MONTHYEARML22011A1312022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML21012A4342021-01-13013 January 2021 Security Inspection Plan ML20015A5772020-01-15015 January 2020 Security and Emergency Preparedness Inspection Plan for Three Mile Island Generating Station, Unit 1 IR 05000289/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000289/2019005 IR 05000289/20180062019-03-0404 March 2019 Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006) IR 05000289/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000289/2018005 IR 05000289/20170062018-02-28028 February 2018 Annual Assessment Letter for Three Mile Island Station-Unit 1 (Reports 05000289-2017006 and 05000289-2017402 and 05000289-2017501) IR 05000289/20170052017-08-28028 August 2017 Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005) IR 05000289/20160062017-03-0101 March 2017 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2016006) IR 05000289/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2016005) IR 05000289/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2015006) IR 05000289/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2015005) IR 05000289/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2014001) IR 05000289/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000289-14-006 IR 05000289/20130012014-03-0404 March 2014 ROP-14 2013 Three Mile Island Nuclear Station Unit 1, Annual Assessment Letter, Report 05000289/2013001, and Inspection Plan IR 05000289/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000289-13-006 IR 05000289/20120012013-03-0404 March 2013 Annual Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289-12-001) IR 05000289/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Three Mile Island Nuclear Station (Report 05000289/2012006) TMI-12-069, Submittal of Inspection Plan for Reactor Internals2012-04-16016 April 2012 Submittal of Inspection Plan for Reactor Internals IR 05000289/20110012012-03-0505 March 2012 Annual Assessment Letter for Three Mile Island Nuclear Generating Station Unit 1 (Report 05000289-11-001) ML1124206742011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Three Mile Island IR 05000289/20100012011-03-0404 March 2011 Annual Assessment Letter for Three Mile Island Nuclear Generating Station, Unit 1, EOC-11 (Report 05000289-10-001) ML1024407172010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Three Mile Island ML1006213042010-03-0303 March 2010 Annual Performance Review and Inspection Plan Three Mile Island 2009 EOC Letter and Report 22 (05000289-10-001) ML0924402202009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Three Mile Island (September 1, 2009) IR 05000289/20090012009-03-0404 March 2009 Annual Assessment Letter - Three Mile Island Unit 1 (05000289/2009001) IR 05000289/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Three Mile Island (Report 05000289/2008001) ML0734706292007-12-13013 December 2007 ROP 8 - Three Mile Island - Change to Inspection Plan, 12/13/07 ML0724309352007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan IR 05000289/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Three Mile Island (05000289/2007001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0606202072006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Three Mile Island Unit 1 (Report 05-289/2006001) ML0524207232005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Three Mile Island, Unit 1 ML0424401732004-08-30030 August 2004 TMI ROP5 Mid-Cycle Performance Review and Inspection Plan ML0323907022003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for TMI, Unit 1 IR 05000289/20030012003-03-0404 March 2003 2003-Annual Assessment Letter - Three Mile Island, Unit 1 (Report No. 50-289/2003-001) ML0223803152002-08-26026 August 2002 2002 Three Mile Island Unit 1 Mid-Cycle Performance Review & Inspection Plan IR 05000289/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Three Mile Island Station, Unit 1 (Report 50-289/02-01) 2022-01-31
[Table view] Category:Letter
MONTHYEARML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 and Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24073A2312024-03-13013 March 2024 and Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 ML23171B0222023-06-19019 June 2023 (TMI-2) - Notification Pursuant to 10 CFR 72.140(d) Regarding Application of Previously Approved TMI-2 Quality Assurance Program to Independent Spent Fuel Storage Installation Activities 2024-09-09
[Table view] |
Text
August 30, 2005 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND UNIT 1
Dear Mr. Crane:
On August 2, 2005, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempted from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the emergency preparedness cornerstone. The White finding was finalized in a letter dated July 29, 2005, and related to not conducting required annual classroom retraining for some members of the emergency response organization. The NRC plans to conduct a Supplemental inspection for this White finding.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Christopher M. Crane 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald R. Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian E. Holian, Director Division of Reactor Projects Docket No. 50-289 License No. DPR-50
Enclosure:
Three Mile Island, Unit 1 Inspection/ Activity Plan cc w/encl:
Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Chief, Division of Nuclear Safety, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)
D. Allard, PADER M. Schoppman, Framatome ANP
Mr. Christopher M. Crane 3 Distribution w/encl:
S. Collins, RA M. Dapas, DRA R. Bellamy, DRP R. Fuhrmeister, DRP D. Kern, DRP, Senior Resident Inspector P. Sauder, DRP, Resident OA S. Lee, RI OEDO R. Laufer, NRR P. Tam, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (5)
C. ODaniell, DRP Region I Docket Room (with concurrences)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
SISP Review Complete: ___AAR_____ (Reviewers Initials)
DOCUMENT NAME: S:\ROP-6 Mid-Cycle Review\2005 Mid-Cycle Letters\TMI2005midletterRev3.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME Rfuhrmeister/RLF1 Rbellamy/RRB BHolian/BEH DATE 8/05/2005 8/08/2005 8/25/2005 OFFICIAL RECORD COPY
Page 1 of 2 Three Mile Island 08/30/2005 10:35:18 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 95001 - F/U TO ERO TRAINING WHITE FINDING 1 1 IP 2515/149 Mitigating Systems Performance Index Pilot Verification 08/29/2005 08/31/2005 Safety Issues 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/10/2005 10/14/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/10/2005 10/14/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/10/2005 10/14/2005 Baseline Inspections 7111108P - INSERVICE INSPECTION 2 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 10/24/2005 10/28/2005 Safety Issues 1 IP 7111108P Inservice Inspection Activities - PWR 10/24/2005 10/28/2005 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 10/31/2005 11/04/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/31/2005 11/04/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/31/2005 11/04/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/31/2005 11/04/2005 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP 7111105T Fire Protection [Triennial] 11/28/2005 12/02/2005 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 12/12/2005 12/16/2005 Baseline Inspections 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 12/05/2005 12/09/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/12/2005 12/16/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/12/2005 12/16/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/12/2005 12/16/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/12/2005 12/16/2005 Baseline Inspections 71152B - PI&R 4 1 IP 71152B Identification and Resolution of Problems 03/13/2006 03/17/2006 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 03/27/2006 03/31/2006 Baseline Inspections 71121 - OCC RAD PROT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/03/2006 04/07/2006 Baseline Inspections MODS - MODS AND 50.59 3 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 07/17/2006 07/21/2006 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 07/17/2006 07/21/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Three Mile Island 08/30/2005 10:35:18 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71122 - PUB RAD PROT 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/17/2006 07/21/2006 Baseline Inspections 71121 - OCC RAD PROT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/06/2006 11/10/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/06/2006 11/10/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/06/2006 11/10/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/06/2006 11/10/2006 Baseline Inspections 71114 - EP PRGM INSP & PI VERIFICATION 1 1 IP 7111402 Alert and Notification System Testing 12/04/2006 12/08/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 12/04/2006 12/08/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/04/2006 12/08/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/04/2006 12/08/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/04/2006 12/08/2006 Baseline Inspections 7111112 - MAINTENANCE RULE INSP 1 1 IP 7111112B Maintenance Effectiveness 01/15/2007 01/19/2007 Baseline Inspections 7111121 - SSD&PC 6 1 IP 7111121 Safety System Design and Performance Capability 01/22/2007 01/26/2007 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 02/05/2007 02/09/2007 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 02/19/2007 02/23/2007 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 02/26/2007 03/02/2007 Baseline Inspections 7111111B - LO REQUALIFICATION INSPECTION 3 1 IP 7111111B Licensed Operator Requalification Program 03/19/2007 03/30/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/05/2007 03/09/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/05/2007 03/09/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/05/2007 03/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.