ML22019A260

From kanterella
Jump to navigation Jump to search
Transmittal of 2021 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant
ML22019A260
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/11/2022
From: Swift P
Exelon Generation Co LLC
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22019A260 (5)


Text

Paul M. Swift Site Vice President R E. Ginna Nuclear Power Exelon Generation ~ Plant 1503 Lake Rd Ontario. NY 14519 315 7915200 Office www exeloncorp.com paul.sw1ft<aexeloncorp.com January 11 , 2022 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington , DC 20555-0001 RE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244

Subject:

Transmittal of 2021 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2021 . This report is submitted as specified by ASME Code Section XI .

There are no regulatory commitments contained in this letter.

If you have any questions, please contact Chris Bradshaw at (315) 791-3246.

Respectfully,

~*~~~

Paul M. Swift Attachment 1: SIXTH INSERVICE INSPECTION (ISi) INTERVAL and THIRD CONTAINMENT INSPECTION INTERVAL (CISI), FIRST INSPECTION PERIOD (ISi AND CISI); 2021 OWNER'S ACTIVITY REPORT FOR RF0-43 INSERVICE EXAMINATIONS (October 4, 2021 through October 23, 2021) cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna

ATTACHMENT 1 SIXTH INSERVICE INSPECTION (ISi) INTERVAL AND THIRD CONTAINMENT INSPECTION INTERVAL (CISI),

FIRST INSPECTION PERIOD (ISi AND CISI );

2021 OWNER'S ACTIVITY REPORT FOR RF0-43 INSERVICE EXAMINATIONS (October 4, 2021 through October 23, 2021)

R.E. Ginna Nuclear Power Plant, LLC January 11 , 202 1

FORM OAR-1 OWNER'S ACTIVITY REPORT Plant R.E. Ginna Nuclear Power Plant, 1503 Lake Road , Ontario New York 14519 Unit No. N/A Commercial Service Date June 1, 1970 Refueling Outage Number G1R43 (if applicable)

Current Inspection Interval Sixth Inspection Interval (ISi), Third Inspection Interval (CISI), [Starting January 1, 2020]

(1", 2°*, 3**, 4'", other)

Current Inspection Period _F_ ir..:..

st.:..l;....n..:..

s"'-pe.:..c:..:t....:io'-n-'p'"-'e:.;.r....:io....:d;....:(..:..IS=-l'--'a:.c.n. . :dc.. .C.=-.:. .S:..;.

1 1,_)""'[S:. . :t;:.;.art:. . :i"'n.,_g.. .:J. . :a"'n. :. u. :.:.a:. .1.r_

y 1"'-'....:2:..:0:..::2:..::0..._

]- - - - - - - - -- - - - --

(1" , 2"'. 3)

Edition and Addenda of Section XI app licable to the inspection plans ASME Section XI 2013 Edition {61h Interval)

Date and Revision of inspection plans August 11 , 2021 , Rev. 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used for inspection and eva luation : N-532-5, N-706, N-716-1, N-722-1, N-729-6, N-731 , N-770-2 (if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFO RMANCE I certify that (a) the statements made in this report are correct; (b) the exam inations and tests meet the Inspection Plan as required by the ASME Code ,Section X I; and (c) the repair/replacement activities and eval uations supporting the completion of G1R43 conform to the requirements of Section X I. (refueling outage number)

Signed Kayla lazzetta, GIN ISi Program Owner Date (Owner or Owner's designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a va lid commission issued by the National Board of Boiler and Pressure Vessel In spectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evalua ion described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perso nal/jury or prop y damage or a loss of any kind arising from or connected ~ith this inspection.

Bruce Sawyer ~ ~ Commissions &;{J /0 496 /(,) 1 (Inspector's Signal ) (National Board Number and Endorsement)

Date I //9 I ~e>Z- 'Z....

Page 1 of 3

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Examination Item Item Description Evaluation Description Category Number IR 04451724 UT indications identified on Was evaluated and found acceptable by 8-8 82.11 Pressurizer Lower Shell-to-Lower ESR-21-0200 . Evaluated and found to Head Circ Weld , C-3. require no additional ASME Section XI examinations by ESR-21-0216.

Degradation of RHE-8-PR1 and IR 04451306 F-A F1 .40 RHE-2-PR1 identified during NOE Was evaluated and found acceptable by VT-3 examinations of supports. ESR-21-0193 Page 2 of 3

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Temporary leak repair via like for like EAC02B , Residual replacement and installation of studs and Heat Removal GORR 43-024 2 leak injection washers. Contingency 05/04/2021 Heat Exchanger WO# C93783989 sealant injection mentioned in R/R plan

'B' not used.

Page 3 of 3