R.E. Ginna Nuclear Power Plant AEExelon Generation. 1503 Lake Rd.

Ontario, NY 14519 www.exeloncorp.com August 12, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 2055-0001 R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 05000244

Subject:

Transmittal of 2014 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2014. This report is submitted as specified by ASME Code Section Xl.

There are no regulatory commitments contained in this letter.

If you have any questions, please contact Thomas Harding at (585) 771-5219.

Respectfully, Thomas G. Mogren Director, Engineering Exelon Generation Company, LLC

Attachment:

FIFTH INSERVICE INSPECTION (ISI) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL, SECOND INSPECTION PERIOD, 2014 OWNER'S ACTIVITY REPORT FOR RFO-38 INSERVICE EXAMINATIONS (April 27, 2014 through May 21, 2014) cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna 4A~cwLr 60 PL4Je( C)OQZ9!

August 12, 2014 Page 2 bcc: T. Paglia T. Harding F. Klepacki D. Ferraro C. Siverd B. Rudell J. Barstow

ATTACHMENT 1 FIFTH INSERVICE INSPECTION (ISI) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL SECOND INSPECTION PERIOD 2014 OWNER'S ACTIVITY REPORT FOR RFO-38 INSERVICE EXAMINATIONS (April 27, 2014 through May 21, 2014)

R.E. Ginna Nuclear Power Plant, LLC August 11,2014

Exelon Generation.,

FIFTH INSERVICE INSPECTION (ISI) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL SECOND INSPECTION PERIOD 2014 OWNER'S ACTIVITY REPORT FOR RFO-38 INSERVICE EXAMINATIONS (April 27, 2014 through May 21, 2014)

For R. E. Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519 Commercial Service Date: June 1, 1970 NRC Docket Number: 50-244 Revision Number: 00 Date: Aucqust 01,2014 Prepared by: ,Ai e Frank A. Klepacki - Site I1 Pr!ram Owýner - R E Ginna Approved by: Y y '

RyA Carey - Engi rng Manager - Programs Engineering - R E Ginna

R. E. Ginna Nuclear Power Plant, Unit I E5t Interval Inservice Inspection and Rev. 00 ExeIlon Generati~on, 2nd Interval Containment Inservice Inspection Date: 8I01/2014 2014 OWNER'S ACTIVITY REPORT Page i-2 of i -8 FOR INSERVICE EXAMINATIONS TABLE OF CONTENTS T a ble of C onte nts ............................................................................................................. i-2 Ab stra ct ................................................................................................................................................ i-3 Form OAR-1 Owner's Activity Report for Fifth Interval Inservice Inspection Plan ........................... i-4 Form OAR-1 Owner's Activity Report for Containment Second Interval Inservice Inspection Plan ... i-5 Table I Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service..... i-6 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service ....................... i-7

R. E. Ginna Nuclear Power Plant, Unit 1 ExelnGeneratin lonExGner~l'o ,

--AW 5oth Interval Inservice Inspection and 2 ndInterval Containment InserviceDae Rev. 00 8/12 4 Inspection 2014 OWNER'S ACTIVITY REPORT Page 1-3 of i -8 FOR INSERVICE EXAMINATIONS ABSTRACT This Owner's Activity Report (OAR) summarizes the results of the R. E. Ginna Nuclear Power Plant (GNPP),

Unit 1, American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection (ISI)

Examinations and Repair/Replacement activities performed during this reporting cycle from November 22, 2012 through August 1, 2014. The 2014 Refueling Outage (RFO) started April 27, 2014 and ended May 21, 2014. This OAR is for the Fifth Interval Inservice Inspection Program, Second Period and the Second Interval Containment Inservice Inspection Program, Second Period. Associated ISl examinations were performed in accordance with ASME Section XI Code, 2004 Edition, No Addenda. The First Interval Containment Inservice Inspection Program was extended to align with the ISI Program Interval in accordance with the Fourth Interval Inservice Inspection Program Relief Request Number 22. The 5 th Interval Inservice Inspection and the 2nd Interval Containment Inservice Inspection Interval are aligned.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC),Section XI, Article IWA-6000, GNPP has implemented ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1". ASME Code Case N-532-4 is approved for use in Regulatory Guide 1.147. This Report complies with the requirements of Code Case N-532-4.

OWNER'S ACTIVITY REPORTS - FORM OAR-1 Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the GNPP Unit 1, 2014 refueling outage RFO-38 examination activity in accordance with the following inspection plans and schedules:

" Inservice Inspection Program Plan(s) for the Fifth Inspection Interval for GNPP Unit I

  • Long Term Plan for GNPP, Unit 1

" ISI Program Plan ASME XI, IWE/IWL Second Inspection Interval In addition to the Owner's Activity Report, Form OAR-I, the following Tables are also included:

a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with inservice flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, whether the item is a repair, replacement or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.

R. E. Ginna Nuclear Power Plant, Unit 1 ri or uxelon~

eriljon e ndInterval 2 Inservice Inspection and Interval Containment Inservice InspectionInspetionDate:

Rev. 00 8/0112014 2014 OWNER'S ACTIVITY REPORT Page i -4 of 1-8 FOR INSERVICE EXAMINATIONS FORM OAR-I OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number GNPP-OAR-ISI-2014 Plant R. E. Ginna Nuclear Power Plant, 1503 Lake Road, Ontario, New York 14519 (Name and Address of Plant)

Unit No, 1 Commercial Service Date June 1, 1970 Refueling Outage Number RFO-38 Current Inspection Interval Fifth Inservice Inspection Interval - January 1. 2010 to December 31, 2019.

(1st, 2nd, 3rd, 4th, Other)

Current Inspection Period Second Inservice Inspection Period - January 1. 2013 to December 31, 2016 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 2004 Edition, No Addenda Date and Revision of Inspection Plan 5 April 2013, Revision 3 Edition and Addenda of ASME Section XI applicable to repairs/replacements, ifdifferent than the Inspection Plan N/A Code Cases used: N-532-4. N-706. N-716, N-722, N-729-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2014 RFO (RFO-38) conform to the requirements of Section XI.

Certificate of Authorization No. N/A Expiration Date N/A (If applicable)

Q; ,n..4 to

  • ql r L A VI1- -. A Date -7/1,1-(Site ISI Program Owner) 1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by HSB Global Standard s of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any pe onal injury or roperty damage or a loss of any kind arising from or connected with this inspection.

Bruce Sawyer = -,L, I. 4A Commissions NB10496, A. N, 10New York 4077 Inspectors Signature National Board, State, Province, and Endorsements Date 7/.A4 / **0o14 _

R. E. Ginna Nuclear Power Plant, Unit I M e5 Interval Inservice Inspection and Rev. 00

~ExelonGeneratIon, 2 nd Interval Containment Inservice Inspection Date: 8/01/2014 2014 OWNER'S ACTIVITY REPORT Page i-5 of i-8 FOR INSERVICE EXAMINATIONS FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number GNPP-OAR-IWE/L-2014 Plant R E Ginna Nuclear Power Plant, 1503 Lake Road, Ontario, New York 14519 (Name and Address of Plant)

Unit No. 1 Commercial Service Date June 1. 1970 Refueling Outage Number RFO-38 Current Inspection Interval Second Containment Inspection Interval - January 1. 2010 to December 31, 2019 (1st, 2nd, 3rd, 4th, Other)

Current Inspection Period Second Inservice Inspection Period - January 1. 2013 to December 31. 2016 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans 2004 Edition, No Addenda Date and Revision of Inspection Plans 29 December 2009, Revision 0 Edition and Addenda of ASME Section XI applicable to repairs/replacements, if different than the Inspection Plan N/A Code Cases used: N-532-4, N-686. N-739, N-753, (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting completion of. 2014 RFO (RFO-381 conform to the requirements of Section XI.

Certificate of Authorization No. N/A____ Expiration Date N/A N/A (If applicable)

Sinned Frank A Klenacki Date 7/a V /.t (Site ISI Program Owner) f CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by HSB Global Standards of Hartford, Connecticut have inspected the items described in this Owners Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any pe, onal injury or paperty damage or a loss of any kind arising from or connected with this inspection.

Bruce Sawyer t_..,eA

  • Commissions NB110496. A. N. I:New York 4077 Inspector's Signature 7 National Board, State, Province, and Endorsements Date 7/ P,

/ ,o/4

R. E. Ginna Nuclear Power Plant, Unit 1 w

ExelonGeneratio AM e 5 th Interval Inservice Inspection and 2 nd Interval Containment Inservice Rev. 00 Date: 8/01/2014 Inspection 2014 OWNER'S ACTIVITY REPORT Page i-6 of i -8 FOR INSERVICE EXAMINATIONS TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 EXAMINATION ITEM EVALUATION DESCCRIPTION CATEGORY AND ITEM NUMBER DESCRIPTION There were no items with flaws or relevant conditions that require evaluation for continued service.

R. E. Ginna Nuclear Power Plant, Unit 1

- x Interval Inservice Inspection and Rev. 00 Exelon~enerion, or 5 th 2 nd Interval Containment Inservice Inspection Date: 8101/2014 2014 OWNER'S ACTIVITY REPORT Page i -7 of i -8 FOR INSERVICE EXAMINATIONS TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 CODE ITEM DESCRIPTION DATE REPAIR/REPLACEMENT CLASS DESCRIPTION OF WORK COMPLETED PLAN NUMBER 3 Component Cooling Small leak identified in the half- May 2014 Work Order Water System, 1"half- coupling fillet weld. ASME C91971435 coupling fillet weld Section X 2004 Edition associated with Mandatory Appendix IX was Temperature Element used to design, build and install TE-621 a mechanical clamp over the leak area. Relief Request ISI-09 was developed and submitted to the NRC dated 9/6/2012.

Approved NRC SER was obtained on 10/16/2012.

Replacement performed during the 2014 RFO & Acceptable 1 Chemical & Volume Weld Repair of Seal Weld May 2014 Work Order Control, 2" Valve 9314. performed during 2014 RFO & C92691877 Body to Bonnet Seal Acceptable (GORR 37-081)

Weld Leak

R. E. Ginna Nuclear Power Plant, Unit 1

-5th Interval Inservice Inspection and Rev. 00 2 nd Interval Containment Inservice Inspection Date: 8/01/2014 2014 OWNER'S ACTIVITY REPORT Page i-8 of i -8 FOR INSERVICE EXAMINATIONS END OF REPORT 2014 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT