IR 05000289/2018006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006)
ML19064B356
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/04/2019
From: Matt Young
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018006
Download: ML19064B356 (6)


Text

UNITED STATES rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2018006)

Dear Mr. Hanson,

The NRC has completed its end-of-cycle performance assessment of Three Mile Island Station, Unit 1, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Three Mile Island Station, Unit 1, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Three Mile Island Station, Unit 1.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. In a letter (ML17171A151) dated June 20, 2017, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Three Mile Island Station, Unit 1 no later than September 30, 2019. Therefore, the inspection schedule is tentative and may be revised. Once you formally notify the NRC in accordance with 10 CFR 50.82(a)(1)(ii) that Three Mile Island Station, Unit 1 is permanently shutdown and that all the nuclear fuel has been removed from the reactor vessel, then Three Mile Island Station, Unit 1 will transition from NRC IMC 0305, Operating Reactor Assessment Program, and IMC 2515, Light-Water Reactor Inspection Program - Operations Phase, to IMC 2561, Decommissioning Power Reactor Inspection Program. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Finally, the Reactor Oversight Process and Inspection Program provides inherent flexibility to permit inspection sampling adjustments using IMC 2515, Appendix G, Baseline Inspection Guidance for Power Reactors Preparing for Transition to Decommissioning Phase. These adjustments are be made in order to better inform our assessment of performance during this unique period of operations prior to permanent plant shutdown. In addition, the NRC will be implementing quarterly assessment reviews, consistent with the guidance contained in IMC 0305, Operating Reactor Assessment Program, in order to more closely monitor and review overall plant activities to assure that there are no issues emerging that might indicate a decline in focus on the safe operation of the facility.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely,

/RA/

Matthew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No. 50-289 License No. DPR-50 Enclosure:

Three Mile Island Inspection Plan

ML19064B356 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/26/19 2/27/19

IP 22 Inspection Activity Plan Report Three Mile Island 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04 1 1 02/11/2019 02/15/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 02/11/2019 02/15/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls ACCESS AUTH & CONTROL, FITNESS FOR DUTY 3 1 02/25/2019 03/01/2019 IP 71130.01 000733 Access Authorization 1 02/25/2019 03/01/2019 IP 71130.02 000734 Access Control 1 02/25/2019 03/01/2019 IP 71130.06 000738 Protection of Safeguards Information 1 02/25/2019 03/01/2019 IP 71130.08 000740 Fitness For Duty Program 1 02/25/2019 03/01/2019 IP 71151 001338 Performance Indicator Verification TMI REQUAL INSP WITH P/F RESULTS 2 1 03/17/2019 03/22/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

1 03/17/2019 03/22/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Radwaste 1 1 03/18/2019 03/22/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP EXERCISE INSPECTION 5 1 05/06/2019 05/10/2019 IP 71114.01 000716 Exercise Evaluation 1 05/06/2019 05/10/2019 IP 71151 001397 Performance Indicator Verification TMI INITIAL OL EXAM 5 1 05/12/2019 05/17/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 06/09/2019 06/14/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RAD SAFETY REMP 1 1 06/10/2019 06/14/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 06/10/2019 06/14/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink 1 1 06/16/2019 06/22/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

2/22/2019 9:42:30 AM

IP 22 Inspection Activity Plan Report Three Mile Island 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count 50.59 PROCESS 3 1 07/14/2019 07/20/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RAD SAFETY OUT 01,02,03,04 1 1 09/30/2019 10/04/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 09/30/2019 10/04/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 09/30/2019 10/04/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 09/30/2019 10/04/2019 IP 71124.04 000728 Occupational Dose Assessment Inservice Inspection 1 1 10/06/2019 10/19/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

EQ PROGRAM 3 1 11/04/2019 11/08/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1 11/18/2019 11/22/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RAD SAFETY 01,02,03,04 1 1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/18/2019 11/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/18/2019 11/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/18/2019 11/22/2019 IP 71124.04 000728 Occupational Dose Assessment 1 11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification Rad Safety Insp 1 1 01/06/2020 01/10/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 01/06/2020 01/10/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 01/06/2020 01/10/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 01/06/2020 01/10/2020 IP 71124.04 000728 Occupational Dose Assessment PI&R Biennial Team Inspection 4 1 01/20/2020 01/24/2020 IP 71152B 000747 Problem Identification and Resolution 1 02/10/2020 02/14/2020 IP 71152B 000747 Problem Identification and Resolution THREE MILE ISLAND EP PROGRAM INSPECTION 1 1 03/09/2020 03/13/2020 IP 71114.02 000717 Alert and Notification System Testing 1 03/09/2020 03/13/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

2/22/2019 9:42:30 AM

IP 22 Inspection Activity Plan Report Three Mile Island 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count THREE MILE ISLAND EP PROGRAM INSPECTION 1 1 03/09/2020 03/13/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 03/09/2020 03/13/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS 1 1 03/23/2020 03/27/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 03/23/2020 03/27/2020 IP 71151 000746 Performance Indicator Verification TRIENNIAL FIRE PROTECTION 4 1 05/04/2020 05/08/2020 IP 71111.05T 000696 Fire Protection (Triennial)

1 05/18/2020 05/22/2020 IP 71111.05T 000696 Fire Protection (Triennial)

Material Control and Accountability 1 1 06/01/2020 06/05/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

Rad Safety Rad Insts 1 1 07/06/2020 07/10/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation CYBER FULL IMP 4 1 07/20/2020 07/24/2020 IP 71130.10P 000741 Cyber Security 1 08/03/2020 08/07/2020 IP 71130.10P 000741 Cyber Security Rad Safety Insp 1 1 12/14/2020 12/18/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 12/14/2020 12/18/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 12/14/2020 12/18/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 12/14/2020 12/18/2020 IP 71124.04 000728 Occupational Dose Assessment 1 12/14/2020 12/18/2020 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

2/22/2019 9:42:30 AM