 5

22 DSI 04H 0.02 0.32 58 P1 TEH TEC 5

28 DNI 08H

-0.10 1.30 16 P1 TEH TEC 5

28 DSI 02H

-0.05 0.45 71 P1 TEH TEC 5

30 DNI 08H 0.00 1.53 31 P1 TEH TEC 5

33 DSI 02H

-0.10 0.29 121 P1 TEH TEC 5

34 DNI 08H

-0.20 1.43 14 P1 TEH TEC 5

52 DSI 02H

-0.02 0.85 81 P1 TEH TEC 5

54 DSI 03H

-0.05 0.19 118 P1 TEH TEC 5

54 DSI 02H 0.15 0.72 101 P1 TEH TEC 5

54 DSI 07C 0.05 0.54 119 P1 TEH TEC 5

56 DSI 03H 0.00 0.38 66 P1 TEH TEC 5

58 DSI 02H 0.00 0.17 105 P1 TEH TEC 5

59 SCI TSH

-0.13 0.13 183 1.40 0.33 127 P2 TSH TSH 5

59 DNI 07H 0.02 1.29 51 P1 TEH TEC 5

59 DNI 06H

-0.02 1.35 53 P1 TEH TEC 5

60 DSI 02H

-0.05 0.24 138 P1 TEH TEC 5

62 DSI 03H 0.02 0.30 79 P1 TEH TEC 5

63 DSI 04H 0.02 0.19 143 P1 TEH TEC 5

64 DSI 03H 0.00 0.15 84 P1 TEH TEC 5

64 DSI 02H 0.00 0.39 109 P1 TEH TEC 5

68 DSI 02H 0.00 0.33 71 P1 TEH TEC 5

70 DSI 05H 0.20 0.92 29 P1 TEH TEC 5

71 DSI 02H

-0.02 0.37 92 P1 TEH TEC 5

71 DSI 06C

-0.02 0.34 107 P1 TEH TEC 5

73 DSI 04H

-0.02 0.28 111 P1 TEH TEC 5

73 DSI 02H 0.00 0.23 48 P1 TEH TEC 5

75 DSI 03H 0.00 0.13 38 P1 TEH TEC 5

75 DSI 04H 0.02 0.34 162 P1 TEH TEC 5

81 DSI 05H 0.02 0.12 39 P1 TEH TEC Page 3 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

82 DNI 08H

-0.05 1.33 53 P1 TEH TEC 5

92 DSI 02H

-0.05 0.22 60 P1 TEH TEC 5

93 DSI 03H 0.12 0.39 116 P1 TEH TEC 6

16 DSI 03H 0.02 0.13 90 P1 TEH TEC 6

23 DSI 04H

-0.02 0.19 103 P1 TEH TEC 6

25 DSI 03H 0.00 0.28 115 P1 TEH TEC 6

26 DSI 02H 0.00 0.19 89 P1 TEH TEC 6

27 DSI 03H 0.00 0.23 92 P1 TEH TEC 6

27 SAI 03H 0.00 0.19 49 0.38 0.17 108 6

03H 03H 6

31 HAI 03H

-0.03 0.31 72 6

03H 03H 6

31 DSI 03H 0.00 0.58 79 P1 TSC TEH 6

38 HAI TSH 0.08 0.21 77 0.59 0.67 72 6

TSH TSH 6

38 DSI 02H

-0.05 0.45 141 P1 TSC TEH 6

43 DSI 03H 0.02 0.39 51 P1 STH TEC 6

52 DSI 02H

-0.05 0.11 152 P1 TEH TEC 6

53 DSI 03H 0.27 0.25 132 P1 TEH TEC 6

53 DSI 02H

-0.07 0.41 40 P1 TEH TEC 6

58 DSI 02H 0.00 0.46 86 P1 TEH TEC 6

58 DSI 03H 0.02 0.22 54 P1 TEH TEC 6

61 DSI 08H

-0.15 0.19 126 P1 TEH TEC 6

63 DSI 02H

-0.07 0.15 83 P1 TEH TEC 6

66 DSI 03H 0.02 0.77 44 P1 TEH TEC 6

66 DSI 05H 0.02 0.11 34 P1 TEH TEC 6

70 DSI 05H 0.17 0.75 89 P1 STH TEC 7

27 PSI 06C 0.54 15.93 164 P5 STH TEC 7

36 DNI 08H

-0.02 1.27 37 P1 TEH TEC 7

52 SCI TSH

-0.09 0.18 145 1.10 0.17 103 P2 TSH TSH 7

52 DSI 02H

-0.05 0.56 46 P1 TEH TEC 7

54 DSI 02H

-0.07 0.12 51 P1 TEH TEC 7

56 DSI 06C 0.00 0.23 122 P1 TEH TEC 7

56 DSI 02H 0.07 1.09 102 P1 TEH TEC 7

57 SCI TSH

-0.09 0.14 26 0.20 0.09 111 P2 TSH TSH 7

63 DSI 07H 0.00 0.28 35 P1 TEH TEC 7

64 DSI 04H

-0.05 0.28 57 P1 TEH TEC 7

70 DSI 04H

-0.05 0.36 44 P1 TEH TEC 7

70 DSI 05H

-0.05 0.22 136 P1 TEH TEC 7

75 DSI 02H

-0.05 0.08 97 P1 TEH TEC 8

2 DSI 03H 0.05 0.16 94 P1 TEH TEC 8

9 DSI 02H 0.00 0.36 148 P1 TEH TEC 8

9 DSI 03H 0.00 0.27 121 P1 TEH TEC 8

18 DSI 02H

-0.05 0.30 54 P1 TEH TEC Page 4 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 8

18 DSI 03H

-0.02 0.24 78 P1 TEH TEC 8

20 DSI 02H 0.02 0.33 156 P1 TEH TEC 8

22 DSI 02H 0.00 0.62 162 P1 TEH TEC 8

31 DSI 07C 0.00 0.31 108 P1 TEH TEC 8

37 DSI 03H 0.07 0.22 20 P1 STH TEC 8

43 DNI 07C 0.00 1.35 30 P1 TEH TEC 8

53 DSI 02H

-0.17 0.86 102 P1 STH TEC 8

56 DSI 03H

-0.05 0.38 76 P1 STH TEC 8

57 DSI 08H

-0.05 0.20 87 P1 STH TEC 8

59 DSI 02H 0.17 0.20 116 P1 STH TEC 8

59 DSI 05H

-0.02 0.14 46 P1 STH TEC 8

63 DSI 04H

-0.05 0.28 40 P1 TEH TEC 9

4 DSI 03H 0.02 0.42 114 P1 TEH TEC 9

4 SAI 03H 0.00 0.11 40 0.31 0.22 97 6

03H 03H 9

5 DSI 03H

-0.05 0.14 106 P1 TEH TEC 9

8 DSI 03H 0.02 0.17 121 P1 TEH TEC 9

11 DSI 03H 0.00 0.53 68 P1 TEH TEC 9

11 DSI 02H

-0.02 0.83 140 P1 TEH TEC 9

16 DSI 03H 0.02 0.13 86 P1 TEH TEC 9

17 DSI 03H

-0.05 0.28 122 P1 TEH TEC 9

17 DSI 02H 0.00 0.34 98 P1 TEH TEC 9

18 DSI 03H 0.00 0.50 71 P1 TEH TEC 9

18 DSI 02H

-0.02 0.12 138 P1 TEH TEC 9

26 DSI 03H 0.05 0.58 55 P1 STH TEC 9

26 DSI 02H 0.02 0.15 96 P1 STH TEC 9

51 DNI 08H

-0.42 1.49 10 P1 STH TEC 9

51 DNI 02H

-0.02 1.51 55 P1 STH TEC 9

52 DSI 03H 0.00 0.24 27 P1 STH TEC 9

52 DSI 02H 0.00 0.17 32 P1 STH TEC 9

59 DSI 03H

-0.05 0.36 104 P1 TEH TEC 9

59 DSI 05H 0.02 0.38 116 P1 TEH TEC 9

61 DSI 07C

-0.05 0.42 135 P1 TEH TEC 9

64 DSI 04H 0.00 0.32 45 P1 TEH TEC 9

64 SAI 04H

-0.05 0.13 40 0.31 0.09 63 P4 04H 04H 9

70 DSI 05H 0.15 0.46 110 P1 STH TEC 9

70 DSI 03H 0.00 0.14 108 P1 STH TEC 9

72 DSI 04H 0.02 0.32 123 P1 STH TEC 9

77 DSI 04H 0.00 0.17 22 P1 TEH TEC 9

80 DNI TSC 1.51 0.33 152 5

TEH TEC 9

80 DSI 02H

-0.02 0.79 90 P1 TEH TEC 9

85 DSI 02H

-0.22 0.38 120 P1 TEH TEC Page 5 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 9

92 DNI 04H 0.05 1.39 45 P1 TEH TEC 9

92 DSI 02H 0.12 0.44 110 P1 TEH TEC 9

92 DNI 07H 0.02 1.61 22 P1 TEH TEC 9

93 DSI 02H 0.00 0.51 145 P1 TEH TEC 9

93 DNI 04H 0.22 1.33 13 P1 TEH TEC 10 6

DSI 02H 0.02 0.76 131 P1 TEH TEC 10 10 DSI 02H 0.00 0.06 13 P1 TEH TEC 10 14 DSI 02H 0.02 0.30 112 P1 STH TEC 10 15 DSI 02H 0.05 0.27 143 P1 TEH TEC 10 17 DSI 02H 0.00 0.83 131 P1 TEH TEC 10 18 DSI 02H

-0.07 0.25 70 P1 TEH TEC 10 26 DSI 02H

-0.05 0.19 30 P1 STH TEC 10 26 DSI 05H

-0.05 0.21 135 P1 STH TEC 10 32 SCI TSH

-0.09 0.18 95 0.73 0.33 88 P2 TSH TSH 10 32 HAI 03H

-0.02 0.13 74 6

03H 03H 10 32 DSI 03H 0.00 0.67 108 P1 TSC TEH 10 37 DSI 03H 0.00 0.30 158 P1 TEH TEC 10 41 DSI 07H

-0.05 0.10 95 P1 STH TEC 10 43 MCI TSH 0.05 0.19 100 0.76 0.14 74 P2 TSH TSH 10 50 DSI 02H

-0.02 0.24 63 P1 TEH TEC 10 50 DSI 03H 0.00 0.16 104 P1 TEH TEC 10 50 DSI 04H

-0.10 0.37 150 P1 TEH TEC 10 52 DSI 04H

-0.05 0.26 81 P1 TEH TEC 10 52 DSI 02H 0.05 0.46 144 P1 TEH TEC 10 53 DSI 02H 0.24 0.75 113 P1 TEH TEC 10 54 DSI 02H

-0.02 0.10 133 P1 STH TEC 10 56 DSI 02H

-0.05 0.34 90 P1 STH TEC 10 58 DSI 05H

-0.02 0.11 81 P1 TEH TEC 10 63 DSI 02H

-0.07 0.24 74 P1 TEH TEC 10 70 PCT AV4 0.00 13 0.58 0

P2 TEH TEC 10 70 WAR AV4 0.00 0.11 63 0.48 0.20 289 2

08C 08H 10 71 DSI 05H 0.00 0.43 162 P1 TEH TEC 10 71 DSI 02H 0.00 0.22 58 P1 TEH TEC 10 76 DSI 03H 0.02 0.25 53 P1 TEH TEC 10 76 SAI 03H 0.00 0.21 43 0.33 0.12 109 6

03H 03H 10 78 DSI 04H

-0.02 0.61 145 P1 TEH TEC 10 80 DSI 03H 0.02 0.29 114 P1 TEH TEC 10 80 DNI 08H 35.71 1.12 145 5

TEH TEC 10 82 DSI 03H 0.00 0.18 90 P1 TEH TEC 10 88 DSI 04C 0.00 0.10 109 P1 TEH TEC 10 89 DSI 02H 0.00 0.29 73 P1 TEH TEC Page 6 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 11 8

DSI 03H 0.00 0.44 138 P1 TEH TEC 11 8

DSI 04H

-0.02 0.13 136 P1 TEH TEC 11 9

DSI 07H 0.12 0.44 37 P1 TEH TEC 11 9

DSI 06H 0.00 0.12 53 P1 TEH TEC 11 18 DSI 02H 0.00 0.37 111 P1 TEH TEC 11 20 DSI 02H 0.05 0.40 141 P1 TEH TEC 11 20 DNI 06H 0.00 1.25 55 P1 TEH TEC 11 21 DSI 03H 0.02 0.21 79 P1 TEH TEC 11 23 DSI 02H

-0.02 0.50 105 P1 TSC TEH 11 23 HAI 02H

-0.07 0.40 94 6

02H 02H 11 25 SAI 03H 0.00 0.41 35 0.27 0.18 57 6

03H 03H 11 25 DSI 03H 0.02 0.34 82 P1 TEH TEC 11 31 SCI TSH

-0.12 0.11 54 0.41 0.09 129 P2 TSH TSH 11 35 DSI 02H

-0.02 0.10 65 P1 TEH TEC 11 42 DSI 03H 0.00 0.12 57 P1 TEH TEC 11 51 DSI 02H 0.02 0.07 30 P1 STH TEC 11 53 DSI 08C

-0.05 0.31 119 P1 TEH TEC 11 53 DSI 02H 0.02 0.48 128 P1 TEH TEC 11 57 DSI 03H

-0.05 0.19 48 P1 TEH TEC 11 58 DSI 03H 0.00 0.32 99 P1 TEH TEC 11 58 DSI 04H 0.07 0.22 124 P1 TEH TEC 11 61 SCI TSH

-0.15 2.02 174 1.33 0.29 126 P2 TSH TSH 11 61 DSI 03H 0.07 0.39 112 P1 TEH TEC 11 61 DSI 02H 0.00 0.88 63 P1 TEH TEC 11 64 DSI 03H

-0.15 0.59 85 P1 TEH TEC 11 75 DSI 03H 0.00 0.20 87 P1 TEH TEC 11 75 DSI 02H

-0.05 0.40 67 P1 TEH TEC 11 78 DNI 06H 0.00 1.61 50 P1 TEH TEC 11 80 SCI TSH

-0.05 0.15 137 1.05 0.15 67 P2 TSH TSH 11 83 DSI 03H 0.02 0.33 99 P1 TEH TEC 11 83 DSI 04H 0.00 0.26 84 P1 TEH TEC 11 83 DNI 08H 0.07 1.37 51 P1 TEH TEC 11 91 DSI 08H 0.00 0.42 114 P1 TEH TEC 12 5

WAR AV4 0.00 0.16 290 2

08H 08C 12 5

PCT AV4 0.00 12 0.68 37 P2 TEH TEC 12 10 DSI 02H 0.05 0.45 103 P1 TEH TEC 12 15 DSI 03H

-0.02 0.50 99 P1 STH TEC 12 15 DSI 02H 0.02 0.42 132 P1 STH TEC 12 16 DSI 03H

-0.02 0.20 149 P1 TEH TEC 12 17 SCI TSH

-0.02 0.16 66 0.51 0.26 61 P2 TSH TSH 12 22 DSI 02H 0.00 0.56 148 P1 TEH TEC Page 7 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 24 DSI 02H 0.02 0.33 112 P1 TEH TEC 12 24 DSI 04H 0.00 0.34 133 P1 TEH TEC 12 48 SCI TSH

-0.10 0.13 86 0.66 0.15 80 P2 TSH TSH 12 51 DSI 02H

-0.02 0.12 127 P1 TEH TEC 12 52 DSI 02H 0.00 0.69 85 P1 STH TEC 12 52 DSI 03H

-0.05 0.57 54 P1 STH TEC 12 59 SCI SBH 0.60 0.18 51 0.39 2.44 105 P3 SBH STH 12 61 DSI 03H 0.00 0.27 49 P1 TEH TEC 13 37 DSI 03H 0.00 0.24 118 P1 TEH TEC 13 39 DSI 07H

-0.02 0.13 114 P1 TEH TEC 13 47 SAI 02H 0.03 0.43 55 0.42 0.15 111 6

02H 02H 13 47 DSI 02H 0.07 0.30 135 P1 TEH TEC 13 48 SCI TSH

-0.11 0.18 131 1.00 0.13 72 P2 TSH TSH 13 53 DSI 02H

-0.02 0.48 168 P1 STH TEC 13 56 DSI 03H 0.07 0.22 60 P1 STH TEC 13 71 DSI 05C

-0.02 0.23 139 P1 TEH TEC 13 73 DSI 02H 0.02 0.34 100 P1 TEH TEC 13 77 DSI 03H

-0.07 0.77 35 P1 STH TEC 13 78 DSI 02H 0.05 0.05 156 P1 TEH TEC 13 85 DSI 02H 0.00 0.30 84 P1 TEH TEC 13 86 DSI 02H 0.00 0.13 158 P1 TEH TEC 13 91 DSI 02H

-0.05 0.33 131 P1 TEH TEC 14 13 DSI 02H 0.02 0.22 80 P1 TEH TEC 14 15 DSI 03H 0.02 0.20 35 P1 TEH TEC 14 18 DSI 02H 0.02 0.42 114 P1 TEH TEC 14 25 DSI 02H

-0.02 0.30 87 P1 TEH TEC 14 27 DSI 03H 0.00 0.13 64 P1 STH TEC 14 28 DSI 05H 0.02 0.11 56 P1 TEH TEC 14 32 DSI 02H 0.12 0.23 157 P1 TEH TEC 14 35 DSI 06H 0.00 0.28 151 P1 TEH TEC 14 36 DSI 03H 0.07 0.23 135 P1 TEH TEC 14 39 DSI 02H

-0.02 0.06 137 P1 TEH TEC 14 49 SCI TSH

-0.09 0.16 180 1.37 0.11 84 P2 TSH TSH 14 54 DSI 02H 0.00 0.30 32 P1 TEH TEC 14 54 DSI 03H

-0.05 0.20 73 P1 TEH TEC 14 57 DSI 02H

-0.02 0.41 63 P1 STH TEC 14 57 DSI 03H

-0.02 0.39 97 P1 STH TEC 14 59 DNI 08C 0.00 1.39 28 P1 TEH TEC 14 59 DNI 08H 0.00 1.29 34 P1 TEH TEC 14 61 DSI 02H 0.00 0.44 109 P1 STH TEC 14 61 DSI 03H 0.02 0.55 50 P1 STH TEC Page 8 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 61 DSI 05H 0.02 0.31 33 P1 STH TEC 14 63 DSI 03H 0.02 0.23 31 P1 TEH TEC 14 66 DNI 05H 0.00 1.54 40 P1 TEH TEC 14 70 DSI 02H 0.00 0.50 94 P1 STH TEC 14 80 DSI 03H 0.05 0.23 79 P1 TEH TEC 14 83 DSI 03C

-0.05 0.31 156 P1 STH TEC 14 84 DSI 04H

-0.05 0.13 102 P1 TEH TEC 14 88 DSI 02H 0.00 0.16 70 P1 TEH TEC 15 12 DSI 03H 0.10 0.10 122 P1 STH TEC 15 21 DSI 03H 0.05 0.07 86 P1 TEH TEC 15 26 DSI 07H 0.07 0.12 51 P1 TEH TEC 15 26 DSI 03H 0.00 0.39 151 P1 TEH TEC 15 27 DSI 02H 0.05 0.13 41 P1 TEH TEC 15 34 DNI 08C

-0.27 1.31 11 P1 TEH TEC 15 36 DSI 02H

-0.07 0.17 50 P1 TEH TEC 15 36 DNI 03H 0.02 1.70 36 P1 TEH TEC 15 43 DSI 06H

-0.02 0.22 40 P1 STH TEC 15 49 DSI 04H

-0.05 0.59 54 P1 TEH TEC 15 52 DSI 02H 0.02 0.19 33 P1 TEH TEC 15 60 DNI 06H 0.00 1.65 43 P1 TEH TEC 15 60 DNI 08H 0.00 1.52 41 P1 TEH TEC 15 60 DNI 03H 0.00 1.45 53 P1 TEH TEC 15 71 DSI 05H 0.02 0.20 35 P1 STH TEC 15 75 DSI 02H

-0.05 0.11 154 P1 STH TEC 15 75 DSI 04H

-0.02 0.22 32 P1 STH TEC 15 80 DSI 04H 0.02 0.33 170 P1 TEH TEC 15 87 DSI 02H 0.05 0.19 151 P1 TEH TEC 15 89 DSI 02H 0.12 0.31 130 P1 TEH TEC 16 12 MCI TSH

-0.03 0.24 132 1.01 0.65 91 P2 TSH TSH 16 12 HAI 04H 0.06 0.35 90 6

04H 04H 16 12 DSI 04H

-0.02 0.36 53 P1 TSC TEH 16 14 HAI 03H 0.05 0.57 90 6

03H 03H 16 14 MCI TSH

-0.05 0.18 92 0.70 0.47 101 P2 TSH TSH 16 14 DSI 03H

-0.02 0.55 78 P1 TSC TEH 16 26 DNI 07H 0.02 1.68 40 P1 STH TEC 16 26 DNI 08H 0.00 1.52 38 P1 STH TEC 16 27 DSI 03H

-0.12 0.12 101 P1 STH TEC 16 28 DNI 06H 0.00 1.36 17 P1 STH TEC 16 28 PSI 06C 0.54 17.19 165 P5 STH TEC 16 28 DNI 08H

-0.15 1.66 16 P1 STH TEC 16 29 DSI 02H

-0.19 0.13 97 P1 TEH TEC Page 9 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 16 29 SAI 02H

-0.11 0.27 20 0.15 0.13 78 6

02H 02H 16 30 PCT AV3 0.00 6

0.36 127 P2 TEH TEC 16 30 PCT AV2 0.00 10 0.67 43 P2 TEH TEC 16 31 DSI 07H 0.00 0.23 145 P1 TEH TEC 16 31 DSI 02H

-0.15 0.18 144 P1 TEH TEC 16 36 DSI 04H 0.05 0.13 47 P1 TEH TEC 16 37 SCI TSH

-0.10 0.24 77 0.59 0.12 101 P2 TSH TSH 16 37 DSI 02H 0.02 0.17 50 P1 TEH TEC 16 37 DSI 04H 0.02 0.29 103 P1 TEH TEC 16 37 SAI 04H

-0.07 0.35 48 0.36 0.19 88 6

04H 04H 16 37 DNI 07H 0.02 1.25 38 P1 TEH TEC 16 44 DSI 02H 0.00 0.18 13 P1 TEH TEC 16 45 DNI 06C 0.22 1.47 7

P1 TEH TEC 16 55 DSI 04H

-0.07 0.30 84 P1 TEH TEC 16 55 DSI 05H 0.00 0.23 125 P1 TEH TEC 16 57 DSI 03H 0.02 0.09 115 P1 TEH TEC 16 61 DSI 02H 0.00 0.26 31 P1 TEH TEC 16 68 DSI 03H

-0.15 0.39 92 P1 TEH TEC 16 68 SAI 03H

-0.09 0.31 32 0.25 0.21 72 6

02H 03H 16 69 DNI 07H 0.00 1.28 53 P1 TEH TEC 16 71 DSI 02H 0.07 0.17 147 P1 TEH TEC 17 26 HAI TSH 0.15 0.31 114 0.87 0.80 79 6

TSH TSH 17 26 SCI TSH

-0.03 0.21 105 0.80 0.27 126 P2 TSH TSH 17 26 DSI 03H

-0.07 0.80 108 P1 TSC TEH 17 27 MCI TSH

-0.04 0.13 145 1.10 0.56 64 P2 TSH TSH 17 27 HAI TSH 0.07 0.16 114 0.87 0.75 70 6

TSH TSH 17 28 DNI 03C 0.00 1.69 6

P1 TEH TEC 17 31 MCI TSH

-0.03 0.23 134 1.02 0.50 76 P2 TSH TSH 17 31 DSI 02H

-0.10 0.28 92 P1 TSC TEH 17 31 HAI 03H 0.02 0.50 85 6

03H 03H 17 31 DSI 03H 0.00 1.02 81 P1 TSC TEH 17 32 MCI TSH

-0.02 0.13 68 0.52 0.14 97 P2 TSH TSH 17 32 DSI 02H 0.07 0.79 103 P1 TSC TEH 17 32 DSI 03H 0.00 0.30 110 P1 TSC TEH 17 32 HAI 02H 0.12 0.36 97 6

02H 02H 17 35 DSI 03H 0.07 0.38 65 P1 TEH TEC 17 40 SAI 03H

-0.16 0.29 63 0.48 0.12 91 6

03H 03H 17 40 DSI 03H

-0.05 0.36 107 P1 TEH TEC 17 40 SCI TSH

-0.05 0.30 195 1.49 0.18 97 P2 TSH TSH 17 42 DSI 03H 0.00 0.58 78 P1 STH TEC 17 42 DSI 04H 0.00 0.41 62 P1 STH TEC Page 10 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 17 43 DSI 04H

-0.02 0.25 62 P1 STH TEC 17 44 DSI 02H

-0.02 0.60 65 P1 STH TEC 17 44 SAI 02H

-0.13 0.14 35 0.27 0.10 121 P4 02H 02H 17 45 SCI TSH

-0.10 0.21 128 0.98 0.17 122 P2 TSH TSH 17 45 DSI 02H

-0.02 0.50 99 P1 TSC TEH 17 45 HAI 02H 0.16 0.40 86 6

02H 02H 17 62 DSI 05H

-0.05 0.41 19 P1 STH TEC 17 62 DNI 02H

-0.10 1.46 28 P1 STH TEC 17 64 DSI 02H 0.02 0.10 147 P1 TEH TEC 17 68 SAI 04H 0.25 0.16 60 0.46 0.11 74 2

04H 04H 17 68 DSI 04H

-0.15 0.97 33 P1 STH TEC 17 68 DSI 03H 0.00 0.46 26 P1 STH TEC 17 68 DNI 05H 0.34 1.29 13 P1 STH TEC 17 68 DSI 02H

-0.02 0.41 85 P1 STH TEC 17 69 DNI 08H 0.02 1.54 10 P1 TEH TEC 17 70 DNI 07C 0.00 2.01 15 P1 TEH TEC 17 70 DNI 07H 0.00 1.62 12 P1 TEH TEC 17 77 DNI 08H 0.00 1.36 55 P1 TEH TEC 17 83 DSI 06C

-0.02 0.21 149 P1 TEH TEC 17 88 DSI 07C 0.07 0.22 113 P1 TEH TEC 18 12 DSI 03H 0.02 0.17 32 P1 TEH TEC 18 14 SCI SBH 0.66 0.20 85 0.65 6.77 115 P3 SBH STH 18 18 DSI 02H

-0.02 0.21 88 P1 TEH TEC 18 24 SCI SBH 0.67 0.23 137 1.05 4.56 112 P3 SBH STH 18 25 MCI TSH

-0.01 0.10 68 0.52 0.21 76 P2 TSH TSH 18 25 SAI TSH 0.10 0.16 54 0.41 0.41 61 6

TSH TSH 18 25 HAI TSH 0.21 0.18 69 0.53 0.30 86 6

TSH TSH 18 25 DSI 02H 0.02 0.56 112 P1 TSC TEH 18 25 DSI 03H

-0.07 0.29 78 P1 TSC TEH 18 27 MCI TSH

-0.06 0.21 134 1.02 0.35 78 P2 TSH TSH 18 27 HAI TSH 0.04 0.16 52 0.40 0.55 73 6

TSH TSH 18 28 DSI 04H 0.02 0.72 160 P1 TEH TEC 18 28 DNI 03H 0.00 1.46 51 P1 TEH TEC 18 29 DSI 02H

-0.05 0.57 87 P1 TEH TEC 18 30 DSI 04H

-0.02 0.22 95 P1 TEH TEC 18 36 DSI 03H

-0.07 0.78 49 P1 TEH TEC 18 36 DNI 08H 0.02 1.51 42 P1 TEH TEC 18 36 DNI 05H 0.00 1.37 54 P1 TEH TEC 18 37 DSI 03H

-0.07 0.20 40 P1 TEH TEC 18 38 DSI 03H

-0.15 0.34 78 P1 TEH TEC 18 40 DSI 02H 0.00 0.28 99 P1 TEH TEC Page 11 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 41 MCI TSH

-0.07 0.18 82 0.62 0.15 101 P2 TSH TSH 18 41 HAI 02H 0.03 0.52 106 6

01H 02H 18 41 DSI 02H 0.12 1.10 103 P1 TSC TEH 18 42 DSI 02H 0.00 0.30 134 P1 TEH TEC 18 53 DSI 04H 0.05 0.25 61 P1 TEH TEC 18 53 DSI 03H 0.05 0.38 66 P1 TEH TEC 18 54 DSI 02H 0.00 0.66 35 P1 TEH TEC 18 56 DNI 07H 0.00 2.05 9

P1 TEH TEC 18 57 DSI 03H 0.02 0.21 126 P1 TEH TEC 18 58 DSI 02H

-0.02 0.43 96 P1 TEH TEC 18 61 DSI 03H 0.00 0.09 60 P1 TEH TEC 18 64 DSI 03H 0.00 0.94 78 P1 TEH TEC 18 65 DNI 07H 0.00 1.35 48 P1 TEH TEC 18 69 DSI 05H 0.00 0.21 26 P1 TEH TEC 18 69 DSI 04H

-0.05 0.07 117 P1 TEH TEC 18 70 DNI 07H 0.00 1.45 34 P1 TEH TEC 18 74 DSI 02H

-0.02 0.24 42 P1 TEH TEC 18 76 DSI 03H 0.00 0.29 39 P1 TEH TEC 18 76 DSI 05H 0.02 0.23 28 P1 TEH TEC 19 15 DSI 04H 0.00 0.05 129 P1 TEH TEC 19 15 DSI 02H 0.07 0.17 138 P1 TEH TEC 19 25 DNI 08H 0.05 1.26 55 P1 TEH TEC 19 26 SAI TSH 0.77 0.24 52 0.40 0.28 7

6 TSH TSH 19 26 HAI TSH 0.14 0.13 63 0.48 0.36 47 6

TSH TSH 19 26 NQI TSH 0.59 0.15 29 P1 TSC TEH 19 29 DSI 03H 0.02 0.86 71 P1 TEH TEC 19 29 DSI 02H

-0.02 0.64 97 P1 TEH TEC 19 30 SAI 03H 0.14 0.25 48 0.36 0.11 118 6

03H 03H 19 30 DSI 03H 0.05 0.45 53 P1 TEH TEC 19 33 DSI 02H 0.05 0.47 118 P1 TEH TEC 19 34 SAI 02H

-0.09 0.40 52 0.40 0.06 120 P4 02H 02H 19 34 DSI 02H 0.05 0.43 122 P1 TEH TEC 19 36 DNI 04H 0.02 1.64 55 P1 TEH TEC 19 36 DSI 02H 0.05 0.54 74 P1 TEH TEC 19 39 DNI 06H 0.00 1.39 50 P1 TEH TEC 19 39 DNI 08C 0.00 1.25 35 P1 TEH TEC 19 39 DSI 04H 0.00 0.20 68 P1 TEH TEC 19 39 DSI 03H 0.00 0.39 55 P1 TEH TEC 19 40 DSI 03H 0.00 0.37 61 P1 TEH TEC 19 45 DNI 07H

-0.02 1.27 54 P1 TEH TEC 19 45 DSI 02H 0.02 0.31 93 P1 TEH TEC Page 12 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 19 50 DSI 03H 0.07 0.45 53 P1 TEH TEC 19 51 DSI 02H 0.12 0.31 97 P1 TEH TEC 19 51 DSI 03H

-0.02 0.57 70 P1 TEH TEC 19 69 DSI 02H

-0.05 0.51 109 P1 STH TEC 19 71 DSI 05H 0.00 0.28 23 P1 TEH TEC 19 74 DNI 08H 0.00 1.27 53 P1 TEH TEC 19 74 DSI 02H

-0.02 0.14 17 P1 TEH TEC 19 76 DSI 02H 0.05 0.15 88 P1 TEH TEC 19 77 SCI TSH

-0.12 0.21 246 1.88 0.14 99 P2 TSH TSH 19 78 DSI 02H

-0.05 0.08 80 P1 TEH TEC 19 83 PCT TSC 1.35 11 0.26 58 0.45 0.08 84 6

TSC 01C 19 83 PCT TSC 0.40 10 0.26 58 0.45 0.07 78 6

TSC 01C 19 83 VOL TSC 0.40 0.26 58 0.45 0.07 78 6

TSC 01C 19 83 VOL TSC 1.35 0.26 58 0.45 0.08 84 6

TSC 01C 19 83 NQI TSC 1.34 0.06 128 P1 TEH TEC 19 85 DSI 02H 0.02 0.20 163 P1 TEH TEC 19 89 DNI 07H 0.17 1.33 12 P1 TEH TEC 20 11 DSI 02H 0.00 0.63 25 P1 TEH TEC 20 11 DNI 06H

-0.07 1.27 12 P1 TEH TEC 20 11 DNI 07H

-0.02 1.29 25 P1 TEH TEC 20 11 DNI 08H 0.00 1.44 9

P1 TEH TEC 20 16 DSI 03H 0.00 0.28 61 P1 TEH TEC 20 19 DSI 04H 0.02 0.05 80 P1 TEH TEC 20 20 DSI 03H 0.00 0.22 75 P1 TEH TEC 20 20 DSI 04H 0.02 0.27 64 P1 TEH TEC 20 23 SAI 02H

-0.08 0.21 63 0.48 0.11 63 2

02H 02H 20 23 DSI 02H 0.05 0.14 142 P1 STH TEC 20 25 HAI TSH 0.19 0.18 62 0.47 0.49 90 6

TSH TSH 20 25 SCI TSH 0.00 0.16 54 0.41 0.19 112 P2 TSH TSH 20 26 HAI TSH 0.50 0.16 78 0.60 0.34 95 6

TSH TSH 20 26 SCI TSH

-0.04 0.10 43 0.33 0.12 94 P2 TSH TSH 20 26 NQI TSH 0.39 0.42 98 P1 TSC TEH 20 27 HAI TSH 0.14 0.18 112 0.86 0.46 58 6

TSH TSH 20 27 MCI TSH

-0.04 0.13 169 1.29 0.30 115 P2 TSH TSH 20 27 DSI 02H

-0.05 0.19 90 P1 TSC TEH 20 27 DSI 04H

-0.12 0.49 121 P1 TSC TEH 20 30 SCI TSH

-0.03 0.12 52 0.40 0.16 83 P2 TSH TSH 20 36 DSI 08H

-0.07 0.29 27 P1 TEH TEC 20 70 DSI 02H

-0.07 0.15 130 P1 TEH TEC 20 78 DSI 04H 0.00 0.21 36 P1 TEH TEC 20 81 DSI 02H 0.00 0.36 168 P1 TEH TEC Page 13 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 20 89 DSI 02H 0.00 0.43 90 P1 TEH TEC 21 10 DSI 03H 0.05 0.37 99 P1 TEH TEC 21 18 DSI 04H 0.07 0.13 117 P1 TEH TEC 21 22 SAI TSH 0.09 0.15 62 0.47 0.28 111 6

TSH TSH 21 22 HAI TSH 0.33 0.15 37 0.28 0.14 88 6

TSH TSH 21 22 SCI TSH 0.04 0.18 157 1.20 0.35 120 P2 TSH TSH 21 24 HAI TSH 0.08 0.18 140 1.07 0.54 84 6

TSH TSH 21 26 HAI TSH 0.61 0.18 55 0.42 0.16 68 6

TSH TSH 21 26 NQI TSH 0.44 0.32 34 P1 TSC TEH 21 29 DSI 03H 0.02 0.44 54 P1 TEH TEC 21 32 DSI 03H

-0.02 0.45 60 P1 STH TEC 21 45 DSI 04H

-0.05 0.27 136 P1 TEH TEC 21 53 DSI 03H 0.12 0.45 64 P1 TEH TEC 21 53 DSI 05H 0.00 0.28 123 P1 TEH TEC 21 54 DSI 02H

-0.02 0.67 75 P1 TEH TEC 21 54 SCI TSH

-0.11 0.16 242 1.84 0.27 52 P2 TSH TSH 21 75 DSI 02H 0.07 0.20 131 P1 TEH TEC 21 85 DSI 02H

-0.07 0.44 150 P1 TEH TEC 22 18 SAI 03H 0.00 0.34 58 0.45 0.07 72 P4 03H 03H 22 18 DSI 03H 0.02 1.00 18 P1 TEH TEC 22 26 SAI TSH 0.00 0.10 83 0.63 0.27 42 6

TSH TSH 22 28 SAI TSH 0.07 0.24 82 0.62 0.26 121 6

TSH TSH 22 36 DSI 03H 0.00 0.14 49 P1 TEH TEC 22 52 DSI 02H

-0.02 0.10 56 P1 TEH TEC 22 52 DSI 03H 0.00 0.17 92 P1 TEH TEC 22 53 DSI 02H

-0.07 0.13 145 P1 TEH TEC 22 61 DSI 05H

-0.05 0.20 145 P1 TEH TEC 22 62 DSI 03H 0.05 0.26 37 P1 TEH TEC 22 64 SCI TSH

-0.06 0.18 25 0.19 0.18 60 P2 TSH TSH 22 64 DSI 02H

-0.07 0.14 98 P1 TEH TEC 23 7

PSI 06H 0.30 17.15 162 P5 TEH TEC 23 33 DSI 03H 0.05 0.20 27 P1 TEH TEC 23 37 SAI 04H

-0.03 0.31 66 0.51 0.15 103 2

04H 04H 23 37 DSI 04H 0.00 0.52 25 P1 STH TEC 23 37 PSI 06C 0.54 16.63 164 P5 STH TEC 23 37 DNI 04C

-0.07 1.58 10 P1 STH TEC 23 37 PCT 05C

-0.31 22 0.23 40 0.31 0.14 79 P4 05C 05C 23 37 VOL 05C

-0.31 0.20 83 6

05C 05C 23 56 DSI 02H 0.17 0.27 124 P1 TEH TEC 23 61 DSI 02H

-0.05 0.22 69 P1 TEH TEC 23 63 DSI 03H 0.00 0.14 46 P1 TEH TEC Page 14 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 23 63 DSI 05H 0.00 0.20 131 P1 TEH TEC 23 67 DSI 05H 0.02 0.22 151 P1 TEH TEC 23 86 PCT AV3 0.00 22 1.63 218 P2 TEH TEC 23 86 DSI 02H 0.02 0.12 102 P1 TEH TEC 24 27 HAI TSH 0.15 0.18 60 0.46 0.59 75 6

TSH TSH 24 29 DSI 05H

-0.05 0.12 18 P1 TEH TEC 24 30 DSI 03H 0.07 0.23 145 P1 TEH TEC 24 32 DSI 03H 0.00 0.32 110 P1 TEH TEC 24 42 DSI 02H 0.00 0.44 45 P1 TEH TEC 24 51 DSI 08H

-0.02 0.13 119 P1 STH TEC 24 52 DSI 02H 0.05 0.30 72 P1 TEH TEC 24 56 DSI 02H

-0.10 0.06 59 P1 TEH TEC 24 58 DSI 03H 0.00 0.24 123 P1 TEH TEC 24 62 DSI 03H 0.00 0.40 64 P1 TEH TEC 24 63 DSI 03H 0.00 0.50 30 P1 TEH TEC 24 65 DSI 02H 0.02 0.08 76 P1 TEH TEC 24 68 DSI 08H 0.00 0.13 47 P1 TEH TEC 24 68 PSI 06H

-0.49 7.94 71 8

TEH TEC 24 71 DSI 05H 0.02 0.21 42 P1 TEH TEC 24 79 DSI 07H 0.07 0.12 91 P1 TEH TEC 24 84 DSI 05H 0.05 0.43 132 P1 TEH TEC 24 86 DNI 04H 0.46 0.42 39 P1 TEH TEC 25 17 DSI 02H 0.02 0.08 44 P1 TEH TEC 25 18 DNI 06H

-0.05 1.52 32 P1 TEH TEC 25 18 DSI 05C 0.02 0.22 114 P1 TEH TEC 25 23 PCT AV3 0.32 15 1.09 0

P2 TEH TEC 25 24 DSI 03H 0.05 0.43 48 P1 TEH TEC 25 25 PSI 06C 0.54 16.73 163 P5 TEH TEC 25 26 SCI TSH

-0.02 0.18 98 0.75 0.34 95 P2 TSH TSH 25 26 HAI TSH 0.17 0.21 55 0.42 0.15 74 6

TSH TSH 25 29 DSI 02H 0.02 0.14 91 P1 TEH TEC 25 30 PSI 06C 0.54 16.87 164 P5 STH TEC 25 38 DSI 04H 0.07 0.13 132 P1 TEH TEC 25 63 DNI 06H 0.00 1.32 22 P1 TEH TEC 25 64 DSI 06H 0.00 0.45 20 P1 TEH TEC 25 79 DSI 08H 0.00 0.49 142 P1 TEH TEC 26 13 DNI 04H 0.00 1.79 11 P1 TEH TEC 26 20 DNI 06H

-0.05 1.37 29 P1 TEH TEC 26 30 DSI 03H 0.00 0.62 106 P1 TEH TEC 26 39 DSI 03H

-0.05 0.08 87 P1 TEH TEC 26 78 DSI 02H 0.00 0.12 62 P1 TEH TEC Page 15 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 27 17 DSI 05H

-0.02 0.11 111 P1 TEH TEC 27 17 DNI 07H 0.00 1.34 33 P1 TEH TEC 27 21 PCT AV3

-0.20 15 1.08 0

P2 TEH TEC 27 21 PCT AV2 0.51 18 1.39 0

P2 TEH TEC 27 21 PSI 06C 0.54 17.86 163 P5 TEH TEC 27 28 DSI 03H

-0.05 0.33 24 P1 TEH TEC 27 46 DSI 06H 0.00 0.15 31 P1 TEH TEC 27 52 DSI 04H 0.00 0.28 31 P1 TEH TEC 27 53 DSI 03H 0.00 0.16 24 P1 TEH TEC 27 68 DSI 02H 0.00 0.20 158 P1 TEH TEC 28 21 PSI 06C 0.51 18.04 163 P5 TEH TEC 28 25 NQI 08H 0.85 0.40 101 3

TEH TEC 28 25 PCT 08H 0.72 17 0.39 51 0.29 0.14 111 6

08H 08H 28 25 VOL 08H 0.72 0.29 51 0.39 0.15 117 6

08H 08H 28 30 PSI 06C 0.54 16.75 165 P5 TEH TEC 28 41 DSI 02H 0.02 0.16 50 P1 TEH TEC 28 57 HCI TSH

-0.07 0.21 158 1.21 0.91 84 P2 TSH TSH 28 58 HCI TSH

-0.10 0.23 169 1.29 1.08 68 P2 TSH TSH 28 59 DSI 04H

-0.02 0.56 63 P1 TEH TEC 28 63 DSI 03H

-0.02 0.14 80 P1 TEH TEC 28 67 DSI 03H 0.05 0.29 70 P1 STH TEC 28 70 PCT AV3 0.00 24 1.83 214 P2 TEH TEC 28 70 PCT AV4

-0.31 25 1.91 22 P2 TEH TEC 28 81 DSI 02H

-0.02 0.15 146 P1 TEH TEC 29 18 DNI 06H 0.05 1.27 47 P1 TEH TEC 29 20 DSI 03H 0.02 0.28 52 P1 TEH TEC 29 25 PSI 06C 0.51 17.25 165 P5 TEH TEC 29 27 DSI 02H

-0.02 0.24 74 P1 TEH TEC 29 27 DSI 03H 0.00 0.47 51 P1 TEH TEC 29 31 DSI 05H

-0.02 0.25 140 P1 TEH TEC 29 32 DSI 05H 0.00 0.17 75 P1 TEH TEC 29 32 DSI 03H 0.00 0.12 99 P1 TEH TEC 29 34 DSI 03H 0.05 0.27 82 P1 TEH TEC 29 35 SAI 04H 0.00 0.16 29 0.22 0.10 91 6

04H 06H 29 35 DSI 04H 0.07 0.18 80 P1 TEH TEC 29 37 DSI 03H

-0.05 0.14 169 P1 TEH TEC 29 38 DSI 02H 0.05 0.28 65 P1 TEH TEC 29 38 DNI 07H 0.00 1.27 53 P1 TEH TEC 29 38 MAI 02H

-0.05 0.10 63 6

02H 02H 29 40 DSI 03H 0.00 0.64 65 P1 TEH TEC 29 41 DSI 02H 0.00 0.17 60 P1 TEH TEC Page 16 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 29 56 DSI 02H 0.12 0.89 87 P1 TEH TEC 29 56 DNI 08H 0.00 1.35 50 P1 TEH TEC 29 56 DNI 06H 0.00 1.32 55 P1 TEH TEC 29 57 MCI TSH

-0.03 0.16 83 0.63 0.37 104 P2 TSH TSH 29 57 DSI 02H

-0.02 0.50 111 P1 TSC TEH 29 57 HAI 02H

-0.06 0.37 93 6

02H 02H 30 16 DSI 07H 0.00 0.11 58 P1 TEH TEC 30 16 DSI 04H 0.05 0.12 90 P1 TEH TEC 30 20 DSI 04H 0.02 0.27 122 P1 TEH TEC 30 27 DSI 02H

-0.02 0.17 33 P1 TEH TEC 30 32 DSI 03H 0.02 0.25 149 P1 STH TEC 30 34 PSI 06H

-0.54 17.25 165 P5 STH TEC 30 34 DNI 03C 0.15 1.36 4

P1 STH TEC 30 48 SAI 04H 0.04 0.15 37 0.28 0.08 138 P4 04H 04H 30 48 DNI 04H 0.00 1.42 41 P1 TEH TEC 30 50 DSI 04H 0.00 0.27 54 P1 TEH TEC 30 51 SCI TSH

-0.10 0.23 35 0.27 0.19 120 P2 TSH TSH 30 53 PCT AV3 0.00 20 1.36 202 P2 TEH TEC 30 55 DSI 03H

-0.12 0.15 170 P1 TEH TEC 30 56 DSI 04H

-0.02 0.46 21 P1 STH TEC 30 59 DSI 04H 0.00 0.20 49 P1 TEH TEC 30 59 PCT AV3 0.00 22 1.56 20 P2 TEH TEC 30 78 DSI 04H 0.00 0.24 20 P1 TEH TEC 30 78 DSI 02H 0.07 0.15 28 P1 TEH TEC 30 79 DSI 02H

-0.07 0.16 22 P1 TEH TEC 30 81 DSI 03H 0.00 0.13 131 P1 TEH TEC 31 21 DSI 07H 0.00 0.42 141 P1 TEH TEC 31 22 DNI 06H 0.00 1.31 54 P1 TEH TEC 31 23 DSI 02H 0.17 0.58 65 P1 TEH TEC 31 32 DSI 05H

-0.07 0.40 146 P1 STH TEC 31 32 DNI 02H 0.00 1.42 23 P1 STH TEC 31 32 DSI 03H 0.00 0.34 34 P1 STH TEC 31 37 DSI 03H

-0.02 0.39 49 P1 TEH TEC 31 39 DSI 02H 0.00 0.09 42 P1 TEH TEC 31 39 DSI 03H

-0.20 0.25 129 P1 TEH TEC 31 41 PCT AV2 0.19 13 0.80 0

P2 TEH TEC 31 41 PCT AV1 0.24 14 0.93 0

P2 TEH TEC 31 41 PCT AV3 0.05 19 1.47 30 P2 TEH TEC 31 48 DSI 02H 0.07 0.51 40 P1 STH TEC 31 52 DSI 02H 0.00 0.16 55 P1 TEH TEC 31 59 PCT AV3 0.00 26 2.26 215 P2 TEH TEC Page 17 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 31 59 PCT AV2 0.00 12 0.64 110 P2 TEH TEC 31 59 WAR AV1 0.00 0.26 138 2

08H AV1 31 59 PCT AV1 0.00 10 0.47 199 P2 TEH TEC 31 59 PCT AV4 0.00 21 1.52 34 P2 TEH TEC 31 64 DSI 02H 0.05 0.09 26 P1 TEH TEC 31 71 DSI 05H 0.07 0.12 58 P1 TEH TEC 31 75 DSI 04H 0.10 0.23 110 P1 TEH TEC 31 75 DNI 03H 0.00 1.25 55 P1 TEH TEC 31 76 DSI 02H 0.05 0.26 83 P1 TEH TEC 31 78 DSI 02H

-0.12 0.39 143 P1 TEH TEC 31 78 DSI 03H 0.10 0.30 110 P1 TEH TEC 32 16 DSI 08H 0.00 0.14 67 P1 TEH TEC 32 29 DSI 05H 0.00 0.19 141 P1 TEH TEC 32 31 SAI 02H 0.05 0.14 34 0.26 0.06 78 6

01H 02H 32 31 DSI 02H 0.00 0.13 11 P1 TEH TEC 32 35 DNI 05H 0.00 1.26 48 P1 TEH TEC 32 42 SCI TSH

-0.14 0.23 26 0.20 0.28 128 P2 TSH TSH 32 50 PCT AV1 0.22 19 1.24 320 P2 TEH TEC 32 50 PCT AV2

-0.79 27 2.30 225 P2 TEH TEC 32 50 PCT AV2 0.59 24 1.95 210 P2 TEH TEC 32 50 PCT AV3

-0.12 19 1.21 197 P2 TEH TEC 32 53 DSI 02H 0.00 0.51 47 P1 TEH TEC 32 55 PCT AV3 0.42 25 1.96 37 P2 TEH TEC 32 55 PCT AV4

-0.14 17 1.01 23 P2 TEH TEC 32 55 DSI 02H

-0.02 0.29 94 P1 TEH TEC 32 55 DSI 05H 0.05 0.17 107 P1 TEH TEC 32 57 PCT AV3

-0.17 20 1.43 30 P2 STH TEC 32 57 PCT AV1 0.07 19 1.34 20 P2 STH TEC 32 59 PCT AV3 0.07 27 2.38 0

P2 STH TEC 32 61 DSI 02H 0.12 0.26 137 P1 TEH TEC 32 61 DSI 05H 0.02 0.41 149 P1 TEH TEC 32 61 DNI 08H 0.00 1.25 47 P1 TEH TEC 32 77 DSI 02H 0.00 0.35 107 P1 TEH TEC 33 29 DSI 02H 0.05 0.04 93 P1 TEH TEC 33 31 DSI 06H 0.00 0.04 59 P1 TEH TEC 33 31 DSI 07H 0.00 0.19 41 P1 TEH TEC 33 32 DSI 02H

-0.02 0.47 156 P1 TEH TEC 33 37 DSI 04H 0.07 0.18 162 P1 STH TEC 33 40 WAR AV1

-0.03 0.53 91 0.69 0.28 114 2

08H AV1 33 40 PCT AV3

-0.20 20 1.57 0

P2 TEH TEC 33 40 PCT AV2 0.19 24 2.10 0

P2 TEH TEC Page 18 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 33 40 PCT AV1 0.00 17 1.19 15 P2 TEH TEC 33 41 PCT AV3 0.00 20 1.59 0

P2 TEH TEC 33 41 PCT AV2 0.00 30 3.10 0

P2 TEH TEC 33 41 PCT AV1 0.22 20 1.54 0

P2 TEH TEC 33 44 DSI 02H

-0.02 0.22 89 P1 TEH TEC 33 46 PSI 06C 0.49 8.27 75 8

TEH TEC 33 48 SCI TSH

-0.05 0.26 152 1.16 0.10 51 P2 TSH TSH 33 55 PCT AV2 0.00 17 1.25 0

P2 TEH TEC 33 57 PCT AV1 0.20 20 1.25 298 P2 STH TEC 33 57 PCT AV2 0.30 22 1.54 68 P2 STH TEC 33 57 PCT AV3

-0.17 18 1.07 22 P2 STH TEC 33 57 WAR AV3

-0.17 0.13 125 2

08C AV3 33 57 PCT AV2

-0.36 19 1.22 65 P2 STH TEC 33 60 DSI 03H 0.05 0.09 50 P1 TEH TEC 33 62 DSI 02H 0.12 0.55 78 P1 TEH TEC 33 63 PCT AV1 0.00 17 1.16 290 P2 TEH TEC 33 63 PCT AV2 0.00 34 3.84 92 P2 TEH TEC 33 63 PCT AV3 0.00 37 4.78 113 P2 TEH TEC 33 63 PCT AV4 0.00 31 3.17 271 P2 TEH TEC 33 64 PCT AV2 0.00 13 0.61 28 P2 TEH TEC 33 65 PCT AV2 0.00 21 1.60 316 P2 TEH TEC 33 65 PCT AV1 0.00 15 0.91 342 P2 TEH TEC 33 73 DSI 07H 0.02 0.53 118 P1 TEH TEC 34 16 DSI 08H

-0.02 0.12 61 P1 TEH TEC 34 18 DSI 08H

-0.02 0.28 155 P1 TEH TEC 34 22 PCT AV4 0.08 17 0.97 32 P2 TEH TEC 34 22 PCT AV3 0.19 18 1.04 209 P2 TEH TEC 34 22 PCT AV2 0.17 19 1.18 28 P2 TEH TEC 34 25 DNI 04H 0.12 1.27 12 P1 TEH TEC 34 26 DNI 07H 0.07 1.33 20 P1 TEH TEC 34 32 DSI 02H

-0.02 0.32 153 P1 TEH TEC 34 35 DSI 03H 0.02 0.13 84 P1 TEH TEC 34 36 DNI 05H 0.00 1.44 20 P1 TEH TEC 34 37 DSI 03H 0.05 0.24 12 P1 TEH TEC 34 40 PSI 06C 0.49 17.52 162 P5 TEH TEC 34 40 PSI 06H

-0.51 17.02 164 P5 TEH TEC 34 41 CSI 06C

-0.05 0.77 108 0.82 67.39 83 10 06C 06C 34 41 PSI 06C

-0.61 18.85 339 P5 TEH TEC 34 41 PSI 02H

-0.51 17.52 155 P5 TEH TEC 34 41 PSI 06H

-0.52 17.99 160 P5 TEH TEC 34 43 PSI 02H

-0.51 16.50 159 P5 TEH TEC Page 19 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 34 48 DSI 04H

-0.02 0.19 97 P1 TEH TEC 34 48 DSI 03H 0.02 0.29 95 P1 TEH TEC 34 48 DSI 02H 0.02 0.49 107 P1 TEH TEC 34 50 PCT AV1 0.00 24 1.83 260 P2 TEH TEC 34 50 PCT AV3 0.00 27 2.38 28 P2 TEH TEC 34 50 PCT AV4

-0.05 19 1.28 16 P2 TEH TEC 34 51 DNI 08H 0.02 1.61 49 P1 TEH TEC 34 51 DSI 03H 0.02 0.40 96 P1 TEH TEC 34 51 DSI 02H 0.00 0.57 57 P1 TEH TEC 34 57 WAR AV3 0.00 0.48 301 2

08C AV3 34 57 PCT AV3 0.00 16 0.92 268 P2 TEH TEC 34 57 DSI 02H 0.05 0.28 20 P1 TEH TEC 34 57 PCT AV2 0.00 25 1.99 205 P2 TEH TEC 35 19 PCT AV4 0.32 20 1.24 334 P2 TEH TEC 35 21 PCT AV3 0.00 23 1.99 0

P2 TEH TEC 35 25 PSI 06H

-0.51 17.66 162 P5 TEH TEC 35 25 PCT AV2 0.15 36 4.59 246 P2 TEH TEC 35 25 PCT AV4 0.14 31 3.33 0

P2 TEH TEC 35 25 PCT AV3 0.00 41 5.98 0

P2 TEH TEC 35 40 WAR AV2

-0.02 0.53 68 0.52 0.40 123 2

08H AV2 35 40 PCT AV2

-0.15 19 1.46 0

P2 TEH TEC 35 40 DSI 02H 0.00 0.10 105 P1 TEH TEC 35 40 WAR AV3 0.00 0.50 120 2

08C AV3 35 40 PCT AV3 0.00 24 2.01 0

P2 TEH TEC 35 41 PCT AV3 0.22 18 1.22 0

P2 STH TEC 35 41 PCT AV2

-0.66 23 1.81 0

P2 STH TEC 35 41 PCT AV3

-0.42 21 1.53 0

P2 STH TEC 35 41 PCT AV2 0.49 32 3.54 0

P2 STH TEC 35 41 PCT AV4 0.18 29 2.80 0

P2 STH TEC 35 41 PCT AV1 0.27 22 1.69 0

P2 STH TEC 35 50 PCT AV1 0.00 27 2.47 0

P2 TEH TEC 35 50 PCT AV3 0.00 25 2.27 0

P2 TEH TEC 35 50 PCT AV4 0.00 18 1.29 0

P2 TEH TEC 35 50 PCT AV2 0.00 21 1.70 0

P2 TEH TEC 35 54 PCT AV1 0.00 16 1.06 0

P2 TEH TEC 35 71 PCT AV4 0.20 16 1.09 87 P2 TEH TEC 35 71 PCT AV2 0.00 21 1.64 42 P2 TEH TEC 36 19 CSI 06H 0.00 0.82 178 1.36 80.94 87 10 06H 06H 36 19 PSI 06H

-0.54 16.32 135 P5 TEH TEC 36 20 CSI 06H

-0.06 0.82 186 1.42 84.53 84 10 06H 06H 36 20 PSI 06H

-0.51 15.94 158 P5 TEH TEC Page 20 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 36 21 PSI 06H

-0.54 15.16 157 P5 TEH TEC 36 23 PSI 06H

-0.51 16.94 159 P5 TEH TEC 36 25 PSI 06H

-0.51 17.30 156 P5 TEH TEC 36 25 DSI 05H 0.05 0.16 35 P1 TEH TEC 36 26 PSI 06H

-0.44 16.89 159 P5 TEH TEC 36 27 VOL TSC 0.21 0.39 58 0.09 0.08 92 6

TSC TSC 36 27 PCT TSC 0.18 12 0.09 51 0.39 0.08 97 6

TSC TSC 36 27 PSI 06H

-0.54 17.17 157 P5 TEH TEC 36 29 PSI 06H

-0.54 16.96 158 P5 TEH TEC 36 29 PSI 06C 0.51 16.18 164 P5 TEH TEC 36 30 PSI 06H

-0.46 16.89 162 P5 TEH TEC 36 31 PSI 06H

-0.54 17.16 158 P5 TEH TEC 36 35 PSI 06H

-0.54 16.92 158 P5 TEH TEC 36 40 PSI 06C 0.51 17.24 157 P5 TEH TEC 36 42 DSI 03H 0.02 0.15 111 P1 TEH TEC 36 50 PCT AV2 0.00 19 1.13 20 P2 TEH TEC 36 50 PCT AV1 0.00 19 1.19 162 P2 TEH TEC 36 55 PCT AV2

-0.02 21 1.71 0

P2 TEH TEC 36 55 PCT AV1

-0.24 12 0.77 0

P2 TEH TEC 36 58 DSI 05H

-0.02 0.11 82 P1 TEH TEC 36 59 PCT AV3 0.00 22 1.45 18 P2 TEH TEC 36 59 PCT AV2 0.00 28 2.41 112 P2 TEH TEC 36 59 PCT AV1 0.00 22 1.54 15 P2 TEH TEC 36 59 WAR AV3 0.00 0.13 84 2

08C AV3 36 64 DSI 02H 0.00 0.06 33 P1 TEH TEC 37 24 DSI 05H 0.10 0.11 117 P1 TEH TEC 37 29 WAR AV3

-0.22 0.43 308 2

08C AV3 37 29 PCT AV1 0.02 19 1.49 0

P2 TEH TEC 37 29 PCT AV3

-0.22 14 0.97 152 P2 TEH TEC 37 29 PCT AV2 0.12 28 2.85 0

P2 TEH TEC 37 32 DSI 03H 0.17 0.60 44 P1 TEH TEC 37 41 PCT AV2 0.00 17 1.19 0

P2 TEH TEC 37 57 PCT AV4 0.38 36 4.42 0

P2 TEH TEC 37 57 DSI 02H 0.00 0.21 82 P1 TEH TEC 37 57 DSI 05H 0.05 0.14 107 P1 TEH TEC 37 57 PCT AV2 0.42 18 1.39 0

P2 TEH TEC 37 57 PCT AV3 0.16 34 4.12 0

P2 TEH TEC 38 35 DSI 02H

-0.05 0.13 49 P1 TEH TEC 38 62 PCT AV2 0.00 15 0.74 311 P2 TEH TEC 38 63 DSI 03H 0.05 0.09 14 P1 TEH TEC 39 31 DSI 05H 0.00 0.15 143 P1 TEH TEC Page 21 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 39 33 DSI 03H 0.07 0.11 64 P1 TEH TEC 39 41 PSI 02H

-0.51 16.54 160 P5 TEH TEC 39 45 PCT AV3 0.00 19 1.47 0

P2 TEH TEC 39 45 PCT AV4

-0.50 33 3.89 0

P2 TEH TEC 39 55 PSI 06H

-0.54 16.97 157 P5 TEH TEC 39 55 PSI 06C 0.54 16.54 159 P5 TEH TEC 39 65 PCT AV4 0.00 9

0.51 137 P2 TEH TEC 39 70 PCT AV3 0.00 30 2.82 45 P2 TEH TEC 39 72 PCT AV1 0.00 6

0.24 150 P2 TEH TEC 40 27 PSI 06H

-0.51 17.22 163 P5 TEH TEC 40 31 DSI 05H 0.00 0.10 62 P1 TEH TEC 40 40 PSI 06C 0.51 17.51 158 P5 TEH TEC 40 41 CSI 02H 0.09 0.76 117 0.89 31.26 91 10 02H 02H 40 41 PSI 02H

-0.51 16.60 163 P5 TEH TEC 40 42 DSI 02H

-0.07 0.58 166 P1 TEH TEC 40 55 PSI 06C 0.54 17.64 158 P5 TEH TEC 41 31 DSI 05H 0.00 0.24 87 P1 TEH TEC 41 36 DNI 03C 0.10 1.68 7

P1 TEH TEC 41 52 DSI 08C

-0.02 0.17 40 P1 TEH TEC 41 68 PCT AV1 0.00 13 0.63 202 P2 TEH TEC 41 68 DSI 04H 0.02 0.29 31 P1 TEH TEC 42 28 PCT AV3 0.19 21 1.30 201 P2 TEH TEC 42 29 PCT AV2 0.17 11 0.72 0

P2 TEH TEC 42 29 PCT AV1 0.24 16 1.16 0

P2 TEH TEC 42 41 PSI 02H

-0.51 16.84 158 P5 TEH TEC 42 41 PSI 06H

-0.54 17.73 158 P5 TEH TEC 42 41 PSI 06C 0.56 17.45 158 P5 TEH TEC 42 45 DNI 07H

-0.02 2.10 38 P1 TEH TEC 42 47 PCT AV2 0.05 23 1.97 0

P2 TEH TEC 42 47 PCT AV1 0.05 24 2.24 0

P2 TEH TEC 42 51 DSI 04H 0.07 0.11 45 P1 TEH TEC 42 55 PCT AV2 0.20 20 1.68 0

P2 TEH TEC 42 55 PCT AV1

-0.45 29 3.04 0

P2 TEH TEC 42 55 PSI 06H

-0.54 17.31 158 P5 TEH TEC 43 41 PSI 06C 0.53 17.59 162 P5 TEH TEC 43 41 PSI 06H

-0.51 17.89 160 P5 TEH TEC 43 41 PSI 02H

-0.50 17.03 157 P5 TEH TEC 43 54 PSI 06H

-0.49 17.42 160 P5 TEH TEC 43 55 PSI 04C 0.54 17.72 158 P5 TEH TEC 43 55 PSI 06H

-0.54 16.80 158 P5 TEH TEC 43 64 PSI 06H 0.83 9.06 71 8

TEH TEC Page 22 of 23

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 44 37 PSI 06H

-0.51 18.03 160 P5 TEH TEC 44 41 PSI 06H

-0.52 18.62 159 P5 TEH TEC 44 41 PSI 02H

-0.50 16.59 161 P5 TEH TEC 44 48 DSI 02H

-0.07 0.25 157 P1 TEH TEC 44 53 DSI 05H 0.12 0.43 118 P1 TEH TEC 44 58 DNI 06H 0.05 1.81 14 P1 TEH TEC 44 59 DNI 06H 0.07 1.96 12 P1 TEH TEC 45 36 DSI 08H

-0.34 0.67 124 P1 TEH TEC 45 37 DSI 08H

-0.35 0.47 133 P1 TEH TEC 45 39 PSI 06C 0.53 17.71 158 P5 TEH TEC 45 39 CSI 06C 0.00 0.77 92 0.70 79.15 265 10 06C 06C 45 41 PSI 06H

-0.54 18.13 158 P5 TEH TEC 45 41 PSI 02H

-0.55 16.83 159 P5 TEH TEC 45 41 PSI 06H 0.61 18.52 339 P5 TEH TEC 45 54 PSI 02H

-0.52 18.69 156 P5 TEH TEC 46 41 PSI 06H

-0.54 8.89 246 8

TEH TEC 46 41 PSI 02H

-0.50 8.32 250 8

TEH TEC 46 54 PSI 02H

-0.45 8.56 247 8

TEH TEC 46 54 PSI 06H

-0.46 17.74 161 P5 TEH TEC Page 23 of 23

Unit #2 - 2R22 Steam Generator 180 Day Report Attachment C BEAVER VALLEY UNIT #2 2R22 SG EXAMINATION RESULTS 2RCS-SG21C TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 1

2 DNI 04C 0.20 1.38 11 P1 08C TEC 1

23 DSI 07C 0.18 0.46 52 P1 08C TEC 1

35 DNI 03C 0.10 1.30 12 P1 08C TEC 2

17 DNI 04C 0.00 1.26 33 P1 08C TEC 2

21 DNI 06H

-0.01 1.29 26 P1 08H TEH 2

21 DNI 04H

-0.01 1.32 27 P1 08H TEH 2

71 DNI 07H 0.00 1.32 54 P1 08H TEH 2

78 DSI 03H

-0.23 0.29 164 P1 08H TEH 2

80 DSI 03H

-0.03 0.23 120 P1 08H TEH 2

84 DNI 04H

-0.03 1.35 52 P1 08H TEH 2

85 DSI 03H 0.00 0.28 15 P1 08H TEH 2

86 DNI 08C 0.05 1.42 50 P1 08C TEC 2

87 DNI 08C 0.10 1.30 49 P1 08C TEC 3

4 DNI 07H 0.00 1.32 42 P1 08H TEH 3

8 DSI 04H

-0.03 0.41 143 P1 08H TEH 3

9 DSI 04H 0.01 0.12 131 P1 08H TEH 3

9 DSI 06H 0.03 0.16 139 P1 08H TEH 3

12 DSI 07H

-0.13 0.21 136 P1 08H TEH 3

16 DNI 03H 0.19 1.52 9

P1 08H TEH 3

17 DNI 08H 0.00 1.47 43 P1 08H TEH 3

18 DSI 03H 0.03 0.26 112 P1 08H TEH 3

23 DNI 08H

-0.01 1.27 43 P1 08H TEH 3

35 DSI 05H 0.00 0.26 157 P1 08H TEH 3

39 DSI 04H

-0.04 0.13 80 P1 08H TEH 3

39 DSI 07H 0.01 0.54 141 P1 08H TEH 3

45 DSI 02H 0.00 0.65 118 P1 08H TEH 3

58 DSI 02H 0.00 0.48 70 P1 08H TEH 3

58 DNI 03H 0.15 1.26 41 P1 08H TEH 3

60 DSI 03H 0.00 0.59 102 P1 08H TEH 3

60 DSI 02H 0.00 0.33 103 P1 08H TEH 3

64 DSI 03H

-0.04 0.63 45 P1 08H TEH 3

64 DSI 02H 0.04 0.21 99 P1 08H TEH 3

80 DSI 02H 0.03 0.63 106 P1 08H TEH 3

82 DNI 05H 0.00 1.88 11 P1 08H TEH 3

90 DSI 06H

-0.03 0.33 69 P1 08H TEH 3

93 DSI 04H

-0.03 0.39 112 P1 08H TEH 3

94 DSI 04H

-0.06 0.48 51 P1 08H TEH 3

94 DNI 05H 0.09 1.41 35 P1 08H TEH 4

3 DSI 04H

-0.01 0.14 65 P1 08H TEH 4

11 DSI 02H

-0.04 0.26 111 P1 08H TEH 4

26 DSI 03H 0.00 0.63 138 P1 08H TEH Page 1 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 4

26 DNI 07H 0.01 1.38 53 P1 08H TEH 4

28 DSI 06H 0.00 0.53 118 P1 08H TEH 4

32 DNI 08H

-0.01 1.27 30 P1 08H TEH 4

33 SAI 02H

-0.07 0.22 52 0.40 0.15 113 2

02H 02H 4

33 SAI 04H 0.00 0.24 58 0.45 0.28 86 2

04H 04H 4

33 DSI 02H

-0.01 0.72 94 P1 08H TEH 4

33 DSI 04H

-0.01 0.74 68 P1 08H TEH 4

34 DNI 06H 0.00 1.37 47 P1 08H TEH 4

39 DSI 07H 0.04 0.40 48 P1 08H TEH 4

48 DSI 02H

-0.10 0.31 120 P1 08H TEH 4

49 DSI 03H 0.00 0.44 108 P1 08H TEH 4

69 DSI 03H 0.01 0.19 79 P1 08H TEH 4

76 DSI 03H

-0.09 0.23 165 P1 08H TEH 4

80 DNI 05H 0.00 1.37 47 P1 08H TEH 4

80 DNI 07H 0.00 1.46 43 P1 08H TEH 5

6 DSI 03H 0.00 0.59 138 P1 TEH TEC 5

6 DSI 04H 0.00 0.12 96 P1 TEH TEC 5

7 DSI 03H 0.22 0.91 106 P1 TEH TEC 5

7 DSI 02H 0.00 0.29 111 P1 TEH TEC 5

15 SAI 04H

-0.37 0.13 43 0.33 0.20 89 6

04H 04H 5

15 SAI 04H 0.02 0.16 25 0.19 0.24 59 6

04H 04H 5

15 DSI 03H 0.00 0.24 70 P1 TEH TEC 5

15 DSI 04H

-0.07 0.89 126 P1 TEH TEC 5

18 DSI 02H 0.02 0.46 95 P1 TEH TEC 5

19 DSI 02H

-0.02 0.43 88 P1 TEH TEC 5

19 DSI 03H 0.02 0.21 109 P1 TEH TEC 5

29 DSI 03H 0.00 0.19 124 P1 STH TEC 5

29 DSI 02H

-0.07 0.51 124 P1 STH TEC 5

61 DSI 02H 0.07 0.40 101 P1 TEH TEC 5

62 DSI 02H 0.00 0.39 102 P1 TEH TEC 5

66 DSI 03H 0.00 0.43 73 P1 TEH TEC 5

68 DNI 07H 0.00 1.48 48 P1 TEH TEC 5

70 DSI 05C 0.00 0.58 57 P1 TEH TEC 5

71 DSI 02H 0.05 0.28 88 P1 TEH TEC 5

73 DNI 03H 0.10 1.42 40 P1 TEH TEC 5

76 DSI 03H 0.00 0.30 71 P1 TEH TEC 5

78 DNI 08H 0.00 1.34 45 P1 TEH TEC 5

81 DNI 07H 0.00 1.36 49 P1 TEH TEC 5

86 DNI 03H 0.00 1.69 51 P1 TEH TEC 5

86 DSI 08H

-0.05 0.42 22 P1 TEH TEC 5

88 DNI 06H

-0.02 1.39 51 P1 TEH TEC Page 2 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

89 DNI 04H 0.00 1.41 53 P1 TEH TEC 5

89 DSI 02H 0.00 0.55 103 P1 TEH TEC 6

23 DSI 02H 0.00 0.14 93 P1 TEH TEC 6

30 DSI 03H

-0.05 0.27 131 P1 TEH TEC 6

30 DSI 02H

-0.02 0.32 134 P1 TEH TEC 6

50 DNI 05H 0.05 1.30 53 P1 TEH TEC 6

54 DSI 03H 0.02 0.58 87 P1 TEH TEC 6

55 DSI 02H

-0.05 0.35 157 P1 TEH TEC 6

63 DSI 02H

-0.02 0.38 120 P1 TEH TEC 6

63 DSI 04H 0.00 0.38 21 P1 TEH TEC 6

78 DSI 03H 0.10 1.09 76 P1 TEH TEC 6

84 DSI 03H 0.00 0.18 46 P1 TEH TEC 6

87 DSI 03H 0.02 0.25 27 P1 TEH TEC 6

92 DSI 04H 0.00 0.32 46 P1 TEH TEC 7

7 DNI 06H

-0.02 1.46 11 P1 TEH TEC 7

7 DNI 07C 0.00 1.99 14 P1 TEH TEC 7

7 DNI 08H 0.00 2.12 13 P1 TEH TEC 7

7 DNI 07H 0.02 2.30 21 P1 TEH TEC 7

12 DSI 08C

-0.05 0.35 43 P1 TEH TEC 7

12 SAI 08C 0.12 0.11 31 0.23 0.10 141 2

08H 08C 7

40 DSI 03H

-0.05 0.46 88 P1 TEH TEC 7

40 DSI 04H 0.00 0.43 38 P1 TEH TEC 7

49 DSI 03H

-0.07 0.35 122 P1 TEH TEC 7

49 DSI 02H 0.02 0.44 109 P1 TEH TEC 7

58 DSI 02H

-0.05 1.03 101 P1 TEH TEC 7

67 DSI 02H 0.00 0.35 55 P1 TEH TEC 7

72 PSI 05C

-0.17 13.29 336 P5 TEH TEC 7

80 DSI 03H

-0.02 0.23 102 P1 TEH TEC 7

86 DNI 07H 0.02 1.18 30 P1 TEH TEC 7

93 DNI 05H 0.05 1.66 14 P1 TEH TEC 8

2 DSI 08H 0.07 0.42 23 P1 TEH TEC 8

12 DNI 06H 0.02 1.25 51 P1 TEH TEC 8

17 DNI 08H 0.00 1.29 43 P1 TEH TEC 8

18 DNI 05H 0.00 1.12 48 P1 TEH TEC 8

23 DSI 02H 0.02 0.46 97 P1 TEH TEC 8

24 DSI 02H

-0.05 0.37 100 P1 TEH TEC 8

43 DSI 03H

-0.10 0.23 55 P1 TEH TEC 8

63 DSI 06H

-0.07 0.17 64 P1 TEH TEC 8

66 DNI 03H 0.27 1.41 10 P1 TEH TEC 8

72 DSI 03H

-0.05 0.26 16 P1 TEH TEC 8

84 DSI 03H 0.05 0.24 163 P1 TEH TEC Page 3 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 8

90 DNI 08H 0.07 1.55 14 P1 TEH TEC 8

92 DNI 04H 0.10 1.27 28 P1 TEH TEC 9

13 DSI 03H

-0.05 0.17 29 P1 TEH TEC 9

20 DSI 04H 0.02 0.35 169 P1 TEH TEC 9

26 DSI 03H 0.02 0.18 106 P1 TEH TEC 9

30 DSI 02H 0.00 0.36 125 P1 TEH TEC 9

30 DNI 07H 0.00 1.45 46 P1 TEH TEC 9

32 DNI 07H

-0.02 1.58 48 P1 TEH TEC 9

32 DSI 02H 0.07 0.49 73 P1 TEH TEC 9

35 DSI 02H 0.00 0.44 102 P1 TEH TEC 9

35 DSI 03H 0.02 0.42 108 P1 TEH TEC 9

37 DSI 02H

-0.10 0.51 119 P1 TEH TEC 9

38 DSI 03H

-0.05 0.32 137 P1 TEH TEC 9

39 DSI 05H

-0.05 0.27 77 P1 TEH TEC 9

41 DSI 02H 0.10 0.29 120 P1 TEH TEC 9

44 DSI 03H 0.02 0.16 85 P1 TEH TEC 9

45 DSI 06H

-0.05 0.24 70 P1 TEH TEC 9

45 DSI 05H 0.00 0.45 86 P1 TEH TEC 9

47 DSI 02H 0.02 0.42 100 P1 STH TEC 9

54 DSI 04H 0.05 0.30 99 P1 TEH TEC 9

54 DSI 02H

-0.20 0.90 98 P1 TEH TEC 9

62 DSI 04H

-0.07 0.19 58 P1 TEH TEC 9

65 DSI 06H 0.02 0.20 61 P1 TEH TEC 9

74 DSI 04H

-0.02 0.31 124 P1 TEH TEC 9

88 DNI 06H 0.02 1.29 47 P1 TEH TEC 9

88 DNI 04H 0.02 1.16 46 P1 TEH TEC 9

91 DNI 04H 0.02 1.26 47 P1 TEH TEC 10 7

DNI 05H 0.02 1.51 49 P1 TEH TEC 10 8

DNI 06C 0.00 1.39 35 P1 TEH TEC 10 8

DSI 02H 0.00 0.54 100 P1 TEH TEC 10 9

DSI 03H 0.15 0.22 145 P1 TEH TEC 10 10 DSI 02H

-0.05 0.63 100 P1 TEH TEC 10 10 DSI 03H 0.05 0.35 84 P1 TEH TEC 10 15 DNI 07H 0.03 1.37 42 P1 TEH TEC 10 15 DNI 04C 0.00 1.25 32 P1 TEH TEC 10 18 DSI 04H 0.02 0.08 149 P1 TEH TEC 10 24 DSI 03H

-0.05 0.24 122 P1 TEH TEC 10 34 DNI 08C

-0.02 1.28 42 P1 TEH TEC 10 36 DSI 02H 0.00 0.41 149 P1 TEH TEC 10 37 DSI 02H 0.22 0.69 64 P1 TEH TEC 10 38 DSI 07H

-0.12 0.44 145 P1 STH TEC Page 4 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 10 43 DSI 02H

-0.03 0.19 120 P1 TEH TEC 10 44 DSI 02H 0.10 0.37 141 P1 TEH TEC 10 51 DSI 02H

-0.10 1.11 50 P1 TEH TEC 10 51 DSI 03H 0.25 0.06 66 P1 TEH TEC 10 51 DSI 05H

-0.02 0.41 23 P1 TEH TEC 10 54 DSI 02H 0.00 0.82 83 P1 TEH TEC 10 54 DSI 03H 0.05 0.36 92 P1 TEH TEC 10 55 DNI 07C

-0.10 1.35 29 P1 TEH TEC 10 55 DNI 08H

-0.02 1.48 41 P1 TEH TEC 10 60 DNI 03H 0.00 1.26 50 P1 TEH TEC 10 72 DSI 03H

-0.02 0.20 58 P1 TEH TEC 10 72 DSI 02H 0.00 0.40 113 P1 TEH TEC 10 76 DSI 04H 0.05 0.20 27 P1 TEH TEC 10 78 DSI 03H 0.05 0.13 29 P1 STH TEC 11 7

DSI 02H 0.00 0.48 88 P1 TEH TEC 11 9

DSI 03H 0.22 0.52 83 P1 TEH TEC 11 17 DNI 07C

-0.02 1.27 41 P1 STH TEC 11 17 DSI 02H

-0.05 0.82 66 P1 STH TEC 11 18 DNI 08C 0.00 1.49 50 P1 STH TEC 11 24 DNI 04H

-0.15 1.41 12 P1 TEH TEC 11 24 DNI 05H 0.00 1.34 29 P1 TEH TEC 11 36 DSI 02H

-0.10 0.44 76 P1 STH TEC 11 36 DNI 04C 0.15 1.29 18 P1 STH TEC 11 36 DNI 04H 0.00 2.17 51 P1 STH TEC 11 36 DNI 07C 0.00 1.34 52 P1 STH TEC 11 45 SCI TSH

-0.05 0.13 49 0.38 0.09 85 P2 TSH TSH 11 48 DNI 04H

-0.05 1.42 11 P1 TEH TEC 11 49 DSI 02H 0.24 0.55 73 P1 TEH TEC 11 54 DNI 03H 0.22 1.31 21 P1 TEH TEC 11 54 DNI 06H 0.00 1.55 43 P1 TEH TEC 11 54 DNI 04C

-0.24 1.28 15 P1 TEH TEC 11 57 DSI 07C 0.00 0.10 33 P1 TEH TEC 11 62 DSI 03H 0.05 0.45 20 P1 TEH TEC 11 70 DSI 03H

-0.05 0.24 23 P1 TEH TEC 11 72 DSI 03H 0.00 0.36 47 P1 TEH TEC 11 77 DSI 04H 0.00 0.26 80 P1 TEH TEC 11 77 DSI 05H 0.00 0.15 37 P1 TEH TEC 11 79 DNI 08H 0.00 1.29 35 P1 TEH TEC 11 88 DSI 05H 0.00 0.60 155 P1 TEH TEC 11 89 DNI 05H 0.00 1.45 49 P1 TEH TEC 11 89 DNI 07C 0.00 1.38 18 P1 TEH TEC Page 5 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 9

DSI 02H 0.00 0.35 76 P1 TEH TEC 12 11 NQI 07C 6.78 0.19 73 3

TEH TEC 12 12 DNI 02H 0.02 1.34 54 P1 TEH TEC 12 12 DNI 05H 0.00 1.38 40 P1 TEH TEC 12 30 DSI 02H

-0.02 0.17 83 P1 TEH TEC 12 35 DSI 04H 0.12 0.10 115 P1 TEH TEC 12 35 DSI 05H 0.02 0.11 111 P1 TEH TEC 12 37 DNI 05C

-0.12 1.25 11 P1 TEH TEC 12 37 DNI 04H 0.02 1.32 43 P1 TEH TEC 12 55 DSI 02H 0.02 0.27 121 P1 TEH TEC 12 59 DNI 04H 0.00 1.69 46 P1 TEH TEC 12 70 DSI 02H 0.02 0.46 112 P1 TEH TEC 12 70 DSI 03H 0.00 0.33 116 P1 TEH TEC 12 71 DNI 08H 0.07 1.28 22 P1 TEH TEC 12 83 DSI 03H 0.00 0.12 143 P1 TEH TEC 12 92 DNI 08H 0.27 1.36 12 P1 TEH TEC 12 92 DNI 04H 0.00 1.63 55 P1 TEH TEC 13 7

DSI 03H 0.05 0.39 93 P1 TEH TEC 13 30 DNI 05H 0.02 1.26 54 P1 TEH TEC 13 32 DSI 02H 0.02 0.15 98 P1 TEH TEC 13 35 DSI 04H

-0.02 0.59 107 P1 TEH TEC 13 35 DNI 07H 0.00 1.71 45 P1 TEH TEC 13 35 DNI 03H 0.00 1.43 52 P1 TEH TEC 13 35 DSI 02H 0.00 1.43 94 P1 TEH TEC 13 35 DSI 05H 0.00 0.39 83 P1 TEH TEC 13 35 SAI 02H 0.18 0.18 51 0.39 0.11 98 P4 02H 02H 13 35 SAI 05H

-0.05 0.15 40 0.31 0.08 74 P4 05H 05H 13 35 SAI 02H 0.00 0.28 54 0.41 0.18 82 6

02H 02H 13 35 SAI 04H

-0.14 0.38 68 0.52 0.10 90 P4 04H 04H 13 35 SAI 04H 0.01 0.13 46 0.35 0.04 74 P4 04H 04H 13 43 DSI 03H 0.07 0.34 161 P1 TEH TEC 13 43 DSI 02H 0.00 0.20 35 P1 TEH TEC 13 45 DNI 08H

-0.05 1.73 22 P1 TEH TEC 13 59 DSI 03H 0.24 0.06 45 P1 TEH TEC 13 61 DNI 03C 0.29 1.28 12 P1 TEH TEC 13 61 DNI 07C 0.29 1.30 15 P1 TEH TEC 13 62 DSI 04H 0.02 0.35 32 P1 TEH TEC 13 63 DSI 02H 0.00 0.18 25 P1 TEH TEC 13 64 DSI 02H 0.00 0.74 61 P1 TEH TEC 13 64 DNI 04H 0.00 1.36 26 P1 TEH TEC 13 64 DSI 08H

-0.05 0.33 85 P1 TEH TEC Page 6 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 13 64 DNI 05H 0.25 1.30 24 P1 TEH TEC 13 74 DNI 05H 0.12 1.26 29 P1 TEH TEC 14 27 DNI 03H

-0.10 1.28 14 P1 TEH TEC 14 29 DSI 04H 0.00 0.23 38 P1 TEH TEC 14 29 SAI 04H 0.00 0.25 74 0.56 0.13 102 6

04H 05H 14 38 DSI 02H 0.02 0.31 88 P1 TEH TEC 14 39 DSI 05H 0.00 0.24 113 P1 TEH TEC 14 43 DNI 03H 0.15 1.32 51 P1 TEH TEC 14 46 DNI 03H

-0.02 1.37 5

P1 TEH TEC 14 50 DSI 02H

-0.10 0.48 82 P1 TEH TEC 14 54 DSI 02H

-0.07 0.54 76 P1 TEH TEC 14 59 DSI 04H 0.00 0.16 148 P1 TEH TEC 14 59 DSI 06H

-0.05 0.11 126 P1 TEH TEC 14 59 DSI 03H 0.00 0.12 63 P1 TEH TEC 14 70 DSI 08H 0.05 0.51 30 P1 TEH TEC 15 5

DSI 04H 0.20 1.32 40 P1 TEH TEC 15 14 DSI 03H 0.02 0.31 38 P1 TEH TEC 15 35 DSI 02H

-0.02 0.18 156 P1 TEH TEC 15 35 DSI 03H 0.10 0.50 68 P1 TEH TEC 15 38 DSI 04H

-0.05 0.44 44 P1 TEH TEC 15 38 SAI 04H 0.00 0.28 51 0.39 0.18 79 6

04H 04H 15 39 DSI 03H 0.00 0.27 93 P1 TEH TEC 15 39 DSI 02H 0.00 0.38 98 P1 TEH TEC 15 61 DSI 02H 0.00 0.23 98 P1 TEH TEC 15 62 DSI 02H

-0.02 0.17 154 P1 TEH TEC 15 78 DNI 08H 0.00 1.26 55 P1 TEH TEC 15 80 DSI 03H 0.00 0.22 121 P1 TEH TEC 15 87 DSI 03H 0.02 0.40 140 P1 TEH TEC 16 15 DSI 03H 0.17 0.38 68 P1 TEH TEC 16 15 DNI 07H 0.00 1.25 46 P1 TEH TEC 16 16 DNI 08H 0.00 1.40 52 P1 TEH TEC 16 16 DNI 06H 0.00 2.02 44 P1 TEH TEC 16 16 DNI 04C

-0.15 1.38 14 P1 TEH TEC 16 17 DSI 02H

-0.07 0.18 35 P1 TEH TEC 16 34 DSI 03H 0.00 0.36 48 P1 STH TEC 16 45 DNI 05H 0.10 1.57 21 P1 TEH TEC 16 45 DNI 06C 0.00 1.35 21 P1 TEH TEC 16 45 SAI 06C 0.17 0.11 49 0.38 0.06 104 P4 06C 06C 16 46 DSI 04H 0.10 0.25 71 P1 TEH TEC 16 46 DSI 02H

-0.07 0.61 111 P1 TEH TEC 16 55 DSI 06H

-0.07 0.48 151 P1 TEH TEC Page 7 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 16 57 DSI 03H 0.02 0.24 79 P1 TEH TEC 16 63 DSI 02H

-0.05 0.14 35 P1 TEH TEC 16 73 DSI 02H 0.00 0.22 72 P1 TEH TEC 17 9

DSI 04H 0.00 0.18 89 P1 TEH TEC 17 9

SAI 04H

-0.03 0.30 55 0.42 0.10 115 6

04H 04H 17 14 DSI 04H

-0.02 0.22 103 P1 TEH TEC 17 17 DSI 02H

-0.02 0.14 48 P1 TEH TEC 17 18 DSI 02H 0.00 0.32 54 P1 TEH TEC 17 24 DSI 04H

-0.02 0.10 146 P1 TEH TEC 17 26 DSI 03H

-0.05 0.23 144 P1 TEH TEC 17 27 DNI 08C 0.02 1.30 26 P1 TEH TEC 17 35 DSI 03H 0.00 0.76 66 P1 TEH TEC 17 35 DNI 06H 0.00 1.38 52 P1 TEH TEC 17 35 SAI 03H 0.00 0.13 202 1.54 0.08 91 P4 03H 03H 17 35 SAI 03H

-0.09 0.15 35 0.27 0.06 99 P4 03H 03H 17 37 DNI 04H 0.00 1.71 49 P1 TEH TEC 17 37 DNI 07H 0.00 1.62 41 P1 TEH TEC 17 37 DNI 08C 0.00 1.29 42 P1 TEH TEC 17 38 DSI 02H 0.10 0.34 88 P1 STH TEC 17 48 DSI 02H 0.00 0.68 78 P1 TEH TEC 17 49 DSI 02H 0.00 0.36 75 P1 TEH TEC 17 50 DSI 03H 0.00 0.58 96 P1 TEH TEC 17 50 DSI 03H 0.02 0.65 96 P1 TEH TEC 17 50 SAI 03H 0.00 0.23 43 0.33 0.21 60 P4 03H 03H 17 50 SAI 03H 0.10 0.15 35 0.27 0.14 94 P4 03H 03H 17 54 DSI 04H 0.07 0.29 112 P1 TEH TEC 17 58 DNI 03H 0.02 1.43 52 P1 TEH TEC 17 61 DSI 03H 0.00 0.45 101 P1 TEH TEC 17 61 DSI 02H 0.00 0.74 81 P1 TEH TEC 17 63 DSI 02H 0.00 0.44 65 P1 TEH TEC 17 66 DSI 02H

-0.02 0.38 111 P1 TEH TEC 17 67 DSI 02H 0.00 0.46 137 P1 TEH TEC 17 68 DSI 02H 0.02 0.36 99 P1 TEH TEC 18 5

DSI 03H 0.00 0.38 139 P1 TEH TEC 18 6

DNI 08H 0.00 1.31 34 P1 TEH TEC 18 8

DNI 08H

-0.02 1.33 37 P1 TEH TEC 18 12 DNI 05H 0.02 1.34 54 P1 TEH TEC 18 15 DNI 02H 0.00 1.44 55 P1 TEH TEC 18 15 DNI 08C 0.00 1.65 34 P1 TEH TEC 18 15 DNI 08H 0.00 1.63 38 P1 TEH TEC 18 15 DSI 06H 0.00 0.16 134 P1 TEH TEC Page 8 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 47 DSI 04H 0.00 0.47 73 P1 TEH TEC 18 47 DSI 03H 0.00 0.59 72 P1 TEH TEC 18 48 DNI 08H 0.00 1.28 49 P1 TEH TEC 18 48 DNI 06H 0.00 1.25 54 P1 TEH TEC 18 48 DSI 04H

-0.02 0.58 76 P1 TEH TEC 18 48 DSI 03H 0.00 0.74 85 P1 TEH TEC 18 48 DSI 02H 0.00 0.60 53 P1 TEH TEC 18 50 DSI 02H 0.07 0.24 104 P1 TEH TEC 18 50 DNI 03H 0.15 1.33 54 P1 TEH TEC 18 51 DSI 02H 0.03 0.56 109 P1 TEH TEC 18 53 DSI 02H 0.00 0.58 72 P1 TEH TEC 18 54 DNI 06H 0.00 1.58 48 P1 TEH TEC 18 54 DSI 02H 0.00 0.39 61 P1 TEH TEC 18 54 DSI 03H 0.00 0.36 102 P1 TEH TEC 18 55 DSI 02H

-0.02 0.53 112 P1 TEH TEC 18 56 DSI 03H 0.02 0.30 90 P1 TEH TEC 18 59 DSI 06H 0.00 0.32 34 P1 TEH TEC 18 59 DSI 03H

-0.05 0.26 89 P1 TEH TEC 18 61 DSI 04H 0.02 0.39 80 P1 TEH TEC 18 61 DSI 08H 0.00 0.39 22 P1 TEH TEC 18 62 DSI 03H

-0.07 0.62 104 P1 TEH TEC 18 62 DSI 04H 0.00 0.24 101 P1 TEH TEC 18 62 DSI 02H 0.00 0.33 115 P1 TEH TEC 18 66 DSI 03H

-0.07 0.60 101 P1 TEH TEC 18 67 DSI 03H 0.05 0.50 78 P1 TEH TEC 18 67 DSI 02H 0.00 0.50 80 P1 TEH TEC 18 73 DSI 03H 0.00 0.14 46 P1 TEH TEC 19 20 DNI 08H 0.12 1.30 15 P1 TEH TEC 19 20 DNI 02H

-0.07 1.77 25 P1 TEH TEC 19 22 DNI 07H

-0.02 1.34 36 P1 TEH TEC 19 25 DNI 08C

-0.02 1.28 25 P1 TEH TEC 19 25 DNI 04H 0.00 1.44 50 P1 TEH TEC 19 26 DSI 03H

-0.02 0.28 117 P1 TEH TEC 19 26 DNI 07H 0.00 1.46 51 P1 TEH TEC 19 29 SAI 08H

-0.01 0.24 58 0.45 0.18 126 2

08H 08H 19 29 DSI 08H 0.05 0.34 54 P1 STH TEC 19 29 DSI 02H

-0.10 0.28 115 P1 STH TEC 19 34 DNI 07H 0.00 1.49 30 P1 TEH TEC 19 47 DSI 04H

-0.12 0.53 49 P1 STH TEC 19 47 SAI 04H

-0.07 0.13 51 0.39 0.08 133 P4 04H 04H 19 48 DSI 03H 0.07 0.70 73 P1 TEH TEC Page 9 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 19 48 DSI 02H 0.05 0.47 97 P1 TEH TEC 19 54 DSI 02H

-0.05 0.21 105 P1 TEH TEC 19 54 DNI 07H 0.00 1.43 52 P1 TEH TEC 19 54 DNI 06H

-0.02 1.27 51 P1 TEH TEC 19 57 DSI 04H 0.00 0.58 62 P1 TEH TEC 19 57 DSI 05H 0.00 0.46 72 P1 TEH TEC 19 65 DSI 05H 0.05 0.30 104 P1 STH TEC 19 75 DNI 05H 0.02 1.54 53 P1 TEH TEC 19 79 DNI 06H 0.00 1.79 53 P1 TEH TEC 19 79 DNI 08H 0.00 1.58 45 P1 TEH TEC 19 79 DSI 02H 0.00 0.93 122 P1 TEH TEC 19 82 DSI 02H

-0.02 0.27 92 P1 TEH TEC 19 89 DSI 06H 0.00 0.17 119 P1 TEH TEC 20 13 DNI 07H 0.00 1.49 37 P1 TEH TEC 20 17 DNI 07H 0.00 1.26 42 P1 TEH TEC 20 21 DSI 04H 0.02 0.14 88 P1 TEH TEC 20 21 SAI 04H 0.08 0.16 58 0.45 0.15 103 6

04H 04H 20 75 DSI 02H

-0.05 0.63 130 P1 STH TEC 20 76 SAI 02H 0.00 0.26 18 0.14 0.12 102 6

02H 02H 20 76 DSI 02H

-0.05 0.75 136 P1 TEH TEC 20 76 DSI 03H 0.02 0.81 85 P1 TEH TEC 20 78 DSI 04H 0.00 0.35 110 P1 TEH TEC 20 78 DNI 07C

-0.12 2.09 13 P1 TEH TEC 20 78 SAI 04H

-0.07 0.15 60 0.46 0.20 112 6

04H 04H 20 83 DNI 07H 0.00 1.33 50 P1 TEH TEC 20 83 DNI 05H 0.15 1.30 50 P1 TEH TEC 20 84 DNI 04H 0.02 1.79 52 P1 TEH TEC 20 85 DNI 07H 0.00 1.38 47 P1 TEH TEC 20 85 DSI 03H 0.00 0.25 122 P1 TEH TEC 20 85 DNI 04H 0.00 1.59 55 P1 TEH TEC 21 18 DSI 08H 0.02 0.48 26 P1 TEH TEC 21 18 DSI 03H 0.05 0.42 148 P1 TEH TEC 21 18 DSI 02H 0.00 0.39 156 P1 TEH TEC 21 25 DSI 04H 0.00 0.06 99 P1 TEH TEC 21 26 DNI 07H 0.00 1.30 38 P1 TEH TEC 21 31 DNI 06H 0.00 1.27 36 P1 TEH TEC 21 62 DSI 02H 0.00 0.33 73 P1 TEH TEC 21 67 DSI 07H

-0.05 0.23 131 P1 TEH TEC 21 71 DNI 05H 0.00 1.41 45 P1 TEH TEC 21 71 DNI 06H 0.00 1.28 54 P1 TEH TEC 21 71 DNI 08H 0.05 1.31 37 P1 TEH TEC Page 10 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 21 79 DNI 07H 0.00 1.33 48 P1 TEH TEC 21 88 NQI 03H 8.51 1.44 109 3

TEH TEC 21 88 NQI 07C 24.43 0.59 137 3

TEH TEC 21 88 NQI 07C 26.17 0.64 121 3

TEH TEC 22 15 DNI 05H 0.02 1.25 31 P1 TEH TEC 22 18 DSI 05H

-0.07 0.35 71 P1 TEH TEC 22 18 DSI 02H 0.02 0.46 106 P1 TEH TEC 22 18 DNI 07H 0.00 1.28 49 P1 TEH TEC 22 20 DNI 07H 0.00 1.82 46 P1 TEH TEC 22 20 DSI 02H

-0.02 0.87 103 P1 TEH TEC 22 24 DSI 03H

-0.05 0.18 131 P1 TEH TEC 22 33 DSI 02H 0.00 0.27 33 P1 TEH TEC 22 36 DNI 04H 0.00 1.30 54 P1 TEH TEC 22 36 DNI 08H 0.00 1.28 49 P1 TEH TEC 22 39 DNI 08H 0.00 1.32 42 P1 TEH TEC 22 54 DSI 06H 0.02 0.34 23 P1 TEH TEC 22 61 DSI 03H

-0.05 0.21 148 P1 TEH TEC 22 64 DSI 03H 0.02 0.26 170 P1 TEH TEC 22 74 DNI 05H

-0.02 1.40 35 P1 TEH TEC 22 75 DNI 05C

-0.15 1.35 23 P1 TEH TEC 22 75 DSI 04H 0.02 0.30 44 P1 TEH TEC 22 75 DNI 07C 0.00 1.52 28 P1 TEH TEC 22 75 SAI 04H 0.04 1.18 31 0.23 0.15 92 6

04H 04H 22 77 DSI 03H

-0.05 0.28 138 P1 TEH TEC 22 78 DNI 05H 0.34 1.73 14 P1 TEH TEC 22 79 DNI 08H 0.00 1.25 55 P1 TEH TEC 22 80 DNI 07H

-0.05 1.29 10 P1 TEH TEC 22 80 DNI 06H 0.25 1.46 8

P1 TEH TEC 22 83 DNI 08H 0.02 1.70 9

P1 TEH TEC 23 10 DSI 02H 0.02 0.28 73 P1 TEH TEC 23 13 PCT AV2 0.00 11 0.67 43 P2 TEH TEC 23 28 DSI 03H 0.15 0.53 102 P1 TEH TEC 23 33 PCT AV1 0.05 14 0.79 49 P2 TEH TEC 23 37 DSI 02H

-0.07 0.84 48 P1 STH TEC 23 39 DSI 05H 0.00 0.18 111 P1 TEH TEC 23 39 DSI 02H 0.07 0.16 92 P1 TEH TEC 23 42 DSI 02H

-0.02 0.21 78 P1 TEH TEC 23 42 DSI 03H

-0.02 0.32 109 P1 TEH TEC 23 43 DNI 06H 0.00 1.40 45 P1 TEH TEC 23 45 DNI 06H 0.00 1.33 55 P1 TEH TEC 23 67 DNI 05H 0.12 1.32 37 P1 TEH TEC Page 11 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 23 69 DSI 03H 0.02 0.16 86 P1 TEH TEC 23 70 DNI 08H 0.15 1.31 14 P1 TEH TEC 23 73 DNI 07H 0.00 1.35 46 P1 TEH TEC 23 76 DNI 03C

-0.29 1.29 13 P1 TEH TEC 23 77 DSI 02H 0.02 0.41 112 P1 TEH TEC 23 77 DSI 03H

-0.02 0.15 110 P1 TEH TEC 23 85 DNI 05H 0.05 1.38 44 P1 TEH TEC 24 11 DSI 03H 0.00 0.28 95 P1 TEH TEC 24 11 DNI 05H 0.00 1.50 51 P1 TEH TEC 24 13 DNI 04H 0.20 1.27 14 P1 TEH TEC 24 17 DNI 07H 0.00 1.30 46 P1 TEH TEC 24 19 DNI 07H 0.00 1.43 38 P1 TEH TEC 24 20 DNI 06H 0.00 1.29 51 P1 TEH TEC 24 32 DNI 06H 0.00 1.47 40 P1 TEH TEC 24 34 DNI 05H 0.02 1.63 50 P1 TEH TEC 24 34 DSI 04H 0.00 0.30 47 P1 TEH TEC 24 34 DNI 07C

-0.07 1.49 24 P1 TEH TEC 24 34 DNI 03H 0.00 2.03 54 P1 TEH TEC 24 34 DSI 02H 0.02 0.61 109 P1 TEH TEC 24 34 DSI 08H

-0.03 0.42 42 P1 TEH TEC 24 34 MAI 02H 0.06 0.28 111 0.85 0.11 129 P4 02H 02H 24 35 DNI 07C

-0.05 1.57 15 P1 TEH TEC 24 48 DSI 03H 0.02 0.56 63 P1 TEH TEC 24 50 DSI 02H

-0.02 0.30 82 P1 TEH TEC 24 56 DSI 03H 0.05 0.32 143 P1 TEH TEC 24 57 DSI 02H 0.05 0.18 65 P1 TEH TEC 24 61 DSI 02H 0.05 0.42 103 P1 TEH TEC 24 62 DNI 05H 0.00 1.40 45 P1 TEH TEC 24 63 DSI 04H

-0.05 0.21 78 P1 TEH TEC 24 69 DNI 06H 0.00 1.25 52 P1 TEH TEC 24 74 DNI 06H 0.00 1.39 51 P1 TEH TEC 24 79 SAI 02H 0.14 0.33 88 0.67 0.59 87 6

02H 02H 24 79 DSI 02H 0.10 1.08 116 P1 TEH TEC 24 84 VOL TSC 0.06 0.35 78 6

TSC TSC 24 84 PCT TSC 0.00 31 0.26 52 0.40 0.34 78 6

TSC TSC 25 17 DSI 03H 0.00 0.20 98 P1 TEH TEC 25 26 DSI 04H 0.00 0.10 97 P1 TEH TEC 25 31 DSI 02H 0.05 0.62 88 P1 STH TEC 25 33 DSI 08H

-0.05 0.13 98 P1 TEH TEC 25 34 DSI 05H 0.00 0.43 16 P1 STH TEC 25 34 DSI 02H 0.07 0.70 78 P1 STH TEC Page 12 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 25 34 DSI 03H

-0.15 0.48 113 P1 STH TEC 25 38 DNI 06H 0.00 1.34 45 P1 TEH TEC 25 47 DSI 08H 0.02 0.28 15 P1 TEH TEC 25 47 DSI 03H

-0.05 0.37 37 P1 TEH TEC 25 54 DSI 02H 0.02 0.13 49 P1 TEH TEC 25 60 DSI 02H 0.05 0.39 118 P1 TEH TEC 25 61 DSI 02H 0.02 0.56 108 P1 TEH TEC 25 61 DSI 05H

-0.02 0.65 25 P1 TEH TEC 25 62 DSI 04H

-0.07 0.51 134 P1 TEH TEC 25 63 DSI 04H 0.00 0.40 85 P1 TEH TEC 25 64 DNI 08H 0.00 1.68 36 P1 TEH TEC 25 65 SAI 07H 0.00 0.18 42 0.32 0.03 105 P4 07H 07H 25 65 DSI 07H 0.00 0.55 31 P1 TEH TEC 25 65 DSI 02H

-0.02 0.38 116 P1 TEH TEC 25 65 DSI 05H 0.07 0.54 115 P1 TEH TEC 25 71 DSI 06H 0.05 0.47 79 P1 STH TEC 25 74 DSI 02H 0.02 0.30 130 P1 STH TEC 25 74 SAI 02H

-0.03 0.26 34 0.26 0.10 128 2

02H 02H 25 75 DNI 07H 0.05 1.68 49 P1 TEH TEC 25 76 DNI 06C

-0.24 1.32 13 P1 TEH TEC 25 76 DSI 05H

-0.07 0.27 95 P1 TEH TEC 25 76 DSI 02H

-0.02 0.68 107 P1 TEH TEC 25 76 DNI 02C 0.29 1.41 10 P1 TEH TEC 25 79 DNI 08H 0.00 1.45 49 P1 TEH TEC 25 79 DSI 02H 0.02 0.24 82 P1 TEH TEC 25 79 DNI 04H 0.00 1.80 52 P1 TEH TEC 26 17 DNI 03H 0.00 1.37 25 P1 TEH TEC 26 17 DNI 06H 0.17 1.61 17 P1 TEH TEC 26 19 DNI 08H 0.00 1.32 27 P1 TEH TEC 26 24 DSI 06H

-0.02 0.09 167 P1 TEH TEC 26 26 DTI TEC 16.13 6.39 155 P1 TEH TEC 26 28 DSI 08H 0.05 0.15 85 P1 TEH TEC 26 30 DNI 07H 0.00 1.80 21 P1 TEH TEC 26 38 DSI 05H

-0.02 0.14 52 P1 STH TEC 26 39 DSI 05H

-0.02 0.29 47 P1 TEH TEC 26 42 DSI 02H 0.05 0.50 49 P1 TEH TEC 26 44 DSI 06H

-0.02 0.31 156 P1 TEH TEC 26 45 DNI 06H 0.00 1.44 15 P1 TEH TEC 26 60 DNI 04H 0.02 1.57 38 P1 TEH TEC 26 65 DSI 03H 0.00 0.32 159 P1 TEH TEC 26 70 DSI 03H 0.05 0.71 112 P1 TEH TEC Page 13 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 26 72 DSI 08H 0.02 0.34 37 P1 TEH TEC 26 84 NQI 05H 38.23 0.56 86 3

TEH TEC 27 12 DNI 06H 0.07 1.44 18 P1 TEH TEC 27 20 DSI 02H

-0.02 0.65 89 P1 TEH TEC 27 21 DNI 02H

-0.07 1.41 18 P1 TEH TEC 27 21 DNI 04H

-0.05 1.46 15 P1 TEH TEC 27 22 DSI 02H

-0.05 0.22 88 P1 TEH TEC 27 24 DSI 04H 0.00 0.16 25 P1 TEH TEC 27 29 DSI 03H 0.00 0.68 115 P1 TEH TEC 27 29 SAI 03H

-0.02 0.46 32 0.25 0.08 123 P4 03H 03H 27 31 DSI 02H

-0.05 0.62 65 P1 TEH TEC 27 33 DSI 03H 0.00 0.69 82 P1 TEH TEC 27 33 SAI 03H

-0.09 0.48 68 0.52 0.16 105 P4 03H 03H 27 60 DSI 02H 0.02 0.53 75 P1 TEH TEC 27 67 DNI 03H 0.17 1.39 12 P1 TEH TEC 27 69 DNI 04H 0.00 1.60 51 P1 TEH TEC 27 69 DSI 02H

-0.07 0.52 121 P1 TEH TEC 27 72 DNI 05H

-0.10 1.73 14 P1 TEH TEC 27 76 DSI 03H

-0.02 0.17 20 P1 TEH TEC 27 79 DSI 02H 0.02 0.24 138 P1 TEH TEC 28 11 DNI 04H 0.00 1.30 33 P1 TEH TEC 28 18 DNI 05H 0.02 1.37 39 P1 TEH TEC 28 20 DNI 07H

-0.02 1.26 36 P1 TEH TEC 28 22 DNI 06H 0.07 1.39 10 P1 TEH TEC 28 23 DNI 05H 0.00 1.45 29 P1 TEH TEC 28 26 DNI 02H 0.00 1.60 6

P1 TEH TEC 28 27 DNI 07C

-0.02 1.32 21 P1 TEH TEC 28 27 DNI 08H 0.05 1.25 37 P1 TEH TEC 28 27 DSI 05H 0.00 0.39 71 P1 TEH TEC 28 29 DNI 03H 0.10 1.46 17 P1 TEH TEC 28 35 DNI 07H 0.00 1.67 45 P1 TEH TEC 28 35 DNI 08H 0.00 1.34 51 P1 TEH TEC 28 35 DSI 02H 0.00 0.94 99 P1 TEH TEC 28 37 DNI 07H 0.00 1.62 46 P1 TEH TEC 28 39 DNI 05H 0.00 1.25 54 P1 TEH TEC 28 42 DSI 04H 0.02 0.19 142 P1 TEH TEC 28 42 DSI 02H

-0.02 0.19 125 P1 TEH TEC 28 44 DSI 02H

-0.05 0.40 115 P1 TEH TEC 28 44 DSI 03H

-0.02 0.15 41 P1 TEH TEC 28 50 DNI 08H 0.00 1.44 46 P1 TEH TEC 28 50 DSI 03H

-0.05 0.23 128 P1 TEH TEC Page 14 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 28 65 DNI 06C

-0.07 1.57 15 P1 TEH TEC 28 70 DSI 08H

-0.05 0.19 85 P1 STH TEC 28 73 DSI 02H 0.22 0.32 104 P1 TEH TEC 28 73 DSI 03H 0.27 0.16 78 P1 TEH TEC 28 75 DNI 04H 0.02 1.44 28 P1 TEH TEC 28 79 NQI 08H 20.79 0.92 41 3

TEH TEC 28 85 DSI 02H

-0.02 0.55 109 P1 TEH TEC 29 11 DSI 05H 0.17 0.44 119 P1 TEH TEC 29 20 DNI 08H 0.00 1.72 14 P1 TEH TEC 29 25 DNI 06H 0.00 1.59 48 P1 TEH TEC 29 26 DSI 05H 0.00 0.17 150 P1 TEH TEC 29 28 DSI 02H

-0.05 0.55 124 P1 TEH TEC 29 28 SAI 02H 0.01 0.25 69 0.53 0.06 95 P4 02H 02H 29 29 DSI 03H 0.17 0.98 94 P1 TEH TEC 29 30 SAI 04H 0.00 0.08 40 0.31 0.16 114 6

03H 04H 29 30 DSI 04H 0.00 0.31 35 P1 TEH TEC 29 37 DSI 02H 0.02 0.37 56 P1 TEH TEC 29 38 DSI 05H 0.00 0.16 106 P1 TEH TEC 29 43 DSI 03H 0.00 0.31 151 P1 TEH TEC 29 43 DNI 08H 0.00 1.47 37 P1 TEH TEC 29 45 DNI 07H 0.00 1.37 43 P1 TEH TEC 29 46 DNI 07H 0.00 1.44 23 P1 TEH TEC 29 47 DSI 02H

-0.02 0.22 88 P1 STH TEC 29 48 DNI 04H 0.00 1.37 42 P1 TEH TEC 29 48 DSI 05H 0.05 0.27 155 P1 TEH TEC 29 49 DNI 07H 0.00 1.33 45 P1 TEH TEC 29 50 DNI 07H 0.00 1.29 55 P1 TEH TEC 29 52 DSI 04H 0.00 0.22 114 P1 TEH TEC 29 57 DSI 05H 0.02 0.12 42 P1 TEH TEC 29 63 DSI 05H 0.02 0.24 86 P1 TEH TEC 29 64 DNI 06H 0.02 1.32 49 P1 TEH TEC 29 66 DNI 06H 0.00 1.30 53 P1 TEH TEC 29 66 DNI 04H 0.00 1.71 48 P1 TEH TEC 30 12 DSI 03H 0.00 0.18 54 P1 TEH TEC 30 17 DNI 06H

-0.02 1.27 11 P1 TEH TEC 30 24 DSI 02H 0.00 0.54 94 P1 STH TEC 30 25 DSI 04H 0.02 0.13 60 P1 TEH TEC 30 31 DSI 03H

-0.05 0.36 56 P1 TEH TEC 30 31 DSI 04H 0.05 0.33 81 P1 TEH TEC 30 41 DSI 02H 0.00 0.13 119 P1 TEH TEC 30 57 DNI 07H

-0.02 1.28 45 P1 STH TEC Page 15 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 30 60 DSI 04H 0.02 0.33 116 P1 TEH TEC 30 60 DSI 03H 0.05 0.65 90 P1 TEH TEC 30 60 DSI 02H

-0.05 0.44 83 P1 TEH TEC 30 61 DSI 04H 0.02 0.58 80 P1 TEH TEC 30 61 DSI 02H 0.02 0.80 92 P1 TEH TEC 30 61 DSI 06H

-0.02 0.26 21 P1 TEH TEC 30 61 SAI 04H

-0.37 0.21 46 0.35 0.22 124 6

04H 04H 30 62 DSI 04H

-0.02 0.26 92 P1 STH TEC 30 64 DSI 02H 0.02 0.42 114 P1 STH TEC 30 64 DSI 04H 0.00 0.38 36 P1 STH TEC 30 64 SAI 04H 0.13 0.36 62 0.47 0.25 91 2

04H 04H 30 65 DSI 04H

-0.02 0.53 87 P1 TEH TEC 30 65 SAI 04H 0.00 0.36 80 0.61 0.10 97 P4 04H 04H 30 77 NQI 06H 40.20 0.28 116 3

TEH TEC 30 77 VOL 06H 40.12 0.14 251 6

06H 07H 30 77 PCT 06H 40.17 18 0.24 25 0.19 0.14 248 6

06H 07H 31 13 PCT AV2 0.07 9

0.53 50 P2 TEH TEC 31 14 DSI 05H 0.05 0.07 103 P1 TEH TEC 31 17 DSI 04H 0.10 0.12 142 P1 TEH TEC 31 22 DSI 02H 0.00 0.20 89 P1 TEH TEC 31 24 NQI 05H 39.07 0.58 120 3

TEH TEC 31 29 DSI 04H

-0.07 0.38 142 P1 TEH TEC 31 37 DNI 08H 0.00 1.45 24 P1 TEH TEC 31 37 DNI 03H 0.00 1.26 34 P1 TEH TEC 31 49 DSI 02H 0.00 0.15 49 P1 TEH TEC 31 60 DSI 02H 0.00 0.19 71 P1 TEH TEC 31 60 DNI 07H 0.00 1.28 44 P1 TEH TEC 31 61 DSI 04H 0.00 0.29 144 P1 TEH TEC 31 61 DSI 03H 0.02 0.26 74 P1 TEH TEC 31 62 DSI 03H 0.02 0.62 105 P1 TEH TEC 31 62 DNI 08C

-0.05 1.29 32 P1 TEH TEC 31 62 DNI 07H 0.00 1.43 48 P1 TEH TEC 31 64 DSI 04H

-0.02 0.45 69 P1 TEH TEC 31 64 DNI 07H

-0.05 1.38 51 P1 TEH TEC 31 64 SAI 04H 0.03 0.43 109 0.83 0.10 85 P4 04H 04H 31 66 DSI 02H

-0.05 0.58 115 P1 TEH TEC 31 66 DNI 08H 0.00 1.48 36 P1 TEH TEC 31 66 DSI 03H 0.00 0.13 88 P1 TEH TEC 31 66 DSI 04H 0.00 0.14 129 P1 TEH TEC 31 66 DSI 05H 0.05 0.18 69 P1 TEH TEC 31 67 DNI 08H 0.00 1.30 41 P1 TEH TEC Page 16 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 31 69 DSI 03H 0.00 0.31 86 P1 TEH TEC 31 72 DSI 04H

-0.10 0.57 94 P1 TEH TEC 31 72 DNI 06H 0.00 1.65 50 P1 TEH TEC 31 75 DSI 02H 0.00 0.30 130 P1 TEH TEC 31 75 DNI 07H

-0.02 1.30 49 P1 TEH TEC 31 75 SAI 02H

-0.03 0.40 66 0.51 0.08 110 P4 02H 02H 31 77 DSI 06H

-0.02 0.14 71 P1 TEH TEC 31 78 DSI 03H

-0.07 0.73 117 P1 TEH TEC 31 78 DSI 04H 0.02 0.97 95 P1 TEH TEC 31 81 DSI 02H 0.00 0.99 120 P1 TEH TEC 31 81 DSI 03H 0.05 0.38 117 P1 TEH TEC 32 19 DSI 05H 0.02 0.25 76 P1 TEH TEC 32 25 DSI 03H 0.05 0.23 22 P1 TEH TEC 32 35 DNI 08H 0.00 1.25 48 P1 TEH TEC 32 36 DNI 05H 0.00 1.28 41 P1 TEH TEC 32 47 DNI 06H 0.02 1.72 16 P1 TEH TEC 32 47 DNI 08H 0.00 1.33 26 P1 TEH TEC 32 51 DNI 04H

-0.15 1.78 16 P1 TEH TEC 32 62 DSI 02H

-0.05 0.22 80 P1 TEH TEC 32 63 SAI 03H

-0.28 0.31 38 0.29 0.25 92 6

03H 03H 32 63 DSI 04H

-0.02 0.32 57 P1 TEH TEC 32 63 DSI 03H 0.02 0.51 64 P1 TEH TEC 32 64 DSI 04H 0.00 0.39 15 P1 TEH TEC 32 65 DSI 02H 0.00 0.48 91 P1 TEH TEC 32 65 SAI 02H 0.13 0.20 46 0.35 0.07 61 P4 02H 02H 32 66 DSI 02H 0.00 0.53 98 P1 TEH TEC 32 67 SAI 06H

-0.10 0.26 32 0.25 0.10 117 6

06H 06H 32 67 DSI 06H 0.00 0.44 51 P1 TEH TEC 32 77 DNI 05C 0.24 1.38 10 P1 TEH TEC 32 78 DSI 05H

-0.02 0.39 106 P1 TEH TEC 32 79 DSI 02H 0.05 0.68 134 P1 TEH TEC 32 79 SAI 02H 0.06 0.13 29 0.22 0.05 88 P4 02H 02H 33 34 DSI 06H 0.00 0.33 11 P1 TEH TEC 33 50 DNI 05H

-0.02 1.33 43 P1 TEH TEC 33 56 DNI 08H 0.07 1.77 9

P1 TEH TEC 33 56 DNI 07H

-0.27 1.62 6

P1 TEH TEC 33 60 DSI 08H 0.00 0.21 27 P1 TEH TEC 33 60 DSI 07H 0.07 0.29 79 P1 TEH TEC 33 61 DSI 04H 0.00 0.25 117 P1 TEH TEC 33 73 DNI 05H 0.00 1.37 42 P1 TEH TEC 33 73 DNI 07H

-0.02 1.32 41 P1 TEH TEC Page 17 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 33 75 DSI 05H 0.00 0.26 135 P1 TEH TEC 34 24 DSI 07H 0.00 0.11 102 P1 TEH TEC 34 26 DNI 04H 0.17 1.29 10 P1 TEH TEC 34 39 DSI 05H

-0.02 0.19 111 P1 TEH TEC 34 47 DNI 07H 0.00 1.25 50 P1 TEH TEC 34 49 DNI 07H 0.00 1.35 43 P1 TEH TEC 34 55 DSI 03H 0.15 0.93 123 P1 TEH TEC 34 58 DSI 05H 0.02 0.37 43 P1 TEH TEC 34 58 DSI 04H 0.02 0.21 47 P1 TEH TEC 34 58 DSI 02H 0.05 0.63 129 P1 TEH TEC 34 59 DSI 02H

-0.02 0.54 89 P1 TEH TEC 35 22 DSI 07H 0.07 0.18 83 P1 TEH TEC 35 22 DSI 02H 0.00 0.14 55 P1 TEH TEC 35 26 DSI 05H 0.00 0.44 137 P1 TEH TEC 35 26 DNI 07H 0.10 1.59 20 P1 TEH TEC 35 34 DSI 04H

-0.10 0.18 113 P1 TEH TEC 35 34 DSI 03H 0.00 0.20 44 P1 TEH TEC 35 38 DSI 07H

-0.02 0.14 52 P1 TEH TEC 35 39 DNI 07H 0.00 1.33 44 P1 TEH TEC 35 45 DNI 07H 0.00 1.31 50 P1 TEH TEC 35 53 DSI 06H 0.02 0.24 149 P1 TEH TEC 35 59 DNI 05H 0.00 1.26 55 P1 TEH TEC 35 62 SCI TSH

-0.12 0.15 40 0.31 0.11 115 P2 TSH TSH 36 20 DSI 03H

-0.12 0.34 149 P1 TEH TEC 36 26 DSI 05H 0.05 0.24 179 P1 TEH TEC 36 27 DSI 05H 0.00 0.20 95 P1 TEH TEC 36 53 DSI 02H

-0.12 0.49 167 P1 STH TEC 36 53 SAI 02H 0.06 0.24 28 0.21 0.16 133 2

02H 02H 36 67 SCI TSH

-0.13 0.10 42 0.32 0.13 110 P2 TSH TSH 37 23 DNI 03H

-0.02 1.28 25 P1 TEH TEC 37 26 DSI 05H

-0.05 0.09 162 P1 TEH TEC 37 33 DSI 04H

-0.05 0.17 49 P1 TEH TEC 37 35 DSI 03H

-0.02 0.19 42 P1 TEH TEC 37 52 DSI 06H 0.05 0.12 65 P1 TEH TEC 37 67 PCT AV1 0.00 18 0.95 211 P2 TEH TEC 37 67 PCT AV3 0.00 35 4.12 249 P2 TEH TEC 37 67 PCT AV2 0.00 32 3.17 241 P2 TEH TEC 38 42 DSI 05H

-0.02 0.22 176 P1 TEH TEC 38 61 PCT AV4 0.17 16 0.96 335 P2 TEH TEC 39 27 DSI 04H 0.00 0.32 27 P1 TEH TEC 39 43 DNI 06H 0.00 1.41 26 P1 TEH TEC Page 18 of 19

Beaver Valley Unit #2 2R22 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

ROW COL IND LOC INCH

%TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 39 43 DNI 07H 0.00 1.53 27 P1 TEH TEC 39 51 DNI 04H 0.00 1.25 42 P1 TEH TEC 39 59 DNI 03H 0.05 1.36 12 P1 TEH TEC 39 65 NQI 01C 13.97 0.18 66 3

TEH TEC 39 65 NQI 01C 18.91 0.17 69 3

TEH TEC 39 72 PCT 03C

-0.17 22 0.24 52 0.40 0.15 126 P4 03C 03C 39 72 VOL 03C

-0.20 0.26 92 6

03C 03C 39 72 NQI 03C

-0.17 0.29 113 P1 TEH TEC 40 25 DSI 03H 0.02 0.10 96 P1 TEH TEC 40 39 DSI 03H 0.02 0.10 159 P1 TEH TEC 40 53 DSI 04H 0.05 0.42 152 P1 TEH TEC 40 60 PCT AV4 0.20 18 1.21 203 P2 TEH TEC 40 60 PCT AV3

-0.10 15 0.89 16 P2 TEH TEC 41 27 DSI 04H 0.00 0.21 67 P1 TEH TEC 41 44 DSI 04H 0.07 0.34 159 P1 TEH TEC 41 50 DSI 08H

-0.07 0.12 56 P1 TEH TEC 41 63 DSI 02H 0.00 0.53 125 P1 TEH TEC 42 32 DSI 04H

-0.02 0.18 108 P1 TEH TEC 45 38 VOL 01H

-0.25 0.24 88 6

01H 01H 45 38 PCT 01H

-0.27 20 0.26 54 0.41 0.13 116 P4 01H 01H 45 38 DSI 01H

-0.21 0.28 121 P1 TEH TEC 46 41 DNI 07H 0.12 0.51 162 P1 TEH TEC Page 19 of 19