Transmittal of 2018 Owner'S Activity Report
ML19025A080
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/18/2019
From: Swift P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML19025A080 (9)


Text

Paul Swift Plant Manager R.E. Ginna Nuclear Power Plant

,;. 1 1503 Lake Rd.

Exelon Generation. . Ontario, NY 14519 315-791-5205 Office www.exeloncorp.com paul.swift@exeloncorp.com January 18, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 2055-0001 R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 05000244

Subject:

Transmittal of 2018 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2018. This report is submitted as specified by ASME Code Section XI.

There are no regulatory commitments contained in this letter.

If you have any questions, please contact Kyle Garnish at (315) 791-5321.

Respectfully,

~

,.0 Paul Swift Ul~

Plant Manager

Attachment:

FIFTH INSERVICE INSPECTION (ISi) INTERVAL and SECOND CONNTAINMENT INSPECTION INTERVAL, THIRD INSPECTION PERIOD 2018 OWNER'S ACTIVITY REPORT FOR RF0-41 INSERVICE EXAMINATIONS (October 22, 2018 through November 8, 2018) cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna

ATTACHMENT 1 FIFTH INSERVICE INSPECTION (ISi) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL THIRD INSPECTION PERIOD 2018 OWNER'S ACTIVITY REPORT FOR RF0-41 INSERVICE EXAMINATIONS (October 22, 2018 through November 8, 2018)

R.E. Ginna Nuclear Power Plant, LLC January 18, 2019

~

1

,..,: Exelon Generation[.

FIFTH INSERVICE INSPECTION (ISi) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL THIRD INSPECTION PERIOD 2018 OWNER'S ACTIVITY REPORT FOR RF0-41 INSERVICE EXAMINATIONS (October 22, 2018 through November 8, 2018)

For R. E. Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519 Commercial Service Date: June 1, 1970 NRG Docket Number: 50-244 Revision Number: 00 Date: January 15, 2019

- Fleet ISi Program Engineer - Exelon Generation

Exelon Generation!

R. E. Ginna Nuclear Power Plant, Unit 1 5th Interval lnservice Inspection and 2"d Interval Containment lnservice Inspection Rev.

Date: 1/15/2019 00 2018 OWNER'S ACTIVITY REPORT Page i - 2 of i - 7 FOR INSERVICE EXAMINATIONS TABLE OF CONTENTS Table of Contents ............................................................................. ................................i-2 Abstract ..... ......... ............. ......... ................. ........... ... ........... ......... ......... .... ... ............ ............. ... ............ i-3 Form OAR-1 Owner's Activity Report for Fifth Interval lnservice Inspection Plan ............................. i-4 Form OAR-1 Owner's Activity Report for Containment Second Interval lnservice Inspection Plan .. i-5 Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service ..... i-6 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service ......................... i-7

Exelon Generation, R. E. Ginna Nuclear Power Plant, Unit 1 5th 2nd Interval lnservice Inspection and Interval Containment lnservice Inspection Rev. 00 Date: 1/15/2019 2018 OWNER'S ACTIVITY REPORT Page i - 3 of i - 7 FOR INSERVICE EXAMINATIONS ABSTRACT This Owner's Activity Report (OAR) summarizes the results of the R. E. Ginna Nuclear Power Plant (GNPP),

Unit 1, American Society of Mechanical Engineers (ASME) Section XI lnservice Inspection (ISi)

Examinations and Repair/Replacement activities performed during this reporting cycle from July 12, 2017 through January 15, 2019. The 2018 Refueling Outage (RFO) started October 22, 2018 and ended November 8, 2018. This OAR is for the Fifth Interval lnservice Inspection Program, Third Period and the Second Interval Containment lnservice Inspection Program, Third Period. Associated ISi examinations were performed in accordance with ASME Section XI Code, 2004 Edition, No Addenda. The First Interval Containment lnservice Inspection Program was extended to align with the ISi Program Interval in accordance with the Fourth Interval lnservice Inspection Program Relief Request Number 22. The 5th Interval lnservice Inspection and the 2nd Interval Containment lnservice Inspection Interval are aligned.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC), Section XI, Article IWA-6000, GNPP has implemented ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and lnservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1". ASME Code Case N-532-4 is approved for use in Regulatory Guide 1.147. This Report complies with the requirements of Code Case N-532-4.

OWNER'S ACTIVITY REPORTS - FORM OAR-1 Owner's Activity Reports Form OAR-1 's were prepared and certified upon completion of the GNPP Unit 1, 2018 refueling outage RF0-41 examination activity in accordance with the following inspection plans and schedules:

  • lnservice Inspection Program Plan(s) for the Fifth Inspection Interval for GNPP Unit 1
  • Long Term Plan for GNPP, Unit 1
  • ISi Program Plan ASME XI, IWE/IWL Second Inspection Interval In addition to the Owner's Activity Report, Form OAR-1, the following Tables are also included:
a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with inservice flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, whether the item is a repair, replacement or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.

.,, R. E. Ginna Nuclear Power Plant, Unit 1 5th Interval lnservice Inspection and Rev. 00

Exelon Generation, 2nd Interval Containment lnservice Date: 1/15/2019 Inspection 2018 OWNER'S ACTIVITY REPORT Page i - 4 of i - 7 FOR INSERVICE EXAMINATIONS FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number -----------=G=N=P_,_P_-O=-'-'A"-'R_,_*IS=l'-'*2=-=0'-'1=8---------------

Plant _ __,_R~*~E=*~G=i~nn=a~N=u=cl=e=a~r~Po=w~e=r~P~l=a~nt=1 _,_1=5=03~L=ak=e~R=oa=d=*~O~n=t=ar=io""""'"N"'"'e~w"'"-'-Y=o~rk~1~4~5'""'1=9_ _ _ _ _ _ __

(Name and Address of Plant)

Unit No. __1_ Commercial Service Date June 1 1970 Refueling Outage Number RF0-41 Current Inspection Interval Fifth lnservice Inspection Interval - January 1, 201 Oto December 31, 2019.

(1st, 2nd, 3rd, 4th, Other)

Current Inspection Period Third lnservice Inspection Period - January 1, 2017 to December 31, 2019 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan --=20=0=-4.:....::E=di=ti=on,.,_,,"'"'N'"'"'o"--'--'A=d=de=n-'-"'d=a,__ __

Date and Revision of Inspection Plan ----"2'""7....,A...,.p"'r.,_,_il..::2"'0'-'-1""'8,_,R'-'-"'-ev.:.:i""'si'-"o.!.!n...,8'-------------------

Edition and Addenda of ASME Section XI applicable to repairs/replacements, if different than the Inspection Plan__N~/~A~----

Code Cases used: N-532-4 N-706 N-716 N-722-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2018 RFO (RF0-41 l conform to the requirements of Section XI.

Expiration Date_ _ ___,_N""/A....,___

Date -""'-11/f--Ll..;;;..'°~/l....._j_ _ __

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by HSB Global Standards of* Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation ascribed in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any p sonal injury or pr erty damage or a loss of any kind arising from or connected with this inspection.

_B!2Jr!]U!QCe~Ssa'!!:iJellr_ _::;~~~!:::_-~~~~L_ _ _ _ _ _ _1Commissions NB10496, N, I: New York 4077 Inspector's ignature National Board, State, Province, and Endorsements Date _ __,I /~1_5. ./_I

Exelon Generation, R. E. Ginna Nuclear Power Plant, Unit 1 5th 2nd Interval lnservice Inspection and Interval Containment lnservice Inspection Rev.

Date: 1/15/2019 I

00 2018 OWNER'S ACTIVITY REPORT Page i - 5 of i - 7 FOR INSERVICE EXAMINATIONS FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number _ _ _ _ _ _ _ ___,,G::..:.N.,_,_P_,_P_-=0.:....:A'"'R_,_-IW.!.!..:eE"-'/L=-*2=0.....,1=8'-----------------

Plant _ _...,R-'-=E'-'G=i,,..,n.:..:.na=-.,...N=u=c=le=a""""r..,__P=o.,_,w=e._r._P=la,,_.,n=t.--=1-=5..,.0=3-=L=a=ke:....:...;R=o=a=d,L,;O=-n'""t=a.:..:.rio=,.....N..:ce::..:w"--'-Y=o.:..:.rk.,_1.,_4.,_,5:..:1=9'-------------

(Name and Address of Plant)

Unit No._~- Commercial Service Date June 1 1970 Refueling Outage Number RF0-41 Current Inspection lnterval _ _~S~e~co~n~d~C~o~n=ta=in~m=e~nt~ln~s~p~e=c=tio=n~ln~te=rv~a~I-~J=a~nu=a=ry""--'1~,~2=0~1~O-'to~D~e~c~e~m=b~e~r~3-'1~,=20~1~9 (1st, 2nd, 3rd, 4th, Other)

Current lnspecti_on Period Third lnservice Inspection Period-January 1, 2017 to December 31, 2019 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans _ _2::.0::..:0=-4'--=Ed::::ai"'ti~on:..:.J,'--'N-'-'o=-.:....:A=d=de"'"'nc.:..:d::.::a::-.._ _ _ __

Date and Revision of Inspection Plans ___1=3:..:Ac-=pr"'il'-'2:.a0:..:1-=8..,_1 ..,__R=e..,_v=is"'"'io""n,_4-'------------------

Edition and Addenda of ASME Section XI applicable to repairs/replacements, if different than the Inspection Plan_--'N..,,_/.,_,A__

Code Cases used: _ _~N:..:*5=3=2--4~N:..:*6=8=6~N...,*7-=3=9-...,1~N...,*7-=5=3~------,----------------------

(if applicable\

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2018 RFO (RF0-41\

conform to the requirements of Section XI.

Certificate of Authorization No. - - - ~ " 7 - , - - : : - : - - : : - - - : - - : - - - - : - - - - - - - - Expiration Date_ _ ____._N=/A'-'---

(lf applicable)

Signed Sarah E S ath Date _ 1(°""-f-"/,......1'-----

_.J'+/......

(Fleet ISi Prag CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by HSB Global Standards of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief. the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation d cribed in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perso I injury or pro rty damage or a loss of any kind arising from or connected with this inspection.

..,, R. E. Ginna Nuclear Power Plant, Unit 1 5th Interval lnservice Inspection and Rev. 00

Exelon Generationu 2nd Interval Containment lnservice Inspection Date: 1/15/2019 2018 OWNER'S ACTIVITY REPORT Page i - 6 of i - 7 FOR INSERVICE EXAMINATIONS TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 .

EXAMINATION ITEM EVALUATION DESCCRIPTION CATEGORY AND ITEM NUMBER DESCRIPTION There were no items with N/A N/A inservice flaws or relevant conditions that require evaluation for continued service.

.,, R. E. Ginna Nuclear Power Plant, Unit 1

=' Exelon Generation.

  • 5th 2nd Interval lnservice Inspection and Interval Containment lnservice Inspection Rev. 00 Date: 1/15/2019 2018 OWNER'S ACTIVITY REPORT Page i - 7 of i - 7 FOR INSERVICE EXAMINATIONS TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provi1?ions of the ASME Code Case N-532-4 CODE ITEM DESCRIPTION DATE REPAIR/REPLACEMENT CLASS DESCRIPTION OF WORK COMPLETED PLAN NUMBER N/A There were no Repair/ N/A N/A NIA Replacement activities required for Continued Service