Informs That as of 980717,util Has Determined to Permanently Cease Operations at Millstone Unit 1 & That Fuel Has Been Permanently Removed from Reactor Vessel.Util Will Submit Post-Shutdown Decommissioning Activities at Later Time
ML18040A008
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/21/1998
From: Kenyon B
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B17388, NUDOCS 9807240016
Download: ML18040A008 (12)


Text

~~///jjjthS Nuclear Energy 1111)stone t uciear Pntt cr Station Northeast Nuclear Energy Company P.O. Box 128 Waterford, CT 06385-0128 s LvLlC t.t.t.i NT RGvi (860) H7-1791 1 e I '98 AUG -8 AR:1 ~

Fa~ (860) 444-027?

The yortheast Utthtics System

~ 21 l998 Docket No. 50-245 B17888 Re: 10CFR50.82 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Millstone Nuclear Power Station, Unit No. 1 Certification of Permanent Cessation of Power Operations and that Fuel Has Been Permanentl Removed from the Reactor Pursuant to 10CFR50.82(a)(1)(i) and 10CFR50.82(a)(1)(ii), Northeast Nuclear Energy Company (NNECO) hereby certifies to the NRC that, as of July 17, 1998, it has determined to permanently cease operations at Millstone Unit No. 1 and that fuel has been'permanently removed from the reactor vessel. NNECO understands and acknowledges that upon docketing these certifications, the Millstone Unit No.

10CFR50 license no longer authorizes operation of. the reactor or emplacement or retemtion of fuel into the reactor vessel.

Millstone Unit No. 1 has been shutdown since November 4, 1995 when the plant entered the Cycle 15 refueling outage. During the outage, all fuel assemblies were offloaded to the spent fuel pool. The removal of fuel from the reactor vessel was completed on November 19, 1995. As of that date, all fuel assemblies were removed from the reactor vessel and placed in the spent fuel pool for temporary storage.

NNECO will submit at a later time the Post-Shutdown Decommissioning Activities Report and the site-specific decommissioning cost estimate in accordance with 10CFR50.82.

I 8072400i 05000245 PDR ADOCK PDR

uwtov oF CONCERNED What is an SCIENTISTS "Administrative Hold" Plant' mmwwaaa

~

lide 11

Operating Nuclear Plants Alvin W. Vogtle 1 Donald C. Cook 1 Nine Mile Point 1 Salem 1 Alvin W. Vogtle 2 Donald C. Cook 2 Nine Mile Point 2 Salem 2 Arkansas Nuclear One 1 Dresden 2 North Anna 1 San Onofre 2 Arkansas Nuclear One 2 Dresden 3 North Anna 2 San Onofre 3 Beaver Valley 1 Duane Arnold Oconee 1 Seabrook Beaver Valley 2 Edwin I. Hatch 1 Oconee 2 Sequoyah 1 Braidwood 1 Edwin I. Hatch 2 Oconee 3 Sequoyah 2 Braidwood 2 Fermi 2 Oyster Creek Shearon Harris Browns Ferry 2 Fort Calhoun Palisades South Texas Project 1 Browns Ferry 3 Grand Gulf Palo Verde 1 South Texas Project 2 Brunswick 1 H. B. Robinson 2 Palo Verde 2 St. Lucie 1 Brunswick 2 Hope Creek Palo Verde 3 St. Lucie 2 Byron 1 Indian Point 2 Peach Bottom 2 Surry 1 Byron 2 Indian Point 3 Peach Bottom 3 Surry 2 Callaway James A, FitzPatrlck Perry Susquehanna 1 Calvert Cliffs 1 Joseph M. Farley 1 Pilgrim Susquehanna 2 Calvert Cliffs 2 'Joseph M. Farley 2 Point Beach 1 Three Mile island 1 Catawba 1 Kewaunee Point Beach 2 Turkey Point 3 Catawba 2 LaSalle County 1 Prairie Island 1 Turkey Point 4 Clinton LaSalle County 2 Prairie Island 2 Vermont Yankee Comanche Peak 1 Limerick 1 Prairie Island 2 Virgil C. Summer Comanche Peak 2 Limerick 2 Quad Cities 1 Washington Nuclear 2 Cooper McGuire 1 Quad Cities 2 Waterford 3 Crystal River 3 McGuire 2 R, E, Ginna Watts Bar 1 Davis-Besse Millstone 2 River Bend Wolf Creek Diablo Canyon 1 Millstone 3 Diablo Canyon 2 Monticello Permanently Closed Nuclear Plants Big Rock Point Indian Point 1 Rancho Seco Yankee Rowe Dresden 1 Haddam Neck Humboldt Ba La Crosse, Maine Yankee 'rojan'Ion San Onofre 1 Zion 1 2

Administrative Hold Nuclear Plants 1 J

f Browns Ferry 1 l

( ~

OPERATING DATA REPORT DOCKET NO 50-259 PREPARED BY S.A RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERR UNIT ON
2. Reporting period: JANUARY 1993
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152 esign Electric Rating (Net N4e)'. 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. powei'.eve 1 To which Restricted, Restrictions, Ii Any:

If Any (Net MWe): N/A.

Iv. gleason For N/A THIS Y EAR- TO MONTH DATE CUMULATIVE

11. Hours In Reporting Period 744.0 744 162272 l2. Hours Reactor Was Critical 0.0 0 59521
13. Reactor Reserve Shutdown Hours 0.0 0 6997
14. Hours Gc.neratgg On Line 0.0 0 58267
15. Unit Reserve Shutdown Hours 0~0 0 0
16. Gross Thermal Generation (MWh) 0.0 0 168066787
17. Gro s Electric Generation (MWh) 0.0 0 55398130
18. Net Electric Generation (MWh) -2418 0 -24 18 535062
19. Unit Service Factor 0.0 0.0 35.9
20. Unit Availabilitv Factor 0.0 0.0 35-9
21. Unit Capacity Factor (MDC Net) 0.0 0.0 3 1-'0
22. Unit Capacity Factor (DER Net) 0.0 0.0 31-0
23. Unit Forced Outage Rate 100 ' 100 '0 59 4
24. Shutdowns Scheduled Over Next. 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of- Reporting Estimated Date Of Startup: To be Period, determined 0,

OPERATING DATA REPORT DOCKET NO 50-259 PREPARED BY S.A.RATLIPF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit. Name: BROWNS F RRY UN
2. Reporting period: FEBRUARY 1993.
3. Licensed Thermal Power (MMt): 3293
4. Nameplate Rating (Gross MMe): 1152
5. Design Electric Rating (Net HMe): 1065
6. Max imum Dependable Capacity (Gross MMe): 0
7. Max imum Dependable Capacity (Net MMe): 0
8. If Change" Occur in Capacity Ratings (Items Number 3

'Through 1) Since Last Report, Give Reason: Administrative hold

9. power Level To which Restricted,
10. Reason For Restrictions, If Any:

If Any '(Net MWe}: 0 Administrative ho)d THIS YEAR-TO MONTH .DATE CUMULATIVE 1 1 ~ Hours In Repor ting per iod 672.0 1416 95743 A apl ~ H s Reactor Mas Critical 0.0 0 59521

13. Reactor Reserve Shutdown Hours 0.0 0 6997 14 ~ Hours Generator On Line 0.0 0 58267
15. Uhit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh) 0~0 0 168066787 17 Gross Electric Generation (MWh) 0.0 0 55398130

'8.

Net Electric Generation (MWh} -3034. 0 -5077 53503595

)9. Unit Service Factor 0.0 0.0 60.9 EO. Unit Availabilihy Factor 0.0 0.0 60.9

21. Unit Capacity Factor (MDC Net) 0.0 0.0 52.8
22. Uni t Capacity .Factor (DER Net) 0.0 O.O 52 8

~

23. Unit Forced Outage Rate 0.0 0.0 25. 6

)4 ~ Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

? 5. If Shut Down At End Of Reporting Period, stimated Date Of Startup: To be determined

  • Excludes hours under administrative hold

OPERATING DATA REPORT 1 ~

Docket No. ~50-25 1 Date: ~S Completed By: J E Wallace Telephone: 256 -729-7874

l. tJmt. Name: BFN Unit 1
2. Reporting Period: Au ust 1998
3. Licensed Thermal Power (MWt): 32 4 Nameplate Rating (Gross Mwe): 1152
5. Design Electrical Rating (Net Mwe): 1065
6. Maximum Dependable Capacity (Gross MWe): 0
7. Maxtmum Dependable Capac>ty (Net MWe). 0
8. Ifchanges Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, Ifany (net MWe): 0
10. Reasons for Restrictions, Ifany: Administrative Hold This Month Yr-To-Date Cu m u la tive*
11. Hours in Reporting Period 0 0
12. Number of Hours Reactor was Critical 0 0 )
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator On-Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0 o
16. Gross Thermal Energy Generated (MWh) 0 0 168066787 1-7. Gross Electric Energy Generated (MWh) 0 0 55398130
18. Net Electrical Energy Generated (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9
20. Unit Availability Factor 0 0 60.9
21. 5nit Capacity Factor (Using MDC Net) 0 0 52.it
22. r Unit Capacity Factor (Using DER Net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. 1f Shutdown at End of Report Period, Estimate Date of Startup: To Be Determined
  • Excludes hours under Administrative Hold (June 1, 1985 to present) 0, E-5

OPERATING DATA REPORT DOCKET NO. 50-259 PREPARED BY S-A- RATLIFF TELEPHONE 205-729-2937 I

OP ERAT NG STATUS

1. Unit Name: BROWNS F RRY UN
2. Reporting period: FEBRUARY 1993
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): l 152
5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 0
7. Max imum Dependable Capacity (Net MWe): 0
8. If Change Occur in Capacity Ratings (Items Number 3 Through )) Since Last Report, Give Reason: Administrative hold
9. Power Level To which Restricted,
10. Reason For Restrictions, If Any:

If Any (Net MWe):

Administrative hold 0

(0 THIS Y EAR-TO MONTH DATE CUMULATIVE

  • 1 1 ~ Hours In Reporting Period 672. 0 1416 95743 t '0 A0 0 H s Reactor Was Critical 0.0 0 59521
13. Reactor Reserve Shutdown Hours 0.0 0 . 6997
14. Hours Generator On Line 0.0 0 58267
15. Uhit Reserve Shutdown Hours 0.0 0 0 16 Gross Thermal Generation (MWh) 0.0 0 168066787

'7.

Gross Electric Generation (MWh) 0.0 0 55398130

18. Net Electric Generation (MWh) -3034.0 -5077 ,53503595
19. Unit Service Factor ~

0.0 0.0 ~60. 9

~0. Unit Availabili~y Factor 0.0 0.0 60.9

21. Unit Capacity Factor (MDC Net) 0.0 0.0 52.8
22. Uni t Capacity .Factor (DER Net) 0.0 0 0 52..8
23. Unit Forced Outage Rate 0.0 0.0 25. 6

>4 ~ Shutdowns Scheduled Over Next 6'onth (Type, Date, and Duration of Each):

f Shut Down At End Of Reporting Period, stimated Date Of Startup: To be determined I

  • Excludes hours under administrative hold

OPERATING DATA REPORT Docket No.

Date:

Completed By:

Telephone:

J~

50-259

&e . >>

256 -729-7874 I. tJnit Name: BFN Unit 1

2. Reporting Period: Au ust 1998
3. Licensed Thermal Power (MWt): 32 Nameplate Rating (Gross Mwe): 1152
5. Design Electrical Rating (Net Mwe): 1065
6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Net MWe): 0
8. Ifchanges Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A Power Level To Which Restricted, Ifany (net MWe): 0
10. Reasons for Restrictions, Ifany: Administrative Hold This Month Yr-To-Date Cumulative"
11. Hours in Reporting Period 0 0
12. Number of Hours Reactor was Critical 0 0
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator On-Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal Energy Generated (MWh) 0 168066787
17. Gross Electric Energy Generated (MWh) 0 0 55398130
18. Net Electrical Energy Generated (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9
20. Unit Availability Factor 0 60.9
21. Snit Capacity Factor (Using MDC Net) 0 52.8
22. Unit Capacity Factor (Using DER Net) 0 0 52.8
23. Unit Forced Outage Rate 25.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): IOA 1'f
25. Shutdown at End of Report Period, Estimate Date of Startup: To Be Determined
  • Excludes hours under Administrative Hold (June 1, 1985 to present)

UNION OF CONCERNED Why Bid TVA Put Unit 1 SCIENTISTS Into "Administrative Hold?"

~ Most probable motive MONEY 8 TVA's debt is $ 29.8 billion, or $ 4,257 for every person living in the TVA service area.

~ TVA's estimated electricity sales in 1998 are $ 6.3 billion.

~ IfALLof TVA's sales income is applied to debt, it'l take 5 years to pay it off.

~ Not all of TVA's sales will be applied to debt. The debt willbe around for awhile.

Slide 12

UNION OF CONCERNED SClENTISTS Why Does It Matter' RAMWATWN

%According to a recent study, an accident at a .

permanently closed BWR plant could have the following consequences for. the area within 50 miles:

Population dose 38 million rem Latent fatalities 15,300 people Condemned land 140 square miles Total cost $ 48 billion

~ Source: Brookhaven National Laboratory, "A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown Nuclear Power Plants," NUREG/CR-6451, April 1997.

de 13

UNION OF CONCERNED SCIENTISTS What Should NRC Do'?

~M&IWII1

~ Compel TVA to bring Unit 1 into compliance with the requirements of its operating license.

OR

~ Compel TVA to place Unit 1 into the permanently closed category and submit a post-shutdown decommissioning activities report .

OR

~ Create regulations and/or regulatory guidance.

applicable to plants in "administrative hold."

Slide l4

~ ak jt 0,

1 .)