Transmittal of 2008 Owners Activity Report for the Refueling Outage Conducted in 2008
ML082270209
Person / Time
Site: Ginna 
Issue date: 08/06/2008
From: Joseph Pacher
Constellation Energy Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML082270209 (16)


Text

Joseph E. Pacher Manager, Nuclear Engineering Services Constellation Enerjy Nuclear Generation Group R.E. Ginna Nuclear Power Plant, LLC 1.503 Lake Road Ontario, New York 14519-9364 585.771.5208 585.771.3392 Fax joseph.pacher@constellation.com August 6, 2008 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Transmittal of 2008 Owners Activity Report for the R.E. Ginna Nuclear Power Plant Enclosed is a copy of the R.E. Ginna Owners Activity Report for the refueling outage conducted in 2008.

This report is submitted as specified by ASME Code section XI.

There are no new commitments being made in this submittal. If you should have any questions regarding this submittal, please contact David F. Wilson at (585) 771-5219.

Very truly yours, Joseph E. Pacher Attachments:

(1) 2008 Owners Activity Report for the Fourth Interval (2000-2009), Third Period, First Outage (2008) - ISI and First Interval (1998-2008), Third Period, Second Outage (2008) - IWE/IWL at R.E. Ginna Nuclear Power Plant cc:

S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC A(W47 100lqq'ý

bcc:

C. W. Fleming, Esquire D. Skolnik COMMITMENTS IDENTIFIED IN THIS CORRESPONDENCE:

None UFSAR/TSB Revision Required? No

Attachment (1) 2008 Owners Activity Report for the Fourth Interval (2000-2009, Third Period, First Outage (2008) - ISI and First Interval (1998-2008), Third Period, Second Outage (2008) - IWE/IWL at R.E. Ginna Nuclear Power Plant

Constellation Energy 111 Market Place, Baltimore, Maryland 21201 2008 OWNERS ACTIVITY REPORT FOR THE FOURTH INTERVAL (2000-2009), THIRD PERIOD, FIRST OUTAGE (2008) - ISi AND FIRST INTERVAL (1998-2008), THIRD PERIOD, SECOND OUTAGE (2008) -

IWE/IWL AT R. EL GINNA NUCLEAR POWER PLANT 1503 Lake Road, Ontario, NY 14519 Revision 0 August 5, 2008:

Prepared by:,

Frank Klepacki Ginna Station ISI Engineer Approved by:

GlolS~tion:

General Supervisor Engineering Programs Reviewed by: t9Q J2-11 Cgýwgdl IAnderson Cororate Princ;'

Engineer Analyst Approved by:

V t1/)

Wfll"PnaznpbellJ Corporate Engineering General Supervisor Engineering Programs.

Date:

Date:

A 1-dl Date:

6A*

6(A'r t

R. E. Gina Nuclear Power Ptaut 2WOO Owners Activity Report Fourth Interval (2000-2009), Third Period, First Outage (200)- ISI First Interval (1998&2008), Third Period. Second Outage (2008) - IWE/IWL TABLE OF CONTENTS T able of C ontents.......................................................................................................

I A bstract.......................................

............ 2 Form OAR-I Owners, Activity Report for Inservice Inspection Plan....................................

4 Form OAR-I Owner's Activity Report for Containment hiservice Inspection Plan............................................................

5 Table I A bstract of Ekam ination and Tests...............................................................................................................................

6 Table 2 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service.......................................

8 Tuble 3 Abstract of Repairs Replacements, or Corrective Measures Required for Continued Service...................................

9 Page.1

R. E. Gins Nuc-ee Power Plant 2M06 Owners Activity Report Fourth interyal (2000-20)9), Third Period, First Outage (2009) - IS!

First Intervai (1991-2006), Third Period, Second Outage (2006) - IW/IAWL ABSTRACT This Owner's Activity Report summarizes the results of the R. E. Ginna Nuclear Power Plant, American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection and Containment Inservice Examinations performed prior to and during the 2008 Refueling Outage, from April 20, 2008 through May 11, 2008.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC).Section XI, Article IWA-6000, R. E. Ginna Nuclear Power Plant is implementing ASME Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XL, Division I". Regulatory Guide 1.147, Revision 14i approved ASME Code Case N-532-1 for use. This Report complies with the requirements of Code Case N-532-1 and the conditions identified in RG 1.147.

OWNER'S ACTIVITY REPORTS - FORM OAR-I Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the R. E.

Ginna Nuclear Power Plant 2008 refueling outage examination activity in accordance with the following inspection plans and schedules:

Inservice Inspection Program Plan for the Fourth Inspection Interval ISIProgramPlanASMEXI, IWE/IWL First Inspection Interval In addition to the Owner's Activity Report, Form OAR-I, the following Tables are also included:

a.

Abstract of Examinations and Tests, Table 1, provides such information as ASME Code Examination Category., Total Examinations Required for the Inspection Interval, Total Examinations Required for this Period, Total Examinations Credited (%) for this Period. Total Examinations Credited (%) to Date for the Interval, and any remarks that may be applicable to each Examination Category.

b.

Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 2, provides a listing of item(s) with service induced flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description and Service Induced Flaw Characterization (as required by IWA-3300).

Page 2

R. E. Ginna Nudear Power Plant ZOOS Owner Activity Report Fourth Interval (2000-2009), Third Period, First Outage (2008) - ISI First Interval (19918-2008), Third Period, Second Outage (2008)- IWE/IWL

c.

Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 3, identifies those items, containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, whether the item is a repair, replacement. or corrective action, item description, description of work, if the service induced flaw or relevant condition was found during a scheduled Section XI Examination or test. date completed and the repair replacement plan number.

In accordance with ASME Section X] Code and with the exception of the examinations that may be deferred until the end of the inspection interval as specified within the applicable Table

[WX-2500-1, including those examinations which R. E. Ginna Nuclear Power Plant has requested and received approval in the form of relief request, or incorporated program ASME Section Xl Code Cases. the required examinations in each examination category have been completed in accordance with the R. E. Ginna Nuclear Power Plant IS! Program Schedule.

Page. 3

R. E. Ginnm NWduer Power Plant 2006 Owners Activity Report Fourth Interval (2000-2009), Third Period, First Outage (2006)- iSI First Interval (1991-2008), Third Period, Second Outage (2008) - IWE/IWL FORM OAR-i OWNER'S ACTIVITY REPORT Report Number GNPP-OARJSI-24M Owner Constellation Enery Nuclear Owun. LLC. I I Market Place. Suite 200. Baltimore. MD 21202 4 No= and Addiss of Owna)

Plant R. E. Ginna Nuclear Power Plant. Unit One. 1503 Lake Road. Ontario. New York 14519' SName and Addms of PtIm Unit No. _

Commercial Service Date July i. l70 (if applkk)

Refueling Outage No.

33t2008 RPO)

Current inspection interval Fourth lnierVaL(2(00-2009)

I'. 2". 3r 4*; odw)

Current inspection period

-Third Period (First Outace - 2008 RF)

(I,'. 2ýd.30*):

Edition and Addenda of Section X! applicable to the inspection plan, ASME XL 1995 Edition, 1996 Addenda Date and revision of inspection plan 4/18/2008. Rev. I Fdition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan N/A Certfiate of Conformanme I certify that the. statementsmade in this OvWNrsActivityý Report arecorrect, and that the examilintionsi tess repr, replaceetsevaluah andcorective measures represented by' tis report confom to the requkrmeuni of Section X).,

Certificate of authorizatsoj no.

Expiration Date N/A Signed£.7/t~tj/f~Vf~(if Wa apeL(I op Eh.Pom aDt Signed.&*!-*

/IIr4*...

W.Q~CamhL 1SCo=. ena.Pro~rans Date W=008 Certificate.f Imervice Inspection I, the undersigned. hotding a valid' commission issued by the National Board of Boiler and Pressmre Vessel Inspectors and the State or Province of.

NewYork and employed by HSBCT of Hartford CT.

have ispected the items described in this Owner's Activity Report. during the period 11/03/2006 to 51 1/2011 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with die requirements of Section XL By signing this certificate neither the Inspector. nor his.employer makes any warranty, expressed or implied, concerning the examinations, tests. repairs. replacements, evaluations and corrective measures described this report. Purthenmore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from the connected with this inspection.

idrgt.Y/65 7

'//._.

R, B; Miller Commissions%

NY2498 Natioam Bawl. Sta*, Province, and Eanwsemeni Date This fo~m{W0126) may be obtained fro te dworder Dept, ASME. -2 Law Udrie Box 23OO,,FabfieKd NJ 07007-2300.

Page.4:

R. L. Ginna Nudear Power Plant 2400 Owners Activity Report Fourth Interval (2000.209)f, Third Period, First Outage (2008)- ISI First Interval (199S.200S), Third Period, Second Outage (200M)- IWFAWL FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number GN*P-MOAR-1W/-O Owner Constellation Enora Nuclear Grup. LLC. I I I Market Place. Suite 200. Baltimore. MD 21202, iName aid Add&= of0wvej Plant R. E. Ginna Nuclear Power Plant. Unit One. 1503 Lake Road. Ontario. New York 14519 (Nuae otd Add=s ot Plmit)

Unit No.

I Commercial Service Date July 1. 1970 (if applicabk)

Refueling Outage No.

332008 Rt )*

Current inspection interval First IntervaL. 1998-20081 Current inspection period Third Period (Second Outase - 2008 RMOt 1 '. e". 3Y1 Edition and Addenda of Section XI applicable to the inspection plan ASME XL 1992 Edition. 1992 MAdd a

Date and revision of inspection pla.

4/1812008, Rev, 1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan NI/A Certificateof Conformance I certify that dih statements made in this Owner's Activity Report are correct, and that the examirUtons, tests. repani, replacements, evaluation's and Corrective measures represented by this report conform to the requirements of Section XL:

Certificate of authorizqion no.

NIA Expiration Date NIA Signed W-agtLG o

nPorm:Date L11 Certifieste otftiservice Inspection

l. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by HSBCr of Hartford CIT have inspected the items described in this Owner's Activity Report, during the period Il30 to 5111/2008

, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report-in accordance with the requirements of Section 343.

By signing this certificate neither the Inspector nor his employer makes any warranty, expwessed oT implied, concerning the examinations& tests, repairs, replacements, evaluations and corrective measure described this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from the connected with this inspection.

d, *,,

4 R. B. Miller, Commissions NY24..

bhapearq st'nana N~aikia Soaud SUae Prvmn'cand n&xnwfe t Date

-. /. lee frs

.frm (Ew0i6J M. be aoined htm die ordw /ep.,

ASMF, 22 Law Duri Bm 2300. Faific. NJ 07007-2M0.

Page 5

R. E. Oamn Nuclear Power Plant 2008 Owners Activity Report Fourth Interval (20082009), Third Period, First Outage 12008) - ISI First interval (1998-2006), Third Period, Second Outage (200) - IWVAWL TABLE I ABSTRACT OF EXAMINATIONS AND TESTS:

Total Total Total Total Ezaminstlons Examlnstiou Examinationm Examnations Credited(%) to Examaination Required for the Credited for this Credited 4%) for Date for the Catelory Interval Period.

the Period Interval Remarlis B-A 7

0 0%

0%

Deferral Permissible and/or Relief.Requests.

B-B 7

3 100%

100%

As modified by Relief Request B-D 22 5

29.4%

45.5 %

% result from, Category footnote reqirements and/or Relief Requests B-F 15 0

0%

46.7%

% result from Category footnote requirements B-G-I 195 0

0%

0%4

% result from Category footnote requirements B-G-2 13 4

50%

69.2%

% result from Category footnote requirements B-J 131 42 79.2%

91.6%

None B.K 10 1

25.0%

70.0%

None B-L-I I

0 0%

100%

%Result fromI having only one componem B-L-2 1

0 0%

0%

Only ifr disassembled.

B-II2 0*

0%

6%

%'ReSuk fromi having-nly one component B-M-2 N/A 0

0%

0%

Only if.

disassembled.

B-N-*

3 0

0%

66.7%

None B-N-2 1

0 0%

0%

% Result from having only one

_comp nent B-N-3 1

0

.0%

0%

%Result from having only one component B-O 3

0 0%

0%

Deferral I Permissible Page 6

R. E. Ginn& Nuclear Power Plant

'ONS Owners Activity Report Fourlh Interval (2000-2009), Third Period, First Outage (200) - ISI First Interval (199-2008), Third Period, Second Outage (200) - IWE/IWL TABLE 1 (Continued)

ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinatlonm ExamikntIons Examinations Credited (%) ts Examination Requiredforthe Creditedforthis CreditedM,)for Date for the Category Interval Period.

Period Interval Remarks C-A 6

0 0%

66.7%

None C-B 12 2

50 %

83.4 %

In accordance with Category footnote

,_requirements C-C 15 3

.50 %

80 %

In accordance with Category footnote

,___requirements C-F-1 55 II

.57.9%

85.5 %

In ac*cordance with Category footnote requirements C-F-2 29 8

80%

93.1 %

In accordance with Category footnote

,,_requirements D-A 21 3

42.9 %

80.9 %

In accordance with Category footnote

_requirements F-A 173 32 52.5%

83.2%

Fl. 10-25%

Sample F1.20- 15%

FI.30-- 10%

sample-I.40- only.of multiple components are required to be*

_examined E-A 258 25&

100%01 200%

includes wetted surfaces E-A 258 0

0%

100%

Rulemakin&

Augmented

_Requirement E-C 2

2 100%

100%

As identified E-D 3

I 1,00%

100%

%result.from Category footnote requirements and/or Relief equests Page 7

f. E. Ginna Nuclear Power Plant 2MOO Owners Activity Report Fourtb Interval (2000-2009), Third Period, First Outage (2006) - ISI First Interval (1998-2008), Third Period. Second Outage 1208). - IWE/IWL TABLE 1 (Continued)

ABSTRACT OF EXAMINATIONS AND TESTS Total Total.

Total Total Examinations Examinations ExaminatIons Examinadom Credited (S) to Examination Required for the Credited for this Credited (%) for Date for the Cateaory Interval Permod the Period Interval Remarks E-G 57 I9 100%

100%

iresult horn Category footnote requirements and/or Relief

_Requests L-A 52 0

0%

100%

Variations depend on how suspect areas are identified L-B 152 0

0%

100%

Exams performed to the requirements of Ginna Station Tendon Program and ASME Section X1 Code GC-:-

195 0

0%

100%.

Rulemaking Augmented Requirement for grease caps TABLE 2 ITEMS WITH FLAWS OR' RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Service Iduced Flaw or Service Induced Relevant Condition Found Flaw:

During Scheduled Section Xl:

Characterizaton Examinaton or Test Examination Category Item Number Item Description (IWA.330)..

(Yes or No)

None Page 8

R. E. Ghina Nuclear Power Plant 2008 Owners Activity Report Fourth Interval (200W-2009), Third Period. First Outage (MMOS) - ISI First Interval (1998-2008 Third Period, Second Outage (20S),- IWEIWL TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECIIVE MEASURES REQUIRED FOR CONTINUED SERVICE..

Service Induced Flaw or Relevant Condition Found

Repair, During Replacemenk Scheduled Code or Corrective Item Deserlphlou of Section XI Date RepIt r/ Replacement Class Measure Description Work Examination or Completed Plan Number Test (Yea/ No) 3 Replacement /

Service Water Expansion No 6/4/07 GORR 33-006 Repair Expansion Joint SSW03:

GORR 33-0o12 Joint (Serice Water WO 207008) 8 Pump "B")

Replacement by mechanical means &

Flange Face Metal Removal 2

Repair Containment Repair by No 6/15/07 GORR 33-013 FIVAC removing U-WO 20703609 Compartment Bend &

Cooler "A-installing a mechanical plug in Compartment Cooler -A" 2

Repair C

ni iet.

Repairb1*"y.

o..

15/OVT.

ORRK33-015 HVAC removing U.

WO 20703966 Compartment Bend &

Cooler "B" installing a mechanical plug in.

Conpartment Cooler "B7

_________(ACA028) 3 Replacement/

Serve Water, Expansion No 12/5A)T GORR 33-029 Repair Expansion Joint SSWO5 GORR 33-030 Joint (Service Water WO 20700820 Pump "D-:

Replacement by mechanical means &

Flange Face Metal Removal Page 9

R. LGClon Nuclear Power Plant 20W Owners Activity Report Fourth interval (20W0-2009), Third Period, First Outage (2008)- 1.51 First Interval (1998-20M), Third Period, Second Outase 42008) - 1WE4FL TABLE 3 (Continued)

ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE.,

Service Iaduced Flaw or Relevant Condition Found

Repair, During Replacement.

Scheduled Code or Corrective Item Dacrlptioe Section XI Date Repeir/ Replacement Class Measure Description of Work Examination or Completed Plan Number Tess (Yel No_).

2 Replacement Containment Mechanical No 5/16/08 GORR 33-043 HVAC Cooler Replacement WO 20704812 of "'A" Reactor Compartment Cooler (ACAO2A) &

associated unions.

2 Replacement Containment Mechanical No 5/10/08 GORR 33-044 HVAC Cooler Replacement.

WO 20704813 of "B" Reactor Compartment Cooler (ACA02B) &

unions;__

3 Replacement Service Water xpan'swi' No 7/I/0o GORR.33-046 Repair Expianiof Joia SSWO2.

GORR.33-047 Joint (Service GORR-3O4-01 Water Pump WO 20700817 WO 20803067 Replacement by mechanial means &

Flange Face Metal Removal Repair 2

Replacement Main Steam Replacement No 5/5/08.

GORR 33-052 Mechanical of bottom WO 20603792 Snubber-Mechanical Snubber m MSU-26 component support Page 10

R. E. Ganae Nnclear Power Plant 200 Owners Activity Report Fourth Interval (2000-2009), Third Period, Firt Outage (2008),- ISI First Interval (1996-200f), Third Period, Second Outage (2001) - IWEIIWL TABLE 3 (Continud)

ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASUPES REQUIRED FOR CONTINUED SERVICE Service Induced Flaw or Reevmant Condition Found

Repair, During Replaecment, Scheduled Code or Corretwive Item Descriptioe Section Xl Datb Repair/ Replacement Class Measure Description of Work Examination or Completed Plan Number Teast 4Ye No) 2 Replacement Main Steam Replacement No 5/22/08 GORR 33-053 Mechanical of various WO 20803201 Snubber items associated with the bottom section of MSUM26 component 2

Replacement Service Water Replacement No 5/9108 GORR 33-054 Piping of Service WO 20803196 Water socket welded piping by Penetrations

_201.&

209 Repair Reactor Repair by.

No 5/4/08 CoRR 33-055 Rev I Coolant 2" welding WO 20803432 Piping.Elbow drilled oes Elbow Body Repair Reactor Repai by No 5/14M:

GORR 33-057 Coolant" rinding &

WO 20803434 Letdown Fillet Welding Fillet Weld Weld&

Repair Reactor Repair by No-5.15.0&]*ORR 33-059 Coolat 2" Grinding &

WO 20702492 Letdown Fillet Welding Fillet Weld Weld 2

Replacement Steam Replacement, No 5/30/08 GORR 33-)60 Generator of North WO 20602742 Handhold Handhole Stud Stud #5 on Steam Generator "A" (EMS01A)

Page II

R. L. Gina Nuclear Power Plant 2006 Owners Activity Report Fourth Interval (2000-2009), Third Period. First Outage (2006)- ISI First Interval (1998-2008), Third Period, Second Outage (2008) - IWL4IWL TABLE 3 (Continued):

ABSTRACT OF REPAIR, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR:

CONTINUED SERVICE Service Induced Flaw or Relevant Condition Found:

Repair, Scheduled Replacement,Section XI Repairl Replacement Code or Corrective Item Description Examination or Date Plan Number clas Measuft Decito of Work Tesd (Yes/ No) ete 2

Replacement Main Steam Replacement:

No 5/27/08 GORR 33-061 Mechanical of Mechanical WO 20603801 Snubber Snubber in MSU-40 component stupporL 2

Replacement Main Steam Replacement No 5/5/08 GORR 33-062 Mechanical of Mechanical WO 20505609 Snubber Snubber in MSU-7 component support.

Page 12