December 13, 2007 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
CHANGE TO THE INSPECTION PLAN FOR THE THREE MILE ISLAND POWER STATION
Dear Mr. Pardee:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
C. Pardee 2
Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Dr. Ronald R. Bellamy, Chief, Projects Branch 6 Division of Reactor Projects Docket Nos. 50-289 License No. DPR-16
Enclosures:
Three Mile Island Power Station Inspection/Activity Plans cc w/encl:
C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA D. Allard, Director, PA DEP J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)
J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency
C. Pardee 2
Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Dr. Ronald R. Bellamy, Chief, Projects Branch 6 Division of Reactor Projects Distribution w/encl:
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP A. Rosebrook, DRP D. Kern, DRP, SRI J. Brand, DRP, RI C. LaRegina, DRP, OA G. West, RI OEDO P. Bamford, PM, NRR E. Miller, NRR, Backup J. Lubinski, NRR H. Chernoff, NRR RidsNrrDirslpab@nrc.gov J. Thompson, NRR (JWT1@nrc.gov)
Region I Docket Room (w/concurrences)
J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA SUNSI Review Complete: _AAR_ _____ (Reviewers Initials)
DOCUMENT NAME: T:\\DRP\\BRANCH6a\\ROP 8 Letters\\TMI ROP Realignment Inspection Plan revisions.doc After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook RBellamy DATE 12/6/07 12/ 12/07 OFFICIAL RECORD COPY
Three Mile Island Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 12/11/2007 14:33:11 Report 22 1
71121
- OCCUPATIONAL RAD PROTECTION Baseline Inspections 03/03/2008 03/07/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/03/2008 03/07/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 03/03/2008 03/07/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 7
- PI&R Baseline Inspections 03/31/2008 04/04/2008 1
71152B IP Identification and Resolution of Problems Baseline Inspections 04/14/2008 04/18/2008 1
71152B IP Identification and Resolution of Problems 1
71122
- RADWASTE Baseline Inspections 04/14/2008 04/18/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/14/2008 04/18/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 04/14/2008 04/18/2008 1
7112202 IP Radioactive Material Processing and Transportation 1
7112201
- RETS Baseline Inspections 07/14/2008 07/18/2008 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
- EP PROGRAM EVALUATION EP Baseline Inspectio 08/04/2008 08/08/2008 1
7111402 IP Alert and Notification System Testing EP Baseline Inspectio 08/04/2008 08/08/2008 1
7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 08/04/2008 08/08/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 08/04/2008 08/08/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/04/2008 08/08/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/04/2008 08/08/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 08/04/2008 08/08/2008 1
71151-EP03 IP Alert & Notification System 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1
7111105T IP Fire Protection [Triennial]
Baseline Inspections 09/08/2008 09/12/2008 1
7111105T IP Fire Protection [Triennial]
1 71121
- OCCUPATIONAL RAD PROT Baseline Inspections 10/13/2008 10/17/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/13/2008 10/17/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/13/2008 10/17/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/13/2008 10/17/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/13/2008 10/17/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.