Requests That Instrumentation & Control Independent Design Review Be Rescheduled at First Available Opportunity.Delays Will Have Significant Impact on Sar,Fsar & CESSAR-F Review
ML17296B286
Person / Time
Site: Palo Verde, 05000470
Issue date: 03/11/1981
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, EMVC-EPS
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LD-81-014, LD-81-14, NUDOCS 8103170458
Download: ML17296B286 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBRs810317045b DOC ~ DATEs 81/03/1f NOTARIZED: NO DOCKET FACIL'sSTN~50'>>528 Palo Vet de>> Nuclear Stat4onr Un) t. 1r Ar) zone Publ i 05000528 STN-50 529 Palo Ve'rde Nuclear Stationr Unit 2'r A'r izona Publi 05000529 STN 50-530 Palo Verde Nuclear Stationr Un)t 3r Ar)zona Publi 05000530 STN 50 592 Palo Verde Nuclear Stationr Unjt 4r Ar)zona Publi 05000592 STN-50-593 Palo Verde Nuclear Stationr Unit 5r Ar izona Publi 05000593 AUTH', NAME AUTHOR AFFILIATION SCHERERrA,E~, C~E Power Systems REGIP ~ NAME RECIPIENT'FFILIATION of Nuc1 e'ar Reactor Regu) ationr Dir ectorI

~

DENTONr H. Rs Of fice

SUBJECT:

Requests that instrumentation L control independent'esign review be rescheduled at fi,rst available opportunity ~ Delays" will significant review.

impact>> on SARrFSAR f

have K CESSAR F DISTRIBUTION CODE>> EODSS COPIES RECEIVED>>LIIR WNCI. SI E'- 'k' ' '"

TITLEs~ Standardized P.lants NOTES Standardl zed Pl ant 1 cy: C Gr imes

~

05000528 Standar dized Plant+i cysC Grimes 05000529 Standardized Plant ~ 1 cy'.C Grimes 05000530 Inactive. 05000592 Inactive, 05000593 RECIPIENT>> COPIES RECIPIENT COPIES'TTR<

ID- CODE/NAME( LTTR ENCL ID COOK/NAME' KNCL ACTIONs A/D LICENSNG MIRAGLIArF ~

LEE,J, 1 KERRIGANr J ~ 03 INTERNALs ACC EVAL BR 05 1 AUX SYS BR 06 1 CHEM ENG BR 07 2 CONT SYS BR 09 2 CORE PERF BR )f I DIRr DIV 0 LIC01 1 EFF TR SYS BR14 1 EMERG PREP 1 EQUIP QUAL BR15 2 HUM FACT>> ENG 37 1 IKC SYS BR 17 2 I8E 19 6 LIC GUID BR 39 MATL ENG BR 1'5 MECH ENG BR 25 2 MPA NRC PDR 02 OELD

'1 1 1 POWER SYS BR 29 1 PROC/TST REV 35 2 QAB: 38. 1 S BR34 f >>

REAC SYS BR 3 REG 1 ENG BR 33 30'TRUC SYS INTER BR 40 1 EXTERNALs ACRS 41 16 1 NSIC 04 TOTAL NUMBER'F COPIES REQUIRKDs LTTR ~ KNCL

0 Q

I II M

n II 4

h rr ~

1 I

p$

'I l~

I jl

~ t f

J II

C-E Power Systems Tel. 203/688-1911 Combustion Engineering, Inc. Telex: 99297 1000 Prospect Hill Road Windsor, Connecticut 06095 SYSTEMS March ll, LD-81-014 1981 e e$

hf/lP Se l 8 tgst Mr. H. R. Denton, Director clihtogy Office of Nuclear Reactor Regulation 'I U. S. Nuclear Regulatory Commission

'o Washington, D. C. 20555 7 l~

Subject:

Instrumentation and Control Independent Design Review Meeting for CESSAR-F

Dear Mr. Denton:

As you are aware, there is a very tight licensing review schedule presently in effect on Combustion Engineering's Standard Safety Analysis Report - FSAR (CESSAR-F) and the Palo Verde Nuclear Generating Station units. Any delays at this point will have significant impact on that review schedule.

On March 5, 1981, representatives of Combustion Engineering (C-E) and Arizona Public Service met with your staff to discuss the agenda and other procedural items of the subject Independent Design Review (IDR) or System Review. At that meeting, the scheduled date of the IDR was delayed by your staff from the end of March to the middle of May. The rationale provided for this six-week delay was the work load within that particular branch. Considering the amount of effort required prior to the issuance of the Safety Evaluation Re-port for CESSAR-F, this delay could result in inadequate time available for the staff to complete its review. On the other hand, should we be allowed to continue with our planned IDR a more effective and efficient use of both of our resources could result.

We, therefore, request that the instrumentation and control IDR be rescheduled at the first available opportunity. Please feel free to contact me or Mr.

T. J. Price of my staff at (203)688-1911, Extension 2803 should you have any additional questions.

Very truly yours, COMBUSTION ENGINEERING, INC.

A,L, 5 h r.~>>

A. E. Scherer Director Nuclear Lice~sing AES:cw