L-20-264, 180-Day Steam Generator Tube Inspection Report

From kanterella
Jump to navigation Jump to search

180-Day Steam Generator Tube Inspection Report
ML20287A373
Person / Time
Site: Beaver Valley
Issue date: 10/13/2020
From: Penfield R
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-20-264
Download: ML20287A373 (77)


Text

.a energy

~-!harbor Energy Harbor Nuclear Corp.

Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Rod L. Penfield 724-682-5234 Site Vice President, Beaver Valley Nuclear October 13, 2020 L-20-264 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 180-Day Steam Generator Tube Inspection Report In accordance with Beaver Valley Power Station, Unit No. 2, Technical Specification 5.6.6.2, "Unit 2 SG [Steam Generator] Tube Inspection Report," Energy Harbor Nuclear Corp. hereby submits the steam generator tube inspection results obtained during inspections conducted during the spring 2020 refueling outage (2R21 ).

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, si&;~/LJ Manager - Fleet Licensing, at (330) 696-7208.

Rod L. Penfie~

Enclosure:

Unit #2 - 2R21 Steam Generator 180 Day Report cc: NRC Region I Administrator NRG Resident Inspector N RR Project Manager Director BRP/DEP Site BRP/DEP Representative

Enclosure L-20-264 Unit #2 - 2R21 Steam Generator 180 Day Report (75 pages follow)

ENERGY HARBOR NUCLEAR Programs Engineering Unit Beaver Valley Power Station Unit #2 - 2R21 Steam Generator 180 Day Report Prepared by: .-WH:!1-.~A=YKrti,--*__________ Date: 09/17/2020 Steam Generator Program Owner Reviewed by: =B-ria=n....,P'""'r..._in=ke=y"'---"J,.__.;*.;...7.1""""

9/tt

, {i;=~-u"'"'M.....--

?f! ~

-k<_

---&G=--...;..13...,;.,

= P___ Date: 9-;?./ , ;?-P/U:>

Supervisor, Programs Engineering Unit Approved by: Andrew Cro Date:

Manager, Strateg c Engineering

Unit #2 - 2R21 Steam Generator 180 Day Report Information Required by Technical Specification (TS) 5.6.6.2.1 Technical Specification 5.6.6.2.1 requires that a report be submitted to the Nuclear Regulatory Commission (NRC) within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Technical Specification 5.5.5.2, Unit 2 Steam Generator Program. For the spring 2020 refueling outage (2R21), the initial entry into MODE 4 occurred on May 3rd, 2020.

NOTE: Refer to the Definitions of Abbreviations, Codes and Reporting Terminology section (Page 12) for abbreviations, 3 letter codes and other nomenclature used throughout this report.

Per Technical Specification 5.6.6.2.1.a through 5.6.6.2.1.h, the following information is to be submitted to the NRC:

TS 5.6.6.2.1.a The scope of inspections performed on each SG:

Primary Side:

  • Bobbin Coil Probe (0.720 inch diameter probe utilized unless stated otherwise)
  • 100 percent of the inservice tubes, full length, tube end to tube end, (except Row 1 through 4 U-bend regions as noted below) in non-sleeved tubes per Generic Letter (GL) 95-05, "Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking," dated August 3, 1995
  • 100 percent of the inservice tubes, from the hot leg tube end to the 8th hot leg TSP (straight length) in non-sleeved tubes in Rows 1 through 4
  • 100 percent of the inservice tubes, from the cold leg tube end to the 8th cold leg TSP (straight length) in sleeved and non-sleeved tubes in Rows 1 through 4
  • 100 percent of the inservice tubes, from the cold leg tube end to the top of the tubesheet sleeve on the hot leg side in sleeved tubes Rows 5 and higher
  • 100 percent of the inservice tubes, from the top hot leg TSP (8th) to the top cold TSP (8th) in Row 3 and 4 U-bend regions using a 0.700 inch probe
  • 100 percent of the hot leg sleeved tubes in Rows 3 and 4 from the top of the sleeve to the 8th hot leg TSP using a 0.630 inch wide groove probe
  • +Point Probe
  • 100 percent of Row 1 and 2 U-bend regions
  • 100 percent of the hot leg TTS (from 6 inches above the TTS to 3 inches below the TTS) in non-sleeved tubes NOTE 1
  • 100 percent of TSP DSI/DNI indications with a bobbin coil voltage > 2.0 volts
  • 100 percent of TSP DSI indications with a bobbin coil voltage > 1.0 volt
  • 100 percent of TSP mix residual signals < 55 degrees and > 1.25 volts
  • 100 percent of TSP mix residual signals > 2.0 volts
  • 100 percent of dented hot and cold leg TSP's > 5.0 volts
  • 100 percent of dents > 2.0 but < 5.0 volts at the 1st, 2nd, 3rd and 4th hot leg TSP's
  • 100 percent of dents located at AVB intersections (+/- 1 inch of AVB centerline)
  • 100 percent of new AVB wear signals plus any previous wear with cycle growth > 6 percent
  • 100 percent of freespan dings (All reported voltages)
  • 100 percent of Row 3 through 10 U-bend regions in SG C Page 2 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report

  • 100 percent of BLG and EXP signals in the hot leg tubesheet below the F* distance but above the tubesheet neutral axis
  • 100 percent of BLG and EXP signals above the cold leg TTS
  • 100 percent of bobbin "I-codes", such as freespan differential signals meeting the change criteria (Change criteria: phase rotation > 10 degrees and/or voltage amplitude > 0.5 volts)
  • 100 percent of freespan signals not resolved as MBMs or without a historical review
  • 100 percent of Westinghouse Alloy 800 hot leg tubesheet sleeves
  • 100 percent of DSI indications < 2.0 volts previously confirmed to contain axial ODSCC
  • 25 percent of dents -> 2.0 but < 5.00 volts at the 5th, 6th, 7th and 8th hot leg TSP's
  • 25 percent of Row 3 through 10 U-bend regions in SG A and SG B
  • 25 percent of TSP mix residual signals > 1.5 volts but < 2.0 volts
  • 20 percent of the cold leg TTS from 6 inches above to 3 inches below the TTS (SG A) NOTE 1
  • Bounding of historical plugged tubes due to foreign object wear at the TTS and newly reported PLP signals In accordance with the guidance provided by GL 95-05, the 2R21 inspection consisted of a 100 percent full length bobbin probe examination of the in-service non-sleeved tubes in all three SGs.

All hot and cold leg TSP intersections were inspected using a 0.720 inch diameter bobbin probe.

The only exception to the use of the 0.720 inch diameter bobbin probe for GL 95-05 applications is the straight length section above the Alloy 800 hot leg tubesheet sleeves in Rows 3 and 4. Due to the thickness of the hot leg tubesheet sleeve wall (0.048 inch) which reduces the inside diameter of the sleeve and the inability of a 0.720 inch diameter bobbin probe to traverse the U-bend region of Rows 3 and 4, a 0.630 inch diameter wide groove bobbin probe was used to inspect the straight length section of the Row 3 and 4 tubes above the hot leg tubesheet sleeve including the TSP intersections.

GL 95-05 states that smaller or larger diameter probes can be used to inspect tubes when it is impractical to utilize a nominal-size probe provided that the probes and procedures have been demonstrated to give an equivalent voltage response and detection capability when compared to the nominal (in this case 0.720 inch) probe. Probe equivalency testing between the nominal 0.720 inch bobbin probe and 0.630 inch wide-groove bobbin probe was performed during 2R21. It was successfully demonstrated that the 0.630 inch wide-groove probe met the equivalency requirements of Appendix H of the EPRI Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8.

Currently, there are twenty-eight in-service tubes in Rows 3 and 4 with hot leg tubesheet sleeves installed. The straight length section of these tubes above the tubesheet sleeve will be examined with 0.630 inch wide groove bobbin probe in future outages when applying GL 95-05 requirements.

+Point is a trademark or registered trademark of Zetec, Inc.

NOTE 1 - For those tube locations where the expansion (EXP) transition is located deeper into the tubesheet, the inspection distance into the tubesheet was adjusted to 5 inches below the top of the tubesheet to ensure adequate inspection coverage of the F* distance.

Page 3 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report Primary Side Visual Examinations

  • Tube Plugs - 100 percent of the tube plugs are visually examined (as-found and as-left condition) each time the primary side is opened for a scheduled inspection. This visual examination is to document the condition of the hot and cold leg tube plugs. This process also includes tube plug accountability. During 2R21, as well as in prior outages, the examinations verified that the correct number of tube plugs were present and in the proper tube locations. Installed tube plugs were examined and determined to be acceptable. No signs of degradation were observed.
  • Westinghouse Plug-in-Plug (PIP) - There are 9 hot leg and 9 cold leg tube locations (SG A - 4; SG B - 2; SG C - 3) which contain Alloy 600 plugs repaired with the Westinghouse PIP technique.

These locations are visually examined each outage to assess the condition of the tack weld which holds the PIP in place. No sign of cracking was reported in any of the eighteen PIP tack welds.

All tube plugs were accounted for and all were verified to be in their proper location

  • Westinghouse Nuclear Safety Advisory Letter (NSAL) 12-1 (Revision 1) - A remote visual inspection of the area around the channelhead drain line was performed in each hot and cold leg channelhead to meet the requirements of Westinghouse NSAL 12-1 (R1), "Steam Generator Channel Head Degradation". Included in this examination was (a) the divider plate to stub runner weld, (b) the tubesheet to stub runner weld, (c) the divider plate to channelhead weld (d) channelhead to tubesheet weld and (e) the entire clad surface of the channelhead bowl. This inspection looked for evidence of gross defects such as indications in welds, missing weld filler material, a breach in the weld metal, and unusual discoloration of the weld metal and/or cladding imperfections. All inspections were determined to be acceptable. No sign of cladding breach, cracking, missing filler metal was observed. During 2R20, in the cold leg of SG C, a small area of discoloration (non-rust color) was observed approximately 1 foot from the divider plate.

Subsequent review of previous channelhead videos showed no change in this area of discoloration. The visual examination of this area in 2R21 showed no changes in appearance from that reported in 2R20. This area will continue to be visually examined each outage the primary manway covers are removed for an inspection.

Secondary Side Visual Examinations:

  • Foreign Object Search and Retrieval (FOSAR) - A visual inspection of the secondary side tubesheet face, annulus and tube lane was performed during 2R21 in all three steam generators.

2RCS-SG21A - Three metallic foreign objects (small wire bristles) were observed on the top of the tubesheet. No tube wear was detected as a result of these objects. Two of the three wire bristles were removed from the SG. An evaluation was performed for the remaining wire bristle to remain in the SG until the next operating cycle.

2RCS-SG21B - No foreign material was observed.

2RCS-SG21C - Three non-metallic foreign objects (sludge rock, other two not positively identified) were observed on the top of the tubesheet. No tube wear was detected as a result of these objects. One of the three objects were removed from the SG. Sludge rocks are not considered foreign material as they are indigenous to the operation of the component.

The foreign material left in the SGs will be re-inspected during 2R22.

  • Possible Loose Part Indications - For those tube locations where possible loose part indications were reported during the 2R21 eddy current examinations and no visual inspections were performed at those particular tube locations, the +Point probe was used to verify that no degradation or tube wall wear was present. These tubes remained in service.

Page 4 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report TS 5.6.6.2.1.b Degradation mechanisms found:

The following degradation mechanisms were reported during 2R21:

  • Axial ODSCC at non-dented TSP intersections
  • Axial ODSCC in the hot leg sludge pile freespan regions
  • Axial ODSCC at the expansion transition regions
  • Circumferential ODSCC at the hot leg TTS expansion transitions
  • Circumferential ODSCC at free-span dings
  • Axial ODSCC at 1st hot leg TSP (Flow distribution baffle)
  • Wear at AVB intersections
  • Wear at 1st hot leg TSP (Flow distribution baffle)
  • Historical foreign object induced wear
  • Historical freespan volumetric indications
  • Cold Leg Thinning One tube, Row 40 Column 71 in 2RCS-SG21A, was reported to contain a 25% through wall (TW) wear indication at the 2nd cold leg support plate. This degradation mode is commonly referred to as cold leg thinning.

Since this indication was initially reported by the bobbin probe, no expansion of the inspection scope was required by virtue of the bobbin probe inspection scope already being 100% of the in-service tubes.

This type of indication is not new to the nuclear industry, however, it is the first time reported in the BVPS Unit 2 SGs. Cold leg thinning was prevalent in the older style Model 51 SGs such as the original Unit 1 SGs.

This degradation mechanism has been included in the Cycle 22 SG Operational Assessment which provides final documentation that supports a full cycle (525 EFPD) of operation. This tube will remain in-service for Cycle 22 as the wear indication depth is below the Tech Spec repair criteria of 40%TW.

This indication was entered in the sites corrective action process.

TS 5.6.6.2.1.c Nondestructive examination techniques utilized for each degradation mechanism:

  • For the degradation mechanisms observed during 2R21, the bobbin coil probe was used as the primary method of detection except at or below TTS and in Row 1 and 2 U-bends where the bobbin probe is not qualified. In these areas, the +Point probe was employed. The +Point probe is also used to re-examine any ambiguous bobbin coil signals (I-codes) that were reported.
  • The 2R21 examination techniques were qualified, for detection and sizing (as applicable) of the existing and potential degradation mechanisms listed in the 2R21 degradation assessment. This qualification was in accordance with Appendices H and I of the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines:

Revision 8".

  • Site-specific ETSS's are developed prior to each steam generator inspection for each existing and potential degradation mechanism identified in the 2R21 degradation assessment. The site-specific ETSS's are developed in accordance with Appendices H and I of the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8."

Page 5 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report

  • The examination techniques utilized during 2R21 are considered "Site Validated" as defined in the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8," for each existing and potential degradation mechanism listed in the 2R21 degradation assessment.
  • Axial ODSCC in the U-bend region is limited to Row 3 through Row 9 due to the bending technique used for those tube locations.
  • Per the Technical Specifications, the +Point probe is required to inspect the nickel banded area of the lower tubesheet sleeve joint. The Ghent Version 2 probe, which includes a +Point probe in the design, was used to inspect 100 percent of the hot leg tubesheet sleeves.

Page 6 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report 2R21 Examination Techniques Used for Degradation Detection/Sizing Degradation Mode Tube Location Probe EPRI ETSS*

Existing Degradation Mechanisms Circumferential ODSCC Tubesheet expansion transitions 3 Coil +Point 21410.1 0.720 Bobbin I28413 Sludge pile, expansion transitions 3 Coil +Point I28424 Non-dented and dented TSP's 0.720 Bobbin I28411 Bobbin < 5 volts, +Point > 5 volts 3 Coil +Point 22401.1 Axial ODSCC Freespan dings < 5 volts 0.720 Bobbin 24013.1 Freespan dings > 5 volts 3 Coil +Point 22401.1 0.720 Bobbin I28413 Row 3 through 9 U-bends (SG C)

Single Coil +Point I28424 HL Freespan (> TSH +6"), CL above 0.720 Bobbin I28412 sludge pile, non-ding locations Axial PWSCC Tubesheet & expansion transitions 3 Coil +Point 20511.1 Circumferential PWSCC Tubesheet & expansion transitions 3 Coil +Point 20510.1 Dented TSP's < 2 volts 0.720 Bobbin 96012.1 Axial PWSCC Dented TSP's > 2 volts 3 Coil +Point 96703.1 Circumferential ODSCC Freespan dings 3 Coil +Point 21410.1 Oblique Circ PWSCC Row 3 through 10 U-bends (SG C) Single Coil +Point 96511.2 AVB locations 0.720 Bobbin I96041.1 Tube Wear TSP Intersections 0.720 Bobbin I96042.1 Entire tube length 0.720 Bobbin I28412 Volumetric Expansion transitions 3 Coil +Point 21998.1 Potential Degradation Mechanisms Axial PWSCC Row 3 through 10 U-bends Single Coil +Point 96511.2 Axial ODSCC Dented AVB locations Single Coil +Point 22401.1 Oblique/Circumferential Row 3 through 10 U-bends Single Coil +Point 96511.2 PWSCC (SG A and B)

Axial/Circumferential Mid-range +Point 96511.2 Row 1 and 2 U-bends PWSCC High freq +Point 99997.1 Row 3 through 9 U-bends 0.720 Bobbin I28413 Axial ODSCC (SG A and B) Single Coil +Point I28424 Thinning CL TSP's 0.720 Bobbin 96001.1 0.720 Bobbin 27091.1 Loose Part Wear TTS, periphery & tube lane 3 Coil +Point 21998.1 0.720 Bobbin 96005.2 Pitting Sludge pile 3 Coil +Point 21998.1

  • The applicable EPRI Examination Technique Specification Sheet (ETSS) is listed for reference only.

Page 7 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report TS 5.6.6.2.1.d Location, orientation (if linear), and measured sizes (if available) of service-induced indications:

The 2R21 SG Examination Results section (Page 13) lists information that includes the location, orientation and measured sizes of service-induced indications. Further explanation of the information provided in the results section is given below:

  • Bobbin probe indications reported as "I-codes" (DNI, DSI, DTI or NQI) were re-inspected with the

+Point probe.

  • Bobbin probe indications reported as PSI were re-inspected with the +Point probe. If the +Point probe indicated a possible TSP ligament breach existed (CSI), it was further evaluated by the original equipment manufacturer (OEM) engineering group. All ligament breach extents were found to be acceptable for continued plant operation.
  • New AVB indications reported from the bobbin probe listed as PCT were inspected with the

+Point probe. If the +Point probe indicated no crack-like flaws were present within the wear scar, a wear call (WAR) was assigned to the +Point report.

  • +Point indications reported as "I-codes" (SAI, SCI, MAI or MCI) were either (a) removed from service via plugging, (b) left in service by installing hot leg tubesheet sleeves or (c) left in service if the indications qualified under the requirements of GL 95-05.
  • For hot leg top of tubesheet circumferential indications that could not be sleeved, a stabilizer was installed prior to plug installation.

TS 5.6.6.2.1.e Number of tubes plugged or repaired during the inspection outage for each degradation mechanism:

The following tables list the number of tubes plugged or repaired for each existing degradation mechanism reported during 2R21. This is the sixth consecutive outage where the alternate repair criteria of GL 95-05 have been implemented.

For the following Tables:

  • The Hot Leg Sludge Pile column includes indications located above the top-of-tubesheet (greater than 0.00 inches).
  • The Hot Leg Expansion Transition (Exp Trans) column includes indications located at or below the top-of-tubesheet (0.00 inch or negative measurement).
  • Circumferential indications recorded above the top-of-tubesheet are still within the expansion transition region of the tube.

Page 8 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report 2RCS-SG21A Degradation Hot Leg Hot Leg Exp Free span Sleeve Total Mode Sludge Pile Trans Ding Installation Tubes Axial ODSCC 1 1 Circ ODSCC 1 54 1 56 Scratch 1 1 Total 1 55 1 1 58 Notes for 2RCS-SG21A:

1) Forty-five tubes were repaired with Alloy 800 hot leg tubesheet sleeves and thirteen tubes were plugged. Of the thirteen tubes that were plugged, two tubes were in-situ tested and had sleeves installed in an attempt to keep the tubes in-service. Engineering analysis of this condition could not be validated and the two sleeved tubes were subsequently removed from service. Another plugged tube, which was sleeved in 2R20, had a scratch reported which was located on either (a) the outside of the nickel band of the lower tubesheet sleeve joint or (b) the inside of the parent tube.

2RCS-SG21B Degradation Hot Leg Hot Leg Exp Free Span Flow Total Mode Sludge Pile Trans Ding Baffle Tubes Axial ODSCC 2 1 3 Circ. ODSCC 1 18 1 20 Total 3 18 1 1 23 Notes for 2RCS-SG21B:

1) 21 tubes were repaired with Alloy 800 hot leg tubesheet sleeves and 2 tubes were plugged.

2RCS-SG21C Degradation Hot Leg Hot Leg Exp Free Span Sleeve Total Mode Sludge Pile Trans Ding Installation Tubes Axial ODSCC Circ. ODSCC 2 21 23 Scratch 1 1 Total 2 21 1 24 Notes for 2RCS-SG21C:

1) 22 tubes were repaired with Alloy 800 hot leg tubesheet sleeves and 2 tubes were plugged. One of the plugged tubes had a sleeve installed which did not meet the axial position requirements. Another plugged tube, which was sleeved in 2R20, had a scratch reported which was located on either (a) the outside of the nickel band of the lower tubesheet sleeve joint or (b) the inside of the parent tube.

Page 9 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report TS 5.6.6.2.1.f The number and percentage of tubes plugged or repaired to date, and the effective plugging percentage in each steam generator:

The following table lists the required information for each steam generator as of the end of 2R21:

Tubes Plugged Percent Sleeves Plug/Sleeve Effective SG Plugged 2R21 Tubes to Date Plugged Inservice Equivalency Plugging %

2RCS-SG21A 13 364 10.782 291 11.98 11.137 2RCS-SG21B 2 326 9.656 190 7.82 9.888 2RCS-SG21C 2 286 8.472 86 3.54 8.576 TOTAL 17 976 9.637 567 23.3 9.867 TS 5.6.6.2.1.g The results of condition monitoring, including the results of tube pulls and in-situ testing:

Condition Monitoring

  • All tubes were shown to satisfy the structural and leakage integrity performance criteria at 2R21.

The relative severity levels of the degradation observed during 2R21 were judged to be consistent with or bounded by the levels associated with previous outage inspection results. Based on the indications observed during 2R21, the SG tubing is expected to meet all operational, structural and leakage integrity requirements at End-of Cycle 22. None of the indications reported during 2R21 represented a leakage potential at postulated main steam line break conditions.

Tube Pulls

  • No tubes were pulled (removed) from the SG's during 2R21.

In-Situ Pressure Testing

  • Three tubes were in-situ pressure tested during 2R21. All tubes satisfied the structural and leakage performance criteria with no leak or burst.

In-situ Test Pressures (psi)

SG Row Col Indication Location Volts Phase NOP MSLB 3NOP Result A 10 26 SCI TSH -0.12" 0.27 59 1775 2975 5250 SAT A 12 40 SCI TSH -0.12" 0.08 66 1775 2975 5250 SAT B 14 47 SCI 02H +28.66" 0.99 26 1775 2975 5250 SAT NOP - Normal operating pressure MSLB - Main steam line break pressure 3NOP - 3 times the Normal Operating Differential Pressure Page 10 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report TS 5.6.6.2.1.h Repair method utilized and the number of tubes repaired by each repair method:

Westinghouse Alloy 800 leak limiting sleeves

  • A total of 91 hot leg tubesheet sleeves were installed in 91 tubes for degradation reported at the hot leg top of tubesheet during 2R21. During the 2R21, five sleeved tubes were taken out of service:

2RCS-SG21A:

Row 10 Column 26 - In-situ pressure tested 2R21, sleeved 2R21, plugged 2R21 Row 12 Column 40 - In-situ pressure tested 2R21, sleeved 2R21, plugged 2R21 Row 17 Column 46 - Axial scratch located in lower tubesheet sleeve joint reported in 2R21, sleeved 2R20, plugged 2R21 2RCS-SG21C:

Row 4 Column 54 - Mis-positioned sleeve 2R21, plugged 2R21 Row 30 Column 55 - Axial scratch located in lower tubesheet sleeve joint reported in 2R21, sleeved 2R20, plugged 2R21 This results in a total of 88 new hot leg tubesheet sleeves in-service for Cycle 22.

Sleeves Sleeves Sleeves Total # of SG Installed Plugged Previously Sleeves 2R21 2R21 Installed Inservice 2RCS-SG21A 47 3 247 291 2RCS-SG21B 21 0 169 190 2RCS-SG21C 23 2 65 86 TOTAL 91 5 481 567 Page 11 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report Definitions of Abbreviations, Codes, and Reporting Terminology 3 Letter Code Definitions Term Bobbin Coil Probe BLG Bulge DNI Dent/Ding with a Possible Indication DSI Distorted Tube Support Plate Signal with Possible Indication DTI Distorted Tubesheet Signal with Possible Indication EXP Tubesheet Expansion MBM Manufacturer's Burnish Mark NQI Non-Quantifiable Indication PCT Percent Through Wall PSI Possible Tube Support Plate Indication (Ligament Breach)

TSP Tube Support Plate Term +Point Probe CSI Confirmed Tube Support Plate Indication (Ligament Breach)

DIS Distance Between Hydraulic Expansions Not Met MAI Multiple Axial Indications MCI Multiple Circumferential Indications NDF No Degradation Found SAI Single Axial Indication SCI Single Circumferential Indication VOL Volumetric Indication WAR Wear Additional Definitions Term Definition AVB Anti-Vibration Bar C/L Cold Leg (Outlet)

DENT Observed within a Tube Support Plate DING Observed in Free-Span Region of the Tubing EPRI Electric Power Research Institute SG Steam Generator H/L Hot Leg (Inlet)

NSAL Nuclear Safety Advisory Letter ODSCC Outside Diameter Stress Corrosion Cracking PLP Possible Loose Part PWSCC Primary Water Stress Corrosion Cracking TSP Tube Support Plate TTS Top of Tubesheet Page 12 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report 2R21 SG Examination Results Attachments A, B, and C provide the examination results for tubes with service-induced indications in the Beaver Valley Power Station, Unit No. 2 SG's.

NOTE: The majority of the data contained in the Attachments comes from the production analysis process however, some data has been re-sized or re-profiled to address structural integrity concerns.

Therefore, variations in the dimensions of a given indication (length, angular extent, voltage) may exist between this document and any documents previously submitted to the NRC in support of the spring 2020 outage (2R21). Regardless of the source of the data being provided, tubes that exceeded the plugging or repair limit were properly dispositioned prior to returning the steam generators to service (MODE 4).

Refer to the following tables for a description of terms used in these attachments.

Description of Column Headings and Data Abbreviations Used in Steam Generator Examination Results Report Header Definitions Term Definition ROW/COL Row & column designation of tube location IND Type of indication LOC Location of nearest support structure INCH Indication distance from nearest support structure

%TW Measured percent through wall of an indication LENGTH Field measured length of an indication ANGLE Measured angular extent of an indication around the tube WIDTH Measured width of an indication VOLTS Measured voltage amplitude of an indication PHASE Measured angular rotation of an indication CHAN Recording channel of an indication FROM Starting point of examination TO End point of examination Examination Extent Definitions (FROM - TO)

Term Definition 01C 1st Tube Support Plate on Cold Leg Side 01H 1st Tube Support Plate on Hot Leg Side AVB1 1st Anti-Vibration Bar (Numbered Hot Leg to Cold Leg)

SBH Bottom of Sleeve - Hot Leg STH Top of Sleeve - Hot leg TEC Tube End - Cold Leg TEH Tube End - Hot Leg TSC Cold Leg Tubesheet (Secondary Face)

TSH Hot Leg Tubesheet (Secondary Face)

Page 13 of 13

Unit #2 - 2R21 Steam Generator 180 Day Report Attachment A BEAVER VALLEY UNIT #2 2R21 SG EXAMINATION RESULTS 2RCS-SG21A TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 1 3 DNI 04H 0.00 1.62 22 P1 08H TEH 1 30 SCI TSH -0.15 0.18 229 1.75 0.09 114 P2 TSH TSH 2 24 DSI 07H -0.03 0.23 162 P1 08H TEH 2 64 PSI 07H 0.40 13.61 161 P5 08H TEH 2 87 DNI 05H 0.01 1.78 45 P1 08H TEH 2 88 DSI 02H -0.28 0.41 111 P1 08H TEH 2 88 DNI 06H 0.01 1.71 42 P1 08H TEH 2 92 DSI 03H -0.06 0.39 110 P1 08H TEH 2 93 DSI 03H 0.01 0.46 133 P1 08H TEH 3 2 PSI 02H 0.40 15.97 165 P5 08H TEH 3 15 DSI 03H 0.04 0.30 108 P1 08H TEH 3 24 DNI 07C -0.05 1.42 49 P1 08C TEC 3 26 DNI 03H 0.00 2.36 45 P1 08H TEH 3 34 SCI TSH -0.07 0.21 60 0.46 0.13 80 P2 TSH TSH 3 45 DNI 03H 0.00 3.96 9 P1 08H TEH 3 59 DSI 02H 0.21 0.46 56 P1 08H TEH 3 65 DSI 07H -0.01 0.75 79 P1 08H TEH 3 65 DSI 07C -0.07 0.37 122 P1 08C TEC 3 71 DNI 08H 0.00 1.26 40 P1 08H TEH 3 77 DNI 06H 0.01 1.26 55 P1 08H TEH 3 77 DSI 08H -0.07 0.41 42 P1 08H TEH 3 77 SAI 08H -0.08 0.13 103 6 08H 08H 3 79 DSI 07H -0.22 0.31 115 P1 08H TEH 3 81 DSI 03H -0.01 0.55 109 P1 08H TEH 3 81 DNI 07H 0.00 1.47 49 P1 08H TEH 3 81 DNI 08H -0.01 1.27 41 P1 08H TEH 3 81 DNI 08C 0.02 1.40 46 P1 08C TEC 3 84 DSI 03H 0.00 0.42 76 P1 08H TEH 3 85 DSI 04H 0.24 0.63 58 P1 08H TEH 3 91 DNI 04H 0.00 1.28 44 P1 08H TEH 3 92 DSI 02H 0.07 0.21 163 P1 08H TEH 4 9 DSI 03H -0.03 0.77 94 P1 08H TEH 4 9 DSI 04H 0.04 0.22 65 P1 08H TEH 4 9 DNI 08H -0.01 1.28 46 P1 08H TEH 4 9 DNI 07C -0.05 1.72 44 P1 08C TEC 4 9 DNI 06C -0.05 1.44 42 P1 08C TEC 4 18 DNI 04H 0.00 1.28 52 P1 08H TEH 4 18 DSI 05H -0.15 0.25 123 P1 08H TEH 4 20 DNI 04H -0.01 1.49 55 P1 08H TEH 4 21 DSI 03H 0.04 0.37 89 P1 08H TEH 4 22 DNI 07H -0.01 1.43 40 P1 08H TEH 4 24 DSI 02H 0.00 0.22 98 P1 08H TEH 4 24 DNI 04H 0.00 1.30 47 P1 08H TEH 4 26 DSI 02H 0.00 0.25 111 P1 08H TEH 4 26 DNI 03H 0.19 1.43 30 P1 08H TEH 4 28 DSI 03H 0.06 0.70 80 P1 08H TEH 4 33 DNI 04H 0.00 1.54 54 P1 08H TEH 4 33 DNI 07H 0.04 1.31 51 P1 08H TEH 4 34 DSI 03H -0.29 0.34 99 P1 08H TEH 4 34 DNI 07H -0.01 1.18 53 P1 08H TEH 4 34 DNI 08H 0.00 1.42 44 P1 08H TEH 4 37 SCI TSH -0.03 0.13 146 1.12 0.24 83 P2 TSH TSH Page 1 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 4 39 DSI 02H 0.00 0.09 42 P1 08H TEH 4 50 DSI 02H 0.07 0.14 58 P1 08H TEH 4 50 DSI 03H 0.04 0.25 45 P1 08H TEH 4 50 DSI 04H 0.03 0.33 35 P1 08H TEH 4 54 DSI 02H -0.25 0.46 86 P1 08H TEH 4 54 DSI 04H 0.09 0.35 82 P1 08H TEH 4 54 DSI 05H -0.04 0.33 119 P1 08H TEH 4 54 DNI 08C -0.05 1.48 46 P1 08C TEC 4 60 DSI 02H -0.10 0.37 125 P1 08H TEH 4 60 DSI 06H 0.00 0.34 28 P1 08H TEH 4 62 DNI 02H 0.00 1.56 42 P1 08H TEH 4 62 DNI 03H 0.03 1.78 44 P1 08H TEH 4 62 DNI 04H 0.18 1.35 19 P1 08H TEH 4 62 DNI 05H 0.12 1.30 34 P1 08H TEH 4 63 DSI 02H -0.06 0.22 57 P1 08H TEH 4 70 DSI 03H 0.01 0.17 48 P1 08H TEH 4 72 DNI 08H -0.03 1.42 53 P1 08H TEH 4 72 DNI 08C -0.02 1.71 47 P1 08C TEC 4 78 DSI 05H 0.00 0.24 114 P1 08H TEH 4 83 PSI 03H 0.38 15.02 155 P5 08H TEH 4 85 DSI 08C 0.05 0.14 135 P1 08C TEC 4 86 DSI 03H 0.06 0.21 127 P1 08H TEH 5 10 DSI 02H 0.01 0.99 76 P1 08H TEH 5 10 DSI 03H -0.03 0.82 111 P1 08H TEH 5 10 DSI 04H -0.01 0.47 95 P1 08H TEH 5 11 DSI 04H 0.05 0.37 46 P1 TEH TEC 5 12 DNI 07H 0.05 1.43 55 P1 TEH TEC 5 12 DNI 08H 0.05 1.37 51 P1 TEH TEC 5 12 DNI 08C 0.00 1.59 40 P1 TEH TEC 5 13 DNI 06H 0.00 1.71 20 P1 08H TEH 5 14 SCI TSH -0.07 0.19 155 1.19 0.28 90 P2 TSH TSH 5 18 SAI 06H -0.11 0.12 81 P4 06H 06H 5 18 DSI 06H -0.05 0.60 25 P1 TEH TEC 5 20 DSI 08C 0.02 0.16 86 P1 08C TEC 5 25 DSI 05H 0.09 0.62 108 P1 08H TEH 5 25 DNI 06H -0.01 1.71 42 P1 08H TEH 5 25 DNI 08H 0.00 1.34 46 P1 08H TEH 5 25 DNI 06C 0.00 1.64 34 P1 08C TEC 5 26 DSI 02H 0.03 0.48 142 P1 08H TEH 5 26 DSI 03H 0.01 0.36 108 P1 08H TEH 5 26 DNI 07H 0.00 1.32 51 P1 08H TEH 5 28 DSI 04H -0.25 1.32 33 P1 STH TEC 5 28 DNI 04H -0.07 1.32 33 P1 STH TEC 5 29 DSI 02H -0.15 1.14 109 P1 08H TEH 5 29 SCI TSH -0.07 0.18 157 1.20 0.61 125 P2 TSH TSH 5 29 SAI 02H -0.15 0.21 46 6 02H 02H 5 29 DNI 06C -0.02 1.27 34 P1 08H TEC 5 30 DSI 03H 0.03 0.10 51 P1 08H TEH 5 35 DNI 04H 0.20 1.23 35 P1 TEH TEC 5 53 DSI 02H 0.00 0.80 117 P1 TEH TEC 5 53 DNI 04H 0.05 1.39 54 P1 TEH TEC 5 53 DNI 07H 0.00 1.46 44 P1 TEH TEC Page 2 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 5 57 DSI 04H 0.02 0.13 19 P1 TEH TEC 5 60 DSI 04H -0.05 0.13 23 P1 TEH TEC 5 61 PSI 07H -0.49 7.68 252 8 TEH TEC 5 71 DNI 08H 0.06 1.36 36 P1 TEH TEC 5 71 DNI 07C 0.00 1.31 49 P1 TEH TEC 5 80 DSI 05H 0.07 0.21 95 P1 TEH TEC 5 82 DSI 03H 0.02 0.33 134 P1 TEH TEC 6 11 DNI 06H 0.05 1.38 45 P1 TEH TEC 6 12 DNI 07H 0.00 1.32 49 P1 TEH TEC 6 14 DNI 06H 0.05 1.29 51 P1 TEH TEC 6 15 SCI TSH -0.08 0.18 94 0.72 0.36 40 P2 TSH TSH 6 15 DSI 02H 0.02 0.37 134 P1 TEH TEC 6 17 DNI 04H 0.15 1.31 52 P1 TEH TEC 6 19 SCI TSH -0.08 0.24 120 0.92 0.19 80 P2 TSH TSH 6 20 DSI 04H -0.05 0.45 67 P1 TEH TEC 6 27 DSI 06H -0.02 0.59 98 P1 TEH TEC 6 27 DNI 07H 0.02 2.23 39 P1 TEH TEC 6 27 DNI 07C 0.02 1.32 52 P1 TEH TEC 6 27 DNI 05C 0.00 1.56 39 P1 TEH TEC 6 29 DNI 08H 0.04 1.34 52 P1 TEH TEC 6 32 DSI 02H 0.00 0.23 156 P1 TEH TEC 6 33 DNI 08H 0.03 1.32 25 P1 STH TEC 6 34 DSI 02H 0.07 0.35 163 P1 TEH TEC 6 35 DSI 02H 0.12 0.99 118 P1 STH TEC 6 35 DSI 03H -0.05 0.40 94 P1 STH TEC 6 35 DSI 04H 0.05 0.39 78 P1 STH TEC 6 35 DSI 05H -0.05 0.36 74 P1 STH TEC 6 35 DNI 06H 0.05 1.47 52 P1 STH TEC 6 35 DNI 08H 0.00 1.27 52 P1 STH TEC 6 35 DSI 08H 0.15 0.66 46 P1 STH TEC 6 35 SAI 02H -0.19 0.08 102 2 02H 02H 6 37 DNI 04C -0.32 1.74 10 P1 TEH TEC 6 40 DSI 03H -0.02 0.25 149 P1 TEH TEC 6 40 DSI 04H 0.05 0.21 145 P1 TEH TEC 6 40 DNI 07C 0.00 1.75 45 P1 TEH TEC 6 40 DNI 05C 0.00 1.32 48 P1 TEH TEC 6 40 DNI 02C -0.07 1.51 27 P1 TEH TEC 6 41 SAI 08H 0.13 0.12 116 2 08H 08H 6 41 DSI 08H 0.02 0.25 19 P1 STH TEC 6 43 DSI 02H 0.05 0.31 58 P1 TEH TEC 6 43 DNI 05H 0.00 1.43 55 P1 TEH TEC 6 43 DNI 06H -0.02 1.42 55 P1 TEH TEC 6 43 DNI 07H 0.00 1.45 55 P1 TEH TEC 6 63 DNI 08H -0.07 1.54 46 P1 TEH TEC 6 68 DNI 07H -0.02 1.86 55 P1 TEH TEC 7 7 DNI 04H 0.17 1.38 27 P1 TEH TEC 7 13 SCI TSH -0.10 0.19 45 0.34 0.15 95 P2 TSH TSH 7 14 DSI 03H 0.15 0.27 114 P1 TEH TEC 7 18 DSI 02H -0.07 1.61 92 P1 TEH TEC 7 18 DSI 03H -0.02 0.56 104 P1 TEH TEC 7 18 DSI 05H -0.07 0.39 132 P1 TEH TEC 7 18 DNI 06C 0.00 1.34 55 P1 TEH TEC Page 3 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 7 19 DSI 02H 0.02 0.45 124 P1 TEH TEC 7 19 DSI 03H 0.12 0.44 106 P1 TEH TEC 7 19 DNI 07H 0.02 1.39 51 P1 TEH TEC 7 27 DSI 05H 0.10 0.47 158 P1 TEH TEC 7 30 MCI TSH -0.10 0.21 132 1.01 0.16 106 P2 TSH TSH 7 31 DNI 04H -0.02 1.07 51 P1 TEH TEC 7 31 DNI 07H 0.02 1.78 39 P1 TEH TEC 7 31 DNI 07C -0.20 1.42 27 P1 TEH TEC 7 31 DNI 05C 0.00 1.55 16 P1 TEH TEC 7 47 DNI 04H 0.00 1.43 10 P1 TEH TEC 7 49 DSI 02H -0.02 0.15 122 P1 TEH TEC 7 49 DNI 05H 0.10 1.28 25 P1 TEH TEC 7 49 DNI 07H 0.02 1.29 45 P1 TEH TEC 7 51 DSI 02H -0.02 0.21 31 P1 STH TEC 7 51 DSI 05H -0.05 0.29 78 P1 STH TEC 7 57 DNI 02H -0.05 1.39 39 P1 STH TEC 7 57 DNI 04H 0.15 1.54 25 P1 STH TEC 7 57 DNI 05H 0.10 1.87 30 P1 STH TEC 7 57 DNI 07H 0.05 1.27 49 P1 STH TEC 7 60 DNI 03H 0.02 1.29 43 P1 TEH TEC 7 72 DNI 04H 0.02 1.45 48 P1 TEH TEC 7 83 DNI 08H 0.03 1.31 54 P1 TEH TEC 7 83 DNI 07C -0.02 1.25 54 P1 TEH TEC 7 87 DNI 07H 0.00 1.44 55 P1 TEH TEC 7 94 DSI 02H 0.07 0.25 167 P1 TEH TEC 8 2 DNI 05H 0.00 1.49 54 P1 TEH TEC 8 6 DNI 04H 0.15 1.37 36 P1 TEH TEC 8 13 DNI 06H 0.02 1.24 51 P1 STH TEC 8 19 DSI 02H -0.05 0.46 126 P1 TEH TEC 8 28 DSI 02H -0.15 0.67 90 P1 STH TEC 8 28 DNI 08H -0.02 1.43 54 P1 STH TEC 8 29 DSI 02H -0.03 0.13 132 P1 STH TEC 8 32 SAI 05H 0.00 0.08 107 6 05H 05H 8 32 DSI 03H 0.00 0.43 95 P1 TEH TEC 8 32 DSI 05H 0.05 0.47 23 P1 TEH TEC 8 32 DSI 07H 0.02 0.32 21 P1 TEH TEC 8 32 DNI 07H 0.17 1.55 19 P1 TEH TEC 8 32 DNI 08H 0.02 1.49 40 P1 TEH TEC 8 33 DNI 07C 0.20 1.23 3 P1 STH TEC 8 34 DSI 03H -0.24 0.78 51 P1 08H TEH 8 40 DNI 08H 0.10 1.27 55 P1 STH TEC 8 40 DNI 05C -0.02 1.42 39 P1 STH TEC 8 42 DSI 02H -0.03 0.08 88 P1 STH TEC 8 42 DNI 08H 0.05 1.50 49 P1 STH TEC 8 56 DNI 08H 0.00 1.37 45 P1 STH TEC 8 59 DNI 08H 0.05 1.38 50 P1 TEH TEC 8 59 DNI 03C -0.15 1.22 17 P1 TEH TEC 8 65 DNI 07C 0.00 1.48 53 P1 TEH TEC 8 66 DNI 06H 0.10 1.48 48 P1 TEH TEC 8 67 DSI 02H 0.02 0.29 123 P1 TEH TEC 8 69 DSI 02H 0.00 0.31 140 P1 TEH TEC 8 76 DSI 05H 0.00 0.11 87 P1 TEH TEC Page 4 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 8 79 DNI 08H 0.12 1.38 34 P1 TEH TEC 8 85 DSI 02H -0.02 0.01 150 P1 TEH TEC 8 91 DSI 04H -0.03 0.63 102 P1 TEH TEC 9 7 DSI 02H 0.10 0.27 114 P1 TEH TEC 9 7 DNI 07H 0.00 1.64 55 P1 TEH TEC 9 7 DNI 08H 0.00 1.62 49 P1 TEH TEC 9 7 SAI 02H -0.07 0.08 106 P4 02H 02H 9 10 DSI 02H -0.28 0.93 92 P1 08H TEH 9 10 DNI 05H -0.01 1.31 55 P1 08H TEH 9 10 DNI 06H 0.04 1.45 53 P1 08H TEH 9 13 DSI 02H -0.07 0.31 101 P1 TEH TEC 9 14 DSI 03H 0.00 0.13 86 P1 TEH TEC 9 16 DSI 02H -0.02 0.43 146 P1 TEH TEC 9 16 DSI 03H 0.05 0.58 52 P1 TEH TEC 9 16 DSI 04H 0.00 0.35 140 P1 TEH TEC 9 18 DSI 05H 0.00 0.28 85 P1 TEH TEC 9 25 DNI 05C -0.02 1.29 53 P1 TEH TEC 9 27 DNI 03H 0.05 1.65 51 P1 TEH TEC 9 28 DNI 08C 0.02 1.38 45 P1 TEH TEC 9 29 DNI 06H 0.02 1.46 52 P1 TEH TEC 9 31 DNI 06H 0.00 1.31 20 P1 STH TEC 9 33 DNI 08H 0.17 1.27 22 P1 TEH TEC 9 34 SAI 02H -0.22 0.11 123 P4 02H 02H 9 34 DSI 02H 0.02 0.27 139 P1 TEH TEC 9 34 DNI 06C -0.02 1.13 41 P1 TEH TEC 9 35 DSI 02H 0.00 0.41 139 P1 STH TEC 9 35 DNI 08H 0.00 1.29 45 P1 STH TEC 9 35 DNI 06C 0.22 1.18 17 P1 STH TEC 9 37 DNI 04H -0.12 1.82 16 P1 TEH TEC 9 37 DNI 05H 0.15 1.25 19 P1 TEH TEC 9 37 DNI 06H 0.02 1.60 29 P1 TEH TEC 9 37 DNI 07H -0.17 1.74 11 P1 TEH TEC 9 37 DNI 08H 0.20 1.72 23 P1 TEH TEC 9 37 DNI 02C -0.20 1.65 8 P1 TEH TEC 9 38 DSI 05H 0.12 0.49 156 P1 TEH TEC 9 40 DSI 03H 0.02 0.42 85 P1 TEH TEC 9 40 DNI 06H 0.05 1.21 54 P1 TEH TEC 9 40 DNI 07H 0.00 1.45 40 P1 TEH TEC 9 40 DNI 08H 0.18 1.10 50 P1 TEH TEC 9 42 VOL TSC -0.11 0.24 58 0.45 0.31 63 6 TSC TSC 9 42 PCT TSC -0.06 34 0.36 63 6 TSC TSC 9 49 DNI 08H 0.17 1.68 25 P1 TEH TEC 9 51 DSI 04H -0.12 0.52 101 P1 STH TEC 9 51 SAI 04H -0.13 0.10 99 2 04H 04H 9 56 DSI 02H -0.08 0.15 82 P1 TEH TEC 9 56 DSI 04H 0.05 0.30 67 P1 TEH TEC 9 56 DNI 06H 0.00 1.26 51 P1 TEH TEC 9 56 DNI 08C -0.02 1.28 51 P1 TEH TEC 9 57 DSI 02H 0.10 0.49 127 P1 TEH TEC 9 57 DSI 03H -0.12 0.59 102 P1 TEH TEC 9 59 DNI 07H 0.02 1.41 54 P1 TEH TEC 9 62 DNI 08H 0.00 1.38 51 P1 TEH TEC Page 5 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 9 74 DSI 03H -0.02 0.20 149 P1 TEH TEC 9 83 PSI 04H -0.07 7.13 222 8 TEH TEC 9 93 DNI 02C 0.05 1.39 22 P1 TEH TEC 10 4 DNI 06H 0.00 1.35 55 P1 TEH TEC 10 7 DSI 02H -0.05 0.42 67 P1 TEH TEC 10 7 DSI 03H 0.00 0.34 122 P1 TEH TEC 10 7 DNI 06H 0.00 1.51 53 P1 TEH TEC 10 8 DSI 03H -0.05 0.24 77 P1 TEH TEC 10 10 DNI 07H 0.02 1.39 50 P1 TEH TEC 10 12 DNI 06H 0.02 1.29 27 P1 TEH TEC 10 12 DNI 07H 0.02 1.40 25 P1 TEH TEC 10 16 SCI TSH -0.04 0.23 235 1.80 0.22 53 P2 TSH TSH 10 18 DNI 06H 0.00 1.29 45 P1 TEH TEC 10 19 DSI 04H -0.02 0.24 89 P1 TEH TEC 10 21 SCI TSH -0.13 0.18 86 0.66 0.22 93 P2 TSH TSH 10 26 SCI TSH -0.12 0.24 314 2.40 0.26 62 P2 TSH TSH 10 26 DSI 04H 0.02 0.17 93 P1 TEH TEC 10 29 DNI 07H -0.12 1.65 19 P1 TEH TEC 10 32 DNI 05H 0.39 1.61 11 P1 TEH TEC 10 32 DNI 08C 0.07 1.85 18 P1 TEH TEC 10 34 SCI TSH -0.08 0.19 154 1.17 0.12 99 P2 TSH TSH 10 34 SAI 04H -0.11 0.08 42 6 04H 04H 10 34 DSI 04H -0.02 0.89 15 P1 TEH TEC 10 37 DSI 03H 0.02 0.27 144 P1 TEH TEC 10 37 DNI 05C -0.02 1.24 44 P1 TEH TEC 10 38 MCI TSH -0.05 0.22 202 1.54 0.09 103 P2 TSH TSH 10 38 DSI 04H 0.00 0.11 56 P1 TEH TEC 10 47 DNI 04H 0.07 1.38 55 P1 TEH TEC 10 47 DNI 05H 0.05 1.40 45 P1 TEH TEC 10 47 DNI 06H 0.07 1.76 28 P1 TEH TEC 10 47 DNI 07H -0.15 1.48 22 P1 TEH TEC 10 47 DNI 07C -0.12 1.20 30 P1 TEH TEC 10 49 DNI 08C -0.02 1.41 50 P1 STH TEC 10 49 DNI 07C 0.00 1.52 54 P1 STH TEC 10 57 DNI 02H -0.19 1.90 21 P1 TEH TEC 10 57 DNI 03H 0.00 1.39 41 P1 TEH TEC 10 57 DNI 04H 0.02 1.56 42 P1 TEH TEC 10 57 DNI 05H 0.00 1.85 32 P1 TEH TEC 10 57 DNI 06H 0.05 1.14 17 P1 TEH TEC 10 57 DNI 07H 0.02 1.94 39 P1 TEH TEC 10 57 DNI 08H -0.12 1.12 36 P1 TEH TEC 10 58 DSI 04H -0.02 0.12 67 P1 TEH TEC 10 58 DNI 07C 0.15 1.74 18 P1 TEH TEC 10 64 DNI 02H 0.02 2.02 5 P1 TEH TEC 10 64 DNI 03H -0.10 1.33 23 P1 TEH TEC 10 64 DNI 05C -0.17 1.38 20 P1 TEH TEC 10 69 DNI 04H 0.02 2.57 13 P1 TEH TEC 10 69 DNI 06C 0.12 1.56 11 P1 TEH TEC 10 72 DNI 07C 0.02 1.30 28 P1 TEH TEC 10 75 DNI 08H 0.12 1.52 31 P1 TEH TEC 10 76 DSI 05H 0.10 0.65 90 P1 TEH TEC 10 76 DNI 07C -0.05 1.35 22 P1 TEH TEC Page 6 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 10 83 DNI 04C -0.10 1.58 19 P1 TEH TEC 10 86 DNI 08C -0.07 1.63 42 P1 TEH TEC 10 89 DNI 05H 0.00 2.11 8 P1 TEH TEC 10 89 DNI 06H 0.02 2.40 30 P1 TEH TEC 10 89 DNI 07H -0.02 1.77 44 P1 TEH TEC 10 89 DNI 08C -0.15 1.62 27 P1 TEH TEC 10 89 DNI 07C -0.15 1.45 31 P1 TEH TEC 11 2 DSI 03H 0.05 0.58 102 P1 TEH TEC 11 7 DNI 02H 0.22 1.25 11 P1 TEH TEC 11 12 DNI 04H 0.02 1.69 54 P1 STH TEC 11 12 DNI 05H -0.02 1.63 44 P1 STH TEC 11 12 DNI 07H 0.05 1.27 47 P1 STH TEC 11 12 DNI 08H 0.07 1.63 38 P1 STH TEC 11 12 DNI 02C -0.05 1.41 16 P1 STH TEC 11 24 SCI TSH -0.08 0.18 89 0.68 0.31 40 P2 TSH TSH 11 24 DNI 04H 0.17 1.20 29 P1 TEH TEC 11 43 SCI TSH -0.04 0.22 43 0.33 0.17 100 P2 TSH TSH 11 48 DSI 02H -0.02 0.80 54 P1 STH TEC 11 48 DNI 06H 0.00 1.91 40 P1 STH TEC 11 48 DNI 07H 0.00 2.16 38 P1 STH TEC 11 48 DSI 08H 0.07 0.32 63 P1 STH TEC 11 48 DNI 04C 0.00 1.81 28 P1 STH TEC 11 48 DNI 03C 0.00 1.51 22 P1 STH TEC 11 48 DNI 02C 0.00 1.27 20 P1 STH TEC 11 76 DNI 03H 0.02 1.31 53 P1 TEH TEC 11 77 DNI 03H 0.12 1.32 54 P1 TEH TEC 11 77 DSI 05H 0.02 0.39 74 P1 TEH TEC 11 78 DSI 05H 0.05 0.12 61 P1 TEH TEC 11 78 DSI 06H 0.00 0.20 24 P1 TEH TEC 11 79 DNI 07C -0.02 1.25 45 P1 TEH TEC 11 80 DNI 06H 0.30 1.53 14 P1 TEH TEC 11 80 DNI 03C -0.02 1.35 18 P1 TEH TEC 12 6 DNI AV4 6.78 0.21 101 5 TEH TEC 12 7 DNI 06H 0.12 1.30 12 P1 TEH TEC 12 7 DNI 04C 0.17 1.35 12 P1 TEH TEC 12 16 SAI 02H -0.26 0.07 65 P4 02H 03H 12 16 DSI 02H -0.15 0.66 126 P1 TEH TEC 12 16 DNI 07H 0.00 1.47 47 P1 TEH TEC 12 19 DNI 07H 0.10 1.29 15 P1 TEH TEC 12 19 DNI 06C -0.29 1.47 11 P1 TEH TEC 12 19 DNI 05C -0.02 1.72 20 P1 TEH TEC 12 20 DNI 05H 0.02 1.54 48 P1 TEH TEC 12 23 DNI 02C 0.29 1.72 14 P1 TEH TEC 12 26 DNI 05H -0.03 1.26 11 P1 TEH TEC 12 27 DNI 05H 0.12 1.38 23 P1 TEH TEC 12 32 DNI 08C -0.07 1.22 39 P1 TEH TEC 12 34 DSI 02H 0.00 0.25 94 P1 TEH TEC 12 34 DNI 06H 0.05 2.00 41 P1 TEH TEC 12 38 DNI 06H 0.00 1.20 42 P1 TEH TEC 12 40 SCI TSH -0.12 0.24 252 1.93 0.10 87 P2 TSH TSH 12 48 DSI 05H 0.00 0.23 32 P1 TEH TEC 12 69 DSI 02H 0.00 0.43 89 P1 TEH TEC Page 7 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 12 69 DSI 03H -0.02 0.25 95 P1 TEH TEC 12 69 DNI 08C 0.00 1.45 51 P1 TEH TEC 12 70 DSI 03H 0.02 0.32 123 P1 TEH TEC 12 71 DNI 08H 0.00 1.89 48 P1 TEH TEC 12 71 DNI 06C 0.00 1.79 49 P1 TEH TEC 12 72 DSI 02H -0.03 0.16 131 P1 TEH TEC 12 73 DSI 05H 0.07 0.18 120 P1 TEH TEC 12 74 DSI 02H 0.02 0.54 155 P1 TEH TEC 12 74 DSI 03H 0.00 0.52 66 P1 TEH TEC 12 75 DNI 02H -0.02 2.34 51 P1 TEH TEC 12 75 DNI 03H 0.00 1.87 53 P1 TEH TEC 12 75 DNI 04H 0.10 1.33 33 P1 TEH TEC 12 75 DNI 05H 0.02 1.65 40 P1 TEH TEC 12 75 DNI 06C -0.02 1.60 50 P1 TEH TEC 12 75 DNI 04C 0.02 1.58 26 P1 TEH TEC 12 78 DNI 06C 0.00 1.40 41 P1 TEH TEC 12 80 DSI 05H 0.15 0.12 78 P1 TEH TEC 12 89 DNI 07C 0.00 1.43 53 P1 TEH TEC 13 17 SCI TSH -0.06 0.21 34 0.26 0.17 89 P2 TSH TSH 13 21 DNI 04H 0.00 1.28 43 P1 TEH TEC 13 22 DNI 06H 0.02 1.64 45 P1 TEH TEC 13 22 DNI 07H 0.02 1.79 38 P1 TEH TEC 13 24 SCI 01C 1.19 0.22 38 0.29 0.91 169 P2 01C 02C 13 29 DNI 05H 0.02 1.51 48 P1 TEH TEC 13 32 DSI 02H -0.05 0.09 123 P1 TEH TEC 13 38 SCI TSH -0.06 0.24 128 0.98 0.08 121 P2 TSH TSH 13 39 DNI 08H 0.02 1.39 31 P1 TEH TEC 13 41 DNI 03H -0.02 1.34 21 P1 TEH TEC 13 41 DNI 07H 0.03 1.58 19 P1 TEH TEC 13 41 DNI 08H -0.03 1.29 18 P1 TEH TEC 13 45 DNI 02H 0.05 1.13 55 P1 TEH TEC 13 46 DNI 08C 0.00 1.35 11 P1 TEH TEC 13 47 DNI 07C 0.00 1.31 43 P1 TEH TEC 13 47 DNI 04C -0.02 1.37 22 P1 TEH TEC 13 49 DSI 04H 0.05 0.13 102 P1 TEH TEC 13 57 DNI 07H 0.02 1.66 53 P1 TEH TEC 13 60 DSI 02H 0.07 0.53 168 P1 TEH TEC 13 65 DSI 06C 0.02 0.13 95 P1 TEH TEC 13 66 DNI 05C -0.10 1.29 18 P1 TEH TEC 13 67 DNI 08H -0.02 1.33 53 P1 TEH TEC 13 67 DSI 06C 0.00 0.30 71 P1 TEH TEC 13 70 DNI 08H 0.00 1.40 40 P1 TEH TEC 13 71 DSI 04H 0.00 0.22 17 P1 TEH TEC 13 80 DSI 03H 0.07 0.37 100 P1 TEH TEC 13 80 DNI 08H 0.02 1.43 47 P1 TEH TEC 13 80 DNI 07C -0.02 1.69 38 P1 TEH TEC 13 80 DNI 06C -0.02 2.03 29 P1 TEH TEC 13 80 DNI 03C -0.32 1.51 13 P1 TEH TEC 13 80 DNI 02C -0.37 1.62 12 P1 TEH TEC 13 83 DNI 06H 0.07 1.86 50 P1 TEH TEC 13 83 DNI 07H 0.05 2.01 47 P1 TEH TEC 13 83 DNI 02C -0.30 1.26 14 P1 TEH TEC Page 8 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 13 84 DSI 02H -0.05 0.59 85 P1 TEH TEC 13 85 DSI 02H 0.05 0.43 85 P1 TEH TEC 13 85 DNI 08C 0.00 1.44 40 P1 TEH TEC 13 85 DNI 07C -0.05 1.87 34 P1 TEH TEC 13 85 DNI 05C -0.05 1.59 34 P1 TEH TEC 13 85 DNI 03C -0.07 1.41 20 P1 TEH TEC 13 86 DSI 03H 0.02 0.22 116 P1 TEH TEC 13 86 DNI 07H 0.02 1.72 38 P1 TEH TEC 13 86 DNI 08H 0.05 1.71 34 P1 TEH TEC 13 86 DNI 05C -0.02 1.79 18 P1 TEH TEC 13 87 DNI 08C -0.05 1.87 23 P1 TEH TEC 13 87 DNI 07C -0.05 2.04 19 P1 TEH TEC 13 87 DNI 06C -0.02 1.98 14 P1 TEH TEC 13 87 DNI 05C 0.00 1.88 28 P1 TEH TEC 13 91 DSI 05H -0.06 0.49 123 P1 08H TEH 13 91 DSI 05C -0.02 0.22 55 P1 08H TEC 13 92 DSI 04H -0.02 0.53 98 P1 TEH TEC 14 6 DNI 03H 0.22 2.30 11 P1 TEH TEC 14 15 DNI 03H 0.02 1.61 16 P1 TEH TEC 14 15 DSI 04H -0.02 0.19 118 P1 TEH TEC 14 20 DSI 03H -0.02 0.24 53 P1 TEH TEC 14 20 DNI 05H 0.37 1.46 17 P1 TEH TEC 14 20 DNI 06H 0.05 1.42 45 P1 TEH TEC 14 20 DNI 04C -0.07 1.96 15 P1 TEH TEC 14 21 DNI 06H 0.00 1.29 55 P1 TEH TEC 14 21 DNI 07H 0.02 1.37 40 P1 TEH TEC 14 24 DNI 06H 0.02 1.34 53 P1 TEH TEC 14 24 DNI 07H 0.05 1.37 48 P1 TEH TEC 14 25 DSI 05H 0.05 0.28 113 P1 TEH TEC 14 27 DSI 05H 0.10 0.01 25 P1 TEH TEC 14 31 DSI 02H 0.02 0.27 11 P1 TEH TEC 14 31 DSI 05H -0.02 0.11 129 P1 TEH TEC 14 37 DNI 08H 0.20 1.54 14 P1 TEH TEC 14 37 DNI 07C 0.00 1.31 26 P1 TEH TEC 14 39 DNI 06H 0.02 1.43 55 P1 TEH TEC 14 40 SAI 05H -0.04 0.16 73 6 05H 05H 14 40 DSI 05H 0.02 0.20 18 P1 TEH TEC 14 41 DNI 05H 0.05 1.33 51 P1 TEH TEC 14 42 DNI 06H 0.05 1.27 55 P1 TEH TEC 14 43 DNI 06H 0.02 1.26 43 P1 TEH TEC 14 46 DSI 02H 0.00 0.10 88 P1 TEH TEC 14 47 DSI 02H 0.07 0.24 79 P1 TEH TEC 14 47 DSI 04H 0.00 0.21 44 P1 TEH TEC 14 48 DSI 05H 0.00 0.40 147 P1 TEH TEC 14 49 DNI 08C 0.00 1.41 53 P1 TEH TEC 14 49 DNI 06C 0.02 1.39 51 P1 TEH TEC 14 49 DNI 05C -0.02 1.45 52 P1 TEH TEC 14 50 DSI 03H 0.00 0.19 120 P1 TEH TEC 14 50 DNI 08H 0.02 1.32 55 P1 TEH TEC 14 50 DNI 03C -0.34 1.70 9 P1 TEH TEC 14 53 DSI 02H -0.05 0.09 62 P1 TEH TEC 14 54 DSI 02H 0.07 0.38 66 P1 TEH TEC Page 9 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 14 54 DNI 06H 0.05 1.68 50 P1 TEH TEC 14 54 DNI 07H 0.02 1.36 55 P1 TEH TEC 14 55 DNI 05H 0.00 1.37 51 P1 TEH TEC 14 55 DNI 06H -0.05 1.50 49 P1 TEH TEC 14 58 DSI 02H 0.07 0.58 115 P1 TEH TEC 14 58 DNI 08H 0.02 1.27 53 P1 TEH TEC 14 58 DNI 06C -0.07 1.58 33 P1 TEH TEC 14 58 DNI 02C -0.25 1.67 15 P1 TEH TEC 14 59 DSI 02H 0.05 0.59 87 P1 TEH TEC 14 59 DSI 03H 0.02 0.20 61 P1 TEH TEC 14 59 DSI 06H 0.15 0.60 90 P1 TEH TEC 14 59 DNI 08H 0.00 1.63 44 P1 TEH TEC 14 59 DNI 08C -0.05 1.58 38 P1 TEH TEC 14 59 DNI 07C 0.00 1.34 48 P1 TEH TEC 14 59 DNI 04C -0.25 1.26 21 P1 TEH TEC 14 60 DNI 08H 0.04 1.64 44 P1 TEH TEC 14 61 DNI 08C -0.05 1.27 52 P1 TEH TEC 14 61 DNI 07C 0.07 1.63 34 P1 TEH TEC 14 61 DNI 06C 0.00 1.32 48 P1 TEH TEC 14 64 DNI 07C -0.02 1.90 40 P1 TEH TEC 14 64 DNI 02C 0.22 2.44 11 P1 TEH TEC 14 65 DNI 02H -0.02 3.35 46 P1 TEH TEC 14 65 DSI 03H -0.10 0.25 79 P1 TEH TEC 14 65 DNI 04C -0.25 1.82 14 P1 TEH TEC 14 67 DNI 06C 0.22 1.56 9 P1 TEH TEC 14 68 DSI 02H -0.05 0.40 24 P1 TEH TEC 14 70 DSI 02H 0.07 0.47 49 P1 TEH TEC 14 70 DSI 03H -0.02 0.77 152 P1 TEH TEC 14 70 DNI 04C 0.15 1.46 10 P1 TEH TEC 14 71 DSI 02H 0.00 0.13 37 P1 TEH TEC 14 71 DSI 03H 0.05 0.19 115 P1 TEH TEC 14 71 DSI 04H 0.00 0.17 22 P1 TEH TEC 14 72 DSI 06H 0.07 0.20 7 P1 TEH TEC 14 73 DNI 06H 0.32 2.18 15 P1 TEH TEC 14 73 DNI 07H 0.05 1.97 51 P1 TEH TEC 14 73 DNI 06C -0.10 2.14 34 P1 TEH TEC 14 77 DSI 02H 0.00 0.15 154 P1 TEH TEC 14 80 DSI 03H -0.05 0.21 100 P1 TEH TEC 14 86 DSI 04H 0.00 0.38 22 P1 TEH TEC 15 15 MCI TSH -0.07 0.21 220 1.68 0.14 104 P2 TSH TSH 15 26 MCI TSH -0.07 0.21 172 1.32 0.20 122 P2 TSH TSH 15 26 DNI 07C 0.00 1.25 26 P1 TEH TEC 15 27 DSI 05H -0.05 0.14 76 P1 TEH TEC 15 31 DSI 04H 0.02 0.28 36 P1 STH TEC 15 31 SAI 04H -0.02 0.24 60 2 04H 05H 15 35 DNI 06H 0.05 1.63 50 P1 TEH TEC 15 38 DNI 07H 0.18 1.24 39 P1 TEH TEC 15 40 DNI 06H 0.05 1.28 42 P1 TEH TEC 15 40 DNI 07H 0.05 1.34 40 P1 TEH TEC 15 40 DNI 08H 0.02 1.51 33 P1 TEH TEC 15 41 SCI TSH -0.11 0.22 125 0.95 0.11 122 P2 TSH TSH 15 47 DNI 05H -0.12 1.06 14 P1 TEH TEC Page 10 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 15 50 DNI 07H 0.00 1.25 53 P1 TEH TEC 15 50 DNI 08H 0.05 1.17 51 P1 TEH TEC 15 54 DNI 04H 0.00 1.48 42 P1 TEH TEC 15 63 DSI 02H 0.02 0.10 90 P1 TEH TEC 15 63 DNI 06H 0.07 1.72 35 P1 TEH TEC 15 65 DNI 03H 0.00 1.65 48 P1 TEH TEC 15 67 DSI 02H -0.02 0.25 26 P1 TEH TEC 15 70 DNI 03H 0.00 1.46 51 P1 TEH TEC 15 71 DSI 02H 0.02 0.08 89 P1 TEH TEC 15 72 DSI 02H 0.00 0.18 96 P1 TEH TEC 15 73 DSI 03H -0.02 0.50 110 P1 TEH TEC 15 73 DSI 05H 0.02 0.17 98 P1 TEH TEC 15 74 DSI 03H -0.15 1.41 46 P1 08H TEH 15 74 DNI 05H -0.03 1.63 51 P1 08H TEH 15 74 DNI 06H 0.03 1.37 49 P1 08H TEH 15 74 DNI 07H 0.01 1.79 47 P1 08H TEH 15 74 DNI 08H 0.00 1.87 42 P1 08H TEH 15 74 DNI 08H 0.00 1.76 47 P1 08H TEC 15 75 DSI 02H 0.00 0.70 146 P1 TEH TEC 15 75 DSI 08H 0.05 0.37 169 P1 TEH TEC 15 75 DNI 07C -0.05 1.75 37 P1 TEH TEC 15 75 DNI 02C 0.07 1.45 12 P1 TEH TEC 15 75 SAI 08H -0.03 0.11 136 6 08H 08H 15 76 DNI 08H 0.00 1.31 52 P1 TEH TEC 15 78 DNI 05C -0.02 1.55 31 P1 TEH TEC 15 80 DNI 02H -0.02 2.07 51 P1 TEH TEC 15 80 DNI 04H 0.02 2.17 50 P1 TEH TEC 15 80 DNI 05H 0.05 1.89 53 P1 TEH TEC 15 80 DNI 07H 0.05 1.75 50 P1 TEH TEC 15 80 DNI 08H 0.02 1.88 42 P1 TEH TEC 15 80 DNI 07C 0.02 1.49 40 P1 TEH TEC 15 82 DNI 03H 0.05 1.52 54 P1 TEH TEC 15 86 NQI 05H 20.06 0.16 102 3 TEH TEC 15 91 DNI 05C 0.02 1.59 11 P1 TEH TEC 16 6 SCI TSH -0.09 0.21 78 0.60 0.19 117 P2 TSH TSH 16 11 SAI 05H 0.00 0.09 75 P4 05H 06H 16 11 DSI 05H 0.00 0.22 133 P1 TEH TEC 16 18 DNI 04H 0.25 1.43 16 P1 TEH TEC 16 38 SCI TSH -0.07 0.22 202 1.54 0.22 93 P2 TSH TSH 16 38 DNI 07C -0.10 1.71 12 P1 TEH TEC 16 39 DNI 04H -0.05 1.76 9 P1 TEH TEC 16 40 DNI 03H 0.00 1.54 55 P1 TEH TEC 16 40 DNI 05H 0.05 1.47 53 P1 TEH TEC 16 40 DNI 06H 0.05 1.43 55 P1 TEH TEC 16 40 DNI 07H 0.05 1.28 55 P1 TEH TEC 16 40 DNI 08C 0.00 1.33 51 P1 TEH TEC 16 44 SCI TSH -0.08 0.24 89 0.68 0.20 72 P2 TSH TSH 16 44 DNI 05H 0.07 1.36 55 P1 TEH TEC 16 50 DSI 05C -0.02 0.25 164 P1 TEH TEC 16 52 DSI 02H 0.02 0.56 155 P1 TEH TEC 16 52 DNI 07H 0.02 1.50 41 P1 TEH TEC 16 52 DNI 04C 0.00 1.28 23 P1 TEH TEC Page 11 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 16 52 DNI 02C 0.17 1.60 15 P1 TEH TEC 16 53 DSI 03H 0.00 0.34 105 P1 TEH TEC 16 53 DSI 03H 0.00 0.27 20 P1 TEH TEC 16 54 DNI 08H -0.02 1.28 51 P1 TEH TEC 16 54 DNI 07C -0.02 1.99 34 P1 TEH TEC 16 56 DNI 07H 0.05 1.60 46 P1 TEH TEC 16 57 DNI 08H 0.00 2.18 43 P1 TEH TEC 16 57 DNI 08C -0.02 1.58 51 P1 TEH TEC 16 57 DNI 07C 0.00 1.37 53 P1 TEH TEC 16 59 DNI 03H 0.00 2.22 53 P1 TEH TEC 16 59 DNI 07H 0.02 1.82 41 P1 TEH TEC 16 59 DNI 08C -0.34 1.65 15 P1 TEH TEC 16 59 DNI 07C -0.20 1.44 23 P1 TEH TEC 16 59 DNI 06C -0.07 1.69 28 P1 TEH TEC 16 60 DSI 02H -0.02 0.28 150 P1 TEH TEC 16 62 DSI 08H -0.05 0.05 101 P1 TEH TEC 16 62 DSI 08H -0.02 0.07 85 P1 TEH TEC 16 66 DSI 03H -0.02 0.21 40 P1 TEH TEC 16 66 DNI 07C -0.10 1.27 37 P1 TEH TEC 16 70 DSI 03H 0.20 0.44 101 P1 TEH TEC 16 72 DSI 02H 0.05 0.09 125 P1 TEH TEC 16 72 DNI 05H 0.07 1.74 50 P1 TEH TEC 16 76 DSI 02H -0.02 0.18 49 P1 TEH TEC 16 77 DSI 05H 0.02 0.11 133 P1 TEH TEC 16 84 DNI 07H 0.02 1.61 50 P1 TEH TEC 16 86 DNI 02C 0.15 1.63 14 P1 STH TEC 17 10 DSI 03H -0.02 0.35 166 P1 TEH TEC 17 12 DNI 04H 0.17 1.84 16 P1 TEH TEC 17 23 DNI 07C -0.15 1.09 17 P1 STH TEC 17 27 DSI 04H 0.10 0.18 88 P1 TEH TEC 17 31 DNI 04H -0.10 1.28 13 P1 TEH TEC 17 32 DSI 05H 0.05 0.28 24 P1 TEH TEC 17 35 DNI 06H 0.00 1.43 42 P1 TEH TEC 17 39 DNI 05H 0.17 1.75 11 P1 TEH TEC 17 46 SAI SBH 0.75 0.10 38 0.29 0.69 78 9 SBH STH 17 46 SAI SBH 1.26 0.18 48 0.36 0.75 65 9 SBH STH 17 46 DSI 02H 0.02 1.28 14 P1 STH TEC 17 46 DNI 04H 0.05 1.23 20 P1 STH TEC 17 49 DNI 06C 0.05 1.50 35 P1 TEH TEC 17 49 DNI 05C -0.02 1.67 38 P1 TEH TEC 17 49 DNI 04C -0.15 1.47 19 P1 TEH TEC 17 51 DNI 07H 0.02 1.48 43 P1 TEH TEC 17 51 DNI 08H 0.00 1.97 51 P1 TEH TEC 17 53 DNI 08C -0.02 1.72 44 P1 TEH TEC 17 54 DSI 03H 0.02 0.19 74 P1 TEH TEC 17 54 DNI 08H 0.05 1.73 46 P1 TEH TEC 17 54 DNI 08C -0.32 1.72 15 P1 TEH TEC 17 54 DNI 07C -0.05 2.04 31 P1 TEH TEC 17 54 DNI 06C -0.10 1.65 23 P1 TEH TEC 17 54 DNI 03C -0.42 1.75 11 P1 TEH TEC 17 58 DNI 07H 0.00 1.29 53 P1 TEH TEC 17 59 DSI 02H 0.05 0.51 138 P1 TEH TEC Page 12 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 17 59 DSI 05H 0.10 0.21 131 P1 TEH TEC 17 66 DNI 03H 0.12 1.61 55 P1 TEH TEC 17 72 DNI 02H -0.02 1.00 31 P1 TEH TEC 17 76 DNI 03H 0.00 1.85 45 P1 TEH TEC 17 76 DNI 07H 0.00 1.83 49 P1 TEH TEC 17 76 DNI 05C 0.10 1.59 24 P1 TEH TEC 17 81 DSI 03H 0.00 0.10 143 P1 TEH TEC 17 81 DSI 04H -0.07 0.23 30 P1 TEH TEC 17 83 DNI AV2 5.59 0.16 125 5 TEH TEC 17 84 DSI 03H 0.02 0.15 68 P1 TEH TEC 18 7 DSI 04H 0.02 0.24 153 P1 TEH TEC 18 7 DNI 07H 0.02 1.29 47 P1 TEH TEC 18 7 DNI 08H 0.05 1.40 46 P1 TEH TEC 18 10 DSI 03H 0.10 0.66 170 P1 TEH TEC 18 10 DSI 04H 0.00 0.20 146 P1 TEH TEC 18 14 DSI 04H 0.05 0.31 24 P1 TEH TEC 18 15 DNI 08H -0.15 1.74 19 P1 TEH TEC 18 17 DNI 04H -0.15 1.47 22 P1 TEH TEC 18 27 DSI 07H -0.02 0.19 81 P1 STH TEC 18 30 DSI 04H 0.00 0.10 32 P1 TEH TEC 18 32 DNI 07H 0.00 1.44 48 P1 TEH TEC 18 43 DNI 05H 0.02 1.51 55 P1 TEH TEC 18 43 DNI 06H 0.02 1.43 55 P1 TEH TEC 18 43 DNI 07H 0.02 1.59 55 P1 TEH TEC 18 45 DNI 07H 0.05 1.26 55 P1 TEH TEC 18 47 DSI 02H 0.05 0.16 86 P1 TEH TEC 18 47 DSI 05H 0.00 0.40 69 P1 TEH TEC 18 48 DSI 02H 0.05 0.18 138 P1 TEH TEC 18 48 DNI 07H 0.07 1.76 42 P1 TEH TEC 18 48 DNI 08H 0.00 1.90 40 P1 TEH TEC 18 52 DNI 06C -0.02 2.12 30 P1 TEH TEC 18 52 DNI 05C -0.05 2.12 24 P1 TEH TEC 18 52 DNI 04C 0.00 1.23 21 P1 TEH TEC 18 55 DNI 05H 0.00 2.46 48 P1 TEH TEC 18 55 DNI 08C -0.02 1.46 46 P1 TEH TEC 18 55 DNI 07C 0.05 1.48 43 P1 TEH TEC 18 55 DNI 06C 0.02 1.45 45 P1 TEH TEC 18 56 DNI 07H 0.05 1.59 49 P1 TEH TEC 18 56 DNI 08H 0.00 1.29 54 P1 TEH TEC 18 57 DSI 02H 0.07 0.61 73 P1 TEH TEC 18 57 DNI 04H 0.07 1.81 52 P1 TEH TEC 18 57 DNI 07H 0.00 1.96 55 P1 TEH TEC 18 57 DNI 08H -0.02 1.67 53 P1 TEH TEC 18 57 DNI 05C 0.00 1.60 39 P1 TEH TEC 18 58 DSI 02H 0.10 0.54 98 P1 TEH TEC 18 88 DSI 05H 0.00 0.11 104 P1 TEH TEC 19 7 SAI 03H 0.00 0.14 76 6 02H 03H 19 7 DSI 02H -0.07 0.35 102 P1 TEH TEC 19 7 DSI 03H -0.02 0.31 84 P1 TEH TEC 19 8 DSI 03H -0.12 0.23 122 P1 TEH TEC 19 13 DNI 04H 0.10 1.55 16 P1 TEH TEC 19 15 DSI 03H -0.03 0.20 151 P1 TEH TEC Page 13 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 19 15 DSI 04H -0.05 0.20 132 P1 TEH TEC 19 28 SCI TSH -0.13 0.21 225 1.72 0.18 71 P2 TSH TSH 19 32 MCI TSH -0.09 0.21 149 1.14 0.13 110 P2 TSH TSH 19 48 DNI 07H 0.00 1.26 47 P1 TEH TEC 19 49 DNI 08C -0.20 1.31 19 P1 TEH TEC 19 54 DNI 03H 0.12 1.30 20 P1 TEH TEC 19 54 DNI 04H 0.25 1.34 14 P1 TEH TEC 19 56 DSI 03H -0.10 0.73 46 P1 TEH TEC 19 56 DNI 06H 0.05 1.51 48 P1 TEH TEC 19 56 DNI 07H 0.02 1.43 49 P1 TEH TEC 19 56 DNI 08H 0.02 1.26 46 P1 TEH TEC 19 57 DSI 02H 0.02 0.57 167 P1 TEH TEC 19 57 DSI 04H 0.00 0.22 134 P1 TEH TEC 19 59 DNI 02H 0.00 2.42 53 P1 TEH TEC 19 59 DNI 03H 0.00 2.45 38 P1 TEH TEC 19 59 DNI 04H 0.00 2.94 36 P1 TEH TEC 19 59 DNI 05H -0.15 1.84 15 P1 TEH TEC 19 59 DNI 08H 0.00 0.99 42 P1 TEH TEC 19 59 DNI 06C -0.22 1.42 23 P1 TEH TEC 19 59 DNI 05C 0.12 1.87 14 P1 TEH TEC 19 60 DSI 02H 0.02 0.20 41 P1 TEH TEC 19 60 DNI 07H 0.07 1.48 38 P1 TEH TEC 20 7 DSI 08C -0.05 0.16 63 P1 TEH TEC 20 9 DSI 03H 0.00 0.20 129 P1 TEH TEC 20 10 DSI 04H -0.02 0.18 95 P1 TEH TEC 20 11 SCI TSH -0.09 0.21 158 1.21 0.31 104 P2 TSH TSH 20 12 DSI 02H 0.00 0.11 14 P1 TEH TEC 20 15 DNI 07H 0.07 1.30 39 P1 TEH TEC 20 22 DSI 02H -0.15 0.91 138 P1 TEH TEC 20 22 DSI 03H 0.05 0.34 60 P1 TEH TEC 20 22 DSI 08H 0.00 0.25 43 P1 TEH TEC 20 24 DNI 06H 0.17 1.33 20 P1 TEH TEC 20 30 DNI 05H 0.00 1.37 52 P1 TEH TEC 20 40 DNI 07H 0.05 0.97 50 P1 TEH TEC 20 43 DNI 06H 0.05 1.43 55 P1 TEH TEC 20 44 DSI 02H 0.00 0.11 47 P1 TEH TEC 20 46 DNI 02C -0.07 1.11 27 P1 TEH TEC 20 57 DSI 02H 0.04 0.14 131 P1 STH TEC 20 57 DNI 07C -0.02 1.29 43 P1 STH TEC 20 57 DNI 06C 0.00 1.94 20 P1 STH TEC 20 58 DNI 08C -0.07 1.68 20 P1 TEH TEC 20 61 DNI 08H 0.20 1.58 49 P1 TEH TEC 20 62 DSI 05H -0.07 0.36 144 P1 TEH TEC 20 64 PCT AV1 0.17 15 1.02 0 P2 TEH TEC 20 64 PCT AV2 0.00 18 1.28 0 P2 TEH TEC 20 64 PCT AV3 0.00 17 1.17 0 P2 TEH TEC 20 68 DNI 06C 0.07 1.29 11 P1 TEH TEC 20 72 DSI 07C -0.07 0.21 34 P1 TEH TEC 20 72 DNI 07C 0.07 1.54 17 P1 TEH TEC 20 75 DSI 05H 0.00 0.33 166 P1 TEH TEC 20 78 DSI 04H 0.05 0.14 129 P1 TEH TEC 20 78 DNI 08H 0.02 1.37 47 P1 TEH TEC Page 14 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 20 81 DNI 05C -0.12 1.95 18 P1 TEH TEC 20 85 DSI 03H 0.00 0.15 155 P1 TEH TEC 21 13 DNI 05H 0.05 1.26 39 P1 TEH TEC 21 18 DSI 04H 0.00 0.41 169 P1 TEH TEC 21 21 DNI 05H 0.07 1.49 23 P1 TEH TEC 21 21 DNI 07H -0.10 1.57 15 P1 TEH TEC 21 25 DSI 03H 0.05 0.17 66 P1 TEH TEC 21 26 DSI 05H 0.00 0.41 111 P1 TEH TEC 21 34 DSI 02H 0.02 0.46 154 P1 TEH TEC 21 40 DNI 07H 0.03 1.45 41 P1 TEH TEC 21 42 DNI 07H 0.00 1.27 53 P1 TEH TEC 21 43 DSI 02H 0.02 0.28 150 P1 TEH TEC 21 43 DNI 05H 0.05 1.29 48 P1 TEH TEC 21 45 DNI 07H 0.18 1.33 42 P1 TEH TEC 21 46 DSI 02H -0.02 0.22 78 P1 TEH TEC 21 48 DNI 02H 0.12 1.23 44 P1 TEH TEC 21 48 DNI 03H -0.15 1.24 25 P1 TEH TEC 21 48 DSI 04H -0.02 0.54 20 P1 TEH TEC 21 48 DNI 05H 0.00 1.95 27 P1 TEH TEC 21 48 DNI 06H 0.00 1.49 38 P1 TEH TEC 21 48 DNI 08H 0.15 1.26 21 P1 TEH TEC 21 48 DNI 08C -0.05 1.41 23 P1 TEH TEC 21 51 DNI 03H -0.07 1.30 24 P1 TEH TEC 21 51 DNI 06H 0.20 1.29 16 P1 TEH TEC 21 51 DNI 05C -0.15 1.64 14 P1 TEH TEC 21 55 DSI 02H -0.05 0.03 96 P1 TEH TEC 21 60 DNI 05H 0.00 1.37 55 P1 TEH TEC 21 60 DNI 08H -0.05 1.43 54 P1 TEH TEC 21 61 DSI 08H 0.05 0.16 128 P1 TEH TEC 21 72 DSI 03H 0.02 0.20 61 P1 TEH TEC 21 73 DSI 03H -0.06 0.26 65 P1 08H TEH 21 73 DNI 05H 0.10 1.53 22 P1 08H TEH 21 73 DNI 07H -0.06 1.59 10 P1 08H TEH 21 73 DNI 02C 0.00 1.30 27 P1 08H TEC 21 75 DNI 08C -0.15 1.36 38 P1 TEH TEC 21 77 DNI 03H -0.07 1.25 19 P1 TEH TEC 21 78 DSI 08H 0.02 0.19 159 P1 TEH TEC 21 87 DSI 08C 0.02 0.13 70 P1 TEH TEC 22 7 DSI 02H 0.07 0.24 127 P1 TEH TEC 22 10 DNI 08C -0.25 1.26 15 P1 TEH TEC 22 18 SCI TSH -0.21 0.18 98 0.75 0.13 81 P2 TSH TSH 22 18 DNI 08C -0.05 1.57 26 P1 TEH TEC 22 21 DSI 02H -0.05 0.04 117 P1 TEH TEC 22 21 DSI 03H 0.00 0.35 153 P1 TEH TEC 22 23 DSI 02H -0.12 0.28 161 P1 TEH TEC 22 23 DNI 08H 0.02 1.57 10 P1 TEH TEC 22 24 DSI 02H 0.10 0.27 130 P1 TEH TEC 22 25 DSI 02H 0.05 0.16 89 P1 TEH TEC 22 51 DNI 08C 0.02 2.42 30 P1 TEH TEC 22 53 DNI 03H -0.07 1.46 20 P1 TEH TEC 22 53 DNI 04H -0.02 1.80 20 P1 TEH TEC 22 59 DNI 05H 0.02 1.23 47 P1 TEH TEC Page 15 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 22 59 DNI 05C -0.05 1.29 16 P1 TEH TEC 22 65 DNI 05C -0.05 1.89 21 P1 TEH TEC 22 66 DNI 03H 0.10 1.39 33 P1 TEH TEC 22 66 DNI 06H 0.02 1.40 32 P1 TEH TEC 22 74 DNI 04H -0.07 1.94 15 P1 TEH TEC 22 74 DNI 08H -0.02 2.11 17 P1 TEH TEC 22 76 DNI 05H 0.25 1.54 18 P1 TEH TEC 22 76 DNI 06H 0.12 1.22 31 P1 TEH TEC 23 11 DSI 02H -0.07 0.37 21 P1 TEH TEC 23 11 DSI 03H 0.00 0.13 104 P1 TEH TEC 23 11 DNI 06H 0.00 1.25 47 P1 TEH TEC 23 11 DNI 08H 0.01 1.03 42 P1 TEH TEC 23 18 DNI 05H 0.05 1.28 39 P1 STH TEC 23 19 DSI 02H 0.00 0.67 33 P1 TEH TEC 23 19 DNI 03H 0.00 1.64 39 P1 TEH TEC 23 19 DNI 04H -0.02 1.54 45 P1 TEH TEC 23 19 DNI 05H 0.02 1.25 41 P1 TEH TEC 23 20 DSI 02H -0.05 0.24 139 P1 TEH TEC 23 21 DSI 03H 0.05 0.16 115 P1 TEH TEC 23 21 DNI 07H 0.15 1.15 19 P1 TEH TEC 23 30 DNI 07H 0.18 1.34 21 P1 TEH TEC 23 33 DNI 07H 0.02 1.44 55 P1 TEH TEC 23 37 SCI TSH -0.11 0.18 54 0.41 0.12 69 P2 TSH TSH 23 46 DNI 03H -0.12 1.40 36 P1 TEH TEC 23 46 DNI 06H 0.00 2.06 45 P1 TEH TEC 23 46 DNI 07H -0.12 1.56 26 P1 TEH TEC 23 46 DNI 08C 0.15 0.90 50 P1 TEH TEC 23 49 DNI 06C 0.20 2.19 12 P1 TEH TEC 23 52 DSI 03H 0.02 0.33 29 P1 TEH TEC 23 53 DSI 02H 0.00 0.22 21 P1 TEH TEC 23 53 DSI 04H 0.00 0.20 28 P1 TEH TEC 23 53 SAI 02H -0.09 0.12 80 6 02H 02H 23 80 DNI 07H -0.12 1.44 19 P1 TEH TEC 23 87 DSI 04H 0.00 0.46 146 P1 TEH TEC 24 16 DSI 02H -0.02 0.25 169 P1 TEH TEC 24 16 DSI 03H 0.02 0.12 136 P1 TEH TEC 24 23 DSI 05H -0.07 0.68 16 P1 08H TEH 24 24 DSI 02H -0.04 0.08 104 P1 TEH TEC 24 24 DNI 05H -0.10 1.48 29 P1 TEH TEC 24 29 DNI 07H 0.00 1.43 45 P1 TEH TEC 24 29 DNI 08H 0.00 1.38 47 P1 TEH TEC 24 33 DSI 03H -0.02 0.20 76 P1 TEH TEC 24 37 DNI 07H 0.00 1.31 48 P1 TEH TEC 24 39 DSI 02H -0.02 0.66 128 P1 TEH TEC 24 40 DNI 06H 0.05 1.51 37 P1 TEH TEC 24 43 DNI 05H 0.00 1.26 51 P1 TEH TEC 24 43 DNI 06H 0.05 1.23 47 P1 TEH TEC 24 52 DSI 02H 0.05 0.37 97 P1 TEH TEC 24 59 DNI 04H -0.12 1.39 18 P1 TEH TEC 24 63 DSI 05H 0.05 0.35 162 P1 TEH TEC 24 63 DSI 05H 0.05 0.35 162 P1 TEH TEC 24 69 DNI 04C 0.20 1.32 8 P1 TEH TEC Page 16 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 24 80 DSI 03H -0.02 0.14 136 P1 TEH TEC 24 80 DNI 05H 0.05 1.42 55 P1 TEH TEC 25 21 DSI 02H 0.07 0.09 158 P1 TEH TEC 25 22 DSI 02H 0.02 0.45 18 P1 TEH TEC 25 30 DSI 04H 0.05 0.55 81 P1 TEH TEC 25 30 DSI 06H 0.02 0.19 87 P1 TEH TEC 25 36 SCI TSH -0.12 0.21 97 0.74 0.12 75 P2 TSH TSH 25 39 DNI 08C -0.12 1.29 20 P1 TEH TEC 25 40 MCI TSH -0.14 0.24 220 1.68 0.23 74 P2 TSH TSH 25 44 SCI TSH -0.09 0.21 100 0.76 0.18 64 P2 TSH TSH 25 50 DSI 08H 0.02 0.29 34 P1 TEH TEC 25 53 DNI 06H 0.00 1.54 23 P1 TEH TEC 26 15 DSI 03H 0.00 0.17 125 P1 TEH TEC 26 19 DSI 04H 0.02 0.11 72 P1 TEH TEC 26 28 DNI 08H 0.05 1.29 36 P1 STH TEC 26 36 DNI 03H 0.02 1.52 50 P1 TEH TEC 26 36 DNI 04H 0.00 1.54 46 P1 TEH TEC 26 36 DNI 05C -0.02 1.35 27 P1 TEH TEC 26 37 NQI 06H 17.12 0.31 93 3 STH TEC 26 39 DNI 04H 0.05 1.29 52 P1 TEH TEC 26 42 DSI 02H -0.02 0.33 124 P1 TEH TEC 26 43 MCI TSH -0.09 0.26 222 1.69 0.18 52 P2 TSH TSH 26 43 DNI 05H -0.17 1.40 43 P1 TEH TEC 26 45 DNI 05H 0.02 1.48 52 P1 TEH TEC 26 60 DNI 06H 0.00 1.29 48 P1 TEH TEC 26 64 SCI TSH 0.00 0.21 65 0.49 0.14 121 P2 TSH TSH 26 64 DSI 02H -0.05 0.24 92 P1 TEH TEC 26 80 DSI 05H 0.00 0.11 64 P1 TEH TEC 27 32 DSI 02H 0.02 0.16 73 P1 TEH TEC 27 33 DSI 03H -0.15 0.46 69 P1 TEH TEC 27 34 DSI 04H -0.05 0.20 116 P1 TEH TEC 27 34 DSI 05H 0.05 0.18 124 P1 TEH TEC 27 36 SCI TSH -0.05 0.24 174 1.33 0.14 106 P2 TSH TSH 27 40 SCI TSH -0.15 0.21 51 0.39 0.13 142 P2 TSH TSH 27 42 DSI 04H 0.02 0.28 124 P1 TEH TEC 27 42 DSI 05H 0.17 0.41 82 P1 TEH TEC 27 42 SAI 04H 0.01 0.08 112 P4 04H 04H 27 47 DSI 02H -0.02 0.34 114 P1 TEH TEC 27 48 SCI TSH -0.13 0.18 68 0.52 0.20 79 P2 TSH TSH 27 50 SCI TSH -0.01 0.26 151 1.15 0.20 74 P2 TSH TSH 27 55 DSI 03H 0.00 0.16 84 P1 TEH TEC 27 55 DSI 04H 0.00 0.13 119 P1 TEH TEC 27 58 DNI 07C -0.20 2.16 11 P1 TEH TEC 27 64 DSI 02H -0.02 0.17 91 P1 TEH TEC 27 64 DSI 02H 0.05 0.09 43 P1 TEH TEC 27 64 DNI 07H 0.05 1.20 43 P1 TEH TEC 27 71 PCT AV2 0.32 15 1.00 0 P2 TEH TEC 27 71 PCT AV3 0.14 19 1.36 0 P2 TEH TEC 27 71 PCT AV4 -0.37 15 0.98 0 P2 TEH TEC 27 75 DSI 05H 0.02 0.18 146 P1 TEH TEC 27 75 PCT AV3 0.00 11 0.69 0 P2 TEH TEC 28 13 DSI 03H 0.05 0.42 161 P1 TEH TEC Page 17 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 28 26 DSI 04H 0.00 0.83 83 P1 TEH TEC 28 27 PSI 05H -0.46 15.09 158 P5 STH TEC 28 27 DNI 07H 0.15 0.86 31 P1 STH TEC 28 30 DNI 08H 0.02 1.15 17 P1 TEH TEC 28 41 DSI 02H 0.00 0.21 74 P1 TEH TEC 28 41 DNI 05H 0.05 1.44 55 P1 TEH TEC 28 41 DNI 06H -0.02 1.28 55 P1 TEH TEC 28 41 DNI 07H 0.05 1.35 52 P1 TEH TEC 28 42 DSI 03H -0.12 0.40 43 P1 TEH TEC 28 45 DSI 02H 0.00 0.49 99 P1 TEH TEC 28 46 DSI 03H 0.07 0.11 18 P1 STH TEC 28 54 DSI 02H -0.02 0.30 119 P1 TEH TEC 28 56 DSI 03H 0.12 0.64 146 P1 TEH TEC 28 56 DNI 06H 0.07 1.63 55 P1 TEH TEC 28 62 MCI TSH -0.06 0.21 152 1.16 0.24 88 P2 TSH TSH 28 66 DSI 04H 0.02 0.23 141 P1 TEH TEC 28 66 SAI 04H -0.20 0.11 117 6 04H 04H 28 75 DNI 08H 0.02 1.25 45 P1 TEH TEC 29 13 DNI 08H -0.03 1.30 41 P1 TEH TEC 29 19 DNI 08H 0.05 1.45 26 P1 TEH TEC 29 24 DSI 02H 0.00 0.52 122 P1 TEH TEC 29 24 DSI 04H 0.29 0.34 53 P1 TEH TEC 29 28 SAI TSH -0.05 0.16 48 0.36 0.15 58 6 TSH TSH 29 29 DNI 03H 0.12 1.98 23 P1 TEH TEC 29 30 DSI 05H 0.00 0.40 21 P1 TEH TEC 29 48 DSI 04H 0.02 0.13 137 P1 TEH TEC 29 54 DSI 03H 0.05 0.29 75 P1 TEH TEC 29 54 SAI 03H -0.08 0.09 108 P4 03H 03H 29 54 SAI 03H 0.01 0.13 116 P4 03H 03H 29 54 SAI 03H 0.03 0.08 98 P4 03H 03H 29 56 DNI 06H 0.22 1.37 17 P1 STH TEC 29 62 DNI 02H 0.02 1.25 55 P1 TEH TEC 29 65 DSI 02H -0.05 0.35 121 P1 TEH TEC 29 72 PCT AV1 0.25 11 0.69 0 P2 TEH TEC 29 76 DNI 08H 0.12 1.46 12 P1 TEH TEC 29 81 DSI 05H -0.02 0.26 151 P1 TEH TEC 30 20 DNI 08H 0.17 1.25 26 P1 TEH TEC 30 21 DNI 06H 0.00 1.27 54 P1 TEH TEC 30 22 DSI 02H 0.02 0.15 49 P1 TEH TEC 30 25 DNI 05H -0.22 1.28 15 P1 STH TEC 30 28 DSI 03H 0.05 0.24 158 P1 TEH TEC 30 38 DSI 02H 0.02 0.15 149 P1 TEH TEC 30 38 DNI 06H -0.15 1.08 23 P1 TEH TEC 30 48 SCI TSH -0.06 0.24 128 0.98 0.18 67 P2 TSH TSH 30 48 DSI 04H 0.00 0.34 27 P1 TEH TEC 30 48 DSI 06H 0.02 0.11 144 P1 TEH TEC 30 49 DNI 08C 0.15 1.12 21 P1 TEH TEC 30 50 DSI 05C 0.02 0.15 133 P1 TEH TEC 30 51 DSI 08C 0.02 0.35 44 P1 TEH TEC 30 51 DNI 04C -0.27 1.41 11 P1 TEH TEC 30 52 DNI 07C -0.07 1.35 14 P1 STH TEC 30 54 DSI 04H -0.05 0.20 24 P1 TEH TEC Page 18 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 30 58 DSI 04H 0.12 0.26 111 P1 TEH TEC 30 63 DSI 08H 0.10 0.11 90 P1 STH TEC 30 68 DSI 02H -0.02 0.15 35 P1 TEH TEC 31 14 DSI 04H 0.08 0.35 161 P1 TEH TEC 31 18 DSI 02H 0.05 0.53 54 P1 TEH TEC 31 18 DSI 03H -0.02 0.36 65 P1 TEH TEC 31 18 DSI 07H -0.07 0.34 140 P1 TEH TEC 31 23 DNI 04H -0.02 1.41 41 P1 TEH TEC 31 23 DNI 06H 0.05 1.37 42 P1 TEH TEC 31 23 DNI 07H 0.02 1.16 45 P1 TEH TEC 31 24 DNI 02H 0.15 1.39 21 P1 TEH TEC 31 24 DNI 08H -0.15 1.37 25 P1 TEH TEC 31 30 MCI TSH -0.08 0.29 186 1.42 0.18 89 P2 TSH TSH 31 30 DNI 07H 0.15 1.66 17 P1 TEH TEC 31 35 DNI 04H 0.00 1.01 34 P1 TEH TEC 31 35 DNI 06H -0.07 1.33 24 P1 TEH TEC 31 35 DNI 07H 0.17 1.68 19 P1 TEH TEC 31 39 DNI 05H 0.05 1.30 51 P1 TEH TEC 31 68 PCT AV2 0.00 17 1.21 0 P2 TEH TEC 31 68 PCT AV3 0.00 22 1.80 0 P2 TEH TEC 31 68 DNI 05C -0.02 1.74 15 P1 TEH TEC 31 69 PCT AV3 -0.26 11 0.71 0 P2 STH TEC 31 74 DSI 02H 0.12 0.46 139 P1 TEH TEC 31 74 SAI 02H 0.11 0.35 88 6 01H 02H 32 22 DSI 02H 0.00 0.17 55 P1 TEH TEC 32 27 DSI 03H -0.07 0.78 68 P1 TEH TEC 32 27 DNI 04H -0.02 1.25 17 P1 TEH TEC 32 35 DSI 06H 0.02 0.10 84 P1 TEH TEC 32 36 DNI 04H 0.02 1.28 39 P1 TEH TEC 32 36 DNI 02C 0.02 1.64 14 P1 TEH TEC 32 38 SCI TSH -0.08 0.21 112 0.86 0.17 71 P2 TSH TSH 32 38 DSI 02H 0.07 0.17 27 P1 TEH TEC 32 38 DSI 03H -0.10 0.25 99 P1 TEH TEC 32 45 DSI 02H 0.02 0.38 37 P1 TEH TEC 32 48 VOL 01C 0.71 0.19 111 6 01C 01C 32 48 PCT 01C 0.65 20 0.10 31 0.23 0.12 108 P4 01C 01C 32 51 DSI 05H 0.02 0.17 91 P1 TEH TEC 32 53 DSI 03H -0.05 0.24 31 P1 TEH TEC 32 69 NQI 01C 3.76 0.23 129 3 STH TEC 32 75 NQI 04C 19.25 2.01 83 6 TEH TEC 33 18 DSI 02H -0.02 0.12 136 P1 TEH TEC 33 18 DSI 03H 0.00 0.26 46 P1 TEH TEC 33 22 DSI 02H 0.00 0.13 131 P1 TEH TEC 33 27 DSI 06H -0.02 0.26 103 P1 STH TEC 33 42 DSI 05H 0.02 0.25 119 P1 TEH TEC 33 45 DSI 07H 0.30 0.24 61 P1 STH TEC 33 54 DSI 06H -0.07 0.30 125 P1 STH TEC 33 57 DSI 04H 0.00 0.25 17 P1 TEH TEC 33 63 SCI TSH 0.02 0.16 52 0.40 0.13 48 P2 TSH TSH 33 64 SCI TSH -0.07 0.21 182 1.39 0.23 70 P2 TSH TSH 33 64 DNI 06H 0.02 1.32 55 P1 TEH TEC 33 66 DSI 02H 0.02 0.26 11 P1 TEH TEC Page 19 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 33 69 PCT AV2 -0.18 7 0.41 0 P2 TEH TEC 33 69 PCT AV3 0.02 16 1.11 0 P2 TEH TEC 33 70 DSI 05H -0.02 0.11 53 P1 TEH TEC 33 70 PCT AV1 0.10 15 1.06 0 P2 TEH TEC 33 74 PCT AV1 0.23 10 0.61 0 P2 TEH TEC 34 24 DSI 03H 0.00 0.11 94 P1 TEH TEC 34 25 SCI TSH -0.07 0.21 181 1.38 0.26 105 P2 TSH TSH 34 26 DNI 04H 0.07 1.28 28 P1 TEH TEC 34 32 SCI TSH -0.05 0.20 118 0.90 0.20 81 P2 TSH TSH 34 33 DNI 02H 0.07 1.22 10 P1 TEH TEC 34 33 DNI 03H -0.02 1.16 34 P1 TEH TEC 34 33 DNI 04H 0.05 1.40 44 P1 TEH TEC 34 38 DNI 03H -0.07 1.26 14 P1 TEH TEC 34 38 DNI 06H 0.02 1.40 20 P1 TEH TEC 34 40 DSI 03H 0.07 0.21 95 P1 TEH TEC 34 41 DNI 04H 0.02 1.35 49 P1 TEH TEC 34 48 PCT AV2 0.00 17 1.38 0 P2 TEH TEC 34 48 PCT AV3 0.00 30 3.21 0 P2 TEH TEC 34 48 PCT AV3 0.10 12 0.90 0 P2 TEH TEC 34 49 SCI TSH -0.09 0.21 134 1.02 0.28 84 P2 TSH TSH 34 52 DSI 02H 0.00 0.06 132 P1 STH TEC 34 52 PSI 03H -0.53 16.74 161 P5 STH TEC 34 53 DSI 02H 0.02 0.28 107 P1 STH TEC 34 56 DSI 05H -0.02 0.28 27 P1 TEH TEC 34 70 SCI TSH -0.08 0.21 202 1.54 0.39 79 P2 TSH TSH 34 70 PCT AV1 0.08 12 0.75 0 P2 TEH TEC 34 70 PCT AV2 0.39 15 1.00 0 P2 TEH TEC 34 70 PCT AV3 0.26 18 1.37 0 P2 TEH TEC 35 32 DNI 07H 0.20 1.20 24 P1 TEH TEC 35 33 SCI TSH -0.06 0.21 137 1.05 0.20 90 P2 TSH TSH 35 37 DNI 03H 0.17 1.37 13 P1 TEH TEC 35 38 DNI 03H 0.15 1.22 39 P1 TEH TEC 35 38 DNI 06H 0.02 1.30 54 P1 TEH TEC 35 42 DNI 08H 0.12 1.88 17 P1 TEH TEC 35 45 DSI 02H -0.25 0.77 131 P1 08H TEH 35 45 DNI 04H 0.10 1.51 35 P1 08H TEH 35 45 DNI 05H 0.00 1.55 44 P1 08H TEH 35 45 DNI 06H -0.01 1.64 38 P1 08H TEH 35 45 DNI 07H -0.01 1.96 30 P1 08H TEH 35 45 DNI 08H -0.03 1.36 20 P1 08H TEH 35 45 DNI 08H 0.02 1.33 31 P1 08H TEC 35 54 PSI 07H 0.44 7.83 68 8 TEH TEC 35 54 CSI 07H 0.00 75.42 83 10 07H 07H 35 64 PCT AV4 0.24 13 0.87 0 P2 TEH TEC 35 64 WAR AV4 0.37 0.43 140 2 08C AV4 35 65 SCI TSH -0.03 0.21 80 0.61 0.25 37 P2 TSH TSH 35 70 PCT AV3 -0.36 12 0.78 0 P2 TEH TEC 35 72 PCT AV1 0.33 17 1.20 0 P2 TEH TEC 35 72 PCT AV3 -0.46 16 1.08 0 P2 TEH TEC 36 23 DNI 06H 0.22 1.46 25 P1 TEH TEC 36 23 DSI 08C 0.00 0.16 93 P1 TEH TEC 36 28 DSI 03H -0.05 0.35 60 P1 TEH TEC Page 20 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 36 28 DSI 04H 0.12 0.18 118 P1 TEH TEC 36 28 DNI 07H 0.05 1.30 52 P1 TEH TEC 36 31 DNI 06H 0.22 1.43 23 P1 TEH TEC 36 37 DNI 02H 0.12 1.49 19 P1 TEH TEC 36 37 DNI 03H 0.05 1.31 44 P1 TEH TEC 36 43 SCI TSH -0.09 0.21 185 1.41 0.32 48 P2 TSH TSH 36 44 DSI 03H -0.05 0.33 52 P1 TEH TEC 36 46 DSI 06H 0.07 0.15 84 P1 TEH TEC 36 46 DNI 07H 0.00 1.40 54 P1 TEH TEC 36 53 PCT AV3 0.14 18 1.19 0 P2 TEH TEC 36 53 WAR AV3 0.05 0.31 132 2 08C AV3 36 56 DSI 07C 0.02 0.15 72 P1 TEH TEC 37 26 DNI 07H 0.12 1.27 22 P1 TEH TEC 37 30 DSI 08H 0.00 0.22 13 P1 TEH TEC 37 39 DSI 02H 0.00 0.13 108 P1 TEH TEC 37 39 DSI 03H -0.02 0.23 82 P1 TEH TEC 37 42 DSI 03H 0.00 0.36 77 P1 TEH TEC 37 43 DNI 03H 0.00 1.77 49 P1 TEH TEC 37 43 DNI 06H 0.15 1.53 30 P1 TEH TEC 37 43 PCT AV1 0.25 17 1.07 0 P2 TEH TEC 37 48 DSI 04H -0.02 0.19 74 P1 TEH TEC 37 53 DNI 06H 0.22 1.28 20 P1 TEH TEC 37 53 DNI 07H 0.00 1.15 49 P1 TEH TEC 37 54 DNI 04H 0.05 1.31 55 P1 TEH TEC 37 54 DSI 05H 0.00 0.20 107 P1 TEH TEC 37 54 DNI 06H -0.02 1.31 55 P1 TEH TEC 37 56 DSI 02H -0.02 0.21 46 P1 TEH TEC 37 56 DSI 03H 0.00 0.42 64 P1 TEH TEC 37 60 DNI 07C -0.17 1.56 18 P1 TEH TEC 38 26 DNI 05H 0.20 1.57 18 P1 TEH TEC 38 37 DNI 03H 0.05 1.71 29 P1 TEH TEC 38 37 DNI 04H 0.02 1.87 40 P1 TEH TEC 38 37 DNI 07H 0.02 1.29 43 P1 TEH TEC 38 40 DSI 05H 0.07 0.32 125 P1 TEH TEC 38 44 DSI 02H 0.00 0.20 50 P1 TEH TEC 38 48 DNI 02H 0.15 1.06 19 P1 TEH TEC 38 48 DNI 03H 0.05 1.68 18 P1 TEH TEC 38 48 DNI 05H 0.20 1.53 14 P1 TEH TEC 38 48 DNI 07H 0.32 1.38 13 P1 TEH TEC 38 52 DNI 03H 0.25 1.83 18 P1 TEH TEC 38 52 DNI 06H -0.22 1.31 20 P1 TEH TEC 38 52 DNI 07H -0.10 1.79 24 P1 TEH TEC 38 52 DNI 08H 0.00 1.22 42 P1 TEH TEC 38 64 PCT AV2 0.19 18 1.36 0 P2 TEH TEC 38 64 PCT AV3 -0.15 19 1.40 0 P2 TEH TEC 38 72 PCT AV1 0.10 13 0.87 0 P2 TEH TEC 38 72 PCT AV2 -0.17 14 0.92 0 P2 TEH TEC 39 23 DSI 02H -0.03 1.03 17 P1 08H TEH 39 31 DNI 04H 0.20 1.36 24 P1 TEH TEC 39 38 PCT AV3 0.21 13 0.84 0 P2 TEH TEC 39 39 DNI 07H 0.00 1.39 55 P1 TEH TEC 39 42 DSI 02H 0.00 0.35 45 P1 TEH TEC Page 21 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 39 46 DSI 02H -0.02 0.39 163 P1 TEH TEC 39 47 DSI 02H 0.05 0.26 147 P1 TEH TEC 39 50 DSI 04H 0.02 0.18 141 P1 TEH TEC 39 54 DNI 02H -0.12 1.25 21 P1 TEH TEC 39 60 SCI TSH -0.02 0.21 45 0.34 0.26 41 P2 TSH TSH 39 66 DNI 08H -0.02 1.40 42 P1 TEH TEC 39 68 PCT AV1 -0.16 8 0.46 0 P2 TEH TEC 40 29 DSI 02H -0.07 0.22 92 P1 TEH TEC 40 33 DNI 08H 0.02 1.22 36 P1 TEH TEC 40 37 DSI 03H 0.00 0.98 70 P1 08H TEH 40 39 DNI 07H 0.22 1.52 11 P1 TEH TEC 40 44 DNI 05H 0.00 1.45 42 P1 TEH TEC 40 44 DSI 06C 0.00 0.12 109 P1 TEH TEC 40 54 DNI 04H 0.03 1.62 49 P1 TEH TEC 40 54 DNI 08C 0.00 1.34 21 P1 TEH TEC 40 55 SCI TSH -0.08 0.19 197 1.50 0.17 130 P2 TSH TSH 40 56 DNI 06H 0.05 1.17 44 P1 TEH TEC 40 58 SCI TSH -0.06 0.19 98 0.75 0.15 74 P2 TSH TSH 40 65 PCT AV3 0.19 20 1.49 0 P2 TEH TEC 40 66 PCT AV1 0.00 17 1.24 0 P2 TEH TEC 40 69 PCT AV2 0.22 17 1.22 0 P2 TEH TEC 40 69 PCT AV3 0.14 22 1.66 0 P2 TEH TEC 40 69 PCT AV4 0.19 28 2.50 0 P2 TEH TEC 40 71 PCT 02C -0.17 25 0.77 0 P1 TEH TEC 40 71 VOL 02C -0.11 0.29 68 0.52 0.18 112 6 02C 02C 41 27 DSI 03H -0.05 0.18 151 P1 TEH TEC 41 32 DNI 05H 0.12 1.35 25 P1 TEH TEC 41 33 DNI 05H 0.20 1.68 20 P1 TEH TEC 41 33 DNI 06H 0.22 1.25 24 P1 TEH TEC 41 52 DNI 04H 0.00 1.46 52 P1 TEH TEC 41 53 PCT AV1 0.05 19 1.22 0 P2 TEH TEC 41 53 WAR AV1 0.05 0.27 109 2 08H AV1 41 57 DNI 05H 0.07 1.17 55 P1 TEH TEC 41 68 PCT AV2 0.15 11 0.66 0 P2 TEH TEC 42 37 PCT AV3 -0.12 17 1.25 0 P2 TEH TEC 42 64 DSI 04H 0.10 0.32 69 P1 TEH TEC 43 42 PCT AV1 0.07 20 1.52 0 P2 TEH TEC 43 45 DNI 04H -0.02 1.47 7 P1 TEH TEC 43 50 DNI 03H -0.05 1.77 21 P1 TEH TEC 43 50 DNI 08H 0.05 1.30 45 P1 TEH TEC 43 54 DNI 04H -0.10 1.28 27 P1 TEH TEC 43 56 PCT AV3 0.17 15 1.13 0 P2 TEH TEC 43 57 PCT AV1 0.13 14 0.77 0 P2 TEH TEC 44 35 DSI 03H -0.12 0.13 77 P1 TEH TEC 44 40 DSI 05C 0.07 0.14 129 P1 TEH TEC 44 42 PCT AV1 0.02 20 1.46 0 P2 TEH TEC 44 42 PCT AV2 0.07 17 1.13 0 P2 TEH TEC 44 48 PCT AV1 0.15 10 0.66 0 P2 TEH TEC 44 48 PCT AV2 -0.55 12 0.86 0 P2 TEH TEC 44 50 DNI 03H -0.07 1.23 25 P1 TEH TEC 44 55 PCT AV3 0.12 23 1.71 0 P2 TEH TEC 44 55 PCT AV4 -0.17 26 2.01 0 P2 TEH TEC Page 22 of 23

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 44 55 WAR AV3 -0.11 0.35 117 2 08C AV3 44 55 WAR AV4 0.12 0.57 132 2 08C AV3 44 58 DSI 06H 0.00 0.13 79 P1 TEH TEC 45 37 PCT AV1 0.00 18 1.30 0 P2 TEH TEC 45 37 WAR AV1 0.22 0.19 65 0.49 0.18 150 2 08H AV1 45 37 WAR AV1 0.23 0.19 114 0.87 0.24 30 2 08H AV1 45 40 PCT AV1 0.28 35 4.20 0 P2 TEH TEC 45 48 DSI 08C 0.07 0.19 72 P1 TEH TEC 46 52 DSI 06H 0.02 0.29 65 P1 TEH TEC Page 23 of 23

Unit #2 - 2R21 Steam Generator 180 Day Report Attachment B BEAVER VALLEY UNIT #2 2R21 SG EXAMINATION RESULTS 2RCS-SG21B TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 1 43 DSI 02H 0.00 0.46 115 P1 08H TEH 1 52 DSI 02H -0.12 0.33 120 P1 08H TEH 1 56 DSI 02H 0.01 0.12 29 P1 08H TEH 1 57 DSI 04H -0.03 0.28 48 P1 08H TEH 1 81 DSI 02H -0.04 0.15 114 P1 08H TEH 2 9 DNI 07H 0.00 1.46 51 P1 08H TEH 2 12 DNI 08C 0.05 2.02 32 P1 08C TEC 2 15 DSI 02H 0.00 1.02 98 P1 08H TEH 2 15 DSI 03H 0.00 0.74 106 P1 08H TEH 2 15 SAI 03H 0.02 0.09 116 P4 03H 03H 2 27 DNI 08C 0.00 1.92 37 P1 08C TEC 2 28 DSI 02H 0.00 0.21 58 P1 08H TEH 2 33 DSI 03H 0.00 0.14 51 P1 08H TEH 2 54 DSI 04H 0.01 0.11 58 P1 08H TEH 2 63 DSI 04H 0.00 0.11 58 P1 08H TEH 2 65 DSI 03H 0.00 0.12 106 P1 08H TEH 2 67 DSI 06H 0.01 0.16 100 P1 08H TEH 2 69 DSI 05H 0.01 0.09 53 P1 08H TEH 2 69 PSI 06H 0.38 15.21 161 P5 08H TEH 2 70 DSI 05H 0.16 0.71 50 P1 08H TEH 2 73 DSI 03H -0.04 0.45 131 P1 08H TEH 2 73 DSI 04H -0.01 0.16 50 P1 08H TEH 2 73 DSI 05H -0.01 0.18 85 P1 08H TEH 2 75 DSI 02H 0.00 0.13 40 P1 08H TEH 2 93 DNI 08C 0.07 1.61 55 P1 08C TEC 2 94 DSI 04H -0.04 0.33 54 P1 08H TEH 3 31 DSI 02H 0.00 0.55 139 P1 08H TEH 3 32 DSI 03H 0.00 0.25 134 P1 08H TEH 3 37 PSI 06H 0.40 16.21 163 P5 08H TEH 3 42 DNI 07C 0.00 1.97 10 P1 08C TEC 3 43 DNI 06H 0.16 1.26 20 P1 08H TEH 3 49 DSI 04C 0.00 0.57 147 P1 08C TEC 3 54 DSI 02H -0.04 0.35 106 P1 08H TEH 3 55 DSI 02H -0.22 0.65 114 P1 08H TEH 3 55 DSI 04H 0.00 0.11 63 P1 08H TEH 3 58 DSI 03H -0.03 0.28 107 P1 08H TEH 3 60 DSI 02H -0.01 0.50 94 P1 08H TEH 3 60 DSI 03H -0.23 0.51 97 P1 08H TEH 3 61 DNI 02H -0.01 1.24 38 P1 08H TEH 3 61 DSI 06H -0.01 0.33 131 P1 08H TEH 3 61 DNI 08H 0.01 1.36 26 P1 08H TEH 3 62 DSI 03H -0.06 0.41 84 P1 08H TEH 3 62 DSI 04H 0.00 0.18 90 P1 08H TEH 3 63 DSI 02H -0.07 0.48 87 P1 08H TEH 3 63 DSI 03H -0.03 0.47 67 P1 08H TEH 3 65 DSI 03H -0.10 0.85 83 P1 08H TEH 3 72 DSI 03H 0.00 0.25 54 P1 08H TEH 3 88 DSI 04H 0.03 0.39 54 P1 08H TEH 3 89 DSI 04H 0.00 0.29 46 P1 08H TEH Page 1 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 4 3 PSI 06H 0.40 15.31 163 P5 08H TEH 4 23 DSI 02H 0.04 0.28 155 P1 08H TEH 4 23 DSI 06H -0.06 0.35 159 P1 08H TEH 4 29 DSI 02H 0.06 0.37 61 P1 08H TEH 4 32 DSI 03H 0.03 0.22 145 P1 08H TEH 4 36 DSI 04H -0.15 0.72 125 P1 08H TEH 4 36 SAI 04H 0.03 0.13 113 2 03H 04H 4 41 DSI 02H 0.01 0.33 87 P1 08H TEH 4 41 DSI 04H -0.03 0.18 77 P1 08H TEH 4 41 DNI 06C 0.00 1.28 35 P1 08C TEC 4 43 DSI 02H 0.03 0.17 23 P1 08H TEH 4 44 DSI 02H -0.10 0.19 46 P1 08H TEH 4 48 DSI 03H -0.07 0.66 153 P1 08H TEH 4 51 DSI 05C 0.05 0.42 91 P1 08C TEC 4 52 DSI 03H 0.04 0.53 53 P1 08H TEH 4 54 DSI 02H -0.10 0.84 95 P1 08H TEH 4 56 DSI 04H -0.01 0.25 165 P1 08H TEH 4 57 DSI 02H 0.07 0.28 118 P1 08H TEH 4 57 DSI 04H -0.01 0.22 145 P1 08H TEH 4 58 DSI 02H -0.01 0.44 126 P1 08H TEH 4 58 DSI 02C 0.00 0.52 152 P1 08C TEC 4 59 DSI 02H -0.11 0.69 47 P1 08H TEH 4 59 DSI 03H 0.12 1.09 67 P1 08H TEH 4 62 DSI 03H 0.00 0.22 65 P1 08H TEH 4 62 DSI 07H -0.01 0.40 23 P1 08H TEH 4 63 DSI 04H -0.03 0.24 26 P1 08H TEH 4 68 DSI 02H 0.01 0.32 94 P1 08H TEH 4 68 PSI 06H 0.39 15.59 159 P5 08H TEH 4 88 DSI 04H -0.04 0.27 37 P1 08H TEH 5 8 DNI 08C 0.00 1.29 54 P1 TEH TEC 5 10 DSI 02H 0.00 0.25 98 P1 TEH TEC 5 12 DSI 03H 0.02 0.15 107 P1 TEH TEC 5 12 DNI 08H -0.03 1.29 37 P1 TEH TEC 5 13 DNI 08H 0.02 1.26 51 P1 TEH TEC 5 14 DSI 03H -0.05 0.35 61 P1 TEH TEC 5 14 DNI 06H 0.05 1.25 50 P1 TEH TEC 5 20 DSI 03H -0.10 0.55 119 P1 TEH TEC 5 22 DSI 04H -0.10 0.79 56 P1 TEH TEC 5 28 DSI 02H -0.03 0.54 63 P1 TEH TEC 5 32 DNI 06H -0.02 1.32 46 P1 TEH TEC 5 33 DSI 02H -0.07 0.54 102 P1 TEH TEC 5 33 DNI 08H 0.05 1.86 11 P1 TEH TEC 5 52 DSI 02H -0.02 1.14 81 P1 TEH TEC 5 54 DSI 02H 0.27 0.56 97 P1 TEH TEC 5 54 DSI 03H -0.02 0.23 101 P1 TEH TEC 5 54 DSI 07C 0.10 0.64 133 P1 TEH TEC 5 56 DSI 03H 0.05 0.50 57 P1 TEH TEC 5 58 DSI 02H 0.07 0.25 94 P1 TEH TEC 5 59 DNI 07H 0.00 1.36 55 P1 TEH TEC Page 2 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 5 60 DSI 02H -0.02 0.20 148 P1 TEH TEC 5 62 DSI 03H 0.02 0.25 65 P1 TEH TEC 5 63 DSI 04H 0.00 0.20 144 P1 TEH TEC 5 64 DSI 02H 0.02 0.29 82 P1 TEH TEC 5 64 DSI 03H 0.00 0.12 70 P1 TEH TEC 5 68 DSI 02H 0.02 0.47 61 P1 TEH TEC 5 68 DNI 08H 0.22 1.34 15 P1 TEH TEC 5 70 DSI 05H 0.15 1.04 27 P1 TEH TEC 5 71 DSI 02H -0.02 0.36 95 P1 TEH TEC 5 71 DSI 06C -0.07 0.32 118 P1 TEH TEC 5 73 DSI 02H 0.10 0.29 52 P1 TEH TEC 5 73 DSI 04H -0.05 0.14 69 P1 TEH TEC 5 75 DSI 03H 0.07 0.16 23 P1 TEH TEC 5 75 DSI 04H 0.10 0.14 140 P1 TEH TEC 5 81 DSI 05H 0.10 0.13 36 P1 TEH TEC 5 82 DNI 08H 0.00 1.42 54 P1 TEH TEC 5 84 DNI 06H 0.02 1.43 53 P1 TEH TEC 5 84 DNI 07H 0.05 1.35 50 P1 TEH TEC 5 84 DNI 08H 0.05 1.29 50 P1 TEH TEC 5 92 DSI 02H 0.05 0.17 57 P1 TEH TEC 5 93 DSI 03H 0.00 0.30 110 P1 TEH TEC 6 16 DSI 03H -0.02 0.19 99 P1 TEH TEC 6 23 DSI 04H -0.02 0.12 112 P1 TEH TEC 6 25 DSI 03H 0.05 0.21 85 P1 TEH TEC 6 26 DSI 02H -0.02 0.19 69 P1 TEH TEC 6 27 DSI 03H 0.00 0.30 58 P1 TEH TEC 6 27 SAI 03H 0.15 0.15 142 P4 03H 03H 6 41 SAI TSH 0.54 0.13 80 0.61 0.11 60 6 TSH 02H 6 52 DSI 02H -0.07 0.12 142 P1 TEH TEC 6 53 DSI 02H -0.05 0.28 22 P1 TEH TEC 6 53 DSI 03H 0.00 0.12 127 P1 TEH TEC 6 58 DSI 02H 0.00 0.36 70 P1 TEH TEC 6 58 DSI 03H 0.07 0.26 53 P1 TEH TEC 6 61 DSI 08H 0.02 0.15 103 P1 TEH TEC 6 63 DSI 02H -0.05 0.14 93 P1 TEH TEC 6 63 DNI 06H 0.00 1.33 55 P1 TEH TEC 6 66 DSI 03H 0.00 0.94 35 P1 TEH TEC 6 70 DSI 05H 0.17 0.78 79 P1 STH TEC 7 30 DNI 05H 0.00 1.74 55 P1 TEH TEC 7 51 SCI TSH -0.10 0.20 103 0.79 0.21 82 P2 TSH TSH 7 52 DSI 02H -0.20 0.63 69 P1 TEH TEC 7 54 DSI 02H -0.07 0.15 38 P1 TEH TEC 7 56 DSI 02H 0.12 1.17 106 P1 TEH TEC 7 56 DSI 06C -0.02 0.31 124 P1 TEH TEC 7 59 MCI TSH -0.08 0.20 123 0.94 0.12 89 P2 TSH TSH 7 63 DSI 07H 0.02 0.31 36 P1 TEH TEC 7 64 DSI 04H -0.05 0.28 46 P1 TEH TEC 7 64 DNI 06H 0.00 1.28 44 P1 TEH TEC 7 70 DSI 04H 0.00 0.43 38 P1 TEH TEC Page 3 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 7 70 DSI 05H 0.00 0.25 130 P1 TEH TEC 7 75 DSI 02H -0.02 0.06 79 P1 TEH TEC 7 89 DNI 08H 0.02 1.33 48 P1 TEH TEC 8 2 DSI 03H 0.05 0.12 101 P1 TEH TEC 8 4 DNI 08H -0.02 1.36 53 P1 TEH TEC 8 9 DSI 02H 0.02 0.17 137 P1 TEH TEC 8 9 DSI 03H 0.02 0.22 159 P1 TEH TEC 8 18 DSI 02H -0.05 0.23 54 P1 TEH TEC 8 18 DSI 03H -0.07 0.28 72 P1 TEH TEC 8 20 DSI 02H 0.12 0.31 161 P1 TEH TEC 8 22 DSI 02H 0.02 0.37 161 P1 TEH TEC 8 31 DSI 07C -0.05 0.30 82 P1 TEH TEC 8 37 DSI 03H 0.07 0.43 13 P1 STH TEC 8 43 DNI 07C 0.00 1.33 37 P1 TEH TEC 8 53 DSI 02H 0.19 0.68 91 P1 STH TEC 8 56 DSI 03H -0.02 0.48 78 P1 STH TEC 8 56 DSI 03H -0.02 0.48 78 P1 STH TEC 8 57 DSI 08H -0.02 0.19 94 P1 STH TEC 8 59 DSI 02H 0.10 0.36 97 P1 STH TEC 8 59 DSI 05H 0.02 0.14 35 P1 STH TEC 8 62 DSI 01H 0.00 0.27 137 P1 TEH TEC 8 62 SAI 01H 0.00 0.52 54 0.41 0.12 111 P4 01H 01H 8 63 DSI 04H -0.05 0.32 36 P1 TEH TEC 8 64 DNI 08H 0.00 1.67 27 P1 TEH TEC 8 83 DNI 08H 0.05 1.30 38 P1 TEH TEC 8 88 DNI 08H 0.05 1.51 39 P1 TEH TEC 9 4 DSI 03H 0.07 0.50 114 P1 TEH TEC 9 4 SAI 03H 0.00 0.19 102 6 03H 03H 9 5 DSI 03H -0.05 0.27 123 P1 TEH TEC 9 8 DSI 03H 0.00 0.31 109 P1 TEH TEC 9 11 DSI 02H -0.07 0.51 156 P1 TEH TEC 9 11 DSI 03H 0.02 0.38 66 P1 TEH TEC 9 16 DSI 03H -0.12 0.10 69 P1 TEH TEC 9 17 DSI 02H 0.05 0.41 84 P1 TEH TEC 9 17 DSI 03H -0.07 0.34 121 P1 TEH TEC 9 18 DSI 02H 0.00 0.13 119 P1 TEH TEC 9 18 DSI 03H 0.02 0.41 61 P1 TEH TEC 9 20 DNI 08H 0.00 1.31 48 P1 TEH TEC 9 26 DSI 02H 0.12 0.31 106 P1 STH TEC 9 26 DSI 03H 0.22 0.60 77 P1 STH TEC 9 51 DNI 02H -0.02 1.67 53 P1 STH TEC 9 51 DNI 08H -0.22 1.49 18 P1 STH TEC 9 51 DNI 07C -0.12 1.21 23 P1 STH TEC 9 52 DSI 02H 0.14 0.22 30 P1 STH TEC 9 52 DSI 03H 0.05 0.34 25 P1 STH TEC 9 59 DSI 03H -0.05 0.43 114 P1 TEH TEC 9 59 DSI 05H 0.07 0.27 94 P1 TEH TEC 9 61 DSI 07C 0.10 0.50 139 P1 TEH TEC 9 63 SCI TSH 0.07 0.22 31 0.23 0.13 84 P2 TSH TSH Page 4 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 9 64 DSI 04H 0.07 0.40 44 P1 TEH TEC 9 64 DNI 07H 0.00 1.26 44 P1 TEH TEC 9 64 SAI 04H -0.04 0.06 98 P4 04H 04H 9 70 DSI 03H 0.05 0.17 117 P1 STH TEC 9 70 DSI 05H 0.07 0.50 108 P1 STH TEC 9 72 DSI 04H 0.02 0.39 130 P1 STH TEC 9 77 DSI 04H -0.02 0.17 15 P1 TEH TEC 9 80 DSI 02H -0.10 0.63 89 P1 TSH TEC 9 80 DNI TSC 1.51 0.30 153 5 TSH TEC 9 80 DSI 02H -0.07 0.37 81 P1 TEH TEC 9 80 DNI TSC 1.60 0.31 154 5 TEH TEC 9 85 DSI 02H 0.20 1.03 72 P1 TEH TEC 9 92 DSI 02H 0.22 0.46 104 P1 TEH TEC 9 92 DNI 04H 0.17 1.44 47 P1 TEH TEC 9 93 DSI 02H 0.00 0.27 137 P1 TEH TEC 9 93 DNI 04H 0.20 1.43 14 P1 TEH TEC 10 6 DSI 02H 0.02 0.50 131 P1 TEH TEC 10 10 DSI 02H 0.02 0.02 135 P1 TEH TEC 10 10 DSI 02H 0.15 0.24 116 P1 TEH TEC 10 14 DSI 02H 0.02 0.45 106 P1 STH TEC 10 15 DSI 02H 0.00 0.34 142 P1 TEH TEC 10 17 DSI 02H 0.00 0.51 116 P1 08H TEH 10 17 DSI 02H 0.00 0.51 116 P1 08H TEH 10 18 DSI 02H -0.05 0.40 58 P1 TEH TEC 10 26 DSI 02H -0.05 0.19 23 P1 STH TEC 10 26 DSI 05H -0.02 0.28 133 P1 STH TEC 10 34 DNI 07H 0.07 1.27 55 P1 STH TEC 10 35 DNI 08H -0.02 1.47 36 P1 TEH TEC 10 37 DSI 03H 0.00 0.38 170 P1 TEH TEC 10 41 DSI 07H -0.07 0.16 125 P1 STH TEC 10 41 DNI 08H -0.03 1.59 36 P1 STH TEC 10 50 DSI 02H 0.05 0.24 79 P1 TEH TEC 10 50 DSI 03H 0.02 0.23 120 P1 TEH TEC 10 50 DSI 04H -0.05 0.21 147 P1 TEH TEC 10 52 DSI 02H 0.00 0.55 140 P1 TEH TEC 10 52 DSI 04H -0.05 0.21 52 P1 TEH TEC 10 53 DSI 02H 0.17 0.69 108 P1 TEH TEC 10 54 DSI 02H -0.05 0.09 132 P1 STH TEC 10 56 DSI 02H -0.05 0.44 100 P1 STH TEC 10 58 DSI 05H -0.02 0.13 59 P1 TEH TEC 10 63 DSI 02H 0.02 0.26 76 P1 TEH TEC 10 65 DNI 08H 0.05 1.26 46 P1 TEH TEC 10 70 PCT AV4 0.00 12 0.69 0 P2 TEH TEC 10 71 DSI 02H 0.00 0.20 29 P1 TEH TEC 10 71 DSI 05H 0.07 0.58 163 P1 TEH TEC 10 71 DNI 08H 0.05 1.34 46 P1 TEH TEC 10 72 DNI 08H 0.05 1.68 35 P1 TEH TEC 10 74 DNI 08H 0.07 1.46 40 P1 TEH TEC 10 75 DNI 08H 0.07 1.57 38 P1 TEH TEC Page 5 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 10 76 DSI 03H 0.10 0.39 39 P1 TEH TEC 10 76 SAI 03H -0.03 0.11 108 6 03H 03H 10 78 DSI 04H 0.05 0.35 136 P1 TEH TEC 10 80 DSI 03H 0.00 0.41 123 P1 TEH TEC 10 80 DNI 08H 35.58 1.31 150 5 TEH TEC 10 81 DNI 08H 0.07 1.53 25 P1 TEH TEC 10 82 DSI 03H 0.00 0.19 46 P1 TEH TEC 10 83 DNI 08H 0.10 1.36 47 P1 TEH TEC 10 84 DNI 08H 0.05 1.49 51 P1 TEH TEC 10 86 DNI 08H 0.05 1.42 52 P1 TEH TEC 10 88 DNI 08H 0.22 1.47 22 P1 TEH TEC 10 88 DSI 04C -0.05 0.11 127 P1 TEH TEC 10 89 DSI 02H 0.02 0.44 44 P1 TEH TEC 11 8 DSI 03H 0.00 0.22 117 P1 TEH TEC 11 8 DSI 04H 0.00 0.12 135 P1 TEH TEC 11 9 DSI 06H 0.02 0.08 101 P1 TEH TEC 11 9 DSI 07H 0.07 0.38 30 P1 TEH TEC 11 17 DNI 08C -0.10 1.36 52 P1 TEH TEC 11 18 DSI 02H 0.00 0.30 77 P1 TEH TEC 11 20 DSI 02H 0.07 0.47 103 P1 TEH TEC 11 21 DSI 03H 0.05 0.17 42 P1 TEH TEC 11 25 DSI 03H 0.05 0.26 35 P1 TEH TEC 11 25 SAI 03H -0.03 0.07 87 P4 03H 03H 11 35 DSI 02H -0.05 0.14 48 P1 TEH TEC 11 37 DNI 05H 0.00 1.35 21 P1 TEH TEC 11 41 DNI 08H 0.00 1.48 23 P1 STH TEC 11 42 DSI 03H -0.05 0.22 43 P1 TEH TEC 11 45 DNI 08H -0.03 1.65 29 P1 TEH TEC 11 51 DSI 02H 0.12 0.05 44 P1 STH TEC 11 53 DSI 02H 0.02 0.48 121 P1 TEH TEC 11 53 DSI 08C 0.00 0.42 139 P1 TEH TEC 11 57 DSI 03H -0.02 0.24 35 P1 TEH TEC 11 58 DSI 03H 0.05 0.10 74 P1 TEH TEC 11 58 DSI 04H 0.10 0.21 109 P1 TEH TEC 11 61 DSI 02H 0.00 0.89 56 P1 TEH TEC 11 61 DSI 03H 0.12 0.38 105 P1 TEH TEC 11 64 DSI 03H -0.15 0.41 78 P1 TEH TEC 11 64 DNI 08C 0.00 1.31 52 P1 TEH TEC 11 75 DSI 02H -0.05 0.45 60 P1 TEH TEC 11 75 DSI 03H 0.12 0.19 94 P1 TEH TEC 11 78 DNI 06H 0.05 1.69 50 P1 TEH TEC 11 83 DSI 03H 0.02 0.39 98 P1 TEH TEC 11 83 DSI 04H 0.10 0.26 107 P1 TEH TEC 11 85 DNI 08C -0.05 1.38 54 P1 TEH TEC 12 10 DSI 02H 0.02 0.51 103 P1 TEH TEC 12 10 DNI 05H 0.12 1.28 51 P1 TEH TEC 12 15 DSI 02H -0.03 0.39 134 P1 STH TEC 12 15 DSI 03H -0.02 0.57 92 P1 STH TEC 12 16 DSI 03H -0.05 0.26 157 P1 TEH TEC Page 6 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 12 22 DSI 02H -0.02 0.48 145 P1 TEH TEC 12 24 DSI 02H 0.00 0.34 106 P1 TEH TEC 12 24 DSI 04H 0.00 0.26 123 P1 TEH TEC 12 45 DNI 08H 0.05 1.64 20 P1 TEH TEC 12 51 DSI 02H -0.02 0.09 88 P1 TEH TEC 12 52 DSI 02H -0.05 0.46 92 P1 STH TEC 12 52 DSI 03H -0.03 0.54 44 P1 STH TEC 12 61 DSI 03H 0.00 0.38 50 P1 TEH TEC 12 63 DNI 06H 0.05 1.41 40 P1 TEH TEC 12 77 DNI 08H 0.00 1.29 29 P1 TEH TEC 12 86 DNI 08H 0.10 1.51 42 P1 TEH TEC 13 37 DSI 03H -0.07 0.32 164 P1 TEH TEC 13 39 DSI 07H -0.02 0.13 134 P1 TEH TEC 13 47 DSI 02H 0.07 0.35 134 P1 TEH TEC 13 47 SAI 02H 0.00 0.16 106 6 02H 02H 13 53 DSI 02H 0.00 0.67 51 P1 STH TEC 13 53 DNI 06H 0.05 1.37 45 P1 STH TEC 13 53 DNI 08H 0.05 1.25 46 P1 STH TEC 13 56 DSI 03H 0.08 0.17 62 P1 STH TEC 13 66 DNI 05H 0.07 1.48 46 P1 TEH TEC 13 71 DSI 05C 0.02 0.17 130 P1 TEH TEC 13 73 DSI 02H 0.00 0.34 85 P1 TEH TEC 13 73 DNI 08H 0.05 1.45 49 P1 TEH TEC 13 77 DSI 03H -0.07 0.71 36 P1 STH TEC 13 78 DSI 02H 0.00 0.07 152 P1 TEH TEC 13 79 DNI 06H 0.07 1.26 53 P1 TEH TEC 13 84 DNI 08H 0.05 1.30 53 P1 TEH TEC 13 85 DSI 02H 0.00 0.35 88 P1 TEH TEC 13 86 DSI 02H 0.00 0.17 154 P1 TEH TEC 13 89 DNI 08H 0.02 1.46 49 P1 TEH TEC 13 91 DSI 02H -0.10 0.49 112 P1 TEH TEC 13 91 DSI 02H -0.07 0.31 130 P1 TEH TEC 14 13 DSI 02H 0.02 0.20 77 P1 TEH TEC 14 15 DSI 03H 0.00 0.31 52 P1 TEH TEC 14 18 DSI 02H 0.02 0.40 112 P1 TEH TEC 14 18 DNI 06H 0.00 1.32 55 P1 TEH TEC 14 25 DSI 02H 0.02 0.33 82 P1 TEH TEC 14 27 DSI 03H 0.00 0.17 60 P1 STH TEC 14 28 DSI 05H 0.02 0.16 32 P1 TEH TEC 14 32 DSI 02H 0.10 0.24 144 P1 TEH TEC 14 35 DSI 06H -0.05 0.27 137 P1 TEH TEC 14 36 DSI 03H 0.07 0.29 148 P1 TEH TEC 14 39 DSI 02H 0.00 0.29 169 P1 TEH TEC 14 47 SCI 02H 28.66 0.16 23 0.18 0.12 59 P2 02H 03H 14 50 DNI 06H 0.05 1.53 20 P1 TEH TEC 14 54 DSI 02H 0.00 0.29 24 P1 TEH TEC 14 54 DSI 03H -0.05 0.24 97 P1 TEH TEC 14 54 DNI 04C 0.00 1.31 35 P1 TEH TEC 14 57 DSI 02H -0.03 0.66 74 P1 STH TEC Page 7 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 14 57 DSI 03H 0.00 0.40 84 P1 STH TEC 14 59 DNI 08H 0.07 1.37 42 P1 TEH TEC 14 59 DNI 08C 0.00 1.44 35 P1 TEH TEC 14 61 DSI 02H 0.00 0.37 105 P1 STH TEC 14 61 DSI 03H -0.02 0.50 43 P1 STH TEC 14 61 DSI 05H 0.02 0.49 40 P1 STH TEC 14 63 DSI 03H 0.05 0.23 28 P1 TEH TEC 14 66 DNI 05H -0.02 1.49 49 P1 TEH TEC 14 66 DNI 07H 0.00 1.46 52 P1 TEH TEC 14 66 DNI 08H 0.00 1.36 48 P1 TEH TEC 14 66 DNI 08C -0.02 1.38 43 P1 TEH TEC 14 70 DSI 02H 0.05 0.68 87 P1 STH TEC 14 80 DSI 03H 0.02 0.19 87 P1 TEH TEC 14 80 DSI 03H 0.02 0.24 92 P1 TEH TEC 14 80 DNI 08H 0.02 1.52 50 P1 TEH TEC 14 83 DSI 03C -0.07 0.29 165 P1 STH TEC 14 84 DSI 04H -0.05 0.16 96 P1 TEH TEC 14 88 DSI 02H 0.05 0.18 85 P1 TEH TEC 15 12 DSI 03H 0.10 0.16 124 P1 STH TEC 15 21 DSI 03H 0.00 0.10 96 P1 TEH TEC 15 26 DSI 03H 0.00 0.47 149 P1 TEH TEC 15 26 DSI 07H 0.10 0.11 49 P1 TEH TEC 15 27 DSI 02H 0.07 0.10 57 P1 TEH TEC 15 36 DSI 02H -0.07 0.25 104 P1 TEH TEC 15 36 DNI 03H 0.17 1.74 39 P1 TEH TEC 15 49 DSI 04H -0.05 0.58 45 P1 TEH TEC 15 52 DSI 02H -0.07 0.26 56 P1 TEH TEC 15 60 DNI 03H 0.05 1.51 54 P1 TEH TEC 15 60 DNI 06H 0.00 1.69 45 P1 TEH TEC 15 60 DNI 08H 0.00 1.51 44 P1 TEH TEC 15 71 DSI 05H 0.02 0.20 35 P1 STH TEC 15 74 DNI 08H 0.05 1.27 48 P1 TEH TEC 15 75 DSI 02H 0.00 0.10 154 P1 STH TEC 15 75 DSI 04H 0.00 0.20 27 P1 STH TEC 15 77 DNI 08H 0.07 1.30 46 P1 TEH TEC 15 80 DSI 04H -0.05 0.49 170 P1 TEH TEC 15 87 DSI 02H 0.05 0.25 151 P1 TEH TEC 15 89 DSI 02H 0.12 0.27 107 P1 TEH TEC 16 26 DNI 07H 0.05 1.76 42 P1 STH TEC 16 26 DNI 08H 0.05 1.58 40 P1 STH TEC 16 27 DSI 03H 0.02 0.34 23 P1 STH TEC 16 28 DNI 04H 0.15 1.28 27 P1 STH TEC 16 28 DNI 06H 0.00 1.51 15 P1 STH TEC 16 28 DNI 08H -0.12 1.55 16 P1 STH TEC 16 29 DSI 02H -0.14 0.12 126 P1 TEH TEC 16 29 SAI 02H 0.09 0.06 129 P4 02H 03H 16 30 PCT AV2 0.00 14 0.52 0 P2 TEH TEC 16 30 PCT AV3 0.02 13 0.45 0 P2 TEH TEC 16 31 DSI 02H 0.15 0.30 113 P1 TEH TEC Page 8 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 16 31 DSI 07H 0.07 0.29 140 P1 TEH TEC 16 36 DSI 04H 0.15 0.22 16 P1 TEH TEC 16 37 DSI 02H 0.05 0.25 107 P1 TEH TEC 16 37 DSI 04H 0.00 0.26 89 P1 TEH TEC 16 37 DNI 07H 0.00 1.30 54 P1 TEH TEC 16 37 SAI 04H -0.14 0.16 87 6 04H 04H 16 44 DSI 02H 0.00 0.27 9 P1 TEH TEC 16 45 DNI 06C 0.20 1.50 11 P1 TEH TEC 16 48 DNI 06H 0.12 1.48 21 P1 TEH TEC 16 55 DSI 05H 0.00 0.30 133 P1 TEH TEC 16 55 DNI 06H 0.00 1.30 46 P1 TEH TEC 16 61 DSI 02H 0.07 0.22 42 P1 TEH TEC 16 62 DNI 07H 0.00 1.39 35 P1 TEH TEC 16 63 DNI 08H 0.05 1.29 50 P1 TEH TEC 16 66 DNI 08H 0.05 1.28 53 P1 TEH TEC 16 69 DNI 07H 0.00 1.52 53 P1 TEH TEC 16 71 DSI 02H 0.07 0.07 128 P1 TEH TEC 17 28 DNI 03C 0.17 1.44 7 P1 TEH TEC 17 35 DSI 03H 0.02 0.65 64 P1 TEH TEC 17 40 DSI 03H -0.05 0.27 112 P1 TEH TEC 17 40 SAI 03H -0.22 0.12 97 6 03H 03H 17 42 DSI 03H 0.07 0.66 89 P1 STH TEC 17 42 DSI 04H 0.20 0.43 83 P1 STH TEC 17 43 DSI 04H -0.05 0.19 75 P1 STH TEC 17 44 DSI 02H 0.17 0.53 68 P1 STH TEC 17 44 SAI 02H -0.19 0.12 92 2 02H 02H 17 62 DNI 02H 0.07 1.43 20 P1 STH TEC 17 62 DSI 05H 0.00 0.48 17 P1 STH TEC 17 62 DNI 06H 0.07 1.33 47 P1 STH TEC 17 64 DSI 02H 0.00 0.06 128 P1 TEH TEC 17 68 DSI 02H -0.02 0.24 96 P1 STH TEC 17 68 DSI 03H 0.02 0.52 17 P1 STH TEC 17 68 DSI 04H -0.15 1.09 30 P1 STH TEC 17 68 DNI 07H 0.07 1.38 53 P1 STH TEC 17 68 SAI 04H 0.20 0.11 91 2 04H 04H 17 69 DNI 08H 0.12 1.47 11 P1 TEH TEC 17 70 DNI 03H 0.17 1.27 27 P1 TEH TEC 17 70 DNI 07H 0.10 1.64 12 P1 TEH TEC 17 70 DNI 07C -0.05 2.19 11 P1 TEH TEC 17 77 DNI 08H 0.00 1.87 39 P1 TEH TEC 17 83 DSI 06C 0.00 0.20 147 P1 TEH TEC 18 12 DSI 03H 0.00 0.16 32 P1 TEH TEC 18 14 SCI TSH 0.00 0.21 114 0.87 0.23 42 P2 TSH TSH 18 18 DSI 02H 0.00 0.16 75 P1 TEH TEC 18 21 DNI 06H 0.00 1.50 36 P1 TEH TEC 18 28 DSI 04H 0.10 0.73 161 P1 TEH TEC 18 29 DSI 02H -0.05 0.40 85 P1 TEH TEC 18 30 DSI 04H -0.02 0.19 101 P1 TEH TEC 18 36 DSI 03H 0.12 0.93 50 P1 TEH TEC Page 9 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 18 36 DNI 07H 0.15 1.27 45 P1 TEH TEC 18 36 DNI 08C -0.15 1.37 41 P1 TEH TEC 18 37 DSI 03H -0.07 0.18 58 P1 TEH TEC 18 38 DSI 03H -0.14 0.31 75 P1 TEH TEC 18 40 DSI 02H 0.00 0.46 108 P1 TEH TEC 18 42 DSI 02H 0.00 0.35 132 P1 TEH TEC 18 43 DNI 08H -0.03 1.34 54 P1 TEH TEC 18 44 DNI 08H 0.15 1.26 51 P1 TEH TEC 18 50 DNI 08H -0.02 1.35 12 P1 STH TEC 18 53 DSI 03H 0.00 0.29 60 P1 TEH TEC 18 53 DSI 04H 0.07 0.23 55 P1 TEH TEC 18 53 DNI 08H 0.07 1.29 42 P1 TEH TEC 18 54 DSI 02H 0.02 0.85 22 P1 TEH TEC 18 54 DNI 08H 0.07 1.28 43 P1 TEH TEC 18 56 DNI 07H 0.22 2.52 8 P1 TEH TEC 18 57 DSI 03H -0.07 0.30 15 P1 TEH TEC 18 58 DSI 02H 0.00 0.39 110 P1 TEH TEC 18 61 DSI 03H 0.00 0.09 80 P1 TEH TEC 18 64 DSI 03H 0.15 1.06 71 P1 TEH TEC 18 64 DNI 08H 0.00 1.29 47 P1 TEH TEC 18 65 DNI 07H 0.02 1.48 52 P1 TEH TEC 18 69 DSI 04H -0.05 0.09 50 P1 TEH TEC 18 69 DSI 05H 0.00 0.26 18 P1 TEH TEC 18 70 DNI 07H 0.05 1.47 41 P1 TEH TEC 18 74 DSI 02H 0.00 0.30 39 P1 TEH TEC 18 76 DSI 03H 0.00 0.27 48 P1 TEH TEC 18 76 DSI 05H 0.00 0.24 49 P1 TEH TEC 18 83 DNI 06H 0.22 1.33 18 P1 TEH TEC 18 83 DNI 08C -0.22 1.41 17 P1 TEH TEC 19 15 DSI 02H 0.25 0.39 90 P1 TEH TEC 19 15 DSI 04H 0.00 0.15 39 P1 TEH TEC 19 29 DSI 02H -0.03 0.56 99 P1 08H TEH 19 29 DSI 03H 0.01 0.70 62 P1 08H TEH 19 30 DSI 03H 0.10 0.49 36 P1 TEH TEC 19 30 SAI 03H 0.14 0.08 121 P4 03H 03H 19 34 DSI 02H 0.07 0.40 120 P1 TEH TEC 19 34 SAI 02H -0.01 0.05 122 P4 02H 02H 19 36 DSI 02H 0.07 0.67 98 P1 TEH TEC 19 36 DNI 05H 0.15 1.69 48 P1 TEH TEC 19 36 DNI 08C -0.15 1.38 41 P1 TEH TEC 19 39 DSI 03H 0.00 0.46 38 P1 TEH TEC 19 39 DSI 04H 0.00 0.28 100 P1 TEH TEC 19 39 DNI 06H 0.00 1.39 55 P1 TEH TEC 19 39 DNI 07H 0.05 1.37 55 P1 TEH TEC 19 39 DNI 08H 0.02 1.30 50 P1 TEH TEC 19 40 DSI 03H 0.10 0.54 76 P1 TEH TEC 19 45 DSI 02H 0.07 0.35 61 P1 TEH TEC 19 45 DNI 08H 0.00 1.40 52 P1 TEH TEC 19 50 DSI 03H 0.02 0.68 54 P1 TEH TEC Page 10 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 19 50 DSI 03H 0.02 0.68 54 P1 TEH TEC 19 51 DSI 02H 0.12 0.40 101 P1 TEH TEC 19 51 DSI 03H 0.00 0.46 45 P1 TEH TEC 19 52 DNI 06H 0.02 1.67 49 P1 TEH TEC 19 52 DNI 08H 0.00 1.36 53 P1 TEH TEC 19 69 DSI 02H -0.02 0.67 105 P1 STH TEC 19 71 DSI 05H -0.02 0.32 21 P1 TEH TEC 19 74 DSI 02H -0.07 0.08 26 P1 TEH TEC 19 74 DSI 02H -0.07 0.08 26 P1 TEH TEC 19 74 DNI 08H 0.00 1.52 48 P1 TEH TEC 19 76 DSI 02H 0.05 0.13 110 P1 TEH TEC 19 76 DSI 02H 0.05 0.13 110 P1 TEH TEC 19 78 DSI 02H -0.05 0.11 87 P1 TEH TEC 19 82 DNI 06H 0.05 1.26 54 P1 TEH TEC 19 83 VOL TSC 0.41 0.09 79 6 TSC 01C 19 83 VOL TSC 1.35 0.06 71 6 TSC 01C 19 83 VOL TSC 0.42 0.26 58 0.45 0.08 76 6 TSC 01C 19 83 VOL TSC 1.45 0.25 52 0.40 0.08 77 6 TSC 01C 19 85 DSI 02H 0.00 0.24 155 P1 TEH TEC 19 85 DNI 08H 0.07 1.60 44 P1 TEH TEC 19 87 DNI 03H 0.34 1.28 12 P1 TEH TEC 19 88 DNI 08H 0.10 1.57 44 P1 TEH TEC 19 89 DNI 07H 0.00 1.39 16 P1 TEH TEC 20 11 DSI 02H 0.10 0.48 23 P1 08H TEH 20 11 DNI 06H -0.03 1.30 11 P1 08H TEH 20 11 DNI 08H -0.21 1.36 8 P1 08H TEH 20 11 DNI 08H -0.10 1.50 10 P1 08H TEC 20 16 DSI 03H 0.00 0.32 37 P1 TEH TEC 20 19 DSI 04H 0.07 0.08 151 P1 TEH TEC 20 20 DSI 03H 0.00 0.24 56 P1 TEH TEC 20 20 DSI 04H 0.02 0.32 55 P1 TEH TEC 20 23 DSI 02H 0.00 0.19 126 P1 STH TEC 20 23 SAI 02H -0.09 0.12 50 2 02H 02H 20 36 DSI 08H -0.03 0.60 15 P1 TEH TEC 20 70 DSI 02H 0.10 0.17 103 P1 TEH TEC 20 76 DNI 07H 0.02 1.38 49 P1 STH TEC 20 78 DSI 04H 0.07 0.24 22 P1 TEH TEC 20 81 DSI 02H 0.07 0.22 166 P1 TEH TEC 20 89 DSI 02H 0.00 0.44 80 P1 TEH TEC 21 18 DSI 04H 0.02 0.16 142 P1 TEH TEC 21 29 DSI 03H 0.05 0.43 56 P1 TEH TEC 21 35 SCI TSH -0.05 0.25 114 0.87 0.16 129 P2 TSH TSH 21 40 DNI 05H 0.15 1.25 37 P1 TEH TEC 21 45 DNI 03H 0.12 0.87 46 P1 TEH TEC 21 45 DSI 04H -0.05 0.23 48 P1 TEH TEC 21 49 DNI 03H 0.05 1.63 50 P1 TEH TEC 21 53 DSI 03H 0.12 0.62 63 P1 TEH TEC 21 53 DSI 05H 0.00 0.21 117 P1 TEH TEC 21 54 DSI 02H 0.00 0.55 89 P1 TEH TEC Page 11 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 21 74 DNI 06H 0.05 1.25 55 P1 TEH TEC 21 75 DSI 02H 0.05 0.19 144 P1 TEH TEC 21 75 DSI 02H 0.05 0.19 144 P1 TEH TEC 21 75 DNI 05H 0.07 1.29 55 P1 TEH TEC 22 18 DSI 03H -0.01 0.74 14 P1 08H TEH 22 18 SAI 03H 0.06 0.10 69 6 03H 03H 22 32 SCI TSH -0.13 0.21 188 1.43 0.07 65 P2 TSH TSH 22 36 DSI 03H -0.02 0.11 63 P1 TEH TEC 22 52 DSI 02H -0.02 0.14 119 P1 TEH TEC 22 52 DSI 03H 0.00 0.35 137 P1 TEH TEC 22 53 DSI 02H -0.05 0.12 159 P1 TEH TEC 22 54 DNI 05H 0.10 1.35 36 P1 TEH TEC 22 60 DNI 08H 0.05 1.29 43 P1 TEH TEC 22 61 DSI 05H 0.02 0.18 142 P1 TEH TEC 22 62 DSI 03H 0.00 0.40 51 P1 TEH TEC 22 64 DSI 02H -0.07 0.37 122 P1 TEH TEC 22 64 DNI 07H 0.05 1.45 54 P1 TEH TEC 22 67 DNI 08H 0.07 1.25 40 P1 TEH TEC 22 69 DNI 08H 0.00 1.57 41 P1 TEH TEC 22 82 DNI 06H 0.00 1.26 54 P1 TEH TEC 23 7 PSI 06H 0.41 16.49 160 P5 08H TEH 23 25 SAI TSH 0.00 0.11 49 0.38 0.21 77 6 TSH TSH 23 33 DSI 03H 0.05 0.30 25 P1 TEH TEC 23 37 SCI TSH -0.03 0.18 106 0.81 0.24 126 P2 TSH TSH 23 37 DNI 02H 0.00 1.25 17 P1 TEH TEC 23 37 DSI 04H 0.00 0.61 22 P1 TEH TEC 23 37 DNI 07H 0.05 1.41 20 P1 TEH TEC 23 37 SAI 04H -0.02 0.09 108 P4 04H 04H 23 56 DSI 02H 0.00 0.11 103 P1 TEH TEC 23 59 DNI 06H 0.00 1.38 41 P1 TEH TEC 23 61 DSI 02H 0.00 0.19 46 P1 TEH TEC 23 63 DSI 03H 0.00 0.14 87 P1 TEH TEC 23 63 DSI 05H 0.00 0.17 122 P1 TEH TEC 23 67 DSI 05H 0.05 0.17 143 P1 TEH TEC 23 75 DNI 08H 0.07 1.54 43 P1 TEH TEC 23 76 DNI 07H 0.05 1.36 52 P1 TEH TEC 23 86 DSI 02H -0.07 0.26 114 P1 TEH TEC 23 86 PCT AV3 0.00 19 1.20 0 P2 TEH TEC 24 13 DNI 08H 0.00 1.34 50 P1 TEH TEC 24 15 DNI 04H 0.00 1.38 46 P1 TEH TEC 24 29 DSI 05H 0.05 0.24 12 P1 TEH TEC 24 30 DSI 03H 0.20 0.33 163 P1 TEH TEC 24 32 DSI 03H 0.00 0.19 76 P1 TEH TEC 24 42 DSI 02H 0.00 0.57 46 P1 TEH TEC 24 42 DSI 02H 0.00 0.57 46 P1 TEH TEC 24 51 DSI 08H 0.00 0.11 110 P1 STH TEC 24 52 DSI 02H 0.00 0.37 69 P1 TEH TEC 24 56 DSI 02H -0.05 0.13 61 P1 TEH TEC 24 58 DSI 03H 0.07 0.23 118 P1 TEH TEC Page 12 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 24 62 DSI 03H 0.22 0.50 59 P1 TEH TEC 24 63 DSI 03H 0.15 0.48 45 P1 TEH TEC 24 65 DSI 02H 0.00 0.09 114 P1 TEH TEC 24 68 PSI 06H -0.54 8.50 255 8 TEH TEC 24 68 DSI 08H -0.02 0.13 39 P1 TEH TEC 24 69 DNI 08H 0.05 1.39 45 P1 TEH TEC 24 71 DSI 05H 0.07 0.15 62 P1 TEH TEC 24 79 DSI 07H 0.12 0.20 90 P1 TEH TEC 24 84 DSI 05H 0.00 0.34 132 P1 TEH TEC 25 17 DSI 02H 0.02 0.09 74 P1 TEH TEC 25 18 DNI 06H -0.03 1.52 33 P1 08H TEH 25 18 DSI 05C 0.00 0.23 86 P1 08H TEC 25 21 DNI 06H 0.05 1.28 53 P1 TEH TEC 25 23 PCT AV3 0.20 18 0.80 0 P2 TEH TEC 25 24 DSI 03H 0.07 0.49 42 P1 TEH TEC 25 25 DNI 06H 0.05 1.27 53 P1 TEH TEC 25 29 DSI 02H 0.05 0.14 78 P1 TEH TEC 25 30 SCI TSH -0.05 0.23 122 0.93 0.09 87 P2 TSH TSH 25 38 DSI 04H 0.02 0.10 120 P1 TEH TEC 25 54 SCI TSH -0.01 0.15 132 1.01 0.17 62 P2 TSH TSH 25 63 DNI 06H 0.00 1.52 23 P1 TEH TEC 25 64 DSI 06H 0.05 0.40 23 P1 TEH TEC 25 79 DSI 08H 0.00 0.38 140 P1 TEH TEC 26 13 DNI 04H 0.30 1.92 10 P1 TEH TEC 26 20 DNI 06H 0.00 1.47 32 P1 TEH TEC 26 30 DSI 03H 0.00 0.56 101 P1 TEH TEC 26 39 DSI 03H -0.02 0.08 60 P1 TEH TEC 26 78 DSI 02H -0.02 0.12 41 P1 TEH TEC 27 17 DNI 03H 0.05 1.36 48 P1 TEH TEC 27 17 DSI 05H -0.05 0.22 121 P1 TEH TEC 27 17 DNI 06H 0.07 1.33 47 P1 TEH TEC 27 17 DNI 07H 0.02 1.44 39 P1 TEH TEC 27 21 PCT AV2 0.20 21 1.10 0 P2 TEH TEC 27 21 PCT AV3 -0.20 16 0.70 0 P2 TEH TEC 27 21 WAR AV3 -0.20 0.30 125 2 08C AV3 27 21 WAR AV2 0.00 0.18 85 2 08H AV2 27 28 DSI 03H -0.02 0.45 26 P1 TEH TEC 27 46 DSI 06H 0.00 0.14 28 P1 TEH TEC 27 50 SCI TSH -0.07 0.15 88 0.67 0.10 88 P2 TSH TSH 27 52 DSI 04H 0.00 0.27 25 P1 TEH TEC 27 53 DSI 03H 0.02 0.18 27 P1 TEH TEC 27 68 DSI 02H 0.10 0.20 95 P1 TEH TEC 28 41 DSI 02H 0.00 0.33 39 P1 TEH TEC 28 41 DSI 02H 0.02 0.18 77 P1 TEH TEC 28 59 DSI 04H -0.05 0.38 81 P1 TEH TEC 28 60 DNI 04H 0.00 1.38 28 P1 TEH TEC 28 63 DSI 03H -0.02 0.18 59 P1 TEH TEC 28 67 DSI 03H 0.32 0.46 32 P1 STH TEC 28 70 PCT AV3 0.02 24 2.17 0 P2 TEH TEC Page 13 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 28 70 PCT AV4 -0.70 23 1.38 0 P2 TEH TEC 28 81 DSI 02H 0.00 0.15 130 P1 TEH TEC 29 20 DSI 03H 0.02 0.30 63 P1 TEH TEC 29 27 DSI 02H 0.00 0.24 58 P1 TEH TEC 29 27 DSI 03H 0.00 0.47 57 P1 TEH TEC 29 31 DSI 05H -0.05 0.20 122 P1 TEH TEC 29 32 DSI 03H 0.00 0.33 95 P1 TEH TEC 29 32 DSI 05H 0.05 0.16 64 P1 TEH TEC 29 34 DSI 03H 0.05 0.34 64 P1 TEH TEC 29 35 DSI 04H 0.06 0.17 78 P1 08H TEH 29 35 SAI 04H 0.06 0.08 119 P4 04H 06H 29 37 DSI 03H -0.07 0.11 169 P1 TEH TEC 29 38 DSI 02H 0.02 0.30 47 P1 TEH TEC 29 38 MAI 02H -0.06 0.10 49 6 02H 02H 29 40 DSI 03H -0.05 0.65 58 P1 TEH TEC 29 41 DSI 02H 0.02 0.25 63 P1 TEH TEC 29 56 DSI 02H 0.22 1.13 79 P1 TEH TEC 29 56 DNI 06H 0.05 1.48 55 P1 TEH TEC 29 56 DNI 08H 0.00 1.49 51 P1 TEH TEC 30 16 DSI 04H 0.05 0.12 82 P1 TEH TEC 30 16 DSI 07H 0.05 0.11 55 P1 TEH TEC 30 20 DSI 04H 0.03 0.22 122 P1 08H TEH 30 24 DNI 06H 0.00 1.39 50 P1 TEH TEC 30 27 DSI 02H -0.02 0.18 38 P1 TEH TEC 30 32 DSI 03H 0.00 0.25 146 P1 STH TEC 30 34 SCI TSH -0.03 0.18 72 0.55 0.14 112 P2 TSH TSH 30 34 DNI 03C 0.15 1.27 8 P1 TEH TEC 30 41 DNI 04H -0.02 1.23 39 P1 TEH TEC 30 48 DNI 04H 0.05 1.56 40 P1 TEH TEC 30 50 DSI 04H 0.07 0.55 36 P1 TEH TEC 30 50 DNI 07H 0.05 1.42 50 P1 TEH TEC 30 53 PCT AV3 -0.02 23 1.37 0 P2 TEH TEC 30 55 DSI 03H 0.15 0.47 117 P1 TEH TEC 30 56 DSI 04H -0.05 0.49 21 P1 TEH TEC 30 56 SCI TSH -0.03 0.15 82 0.62 0.21 124 P2 TSH TSH 30 59 DSI 04H 0.10 0.20 64 P1 TEH TEC 30 59 PCT AV3 0.00 21 1.13 0 P2 TEH TEC 30 59 WAR AV3 0.00 0.44 113 2 08C AV3 30 65 SCI TSH -0.14 0.20 154 1.17 0.16 116 P2 TSH TSH 30 78 DSI 02H -0.07 0.08 72 P1 TEH TEC 30 78 DSI 04H 0.00 0.24 26 P1 TEH TEC 30 79 DSI 02H -0.07 0.23 30 P1 TEH TEC 30 81 DSI 03H 0.07 0.12 108 P1 TEH TEC 31 21 DSI 07H 0.00 0.41 132 P1 TEH TEC 31 23 DSI 02H 0.21 0.57 69 P1 08H TEH 31 26 DNI 04H 0.05 1.34 53 P1 TEH TEC 31 26 DNI 08H 0.07 1.20 43 P1 TEH TEC 31 31 DNI 05H 0.02 1.32 52 P1 TEH TEC 31 32 SCI TSH -0.07 0.20 165 1.26 0.16 118 P2 TSH TSH Page 14 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 31 32 DNI 02H 0.05 1.48 46 P1 TEH TEC 31 32 DSI 03H 0.00 0.43 28 P1 TEH TEC 31 32 DSI 05H 0.07 0.41 156 P1 TEH TEC 31 37 DSI 03H 0.02 0.50 46 P1 TEH TEC 31 39 DSI 02H 0.07 0.10 28 P1 TEH TEC 31 39 DSI 03H -0.20 0.17 68 P1 TEH TEC 31 41 PCT AV1 0.15 14 0.69 0 P2 TEH TEC 31 41 PCT AV2 0.00 17 0.90 0 P2 TEH TEC 31 41 PCT AV3 0.14 20 1.28 0 P2 TEH TEC 31 44 SCI TSH -0.04 0.15 71 0.54 0.17 79 P2 TSH TSH 31 48 DSI 02H 0.19 0.81 42 P1 STH TEC 31 52 DSI 02H -0.10 0.50 64 P1 TEH TEC 31 58 SCI TSH -0.05 0.15 108 0.82 0.20 61 P2 TSH TSH 31 59 PCT AV2 0.00 11 0.34 0 P2 TEH TEC 31 59 PCT AV3 0.00 27 1.94 0 P2 TEH TEC 31 59 PCT AV4 0.00 21 1.09 0 P2 TEH TEC 31 64 DSI 02H -0.02 0.09 30 P1 TEH TEC 31 71 DSI 05H 0.10 0.13 47 P1 TEH TEC 31 75 DNI 03H 0.15 1.28 55 P1 TEH TEC 31 75 DSI 04H 0.10 0.15 107 P1 TEH TEC 31 76 DSI 02H 0.05 0.32 87 P1 TEH TEC 31 78 DSI 02H -0.10 0.34 146 P1 TEH TEC 31 78 DSI 03H 0.22 1.17 63 P1 TEH TEC 32 16 DSI 08H 0.00 0.18 41 P1 TEH TEC 32 29 DSI 05H 0.02 0.21 143 P1 TEH TEC 32 31 DSI 02H 0.00 0.20 14 P1 TEH TEC 32 31 SAI 02H 0.19 0.08 74 6 01H 02H 32 35 DNI 05H 0.00 1.37 48 P1 TEH TEC 32 50 PCT AV1 0.27 19 1.10 0 P2 TEH TEC 32 50 PCT AV2 -0.72 27 2.22 0 P2 TEH TEC 32 50 PCT AV2 0.20 23 1.60 0 P2 TEH TEC 32 50 PCT AV3 0.00 20 1.21 0 P2 TEH TEC 32 50 WAR AV2 0.20 0.39 133 P2 08H AV2 32 53 DSI 02H -0.05 0.31 54 P1 TEH TEC 32 55 DSI 02H -0.22 0.20 150 P1 TEH TEC 32 55 DSI 05H 0.02 0.17 105 P1 TEH TEC 32 55 PCT AV3 0.74 30 2.61 0 P2 TEH TEC 32 55 PCT AV4 -0.17 18 1.33 0 P2 TEH TEC 32 55 WAR AV3 0.13 0.69 124 2 08C AV3 32 55 WAR AV4 -0.34 0.37 141 2 08C AV3 32 57 PCT AV1 0.00 17 0.85 0 P2 STH TEC 32 57 PCT AV3 -0.17 21 1.73 0 P2 STH TEC 32 59 PCT AV3 0.00 28 2.26 0 P2 TEH TEC 32 59 SCI TSH -0.11 0.20 189 1.44 0.13 88 P2 TSH TSH 32 61 DSI 02H 0.00 0.37 114 P1 TEH TEC 32 61 DSI 05H 0.00 0.42 146 P1 TEH TEC 32 61 DNI 08H 0.07 1.37 50 P1 TEH TEC 32 77 DSI 02H -0.02 0.28 78 P1 TEH TEC 33 29 DSI 02H 0.10 0.06 62 P1 TEH TEC Page 15 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 33 31 DSI 06H -0.05 0.09 29 P1 TEH TEC 33 31 DSI 07H 0.00 0.28 45 P1 TEH TEC 33 32 DSI 02H -0.05 0.33 148 P1 TEH TEC 33 37 DSI 04H 0.05 0.21 166 P1 STH TEC 33 40 PCT AV2 0.20 25 1.63 0 P2 TEH TEC 33 40 PCT AV3 -0.25 21 1.11 0 P2 TEH TEC 33 41 PCT AV1 0.15 20 1.35 0 P2 TEH TEC 33 41 PCT AV2 0.00 31 3.28 0 P2 TEH TEC 33 41 PCT AV3 0.00 20 1.41 0 P2 TEH TEC 33 44 DSI 02H -0.02 0.26 87 P1 TEH TEC 33 46 PSI 06C 0.50 8.35 77 8 TEH TEC 33 48 PSI 06H -0.49 17.62 163 P5 TEH TEC 33 55 PCT AV2 0.00 17 1.02 0 P2 TEH TEC 33 55 PSI 06C 0.52 16.73 165 P5 TEH TEC 33 56 SCI TSH -0.05 0.20 205 1.56 0.21 136 P2 TSH TSH 33 57 PCT AV1 0.20 20 1.66 0 P2 STH TEC 33 57 PCT AV2 -0.32 17 1.24 0 P2 STH TEC 33 57 PCT AV2 0.28 20 1.58 0 P2 STH TEC 33 60 DSI 03H 0.00 0.09 45 P1 TEH TEC 33 62 DSI 02H 0.24 0.46 111 P1 TEH TEC 33 63 PCT AV1 0.00 15 0.82 0 P2 TEH TEC 33 63 PCT AV2 0.00 34 4.18 0 P2 TEH TEC 33 63 PCT AV3 0.00 35 4.44 0 P2 TEH TEC 33 63 PCT AV4 0.00 31 3.18 0 P2 TEH TEC 33 63 WAR AV3 0.00 0.54 121 2 08C AV3 33 63 WAR AV4 0.00 0.61 297 2 08C AV3 33 64 PCT AV2 0.15 19 1.16 0 P2 TEH TEC 33 65 PCT AV1 0.27 18 0.83 0 P2 TEH TEC 33 65 PCT AV2 -0.05 24 1.46 0 P2 TEH TEC 33 73 DSI 07H 0.05 0.37 136 P1 TEH TEC 34 18 DSI 08H 0.00 0.37 146 P1 TEH TEC 34 22 PCT AV2 0.00 15 0.55 0 P2 TEH TEC 34 22 PCT AV3 0.00 15 0.53 0 P2 TEH TEC 34 22 PCT AV4 0.00 19 0.84 0 P2 TEH TEC 34 25 DNI 04H 0.17 1.26 18 P1 TEH TEC 34 26 DNI 07H 0.12 1.51 23 P1 TEH TEC 34 32 DSI 02H 0.00 0.29 166 P1 TEH TEC 34 35 DSI 03H 0.02 0.17 71 P1 TEH TEC 34 36 DNI 05H 0.02 1.70 24 P1 TEH TEC 34 37 DSI 03H 0.07 0.27 16 P1 TEH TEC 34 41 PSI 02H -0.01 7.66 64 8 TEH TEC 34 41 PSI 06C 0.52 9.13 256 8 TEH TEC 34 41 CSI 06C 0.00 10.92 77 11 06C 06C 34 43 PSI 02H -0.51 8.25 258 8 TEH TEC 34 48 DSI 02H 0.05 0.65 113 P1 TEH TEC 34 48 DSI 03H -0.02 0.29 95 P1 TEH TEC 34 48 DSI 04H -0.05 0.20 84 P1 TEH TEC 34 48 DSI 04H -0.05 0.20 84 P1 TEH TEC 34 50 PCT AV1 0.00 23 1.62 0 P2 TEH TEC Page 16 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 34 50 PCT AV3 0.00 27 2.28 0 P2 TEH TEC 34 50 PCT AV4 -0.17 21 1.33 0 P2 TEH TEC 34 51 DSI 02H -0.02 0.76 63 P1 TEH TEC 34 51 DSI 03H -0.02 0.34 94 P1 TEH TEC 34 51 DNI 08H 0.00 1.64 52 P1 TEH TEC 34 57 DSI 02H 0.07 0.17 16 P1 TEH TEC 34 57 DSI 02H 0.07 0.17 16 P1 TEH TEC 34 57 PCT AV2 0.00 25 2.14 0 P2 TEH TEC 35 19 PCT AV4 0.22 19 0.90 0 P2 TEH TEC 35 21 PCT AV3 0.02 25 1.62 0 P2 TEH TEC 35 25 PCT AV2 0.53 34 3.76 0 P2 TEH TEC 35 25 PCT AV3 0.00 37 5.10 0 P2 TEH TEC 35 25 PCT AV4 0.33 31 2.89 0 P2 TEH TEC 35 36 MCI TSH 0.00 0.08 200 1.53 0.10 81 P2 TSH TSH 35 36 DNI 07H 0.00 1.29 55 P1 TEH TEC 35 40 DSI 02H -0.03 0.11 101 P1 TEH TEC 35 41 PCT AV1 0.25 23 1.98 0 P2 STH TEC 35 41 PCT AV2 -0.52 22 1.85 0 P2 STH TEC 35 41 PCT AV2 0.50 33 3.77 0 P2 STH TEC 35 41 PCT AV3 -0.30 18 1.35 0 P2 STH TEC 35 41 PCT AV3 0.29 18 1.38 0 P2 STH TEC 35 41 PCT AV4 0.25 30 2.91 0 P2 STH TEC 35 50 PCT AV1 0.00 26 2.13 0 P2 TEH TEC 35 50 PCT AV2 0.00 21 1.38 0 P2 TEH TEC 35 50 PCT AV3 0.00 27 2.23 0 P2 TEH TEC 35 50 PCT AV4 0.15 21 1.39 0 P2 TEH TEC 35 54 PCT AV1 -0.07 19 1.10 0 P2 TEH TEC 35 71 PCT AV2 -0.39 23 1.42 0 P2 TEH TEC 35 71 PCT AV4 0.66 23 1.31 0 P2 TEH TEC 36 19 PSI 06H 0.40 15.22 133 P5 08H TEH 36 19 CSI 06H 0.00 91.57 91 10 06H 06H 36 20 PSI 06H 0.41 14.19 156 P5 08H TEH 36 20 CSI 06H -0.02 83.14 86 10 06H 06H 36 25 DSI 05H 0.10 0.13 36 P1 TEH TEC 36 26 PSI 06H -0.52 16.92 165 P5 TEH TEC 36 27 PSI 06H -0.54 17.28 165 P5 TEH TEC 36 27 VOL TSC 0.19 0.09 91 6 TSC TSC 36 27 PCT TSC 0.19 13 0.09 76 6 TSC TSC 36 27 VOL TSC 0.20 0.25 57 0.43 0.09 78 6 TSC TSC 36 30 PSI 06H -0.52 16.72 165 P5 TEH TEC 36 42 DSI 03H 0.07 0.19 109 P1 TEH TEC 36 50 PCT AV1 0.00 21 1.40 0 P2 TEH TEC 36 50 PCT AV2 0.00 18 1.03 0 P2 TEH TEC 36 54 DNI 07H 0.07 1.27 46 P1 STH TEC 36 55 PCT AV1 0.00 12 0.65 0 P2 TEH TEC 36 55 PCT AV2 0.00 24 1.88 0 P2 TEH TEC 36 58 DSI 05H 0.05 0.27 49 P1 TEH TEC 36 59 PCT AV1 0.00 24 1.90 0 P2 TEH TEC 36 59 PCT AV2 0.00 27 2.42 0 P2 TEH TEC Page 17 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 36 59 WAR AV1 0.00 0.45 326 P2 08H AV2 36 59 WAR AV2 0.00 0.53 134 P2 08H AV2 36 64 DSI 02H 0.00 0.08 36 P1 TEH TEC 36 64 DSI 02H 0.00 0.08 36 P1 TEH TEC 37 24 DSI 05H 0.10 0.08 104 P1 TEH TEC 37 29 PCT AV1 0.22 20 1.13 0 P2 TEH TEC 37 29 PCT AV2 0.20 27 2.14 0 P2 TEH TEC 37 30 DNI 04H -0.02 1.25 29 P1 TEH TEC 37 32 DSI 03H 0.18 0.69 49 P1 08H TEH 37 41 PCT AV2 0.00 17 1.06 0 P2 TEH TEC 37 57 DSI 02H 0.02 0.29 79 P1 TEH TEC 37 57 DSI 05H 0.05 0.07 112 P1 TEH TEC 37 57 PCT AV2 0.00 19 1.30 0 P2 TEH TEC 37 57 PCT AV3 0.17 33 3.71 0 P2 TEH TEC 37 57 PCT AV4 0.00 35 4.22 0 P2 TEH TEC 37 57 WAR AV3 0.17 0.79 115 2 08C AV3 37 57 WAR AV4 0.00 0.74 117 2 08C AV3 38 35 DSI 02H -0.02 0.18 53 P1 TEH TEC 38 40 DNI 05H 0.00 1.28 43 P1 TEH TEC 38 52 DNI 07H 0.05 1.31 51 P1 TEH TEC 38 62 PCT AV2 0.00 15 0.75 0 P2 TEH TEC 38 63 DSI 03H -0.02 0.07 15 P1 TEH TEC 38 63 DSI 03H -0.02 0.07 15 P1 TEH TEC 39 31 DSI 05H 0.02 0.14 131 P1 TEH TEC 39 33 DSI 03H 0.07 0.23 43 P1 TEH TEC 39 45 PCT AV3 0.02 22 1.64 0 P2 TEH TEC 39 45 PCT AV4 0.00 34 4.09 0 P2 TEH TEC 39 55 PSI 06H 0.15 8.36 160 8 TEH TEC 39 55 PSI 06C -0.07 7.71 160 8 TEH TEC 39 65 PCT AV4 0.00 10 0.51 0 P2 TEH TEC 39 70 PCT AV3 0.00 30 2.56 0 P2 TEH TEC 39 72 PCT AV1 0.00 7 0.17 0 P2 TEH TEC 40 31 DSI 05H 0.00 0.10 91 P1 TEH TEC 40 40 PSI 06C 0.52 17.62 165 P5 TEH TEC 40 41 PSI 02H 0.38 15.12 163 P5 08H TEH 40 41 CSI 02H 0.08 8.95 93 11 02H 02H 40 42 DSI 02H -0.07 0.61 167 P1 TEH TEC 41 31 DSI 05H 0.07 0.23 92 P1 TEH TEC 41 36 DNI 03C 0.10 1.66 8 P1 TEH TEC 41 52 DSI 08C -0.02 0.21 33 P1 TEH TEC 41 68 DSI 04H 0.10 0.26 36 P1 TEH TEC 41 68 PCT AV1 0.00 13 0.43 0 P2 TEH TEC 42 28 PCT AV3 0.00 19 1.09 0 P2 TEH TEC 42 29 PCT AV1 0.25 12 0.69 0 P2 TEH TEC 42 29 PCT AV2 0.40 14 0.84 0 P2 TEH TEC 42 36 DNI 08H 0.02 1.54 14 P1 TEH TEC 42 41 PSI 02H -0.54 8.48 258 8 TEH TEC 42 41 PSI 06H -0.54 17.95 164 P5 TEH TEC 42 41 PSI 06C 0.55 8.89 255 8 TEH TEC Page 18 of 19

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Degrees) CHAN FROM TO 42 45 DNI 07H 0.02 2.26 39 P1 TEH TEC 42 47 PCT AV1 0.00 27 2.47 0 P2 TEH TEC 42 47 PCT AV2 0.00 24 1.98 0 P2 TEH TEC 42 51 DSI 04H 0.10 0.09 119 P1 TEH TEC 42 55 PCT AV1 0.00 30 3.15 0 P2 TEH TEC 42 55 PCT AV2 0.00 20 1.42 0 P2 TEH TEC 42 55 WAR AV1 0.00 0.60 121 P2 08H AV1 43 41 PSI 02H 0.66 8.95 77 8 TEH TEC 43 54 PSI 06H -0.49 18.10 165 P5 TEH TEC 43 64 PSI 06H 0.76 9.95 79 8 TEH TEC 44 48 DSI 02H 0.00 0.26 167 P1 TEH TEC 44 53 DSI 05H 0.12 0.45 112 P1 TEH TEC 44 58 DNI 06H 0.10 2.02 14 P1 TEH TEC 44 59 DNI 06H 0.17 1.94 13 P1 TEH TEC 45 36 DSI 08H -0.34 0.66 123 P1 TEH TEC 45 37 DSI 08H -0.35 0.42 129 P1 TEH TEC 45 41 PSI 06H -0.55 9.17 255 8 TEH TEC 45 54 PSI 02H -0.51 18.65 164 P5 TEH TEC 45 59 DNI 04H -0.15 1.78 171 P1 TEH TEC 46 41 PSI 02H -0.53 8.85 257 8 TEH TEC 46 41 PSI 02H -0.22 9.03 258 8 TEH TEC 46 41 PSI 06H -0.53 9.44 250 8 TEH TEC 46 41 PSI 06H 0.25 8.88 69 8 TEH TEC 46 54 PSI 02H -0.52 9.05 254 8 TEH TEC 46 54 PSI 06H -0.54 17.77 165 P5 TEH TEC Page 19 of 19

Unit #2 - 2R21 Steam Generator 180 Day Report Attachment C BEAVER VALLEY UNIT #2 2R21 SG EXAMINATION RESULTS 2RCS-SG21C TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS)

LENGTH ANGLE WIDTH PHASE ROW COL IND LOC INCH %TW (Inches) (Degrees) (Inches) VOLTS (Inches) CHAN FROM TO 1 23 DSI 07C 0.17 0.33 109 P1 08C TEC 2 21 DNI 06H 0.00 1.25 27 P1 08H TEH 2 71 DNI 07H 0.00 1.28 54 P1 08H TEH 2 78 DSI 03H 0.03 0.37 145 P1 08H TEH 2 80 DSI 03H 0.00 0.19 128 P1 08H TEH 2 85 DSI 03H -0.01 0.40 13 P1 08H TEH 3 8 DSI 04H -0.01 0.38 140 P1 08H TEH 3 9 DSI 04H 0.00 0.10 119 P1 08H TEH 3 9 DSI 06H 0.00 0.12 100 P1 08H TEH 3 12 DSI 07H -0.13 0.27 148 P1 08H TEH 3 16 DNI 03H 0.20 1.42 13 P1 08H TEH 3 18 DSI 03H 0.06 0.22 126 P1 08H TEH 3 35 DSI 05H 0.00 0.27 154 P1 08H TEH 3 39 DSI 04H -0.04 0.14 50 P1 08H TEH 3 39 DSI 07H 0.00 0.56 143 P1 08H TEH 3 45 DSI 02H 0.00 0.46 119 P1 08H TEH 3 58 DSI 02H 0.00 0.45 70 P1 08H TEH 3 58 DNI 03H 0.12 1.42 43 P1 08H TEH 3 60 DSI 02H 0.00 0.38 95 P1 08H TEH 3 60 DSI 03H 0.00 0.32 71 P1 08H TEH 3 64 DSI 02H 0.04 0.21 104 P1 08H TEH 3 64 DSI 03H -0.04 0.66 41 P1 08H TEH 3 80 DSI 02H 0.03 0.55 102 P1 08H TEH 3 80 DNI 05C 0.00 1.13 26 P1 08C TEC 3 82 DNI 05H 0.00 1.74 13 P1 08H TEH 3 90 DSI 06H 0.00 0.32 65 P1 08H TEH 3 93 DSI 04H -0.07 0.35 101 P1 08H TEH 3 94 DSI 04H 0.00 0.55 43 P1 08H TEH 3 94 DNI 05H 0.00 1.34 44 P1 08H TEH 4 3 DSI 04H -0.01 0.14 66 P1 08H TEH 4 11 DSI 02H -0.03 0.26 113 P1 08H TEH 4 26 DSI 03H 0.00 0.68 143 P1 08H TEH 4 28 DSI 06H -0.01 0.31 122 P1 08H TEH 4 28 SCI TSH -0.11 0.22 135 1.03 0.12 127 P2 TSH TSH 4 33 DSI 02H 0.01 0.82 47 P1 08H TEH 4 33 DSI 04H -0.03 0.51 77 P1 08H TEH 4 33 SAI 02H -0.08 0.16 129 2 02H 02H 4 33 SAI 04H 0.00 0.22 84 2 04H 04H 4 39 DSI 07H 0.04 0.50 49 P1 08H TEH 4 39 SAI 07H 0.06 0.18 111 6 07H 07H 4 48 DSI 02H -0.10 0.24 120 P1 08H TEH 4 49 DSI 03H 0.00 0.48 98 P1 08H TEH 4 54 SCI TSH 0.04 0.13 171 1.3 0.28 74 P2 TSH TSH 4 55 SCI TSH -0.09 0.21 162 1.23 0.21 78 P2 TSH TSH 4 69 DSI 03H 0.01 0.26 94 P1 08H TEH 4 73 DNI 08C -0.02 1.32 27 P1 08C TEC 4 76 DSI 03H -0.04 0.41 132 P1 08H TEH 4 80 DNI 05H 0.00 1.30 52 P1 08H TEH 4 80 DNI 07H 0.00 1.36 45 P1 08H TEH 4 81 DNI 04H 0.00 1.42 54 P1 08H TEH 5 6 DSI 03H -0.05 0.61 131 P1 TEH TEC 5 6 DSI 04H 0.00 0.18 99 P1 TEH TEC 5 7 DSI 02H 0.00 0.24 105 P1 TEH TEC 5 7 DSI 03H 0.00 0.86 84 P1 TEH TEC 5 12 DNI 04H 0.20 1.14 44 P1 TEH TEC 5 15 DSI 03H 0.00 0.30 116 P1 TEH TEC 5 15 DSI 04H -0.10 Page 1 of 17 0.50 124 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 5 15 SAI 04H -0.27 0.18 83 6 04H 04H 5 18 DSI 02H -0.10 0.22 125 P1 TEH TEC 5 19 DSI 02H 0.20 0.48 95 P1 TEH TEC 5 19 DSI 03H 0.18 0.22 116 P1 TEH TEC 5 29 DSI 02H -0.02 0.61 125 P1 STH TEC 5 29 DSI 03H 0.14 0.18 131 P1 STH TEC 5 30 DNI 05H 0.05 1.17 45 P1 TEH TEC 5 31 SCI TSH -0.07 0.05 168 1.28 0.26 81 P2 TSH TSH 5 58 SCI TSH -0.04 0.19 112 0.86 0.23 139 P2 TSH TSH 5 61 DSI 02H 0.05 0.32 80 P1 TEH TEC 5 62 DSI 02H 0.02 0.29 108 P1 TEH TEC 5 66 DSI 03H 0.02 0.47 69 P1 TEH TEC 5 68 DNI 07H 0.17 1.50 43 P1 TEH TEC 5 70 DSI 05C 0.15 0.54 48 P1 TEH TEC 5 71 DSI 02H 0.02 0.34 91 P1 TEH TEC 5 73 DNI 03H 0.12 1.45 39 P1 TEH TEC 5 76 DSI 03H -0.02 0.30 77 P1 TEH TEC 5 78 DNI 08H 0.02 1.40 41 P1 TEH TEC 5 81 DNI 07H 0.02 1.39 47 P1 TEH TEC 5 86 DNI 03H 0.00 1.68 51 P1 TEH TEC 5 86 DSI 08H 0.05 0.68 25 P1 TEH TEC 5 88 DNI 06H 0.00 1.28 55 P1 TEH TEC 5 88 DNI 04C -0.02 1.07 35 P1 TEH TEC 5 89 DSI 02H 0.02 0.54 102 P1 TEH TEC 5 89 DNI 04H 0.10 1.41 52 P1 TEH TEC 5 94 DNI 05H 0.05 1.37 14 P1 TEH TEC 6 23 DSI 02H -0.02 0.36 116 P1 TEH TEC 6 30 DSI 02H -0.05 0.43 117 P1 TEH TEC 6 30 DSI 03H -0.07 0.19 131 P1 TEH TEC 6 50 DNI 05H -0.05 1.26 40 P1 TEH TEC 6 54 DSI 03H 0.07 0.54 82 P1 TEH TEC 6 55 DSI 02H 0.00 0.38 153 P1 TEH TEC 6 63 DSI 02H -0.02 0.68 114 P1 TEH TEC 6 63 DSI 04H 0.00 0.32 17 P1 TEH TEC 6 71 DNI 07H 0.05 1.49 29 P1 TEH TEC 6 78 DSI 03H 0.00 0.76 94 P1 TEH TEC 6 84 DSI 03H 0.02 0.34 81 P1 TEH TEC 6 87 DSI 03H 0.02 0.24 27 P1 TEH TEC 6 88 DNI 08H 0.00 1.30 50 P1 TEH TEC 6 92 DSI 04H -0.03 0.27 41 P1 TEH TEC 7 7 DNI 07H 0.00 2.57 17 P1 TEH TEC 7 7 DNI 07C 0.12 2.13 10 P1 TEH TEC 7 9 DNI 06H 0.00 1.23 41 P1 TEH TEC 7 10 DNI 05H 0.02 1.23 40 P1 TEH TEC 7 12 DNI 02H 0.02 1.39 51 P1 TEH TEC 7 12 DSI 08C -0.20 0.82 27 P1 TEH TEC 7 12 SAI 08C -0.08 0.10 127 2 08C 08H 7 40 DSI 03H -0.05 0.32 89 P1 TEH TEC 7 40 DSI 04H 0.00 0.28 47 P1 TEH TEC 7 49 DSI 02H 0.02 0.28 97 P1 TEH TEC 7 49 DSI 03H -0.07 0.17 130 P1 TEH TEC 7 58 DSI 02H -0.05 0.30 58 P1 TEH TEC 7 59 DNI 04H 0.00 1.30 52 P1 TEH TEC 7 62 DNI 04H 0.00 1.36 52 P1 TEH TEC 7 67 DSI 02H -0.07 0.39 59 P1 TEH TEC 7 80 DSI 03H -0.02 0.21 90 P1 TEH TEC 7 86 DNI 07H 0.05 1.13 30 P1 TEH TEC 7 93 DNI 05H 0.07 1.78 13 P1 TEH TEC 8 2 DSI 08H 0.07 Page 2 of 17 0.32 26 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 8 12 DNI 06H 0.00 1.25 55 P1 TEH TEC 8 18 DNI 05H 0.00 1.03 54 P1 TEH TEC 8 21 DNI 04H 0.17 1.21 20 P1 TEH TEC 8 23 DSI 02H 0.20 0.72 73 P1 TEH TEC 8 24 DSI 02H 0.22 0.41 103 P1 TEH TEC 8 26 SCI TSH -0.10 0.22 82 0.62 0.11 98 P2 TSH TSH 8 35 SCI TSH -0.05 0.17 206 1.57 0.09 98 P2 TSH TSH 8 43 DSI 03H -0.12 0.23 73 P1 TEH TEC 8 54 MCI TSH -0.10 0.18 274 2.09 0.13 111 P2 TSH TSH 8 63 DSI 06H -0.05 0.17 67 P1 TEH TEC 8 72 DSI 03H 0.00 0.15 27 P1 TEH TEC 8 84 DSI 03H 0.09 0.29 157 P1 TEH TEC 8 85 DNI 06H 0.10 1.33 30 P1 TEH TEC 8 90 DNI 05H -0.15 1.49 15 P1 TEH TEC 8 90 DNI 06H 0.15 1.22 19 P1 TEH TEC 9 13 DSI 03H -0.05 0.10 50 P1 TEH TEC 9 20 DSI 04H 0.00 0.51 160 P1 TEH TEC 9 26 DSI 03H 0.07 0.41 69 P1 TEH TEC 9 27 DNI 08C -0.13 1.32 28 P1 TEH TEC 9 30 DSI 02H -0.05 0.32 114 P1 TEH TEC 9 30 DNI 07H 0.05 1.35 51 P1 TEH TEC 9 32 DSI 02H 0.14 0.82 74 P1 TEH TEC 9 32 DNI 07H -0.02 1.49 52 P1 TEH TEC 9 35 DSI 02H 0.02 0.47 89 P1 TEH TEC 9 37 DSI 02H -0.10 0.30 131 P1 TEH TEC 9 38 DSI 03H -0.05 0.31 138 P1 TEH TEC 9 39 DSI 05H -0.07 0.27 121 P1 TEH TEC 9 41 DSI 02H 0.10 0.34 117 P1 TEH TEC 9 44 DSI 03H 0.02 0.15 89 P1 TEH TEC 9 45 DSI 05H 0.12 0.43 95 P1 TEH TEC 9 45 DSI 06H -0.05 0.25 67 P1 TEH TEC 9 47 DSI 02H 0.02 0.55 92 P1 STH TEC 9 48 SCI TSH -0.06 0.15 58 0.45 0.12 121 P2 TSH TSH 9 54 DSI 02H -0.20 0.75 103 P1 TEH TEC 9 54 DSI 04H 0.00 0.30 96 P1 TEH TEC 9 62 DSI 04H -0.10 0.14 64 P1 TEH TEC 9 65 DSI 06H 0.05 0.25 53 P1 TEH TEC 9 68 NQI 06C 2.65 0.57 118 3 TEH TEC 9 74 DSI 04H -0.02 0.28 111 P1 TEH TEC 9 88 DNI 04H 0.05 1.17 46 P1 TEH TEC 9 88 DNI 06H 0.05 1.21 48 P1 TEH TEC 9 91 DNI 04H 0.02 1.24 49 P1 TEH TEC 10 7 DNI 05H 0.17 1.40 54 P1 TEH TEC 10 7 DNI 07H 0.10 1.23 55 P1 TEH TEC 10 8 DSI 02H 0.00 0.78 96 P1 TEH TEC 10 8 DNI 06C 0.00 1.35 34 P1 TEH TEC 10 9 DSI 03H 0.12 0.20 100 P1 TEH TEC 10 10 DSI 02H -0.02 0.60 91 P1 TEH TEC 10 10 DSI 03H 0.02 0.47 85 P1 TEH TEC 10 14 DNI 08H 0.12 1.10 45 P1 TEH TEC 10 15 DNI 07H 0.05 1.36 42 P1 TEH TEC 10 15 DNI 04C -0.05 1.44 27 P1 TEH TEC 10 18 DSI 04H 0.00 0.18 124 P1 TEH TEC 10 24 DSI 03H -0.10 0.19 127 P1 TEH TEC 10 24 DNI 07H -0.02 1.17 48 P1 TEH TEC 10 31 DNI 07H 0.05 1.20 50 P1 TEH TEC 10 32 DNI 03H -0.12 1.30 18 P1 TEH TEC 10 36 DSI 02H 0.00 0.28 137 P1 TEH TEC 10 37 DSI 02H 0.00 Page 3 of 17 0.54 88 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 10 38 DSI 07H -0.10 0.45 139 P1 STH TEC 10 43 DSI 02H 0.00 0.22 121 P1 TEH TEC 10 44 DSI 02H 0.10 0.35 125 P1 TEH TEC 10 51 DSI 02H -0.17 0.93 64 P1 TEH TEC 10 51 DSI 03H 0.10 0.96 60 P1 TEH TEC 10 51 DSI 05H -0.02 0.24 23 P1 TEH TEC 10 54 DSI 02H 0.00 0.61 74 P1 TEH TEC 10 54 DSI 03H 0.07 0.33 96 P1 TEH TEC 10 55 DNI 08H 0.00 1.34 42 P1 TEH TEC 10 60 DNI 03H 0.17 1.29 46 P1 TEH TEC 10 69 DNI 06H 0.02 1.71 46 P1 TEH TEC 10 72 DSI 02H 0.00 0.45 120 P1 TEH TEC 10 72 DSI 03H 0.00 0.14 64 P1 TEH TEC 10 72 DNI 07H 0.17 1.39 47 P1 TEH TEC 10 76 DSI 04H 0.02 0.12 47 P1 TEH TEC 10 78 DSI 03H 0.03 0.05 95 P1 STH TEC 10 83 DNI 07H -0.02 1.31 46 P1 TEH TEC 10 89 DNI 07H 0.02 1.33 41 P1 TEH TEC 11 7 DSI 02H 0.02 0.57 87 P1 TEH TEC 11 9 DSI 03H 0.22 0.62 56 P1 TEH TEC 11 17 DSI 02H -0.03 0.47 65 P1 STH TEC 11 17 DNI 04H 0.17 2.00 51 P1 STH TEC 11 17 DNI 07C -0.20 1.31 36 P1 STH TEC 11 18 DNI 07H 0.18 1.47 54 P1 STH TEC 11 18 DNI 08C -0.17 1.68 38 P1 STH TEC 11 24 DNI 04H -0.20 1.46 10 P1 TEH TEC 11 24 DNI 05H -0.20 1.32 17 P1 TEH TEC 11 24 DNI 06H 0.15 1.26 15 P1 TEH TEC 11 36 DSI 02H -0.10 0.68 81 P1 STH TEC 11 36 DNI 04H 0.16 2.13 45 P1 STH TEC 11 36 DNI 06H 0.17 1.76 44 P1 STH TEC 11 36 DNI 07C -0.15 1.54 38 P1 STH TEC 11 41 DNI 08C 0.00 1.31 26 P1 TEH TEC 11 43 SCI TSH -0.04 0.23 63 0.48 0.11 86 P2 TSH TSH 11 48 DNI 04H -0.12 1.40 18 P1 TEH TEC 11 49 DSI 02H 0.00 0.45 72 P1 TEH TEC 11 49 DNI 03H 0.00 1.56 52 P1 TEH TEC 11 49 DNI 07H 0.00 1.27 51 P1 TEH TEC 11 54 DNI 06H 0.02 1.57 34 P1 TEH TEC 11 55 DNI 02H -0.05 1.58 50 P1 TEH TEC 11 57 DSI 07C -0.22 0.26 123 P1 TEH TEC 11 62 DSI 03H 0.05 0.35 22 P1 TEH TEC 11 70 DSI 03H 0.15 0.19 43 P1 TEH TEC 11 72 DSI 03H 0.00 0.35 45 P1 TEH TEC 11 77 DSI 04H 0.00 0.25 79 P1 TEH TEC 11 77 DSI 05H 0.00 0.18 30 P1 TEH TEC 11 78 DNI 06H 0.00 1.31 40 P1 TEH TEC 11 79 DNI 04H 0.00 1.33 54 P1 TEH TEC 11 79 DNI 08H 0.00 1.22 36 P1 TEH TEC 11 84 DNI 04H 0.00 1.34 50 P1 TEH TEC 11 87 DNI 06C 0.00 1.15 28 P1 TEH TEC 11 88 DNI 04H 0.00 1.51 48 P1 TEH TEC 11 88 DSI 05H 0.05 0.60 149 P1 TEH TEC 11 88 DNI 06H 0.00 1.61 37 P1 TEH TEC 11 89 DNI 05H 0.00 1.49 43 P1 TEH TEC 11 89 DNI 07C 0.00 1.42 16 P1 TEH TEC 12 9 DSI 02H 0.00 0.49 73 P1 TEH TEC 12 11 NQI 07C 6.75 0.15 86 3 TEH TEC 12 12 DNI 02H 0.13 Page 4 of 17 1.38 54 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 12 12 DNI 05H 0.17 1.29 44 P1 TEH TEC 12 26 DNI 02H 0.05 1.11 38 P1 TEH TEC 12 27 DNI 06H 0.05 1.39 44 P1 TEH TEC 12 28 DNI 05H 0.00 1.18 38 P1 TEH TEC 12 30 DSI 02H -0.02 0.37 112 P1 TEH TEC 12 35 DSI 04H 0.07 0.08 131 P1 TEH TEC 12 35 DSI 05H 0.05 0.08 131 P1 TEH TEC 12 45 DNI 07H -0.05 1.27 46 P1 TEH TEC 12 55 DSI 02H 0.07 0.30 94 P1 TEH TEC 12 59 DNI 04H 0.00 1.61 49 P1 TEH TEC 12 70 DSI 02H 0.12 0.21 100 P1 TEH TEC 12 70 DSI 03H 0.00 0.26 109 P1 TEH TEC 12 70 DNI 04H 0.17 1.41 49 P1 TEH TEC 12 71 DNI 08H 0.05 1.49 10 P1 TEH TEC 12 83 DSI 03H -0.15 0.21 148 P1 TEH TEC 12 92 DNI 04H 0.05 1.55 51 P1 TEH TEC 12 92 DNI 06H 0.00 1.36 13 P1 TEH TEC 12 92 DNI 03C 0.00 1.24 22 P1 TEH TEC 13 7 DSI 03H 0.10 0.32 91 P1 TEH TEC 13 32 DSI 02H 0.15 0.10 88 P1 TEH TEC 13 32 DNI 08H 0.07 1.21 52 P1 TEH TEC 13 35 SAI 02H -0.01 0.11 92 P4 02H 02H 13 35 SAI 02H 0.15 0.08 79 P4 02H 02H 13 35 SAI 05H 0.08 0.06 61 P4 05H 05H 13 35 DSI 02H 0.02 0.82 89 P1 TEH TEC 13 35 DNI 03H 0.17 1.35 52 P1 TEH TEC 13 35 DSI 05H 0.07 0.32 70 P1 TEH TEC 13 35 DNI 07H 0.05 1.82 41 P1 TEH TEC 13 37 DNI 07H 0.03 1.29 46 P1 TEH TEC 13 43 DSI 02H 0.00 0.18 39 P1 TEH TEC 13 43 DSI 03H 0.12 0.39 161 P1 TEH TEC 13 45 DNI 08H 0.00 1.63 19 P1 TEH TEC 13 59 DSI 03H 0.15 0.44 32 P1 TEH TEC 13 62 DSI 04H 0.02 0.27 37 P1 TEH TEC 13 63 DSI 02H 0.02 0.21 27 P1 TEH TEC 13 64 DSI 02H 0.07 0.38 71 P1 TEH TEC 13 64 DNI 04H -0.02 1.36 20 P1 TEH TEC 13 64 DNI 05H 0.27 1.26 21 P1 TEH TEC 13 64 DSI 08H 0.00 0.32 83 P1 TEH TEC 13 74 DNI 05H 0.00 1.44 35 P1 TEH TEC 13 74 DNI 07H -0.05 1.32 42 P1 TEH TEC 14 17 DNI 08H 0.02 1.02 41 P1 TEH TEC 14 27 DNI 03H -0.05 1.29 13 P1 TEH TEC 14 27 DNI 04H 0.17 1.19 16 P1 TEH TEC 14 27 DNI 06H 0.02 1.04 31 P1 TEH TEC 14 27 DNI 08H 0.07 1.01 38 P1 TEH TEC 14 29 DSI 04H 0.00 0.17 55 P1 TEH TEC 14 29 SAI 04H -0.02 0.06 111 P4 04H 05H 14 38 DSI 02H 0.02 0.24 85 P1 TEH TEC 14 39 DSI 05H 0.02 0.18 65 P1 TEH TEC 14 43 DNI 03H 0.10 1.38 40 P1 TEH TEC 14 46 DNI 03H 0.00 1.42 22 P1 TEH TEC 14 50 DSI 02H -0.10 0.53 80 P1 TEH TEC 14 54 DSI 02H -0.07 0.35 79 P1 TEH TEC 14 59 DSI 03H 0.00 0.13 61 P1 TEH TEC 14 59 DSI 04H 0.00 0.16 143 P1 TEH TEC 14 59 DSI 06H -0.05 0.07 103 P1 TEH TEC 14 70 DSI 08H 0.00 0.18 45 P1 TEH TEC 15 5 DSI 04H 0.20 Page 5 of 17 1.45 33 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 15 5 DNI 08H 0.07 1.10 55 P1 TEH TEC 15 8 DNI 04H 0.02 1.44 54 P1 TEH TEC 15 8 DNI 05H 0.05 1.35 43 P1 TEH TEC 15 8 DNI 06H 0.02 1.33 54 P1 TEH TEC 15 8 DNI 07H 0.00 1.29 49 P1 TEH TEC 15 11 DNI 06H 0.05 1.31 43 P1 TEH TEC 15 14 DSI 03H 0.18 0.26 44 P1 TEH TEC 15 14 DNI 07H 0.02 1.34 55 P1 TEH TEC 15 35 DSI 02H -0.02 0.14 150 P1 TEH TEC 15 35 DSI 03H 0.00 0.25 72 P1 TEH TEC 15 38 SAI 04H 0.15 0.17 75 6 04H 04H 15 38 DSI 04H -0.02 0.35 50 P1 TEH TEC 15 39 DSI 02H 0.02 0.64 120 P1 TEH TEC 15 39 DSI 03H -0.05 0.39 120 P1 TEH TEC 15 39 DNI 05H 0.12 1.35 49 P1 TEH TEC 15 40 DNI 04H 0.00 1.53 55 P1 TEH TEC 15 43 DNI 08C -0.15 1.19 33 P1 TEH TEC 15 61 DSI 02H 0.00 0.20 86 P1 TEH TEC 15 62 DSI 02H 0.19 0.36 51 P1 TEH TEC 15 78 DNI 04H 0.02 1.35 55 P1 TEH TEC 15 78 DNI 06H 0.00 1.47 37 P1 TEH TEC 15 78 DNI 08H 0.00 1.32 43 P1 TEH TEC 15 80 DSI 03H 0.00 0.19 89 P1 TEH TEC 15 87 DSI 03H 0.00 0.34 141 P1 TEH TEC 16 15 DSI 03H 0.24 0.38 57 P1 TEH TEC 16 15 DNI 07H 0.02 1.21 48 P1 TEH TEC 16 15 DNI 08H 0.07 1.21 49 P1 TEH TEC 16 16 DNI 06H 0.02 2.11 42 P1 TEH TEC 16 16 DNI 08H 0.07 1.37 54 P1 TEH TEC 16 16 DNI 04C -0.07 1.39 25 P1 TEH TEC 16 17 DSI 02H -0.07 0.26 34 P1 TEH TEC 16 20 DNI 08H 0.10 1.17 29 P1 TEH TEC 16 23 DNI 07C -0.02 1.27 32 P1 TEH TEC 16 23 DNI 06C -0.02 1.28 25 P1 TEH TEC 16 34 DNI 03H 0.02 1.34 51 P1 TEH TEC 16 34 MCI TSH -0.06 0.17 265 2.02 0.17 65 P2 TSH TSH 16 43 DNI 06H 0.05 1.38 15 P1 TEH TEC 16 45 DNI 05H 0.20 1.35 12 P1 TEH TEC 16 45 DNI 06C -0.02 1.31 18 P1 TEH TEC 16 45 SAI 06C 0.12 0.03 75 P4 06C 06C 16 46 DSI 02H -0.07 0.49 106 P1 TEH TEC 16 46 DSI 04H 0.27 0.55 81 P1 TEH TEC 16 46 DNI 06H 0.00 1.82 41 P1 TEH TEC 16 46 DNI 08C 0.00 1.16 38 P1 TEH TEC 16 46 DNI 06C 0.02 1.38 34 P1 TEH TEC 16 47 DNI 06H 0.07 1.52 10 P1 TEH TEC 16 55 DSI 06H -0.07 0.33 144 P1 TEH TEC 16 57 DSI 03H 0.15 0.60 72 P1 TEH TEC 16 63 DSI 02H -0.07 0.11 49 P1 TEH TEC 16 73 DSI 02H 0.00 0.27 84 P1 TEH TEC 17 9 DSI 04H 0.00 0.23 119 P1 TEH TEC 17 9 SAI 04H -0.07 0.11 103 6 04H 04H 17 14 DSI 04H 0.02 0.22 131 P1 TEH TEC 17 17 DSI 02H 0.12 0.24 150 P1 TEH TEC 17 18 DSI 02H 0.10 0.33 54 P1 TEH TEC 17 24 DSI 04H 0.02 0.09 141 P1 TEH TEC 17 26 DSI 03H -0.05 0.24 144 P1 TEH TEC 17 30 DNI 08H 0.10 1.11 37 P1 TEH TEC 17 32 DNI 04H 0.05 Page 6 of 17 1.05 42 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 17 35 SAI 03H -0.19 0.05 73 P4 03H 03H 17 35 SAI 03H -0.02 0.04 85 P4 03H 03H 17 35 DSI 03H 0.00 0.67 63 P1 TEH TEC 17 35 DNI 06H 0.05 1.39 50 P1 TEH TEC 17 37 DNI 04H 0.05 1.45 50 P1 TEH TEC 17 37 DNI 07H 0.00 1.47 38 P1 TEH TEC 17 37 DNI 08C -0.02 1.42 32 P1 TEH TEC 17 38 MCI TSH 0.04 0.17 114 0.87 0.10 101 P2 TSH TSH 17 38 DSI 02H 0.05 0.22 100 P1 TEH TEC 17 38 DNI 08H 0.00 1.38 53 P1 TEH TEC 17 42 DNI 08H 0.02 1.32 34 P1 TEH TEC 17 42 DNI 06C -0.05 1.26 15 P1 TEH TEC 17 48 DSI 02H 0.07 0.95 77 P1 TEH TEC 17 49 DSI 02H 0.00 0.26 66 P1 TEH TEC 17 50 DSI 03H 0.02 0.56 93 P1 TEH TEC 17 50 SAI 03H -0.04 0.22 68 6 03H 03H 17 50 SAI 03H 0.05 0.21 92 6 03H 03H 17 58 DNI 03H 0.10 1.45 49 P1 TEH TEC 17 61 DSI 02H 0.00 0.65 65 P1 TEH TEC 17 61 DSI 03H 0.05 0.30 109 P1 TEH TEC 17 63 DSI 02H 0.00 0.28 63 P1 TEH TEC 17 66 DSI 02H 0.00 0.53 115 P1 TEH TEC 17 66 DNI 07H 0.00 1.35 50 P1 TEH TEC 17 67 DSI 02H 0.00 0.56 131 P1 TEH TEC 17 68 DSI 02H -0.02 0.34 110 P1 TEH TEC 17 68 DNI 06H 0.15 1.41 44 P1 TEH TEC 17 68 DNI 07H 0.00 1.49 44 P1 TEH TEC 17 80 DNI 08H 0.00 1.29 40 P1 TEH TEC 18 6 DNI 08H 0.02 1.29 29 P1 TEH TEC 18 8 DNI 08H 0.00 1.28 40 P1 TEH TEC 18 12 DNI 02H 0.05 1.52 51 P1 TEH TEC 18 14 DNI 05H 0.10 1.13 41 P1 TEH TEC 18 15 DNI 02H 0.02 1.46 54 P1 TEH TEC 18 15 DSI 06H 0.05 0.21 117 P1 TEH TEC 18 15 DNI 08H 0.07 1.55 41 P1 TEH TEC 18 15 DNI 08C -0.02 1.64 36 P1 TEH TEC 18 30 DNI 07H 0.02 1.39 42 P1 TEH TEC 18 36 DNI 08H 0.00 1.29 46 P1 TEH TEC 18 36 DNI 07C 0.00 1.34 32 P1 TEH TEC 18 47 DSI 03H 0.02 0.41 61 P1 TEH TEC 18 47 DSI 04H 0.05 0.44 69 P1 TEH TEC 18 48 DSI 02H 0.02 0.39 39 P1 TEH TEC 18 48 DSI 03H 0.20 0.31 108 P1 TEH TEC 18 48 DSI 04H 0.30 0.49 46 P1 TEH TEC 18 48 DNI 08H 0.12 1.11 54 P1 TEH TEC 18 50 DSI 02H 0.07 0.32 129 P1 TEH TEC 18 50 DNI 03H 0.20 1.30 48 P1 TEH TEC 18 51 DSI 02H -0.03 0.29 87 P1 TEH TEC 18 51 DNI 04H 0.07 1.43 52 P1 TEH TEC 18 51 DNI 06C -0.02 1.26 35 P1 TEH TEC 18 52 DNI 06H 0.00 1.29 53 P1 TEH TEC 18 52 DNI 07H 0.00 1.27 50 P1 TEH TEC 18 53 DSI 02H -0.02 0.68 83 P1 TEH TEC 18 53 DNI 03H 0.20 1.61 42 P1 TEH TEC 18 54 DSI 02H 0.02 0.49 61 P1 TEH TEC 18 54 DSI 03H 0.05 0.32 77 P1 TEH TEC 18 54 DNI 06H 0.00 1.53 45 P1 TEH TEC 18 55 DSI 02H -0.02 0.30 102 P1 TEH TEC 18 55 DNI 04H 0.12 Page 7 of 17 1.39 54 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 18 56 DSI 03H 0.07 0.44 80 P1 TEH TEC 18 56 DNI 06H 0.00 1.53 51 P1 TEH TEC 18 59 DSI 03H -0.02 0.20 111 P1 TEH TEC 18 59 DSI 06H 0.02 0.14 45 P1 TEH TEC 18 59 DNI 07H 0.00 1.32 53 P1 TEH TEC 18 61 DSI 04H 0.00 0.30 64 P1 TEH TEC 18 61 DSI 08H -0.02 0.17 34 P1 TEH TEC 18 62 DSI 02H -0.10 0.39 98 P1 TEH TEC 18 62 DSI 03H 0.00 0.44 93 P1 TEH TEC 18 62 DSI 04H 0.02 0.17 94 P1 TEH TEC 18 65 DNI 06H 0.00 1.26 53 P1 TEH TEC 18 66 DSI 03H 0.02 0.38 104 P1 TEH TEC 18 67 DSI 02H 0.00 0.43 75 P1 TEH TEC 18 67 DSI 03H 0.07 0.69 74 P1 TEH TEC 18 70 SCI TSH -0.11 0.18 78 0.6 0.20 97 P2 TSH TSH 18 73 DSI 03H 0.00 0.17 36 P1 TEH TEC 18 88 DNI 04H 0.02 1.34 52 P1 TEH TEC 19 20 DNI 02H -0.17 1.75 25 P1 TEH TEC 19 22 DNI 07H -0.02 1.31 39 P1 TEH TEC 19 23 DNI 06C -0.02 1.42 24 P1 TEH TEC 19 25 DNI 04H 0.05 1.33 54 P1 TEH TEC 19 26 DSI 03H 0.00 0.34 101 P1 TEH TEC 19 26 DNI 07H 0.02 1.39 52 P1 TEH TEC 19 29 DSI 02H -0.10 0.45 112 P1 STH TEC 19 29 DSI 08H 0.00 0.32 56 P1 STH TEC 19 29 SAI 08H -0.03 0.19 110 2 08H 08H 19 34 DNI 07H 0.05 1.38 33 P1 TEH TEC 19 40 MCI TSH 0.08 0.2 62 0.47 0.09 70 P2 TSH TSH 19 47 SCI TSH -0.24 0.23 29 0.22 0.08 71 P2 TSH TSH 19 47 SAI 04H 0.03 0.07 120 P4 04H 04H 19 47 DSI 04H 0.10 0.35 160 P1 TEH TEC 19 48 DSI 02H 0.15 0.69 108 P1 TEH TEC 19 48 DSI 03H 0.25 0.65 102 P1 TEH TEC 19 52 SCI TSH 0.01 0.21 38 0.29 0.17 69 P2 TSH TSH 19 53 DNI 08H -0.02 1.34 40 P1 TEH TEC 19 54 DSI 02H 0.00 0.28 97 P1 TEH TEC 19 54 DNI 07H 0.02 1.32 52 P1 TEH TEC 19 56 DNI 05H 0.00 1.40 54 P1 TEH TEC 19 57 DSI 04H -0.05 0.45 41 P1 TEH TEC 19 57 DSI 05H 0.07 0.43 67 P1 TEH TEC 19 57 DNI 07H 0.00 1.40 40 P1 TEH TEC 19 74 DNI 07H 0.00 1.29 48 P1 TEH TEC 19 75 DNI 05H 0.02 1.47 54 P1 TEH TEC 19 79 DSI 02H -0.02 0.82 124 P1 TEH TEC 19 79 DNI 06H 0.00 1.69 55 P1 TEH TEC 19 79 DNI 08H 0.00 1.54 44 P1 TEH TEC 19 82 DSI 02H 0.00 0.31 116 P1 TEH TEC 19 82 DNI 07H 0.00 1.29 45 P1 TEH TEC 19 89 DSI 06H 0.02 0.14 103 P1 TEH TEC 20 10 DNI 08H 0.05 0.97 30 P1 TEH TEC 20 13 DNI 05H 0.12 1.26 45 P1 TEH TEC 20 13 DNI 06H 0.02 1.20 42 P1 TEH TEC 20 13 DNI 07H 0.05 1.48 38 P1 TEH TEC 20 13 DNI 07C -0.02 1.29 33 P1 TEH TEC 20 17 DNI 07H 0.05 1.33 41 P1 TEH TEC 20 17 DNI 08H 0.05 0.99 44 P1 TEH TEC 20 17 DNI 08C 0.10 1.19 34 P1 TEH TEC 20 21 DSI 04H 0.07 0.22 140 P1 TEH TEC 20 21 SAI 04H 0.08 Page 8 of 17 0.08 79 P4 04H 05H

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 20 22 SCI TSH -0.03 0.19 69 0.53 0.12 97 P2 TSH TSH 20 26 DNI 07H 0.05 1.20 43 P1 TEH TEC 20 75 DSI 02H -0.03 0.52 125 P1 STH TEC 20 75 DNI 07H 0.20 1.47 52 P1 STH TEC 20 76 DSI 02H -0.02 0.41 134 P1 TEH TEC 20 76 DSI 03H 0.15 1.09 77 P1 TEH TEC 20 76 DNI 06H 0.00 1.65 54 P1 TEH TEC 20 76 SAI 02H 0.10 0.12 95 6 02H 02H 20 78 DSI 04H 0.00 0.34 114 P1 TEH TEC 20 78 DNI 08H 0.05 1.39 48 P1 TEH TEC 20 78 DNI 07C -0.14 1.70 18 P1 TEH TEC 20 78 SAI 04H 0.06 0.24 88 6 04H 04H 20 78 SAI 04H 0.00 0.10 94 P4 04H 04H 20 79 DNI 07H 0.05 1.26 47 P1 TEH TEC 20 80 DNI 06H 0.00 1.36 49 P1 TEH TEC 20 80 DNI 07H 0.02 1.13 51 P1 TEH TEC 20 83 DNI 05H 0.15 1.23 50 P1 TEH TEC 20 83 DNI 07H 0.00 1.32 49 P1 TEH TEC 20 84 DNI 04H 0.05 1.81 42 P1 TEH TEC 20 85 DSI 03H 0.02 0.25 121 P1 TEH TEC 20 85 DNI 04H 0.02 1.57 55 P1 TEH TEC 20 85 DNI 07H 0.05 1.32 46 P1 TEH TEC 20 87 DNI 06H 0.02 1.41 51 P1 TEH TEC 20 88 DNI 06H 0.00 1.21 52 P1 TEH TEC 21 10 DNI 05H 0.00 1.21 29 P1 TEH TEC 21 18 DSI 02H 0.05 0.42 154 P1 TEH TEC 21 18 DSI 03H 0.07 0.40 149 P1 TEH TEC 21 18 DNI 08H 0.10 1.22 50 P1 TEH TEC 21 25 DSI 04H 0.05 0.07 121 P1 TEH TEC 21 31 DNI 06H 0.02 1.28 35 P1 TEH TEC 21 62 DSI 02H -0.05 0.37 79 P1 TEH TEC 21 67 DSI 07H 0.00 0.29 134 P1 TEH TEC 21 71 DNI 05H 0.00 1.34 47 P1 TEH TEC 21 71 DNI 06H 0.00 1.31 50 P1 TEH TEC 21 71 DNI 08H 0.05 1.28 36 P1 TEH TEC 21 78 DNI 06H 0.00 1.64 45 P1 TEH TEC 21 78 DNI 08H 0.00 1.34 37 P1 TEH TEC 21 79 DNI 07H 0.00 1.28 49 P1 TEH TEC 21 80 DNI 05H 0.00 1.53 43 P1 TEH TEC 21 82 DNI 07H 0.00 1.31 46 P1 TEH TEC 21 88 NQI 03H 8.64 1.51 74 3 TEH TEC 21 88 NQI 07C 24.33 0.53 131 3 TEH TEC 21 88 NQI 07C 26.25 0.64 95 3 TEH TEC 22 9 DNI 07H 0.02 1.07 47 P1 TEH TEC 22 12 DNI 05H 0.05 1.04 40 P1 TEH TEC 22 15 DNI 05H 0.05 1.36 31 P1 TEH TEC 22 16 DNI 07H 0.02 1.15 38 P1 TEH TEC 22 18 DSI 02H 0.12 0.41 111 P1 TEH TEC 22 18 DSI 05H 0.07 0.29 76 P1 TEH TEC 22 20 DSI 02H -0.05 0.51 88 P1 TEH TEC 22 20 DNI 07H 0.12 1.90 38 P1 TEH TEC 22 20 DNI 08H 0.12 1.42 48 P1 TEH TEC 22 21 DNI 05H 0.05 1.71 51 P1 TEH TEC 22 21 DNI 06H 0.07 1.74 48 P1 TEH TEC 22 21 DNI 08H 0.02 1.07 54 P1 TEH TEC 22 22 DNI 08H 0.07 1.02 36 P1 TEH TEC 22 24 DSI 03H -0.05 0.27 131 P1 TEH TEC 22 30 DNI 03H 0.00 1.29 52 P1 TEH TEC 22 33 DSI 02H -0.02 Page 9 of 17 0.27 39 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 22 36 DNI 04H 0.02 1.36 53 P1 TEH TEC 22 39 DNI 08H 0.00 1.18 48 P1 TEH TEC 22 54 DSI 06H 0.00 0.29 22 P1 TEH TEC 22 61 DSI 03H -0.12 0.25 123 P1 TEH TEC 22 64 DSI 03H 0.02 0.30 168 P1 TEH TEC 22 72 DNI 05H 0.15 1.42 46 P1 TEH TEC 22 73 DNI 05H 0.00 1.36 55 P1 TEH TEC 22 74 DNI 03H 0.02 1.50 49 P1 TEH TEC 22 74 DNI 04H 0.02 1.59 46 P1 TEH TEC 22 74 DNI 05H 0.17 1.40 28 P1 TEH TEC 22 74 DNI 07H 0.02 1.16 41 P1 TEH TEC 22 75 DSI 04H 0.02 0.29 37 P1 TEH TEC 22 75 DNI 07C 0.00 1.53 27 P1 TEH TEC 22 75 DNI 05C -0.15 1.38 20 P1 TEH TEC 22 75 SAI 04H 0.00 0.12 91 6 04H 04H 22 77 DSI 03H -0.03 0.20 149 P1 TEH TEC 22 78 DNI 05H 0.20 1.12 36 P1 TEH TEC 22 78 DNI 07H 0.05 1.21 50 P1 TEH TEC 22 79 DNI 08H 0.00 1.28 51 P1 TEH TEC 22 80 DNI 06H 0.12 1.36 10 P1 TEH TEC 22 80 DNI 07H 0.07 1.46 9 P1 TEH TEC 22 83 DNI 08H 0.07 1.81 8 P1 TEH TEC 22 84 DNI 06H 0.00 1.28 55 P1 TEH TEC 22 86 DNI 04H 0.00 1.52 55 P1 TEH TEC 23 10 DSI 02H 0.00 0.25 69 P1 TEH TEC 23 13 DNI 06H 0.00 1.19 49 P1 TEH TEC 23 13 PCT AV2 0.17 12 0.56 0 P2 TEH TEC 23 28 DSI 03H 0.15 0.55 67 P1 TEH TEC 23 28 DNI 07H 0.00 1.24 36 P1 TEH TEC 23 33 PCT AV1 0.00 15 0.73 0 P2 TEH TEC 23 37 DSI 02H -0.07 0.72 48 P1 STH TEC 23 39 DSI 02H 0.07 0.26 90 P1 TEH TEC 23 39 DSI 05H -0.05 0.29 94 P1 TEH TEC 23 42 DSI 02H -0.02 0.27 76 P1 TEH TEC 23 42 DSI 03H -0.02 0.39 104 P1 TEH TEC 23 43 DNI 06H 0.00 1.39 49 P1 TEH TEC 23 45 DNI 06H 0.05 1.33 54 P1 TEH TEC 23 67 DNI 05H 0.15 1.29 28 P1 TEH TEC 23 69 DSI 03H 0.00 0.17 57 P1 TEH TEC 23 70 DNI 08H 0.20 1.45 27 P1 TEH TEC 23 73 DNI 06H 0.00 1.29 54 P1 TEH TEC 23 75 DNI 08H 0.05 1.28 37 P1 TEH TEC 23 77 DSI 02H 0.02 0.42 111 P1 TEH TEC 23 77 DSI 03H -0.02 0.26 87 P1 TEH TEC 23 78 DNI 05H 0.00 1.71 40 P1 TEH TEC 23 84 DNI 04H 0.00 1.61 46 P1 TEH TEC 23 84 DNI 05H 0.25 1.34 19 P1 TEH TEC 23 84 DNI 06H -0.07 1.21 51 P1 TEH TEC 23 85 DNI 05H 0.05 1.43 39 P1 TEH TEC 24 11 DSI 03H -0.02 0.31 88 P1 TEH TEC 24 11 DNI 05H 0.12 1.55 53 P1 TEH TEC 24 13 DNI 04H 0.00 1.22 15 P1 TEH TEC 24 15 DNI 08H -0.02 1.04 48 P1 TEH TEC 24 17 DNI 07H 0.05 1.34 44 P1 TEH TEC 24 19 DNI 07H 0.20 1.30 44 P1 TEH TEC 24 32 DNI 06H 0.02 1.38 44 P1 TEH TEC 24 34 DNI 05H 0.17 1.54 42 P1 TEH TEC 24 34 DSI 08H -0.05 0.44 45 P1 TEH TEC 24 34 DNI 07C -0.07 Page 10 of 17 1.60 26 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 24 35 DNI 07C -0.07 1.47 14 P1 TEH TEC 24 38 SCI TSH -0.08 0.2 102 0.78 0.13 60 P2 TSH TSH 24 48 DSI 03H 0.17 1.08 67 P1 TEH TEC 24 50 DSI 02H 0.00 0.20 51 P1 TEH TEC 24 53 DNI 06H 0.00 1.27 53 P1 TEH TEC 24 56 DSI 03H 0.00 0.35 130 P1 TEH TEC 24 57 DSI 02H 0.02 0.14 63 P1 TEH TEC 24 61 DSI 02H 0.05 0.39 97 P1 TEH TEC 24 62 DNI 05H 0.12 1.33 38 P1 TEH TEC 24 63 DSI 04H 0.00 0.16 101 P1 TEH TEC 24 74 DNI 06H 0.00 1.48 41 P1 TEH TEC 24 78 DNI 07H 0.02 1.35 46 P1 TEH TEC 24 79 DSI 02H 0.10 0.78 113 P1 TEH TEC 24 80 DNI 06H 0.00 1.32 52 P1 TEH TEC 24 84 VOL TSC 0.03 0.34 66 0.51 0.31 95 6 TSC TSC 24 84 PCT TSC 0.05 29 0.32 82 6 TSC TSC 25 11 DNI 02H -0.02 1.26 46 P1 TEH TEC 25 14 DNI 06H 0.02 1.18 30 P1 TEH TEC 25 17 DSI 03H -0.07 0.21 117 P1 TEH TEC 25 26 DSI 04H 0.02 0.11 97 P1 TEH TEC 25 26 DNI 07H 0.10 1.15 24 P1 TEH TEC 25 31 DSI 02H 0.02 0.50 90 P1 STH TEC 25 33 DNI 04H 0.07 1.32 40 P1 TEH TEC 25 33 DSI 08H 0.02 0.20 141 P1 TEH TEC 25 34 DSI 02H 0.02 0.70 74 P1 TEH TEC 25 34 DSI 03H 0.10 0.45 113 P1 TEH TEC 25 34 DSI 05H 0.00 0.37 19 P1 TEH TEC 25 34 SCI TSH -0.09 0.14 115 0.88 0.18 100 P2 TSH TSH 25 38 DNI 06H 0.07 1.30 49 P1 TEH TEC 25 47 DSI 03H -0.02 0.48 47 P1 TEH TEC 25 47 DNI 04H 0.05 1.16 53 P1 TEH TEC 25 47 DSI 08H 0.02 0.19 26 P1 TEH TEC 25 54 DSI 02H 0.02 0.15 46 P1 TEH TEC 25 60 DSI 02H 0.07 0.54 117 P1 TEH TEC 25 61 DSI 02H 0.24 0.45 98 P1 TEH TEC 25 61 DSI 05H 0.00 0.42 27 P1 TEH TEC 25 61 DNI 08H -0.02 1.29 45 P1 TEH TEC 25 62 DSI 04H -0.07 0.46 139 P1 TEH TEC 25 63 DSI 04H -0.05 0.42 99 P1 TEH TEC 25 64 DNI 04H 0.00 1.76 54 P1 TEH TEC 25 64 DNI 08H 0.00 1.68 34 P1 TEH TEC 25 65 DSI 02H -0.05 0.34 104 P1 TEH TEC 25 65 DSI 07H 0.05 0.29 42 P1 TEH TEC 25 65 SAI 07H -0.05 0.03 63 P4 07H 07H 25 66 DNI 02H 0.12 1.80 52 P1 TEH TEC 25 71 DSI 06H 0.02 0.36 82 P1 STH TEC 25 73 DNI 08H 0.00 1.26 52 P1 TEH TEC 25 74 DSI 02H 0.05 0.35 134 P1 STH TEC 25 74 SAI 02H 0.02 0.09 126 2 02H 02H 25 75 DNI 07H 0.05 1.63 49 P1 TEH TEC 25 75 DNI 08H 0.12 1.41 54 P1 TEH TEC 25 76 DSI 02H 0.00 0.34 102 P1 TEH TEC 25 76 DSI 05H -0.02 0.28 119 P1 TEH TEC 25 76 DNI 06H -0.02 1.60 52 P1 TEH TEC 25 76 DNI 06C 0.00 1.27 33 P1 TEH TEC 25 78 DNI 08H 0.00 1.27 54 P1 TEH TEC 25 79 DSI 02H 0.00 0.22 70 P1 TEH TEC 25 79 DNI 04H 0.00 1.80 50 P1 TEH TEC 25 79 DNI 08H 0.00 Page 11 of 17 1.40 49 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 26 17 DNI 02H 0.02 1.22 41 P1 TEH TEC 26 17 DNI 03H 0.05 1.40 27 P1 TEH TEC 26 17 DNI 04H -0.60 1.39 11 P1 TEH TEC 26 17 DNI 05H 0.26 1.25 26 P1 TEH TEC 26 17 DNI 06H 0.22 1.68 18 P1 TEH TEC 26 19 DNI 07H 0.05 1.09 33 P1 TEH TEC 26 19 DNI 08H 0.02 1.09 33 P1 TEH TEC 26 24 DSI 06H -0.05 0.17 89 P1 TEH TEC 26 26 DTI TEC 15.99 6.21 154 P1 TEH TEC 26 30 DNI 07H 0.05 1.55 26 P1 TEH TEC 26 38 DSI 05H 0.00 0.15 70 P1 STH TEC 26 39 DSI 05H 0.00 0.26 39 P1 TEH TEC 26 42 DSI 02H 0.07 0.56 53 P1 TEH TEC 26 44 DSI 06H 0.02 0.28 149 P1 TEH TEC 26 45 DNI 06H 0.22 1.38 15 P1 TEH TEC 26 48 DNI 06H 0.00 1.23 51 P1 TEH TEC 26 60 DNI 04H 0.02 1.55 39 P1 TEH TEC 26 60 DNI 08H 0.02 1.28 30 P1 TEH TEC 26 65 DSI 03H -0.02 0.23 158 P1 TEH TEC 26 70 DSI 03H 0.19 1.12 74 P1 TEH TEC 26 72 DNI 06H 0.15 1.39 49 P1 TEH TEC 26 72 DSI 08H 0.12 0.23 53 P1 TEH TEC 26 78 DNI 05H 0.12 1.34 51 P1 TEH TEC 26 78 DNI 07H 0.02 1.31 43 P1 TEH TEC 26 79 DNI 06H 0.00 1.29 51 P1 TEH TEC 26 84 DNI 05H 0.00 1.29 40 P1 TEH TEC 26 84 NQI 05H 38.13 0.49 84 3 TEH TEC 27 12 DNI 04H -0.02 1.41 38 P1 TEH TEC 27 14 DNI 04H 0.05 1.33 55 P1 TEH TEC 27 14 DNI 07H 0.02 1.10 49 P1 TEH TEC 27 17 DNI 04H 0.00 1.43 21 P1 TEH TEC 27 20 DSI 02H 0.00 0.56 71 P1 TEH TEC 27 20 DNI 05H 0.02 1.60 55 P1 TEH TEC 27 20 DNI 08H 0.00 1.32 53 P1 TEH TEC 27 21 DNI 02H -0.07 1.50 10 P1 TEH TEC 27 21 DNI 04H -0.20 1.42 15 P1 TEH TEC 27 22 DSI 02H -0.02 0.21 103 P1 TEH TEC 27 23 DNI 07H 0.02 1.57 48 P1 TEH TEC 27 23 DNI 08H 0.00 1.36 55 P1 TEH TEC 27 24 DSI 04H 0.00 0.10 33 P1 TEH TEC 27 26 DNI 07H 0.00 1.27 28 P1 TEH TEC 27 31 DSI 02H 0.05 0.63 61 P1 TEH TEC 27 35 DNI 07H 0.00 1.58 42 P1 STH TEC 27 60 DSI 02H 0.02 0.57 75 P1 TEH TEC 27 67 DNI 03H 0.15 1.34 10 P1 TEH TEC 27 69 DSI 02H -0.05 0.35 131 P1 TEH TEC 27 69 DNI 04H 0.00 1.61 49 P1 TEH TEC 27 72 DNI 05H 0.05 1.50 13 P1 TEH TEC 27 76 DSI 03H 0.02 0.45 18 P1 TEH TEC 27 79 DSI 02H 0.02 0.23 131 P1 TEH TEC 27 79 DNI 05H 0.00 1.34 55 P1 TEH TEC 27 84 NQI 02C 25.53 0.37 128 3 TEH TEC 28 10 DNI 04H 0.00 1.44 49 P1 TEH TEC 28 11 DNI 04H 0.00 1.36 35 P1 TEH TEC 28 18 DNI 03H 0.30 1.06 12 P1 TEH TEC 28 18 DNI 05H 0.07 1.44 39 P1 TEH TEC 28 20 DNI 07H 0.00 1.12 43 P1 TEH TEC 28 21 DNI 04H 0.00 1.00 40 P1 TEH TEC 28 23 DNI 05H 0.05 Page 12 of 17 1.34 33 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 28 23 DNI 07H 0.02 1.11 34 P1 TEH TEC 28 26 DNI 02H -0.15 1.60 9 P1 TEH TEC 28 27 DSI 05H 0.02 0.22 118 P1 TEH TEC 28 27 DNI 08H 0.07 1.24 33 P1 TEH TEC 28 27 DNI 07C -0.05 1.28 21 P1 TEH TEC 28 29 DNI 03H 0.10 1.29 20 P1 TEH TEC 28 29 DNI 08H 0.00 1.14 30 P1 TEH TEC 28 35 DSI 02H 0.00 0.63 87 P1 TEH TEC 28 35 DNI 07H 0.05 1.61 45 P1 TEH TEC 28 35 DNI 08H 0.09 1.22 54 P1 TEH TEC 28 37 DNI 07H 0.00 1.58 45 P1 TEH TEC 28 39 DNI 05H 0.07 1.24 53 P1 TEH TEC 28 42 DSI 02H 0.00 0.30 127 P1 TEH TEC 28 42 DSI 04H 0.02 0.12 132 P1 TEH TEC 28 44 DSI 02H -0.02 0.32 118 P1 TEH TEC 28 44 DSI 03H -0.02 0.16 34 P1 TEH TEC 28 50 DSI 03H 0.05 0.20 84 P1 TEH TEC 28 50 DNI 08H 0.00 1.38 48 P1 TEH TEC 28 65 DNI 06C -0.07 1.54 12 P1 TEH TEC 28 68 DNI 08H 0.00 1.35 47 P1 TEH TEC 28 68 DNI 07C -0.15 1.30 31 P1 TEH TEC 28 69 DNI 07H 0.00 1.39 54 P1 TEH TEC 28 70 SCI TSH -0.05 0.18 49 0.38 0.15 124 P2 TSH TSH 28 70 DSI 08H 0.00 0.34 129 P1 TEH TEC 28 71 DNI 05H 0.02 1.26 53 P1 TEH TEC 28 73 DSI 02H 0.00 0.28 116 P1 TEH TEC 28 73 DSI 03H -0.02 0.14 93 P1 TEH TEC 28 73 DNI 06H 0.00 1.27 52 P1 TEH TEC 28 74 DNI 03H 0.05 1.45 49 P1 TEH TEC 28 75 DNI 04H 0.02 2.09 17 P1 TEH TEC 28 76 DNI 07H 0.05 1.25 45 P1 TEH TEC 28 78 DNI 04H 0.00 1.40 55 P1 TEH TEC 28 78 DNI 06H 0.05 1.27 49 P1 TEH TEC 28 81 DNI 05H 0.02 1.36 54 P1 TEH TEC 28 85 DSI 02H -0.02 0.55 117 P1 TEH TEC 29 11 DNI 04H 0.00 1.25 33 P1 TEH TEC 29 11 DSI 05H 0.17 0.39 89 P1 TEH TEC 29 20 DNI 08H 0.22 1.74 11 P1 TEH TEC 29 22 DNI 07H 0.02 1.38 44 P1 TEH TEC 29 25 DNI 06H 0.05 1.92 34 P1 TEH TEC 29 26 DSI 05H 0.00 0.19 154 P1 TEH TEC 29 29 DSI 03H 0.15 0.99 75 P1 TEH TEC 29 29 DNI 05H 0.05 1.42 48 P1 TEH TEC 29 37 DSI 02H 0.05 0.35 61 P1 TEH TEC 29 38 DSI 05H 0.00 0.17 78 P1 TEH TEC 29 43 DSI 03H 0.00 0.39 149 P1 TEH TEC 29 43 DNI 06H 0.02 1.28 55 P1 TEH TEC 29 43 DNI 08H 0.02 1.33 39 P1 TEH TEC 29 45 DNI 07H 0.00 1.35 42 P1 TEH TEC 29 46 DNI 07H 0.00 1.26 28 P1 TEH TEC 29 47 DSI 02H 0.02 0.17 75 P1 TEH TEC 29 47 SCI TSH 0.00 0.18 109 0.83 0.27 81 P2 TSH TSH 29 48 DNI 04H 0.05 1.39 43 P1 TEH TEC 29 48 DSI 05H 0.07 0.30 152 P1 TEH TEC 29 49 DNI 07H 0.07 1.28 44 P1 TEH TEC 29 57 DSI 05H 0.12 0.20 33 P1 TEH TEC 29 63 DSI 05H 0.00 0.28 84 P1 TEH TEC 29 66 DNI 04H 0.05 1.55 45 P1 TEH TEC 30 12 DSI 03H 0.00 Page 13 of 17 0.16 66 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 30 24 DSI 02H 0.00 0.32 83 P1 TEH TEC 30 24 DNI 08H 0.17 1.33 52 P1 TEH TEC 30 24 SCI TSH -0.10 0.11 83 0.63 0.10 115 P2 TSH TSH 30 25 DSI 04H 0.05 0.11 92 P1 TEH TEC 30 31 DSI 03H -0.05 0.36 69 P1 TEH TEC 30 31 DSI 04H 0.08 0.25 70 P1 TEH TEC 30 41 DSI 02H -0.02 0.16 118 P1 TEH TEC 30 51 DNI 06H 0.05 1.21 50 P1 TEH TEC 30 55 DNI 06H 0.15 1.63 27 P1 STH TEC 30 55 DNI 08H 0.15 1.48 27 P1 STH TEC 30 55 SAI SBH 0.55 1.23 62 9 SBH STH 30 57 DNI 07H 0.16 1.38 38 P1 STH TEC 30 58 DNI 08H 0.14 1.35 36 P1 STH TEC 30 60 DSI 02H -0.02 0.51 87 P1 TEH TEC 30 60 DSI 03H 0.02 0.65 102 P1 TEH TEC 30 60 DSI 04H 0.00 0.22 105 P1 TEH TEC 30 61 DSI 02H 0.00 0.72 82 P1 TEH TEC 30 61 DSI 04H 0.00 0.43 89 P1 TEH TEC 30 61 DNI 06H 0.00 1.67 50 P1 TEH TEC 30 61 SAI 04H 0.04 0.11 74 6 04H 04H 30 62 DSI 04H 0.00 0.20 85 P1 STH TEC 30 64 DSI 02H 0.05 0.38 113 P1 STH TEC 30 64 DSI 04H 0.00 0.45 53 P1 STH TEC 30 64 SAI 04H 0.12 0.21 91 2 04H 04H 30 65 DNI 07H 0.05 1.37 46 P1 TEH TEC 30 66 DNI 06H 0.02 1.53 47 P1 TEH TEC 30 68 DNI 07H 0.17 1.27 46 P1 STH TEC 30 77 NQI 06H 40.13 0.29 105 3 TEH TEC 30 77 VOL 06H 40.13 0.14 67 6 06H 07H 30 77 VOL 06H 40.31 0.28 58 0.45 0.13 65 6 06H 07H 30 77 PCT 06H 40.31 18 0.15 61 6 06H 07H 31 13 PCT AV2 0.20 9 0.41 0 P2 TEH TEC 31 14 DSI 05H 0.07 0.14 112 P1 TEH TEC 31 17 DSI 04H 0.10 0.15 153 P1 TEH TEC 31 22 DSI 02H 0.02 0.18 119 P1 TEH TEC 31 22 DNI 06H 0.00 1.32 50 P1 TEH TEC 31 22 DNI 08H 0.00 1.19 46 P1 TEH TEC 31 24 NQI 05H 39.13 0.58 114 3 TEH TEC 31 29 DSI 04H 0.00 0.45 149 P1 TEH TEC 31 31 DNI 05H 0.00 1.45 41 P1 TEH TEC 31 31 DNI 07H 0.05 1.46 39 P1 TEH TEC 31 35 DNI 08H 0.02 1.17 36 P1 TEH TEC 31 37 DNI 03H 0.05 1.25 35 P1 TEH TEC 31 37 DNI 08H 0.05 1.41 24 P1 TEH TEC 31 47 DNI 07H 0.02 1.16 45 P1 TEH TEC 31 49 DSI 02H 0.02 0.17 41 P1 TEH TEC 31 60 DSI 02H -0.05 0.40 85 P1 TEH TEC 31 60 DNI 07H 0.00 1.27 44 P1 TEH TEC 31 61 DSI 03H 0.05 0.24 66 P1 TEH TEC 31 61 DSI 04H -0.02 0.25 145 P1 TEH TEC 31 62 DSI 03H 0.00 0.59 106 P1 TEH TEC 31 62 DNI 07H 0.02 1.35 49 P1 TEH TEC 31 64 DSI 04H 0.00 0.42 53 P1 TEH TEC 31 64 DNI 07H 0.02 1.38 48 P1 TEH TEC 31 64 SAI 04H 0.07 0.14 120 6 04H 04H 31 66 DSI 02H 0.02 0.33 118 P1 TEH TEC 31 66 DSI 03H 0.05 0.53 89 P1 TEH TEC 31 66 DSI 04H -0.07 0.07 98 P1 TEH TEC 31 66 DSI 05H 0.05 Page 14 of 17 0.30 66 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 31 66 DNI 08H 0.00 1.35 37 P1 TEH TEC 31 68 SCI TSH -0.03 0.13 65 0.49 0.10 110 P2 TSH TSH 31 69 DNI 06H -0.02 1.60 53 P1 TEH TEC 31 72 DSI 04H -0.10 0.40 97 P1 TEH TEC 31 72 DNI 06H 0.02 1.54 52 P1 TEH TEC 31 74 DNI 05H 0.00 1.33 54 P1 TEH TEC 31 75 DSI 02H 0.00 0.30 131 P1 TEH TEC 31 75 DNI 07H 0.00 1.35 50 P1 TEH TEC 31 75 SAI 02H -0.04 0.12 89 6 02H 02H 31 77 DSI 06H 0.00 0.21 84 P1 TEH TEC 31 78 DSI 03H 0.02 0.71 116 P1 TEH TEC 31 78 DSI 04H 0.00 0.62 108 P1 TEH TEC 31 78 DNI 07H 0.00 1.33 49 P1 TEH TEC 31 81 DSI 02H -0.02 0.72 116 P1 TEH TEC 31 81 DSI 03H 0.00 0.51 104 P1 TEH TEC 32 19 DSI 05H 0.05 0.28 108 P1 TEH TEC 32 25 DSI 03H 0.02 0.18 50 P1 TEH TEC 32 35 DNI 08H 0.05 1.29 46 P1 TEH TEC 32 36 DNI 05H 0.07 1.26 42 P1 TEH TEC 32 38 DNI 03H 0.07 1.22 39 P1 TEH TEC 32 47 DNI 06H -0.10 1.80 15 P1 TEH TEC 32 47 DNI 08H 0.10 1.56 21 P1 TEH TEC 32 51 DNI 04H -0.20 1.71 17 P1 TEH TEC 32 62 DSI 02H -0.05 0.19 58 P1 TEH TEC 32 63 DSI 03H 0.02 0.41 73 P1 TEH TEC 32 63 DSI 04H -0.02 0.21 57 P1 TEH TEC 32 63 DNI 06H 0.05 1.28 54 P1 TEH TEC 32 63 SAI 03H 0.00 0.16 101 6 03H 03H 32 64 DNI 07H 0.17 1.50 46 P1 TEH TEC 32 65 DNI 06H 0.15 1.55 50 P1 TEH TEC 32 67 DSI 06H 0.15 0.27 35 P1 TEH TEC 32 67 DNI 07C -0.15 1.37 32 P1 TEH TEC 32 67 SAI 06H -0.07 0.10 79 6 06H 06H 32 72 DNI 07H 0.00 1.40 50 P1 TEH TEC 32 73 DNI 07H -0.02 1.50 49 P1 TEH TEC 32 74 DNI 07H 0.17 1.31 48 P1 TEH TEC 32 75 DNI 06H 0.00 1.53 49 P1 TEH TEC 32 78 DSI 05H 0.00 0.24 98 P1 TEH TEC 33 23 DNI 06H 0.00 1.26 55 P1 TEH TEC 33 34 DSI 06H -0.02 0.25 8 P1 TEH TEC 33 50 DNI 05H 0.00 1.34 42 P1 TEH TEC 33 56 DNI 07H -0.22 1.60 11 P1 TEH TEC 33 56 DNI 08H 0.02 1.53 10 P1 TEH TEC 33 60 DSI 07H 0.07 0.16 121 P1 TEH TEC 33 60 DSI 08H 0.00 0.18 21 P1 TEH TEC 33 61 DSI 04H 0.05 0.21 108 P1 TEH TEC 33 73 DNI 05H 0.00 1.41 41 P1 TEH TEC 33 75 DSI 05H 0.02 0.25 125 P1 TEH TEC 34 24 DSI 07H 0.00 0.15 103 P1 TEH TEC 34 32 DNI 07H 0.05 1.18 53 P1 TEH TEC 34 39 DSI 05H 0.02 0.13 112 P1 TEH TEC 34 55 DSI 03H 0.10 0.75 96 P1 TEH TEC 34 55 DNI 04H 0.02 1.36 54 P1 TEH TEC 34 57 DNI 03H 0.00 1.26 51 P1 TEH TEC 34 58 DSI 02H 0.05 0.51 102 P1 TEH TEC 34 58 DSI 04H 0.22 0.46 101 P1 TEH TEC 34 58 DSI 05H 0.00 0.30 43 P1 TEH TEC 34 59 DSI 02H 0.00 0.59 74 P1 TEH TEC 35 22 DSI 02H -0.02 Page 15 of 17 0.19 81 P1 TEH TEC

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 35 26 DSI 05H 0.12 0.71 116 P1 TEH TEC 35 26 DNI 07H 0.20 1.57 20 P1 TEH TEC 35 34 DSI 03H 0.00 0.15 48 P1 TEH TEC 35 34 DSI 04H -0.05 0.23 124 P1 TEH TEC 35 38 DSI 07H 0.02 0.11 103 P1 TEH TEC 35 39 DNI 03H 0.17 1.34 53 P1 TEH TEC 35 39 DNI 07H 0.15 1.32 42 P1 TEH TEC 35 40 DNI 06H 0.00 1.37 50 P1 TEH TEC 35 45 DNI 07H 0.00 1.44 42 P1 TEH TEC 35 53 DSI 06H 0.05 0.26 150 P1 TEH TEC 35 59 DNI 05H 0.02 1.30 53 P1 TEH TEC 36 20 DSI 03H -0.15 0.55 159 P1 TEH TEC 36 26 DSI 05H 0.20 0.56 62 P1 TEH TEC 36 27 DSI 05H -0.02 0.19 72 P1 TEH TEC 36 53 DSI 02H -0.10 1.04 160 P1 STH TEC 36 53 SAI 02H 0.10 0.13 128 2 02H 02H 36 56 DNI 06H 0.02 1.33 55 P1 TEH TEC 37 23 DNI 03H 0.22 1.39 20 P1 TEH TEC 37 26 DSI 05H -0.05 0.11 147 P1 TEH TEC 37 35 DSI 03H 0.02 0.12 55 P1 TEH TEC 37 52 DSI 06H 0.05 0.12 87 P1 TEH TEC 37 67 PCT AV1 0.00 15 0.66 0 P2 TEH TEC 37 67 PCT AV2 0.00 33 3.15 0 P2 TEH TEC 37 67 PCT AV3 0.00 36 4.04 0 P2 TEH TEC 37 67 WAR AV1 0.00 0.28 332 2 08H AV1 38 33 DNI 04H 0.02 1.36 51 P1 TEH TEC 38 42 DSI 05H -0.02 0.27 160 P1 TEH TEC 38 61 PCT AV4 0.00 14 0.76 0 P2 TEH TEC 39 27 DSI 04H 0.05 0.36 29 P1 TEH TEC 39 40 DNI 06H 0.05 1.11 51 P1 TEH TEC 39 40 DNI 08H 0.05 1.18 32 P1 TEH TEC 39 43 DNI 06H 0.02 1.31 28 P1 TEH TEC 39 43 DNI 07H 0.02 1.55 21 P1 TEH TEC 39 43 DNI 08H -0.07 1.41 8 P1 TEH TEC 39 53 DNI 08H 0.02 0.92 49 P1 TEH TEC 39 59 DNI 03H -0.12 1.35 13 P1 TEH TEC 39 65 DNI 07H 0.00 1.30 51 P1 TEH TEC 39 65 NQI 01C 13.83 0.16 75 3 TEH TEC 39 65 NQI 01C 18.79 0.15 77 3 TEH TEC 39 72 NQI 03C -0.17 0.28 117 P1 TEH TEC 39 72 VOL 03C -0.21 0.24 110 6 03C 03C 39 72 PCT 03C -0.20 23 0.26 52 0.4 0.17 298 P4 03C 03C 40 25 DSI 03H 0.05 0.13 88 P1 TEH TEC 40 39 DSI 03H 0.00 0.04 127 P1 TEH TEC 40 53 DSI 04H 0.10 0.34 150 P1 TEH TEC 40 60 PCT AV3 0.24 15 0.76 0 P2 TEH TEC 40 60 PCT AV4 0.22 20 1.22 0 P2 TEH TEC 40 60 WAR AV3 0.00 0.29 125 2 08C AV3 40 60 WAR AV4 -0.03 0.31 124 2 08C AV4 40 63 DNI 08H 0.00 1.26 47 P1 TEH TEC 41 27 DSI 04H 0.00 0.24 72 P1 TEH TEC 41 44 DSI 04H 0.12 0.35 162 P1 TEH TEC 41 50 DSI 08H -0.05 0.10 79 P1 TEH TEC 41 54 DNI 06H 0.00 1.06 41 P1 TEH TEC 41 63 DSI 02H 0.00 0.56 125 P1 TEH TEC 42 32 DSI 04H 0.05 0.18 75 P1 TEH TEC 45 38 DSI 01H -0.21 0.23 101 P1 TEH TEC 45 38 VOL 01H -0.31 0.22 87 6 01H 01H 45 38 PCT 01H -0.29 22 Page 16 of 17 0.19 92 6 01H 01H

Beaver Valley Unit #2 2R21 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICED INDUCED INDICATIONS) 45 38 VOL 01H -0.28 0.3 63 0.48 0.17 97 6 01H 01H 46 41 DSI 07H 0.20 0.21 86 P1 TEH TEC Page 17 of 17