ML100621304
| ML100621304 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/03/2010 |
| From: | Ronald Bellamy NRC/RGN-I/DRP/PB6 |
| To: | Pardee C Exelon Generation Co, Exelon Nuclear |
| BELLAMY RR | |
| References | |
| IR-10-001 | |
| Download: ML100621304 (4) | |
See also: IR 05000289/2010001
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406*1415
March 3, 2010
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Rd
Warrenville, IL 60555
SUBJECT:
ANNUAL PERFORMANCE*REVIEWAND INSPECTION PLAN
THREE MILE ISLAND NUCLEAR GENERATING STATION UNIT1
Dear Mr. Pardee,
On February 12,2010, the NRC staff completed its performance review of the Three Mile
Island Nuclear Generating Station (Three Mile Island) Unit 1. Our technical staff reviewed
performance indicators (Pis) for the most recent quarter and inspection results for the period
from January 1 through December 31, 2009. The purpose of this letter is to inform you of our
assessment of your safety performance during this period and our plans for future inspections
at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only - Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, Three Mile Island Unit 1 operated in a manner that preserved public health and safety
and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well
as for the first three quarters of the assessment cycle, was within the Licensee Response
column of the NRC's Action Matrix, based on all inspection findings being classified as having
very low safety significance (Green) and all Pis indicating performance at a level requiring no
additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process
(ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of
any scheduling conflicts and personnel availability issues well in advance of inspector arrival
onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised
at the mid*cycle review.
C. Pardee
2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,* a copy of this letter and
its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at 610-337-5200 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
~<<.
Ronald R. Belfamy, Ph.D., Chief
Projects Branch 6
Division of Reactor Projects
Docket Nos.: 50-289
License Nos: DPR-50
cc w/encrs: Distribution via ListServ
Three Mile Island Inspectionl Activity Plan
C. Pardee
3
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rmfadams.html(the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at 610-337-5200 with any
questions you may have regarding this letter or the inspection plan.
Sincerely.
(RAJ
Ronald R. Bellamy, Ph.D., Chief
Projects Branch 6
Division of Reactor Projects
Distribution w/enel:
N. McNamara, RI
S. Collins, RA
D. Tifft, RI
M. Dapas, DRA
D. Serenei, RI
D. Lew, DRP
N. Sheehan, RI
J. Clifford, DRP
DRS Directors
DRS Branch Chjefs (6)
J. Brand, DRP, RI
R. Bellamy, DRP
C. LaRegina, DRP, Resident OA
G. Barber, DRP
RidSNrrPMThreeMilelsland Resource
C.Newport,DRP
RidsNrrDirslpab@nrc.gov
J. Grejves, DRP
ROPReportsResource@nrc.gov
L. Trocine, RI OEDO
SUNSI REVIEW COMPLETE: ALB
(Reviewer's Initials)
DOCUMENT NAME: S:\\ROP-10 EOC Review\\Branch 6\\TMI\\TMI ROP10 EOC letter. doc
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy ofIhIs document, Indicate in the box: "C"" Copy w~houl attac!'IIneo!lenciosure 'e"" Copy with aIt.a::tYnenUenclosure ON"" No copy
RIIORP
RI/DRP
RI/DRP
OKernl OK
SBarberl S8
02124/10
02/25/10
OFFICIAL RECORD COPY
Page 1 of2
Three Mile Island
02/2412010 .:11;19:57
Iruspection / Activity Plan
'.
Report 22
01/01/2010 - 06/30/2011
Planned Dates
Start
End
Title
50001
- SG REPLACENENT INSP CONTINUED
2
01/04/2010
02/1212010
Steam Generator Replacement Inspection
01/11/2010
01/1312010
Steam Generator Replacement Inspection
71124
- ACCESS/ALARAIDOSEIINSTRUMENTS
03115/2010
03119/2010
Radiological Hazard Assessment and Exposure Controls
03/15/2010
03119/2010
Occupational ALARA Planning and Controls
03/15/2010
0311912010
In-Plant Airborne Radioactivity Control and Mitigation
03115/2010
03/19/2010
Occupational Dose Assessment
03/15/2010
03/19/2010
Radiation Monitoring Instrumentation
TI*177
- MANAGING GAS ACCUMULATION IN ECCS
3
1
03/22/2010
0312612010
Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System
EP PROGR - EP PROGRAM INSPECTION
1
03/29/2010
04/0212010
Radiological Environmental Monitoring Program
03129/2010
04102/2010
Emergency Response Organization Augmentation Testing
03/2912010
04/02/2010
Emergency Action Level and Emergency Plan Changes
1
03129/2010
0410212010
Correction of Emergency Preparedness Weaknesses and Deficiencies
1
03/29/2010
04/02/2010
lP 71151-EP01
DrllilExercise Performance
03/29i2010
04(02/2010
IP 71151*EP02
ERO Drill Participation
03/2912010
04/02/2010
IP 71151*EP03
Alert & Notification System
MODS
- PERMANENT PLANT MODIFICATIONS
4
0411212010
04/16/2010
IP 7111117T
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modlflcations
04126/2010
04f3OJ2010
IP 7111117T
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
71124
-INSTRUMENTSfEFFLUENTS
05110/2010
05/14/2010
Radiation MonitOring Instrumentation
0511012010
0511412010
Radioactive Gaseous and liquid Effluent Treatment
TI*173
- GROUND WATER TI
05/1012010
OSf14f2010
Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative
711528
- PI&R
4
07f12/2010
07/16/2010
Identification and Resolution of Problems
07/26/2010
07/30/2010
Identification and Resolution of Problems
7111107T
- TRIENNIAL HEAT SINK
1
08/23/2010
08/27/2010
IP 711110IT
Heat Sink Performance
HP*71124
- ACCESS/ALARAlAIRJDOSEIINSTRUMENTS/PI
1111512010
11/19/2010
Radiological Hazard Assessment and Exposure Controls
11f15/2010
11/1912010
Occupational ALARA Planning and Controls
his report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures,
Page 20f2
02/241:2010
Report 22
1
1
1
1
1
11:19:57
Planned Dates
Start
End
emMM&.ljjt&&A
.fuN
11/1512010
1111912010
11/15/2010
11/19/2010
11/15/2010
11/19/2010
11/15/2010
11/1912010
11115/2010
11/19/2010
11/1512010
11{19/2010
0311412011
03/18/2011
01/24/2011
01/28/2011
02/07/2011
02111/2011
04/11/2011
04/15/2011
04/1112011
04115/2011
04/11/2011
04/15/2011
04/11/2011
0411512011
04/1112011
04/15/2011
05109/2011
05/13/2011
05f23/2011
05t27{2011
05/23/2011
05/27/2011
Three Mile Island
Inspection I Activity Plan
01/01/2010 - 06130/2011
Title
HP-71124
- ACCESSJALARAlAIRJDOSEIINSTRUMENTSJPI
1
In-Plant Airborne Radioactivity Control and Mitigation
tP 71124.03
In-Plant Airborne Radioactivity Control and Mitigation
Occupational Dose Assessment
Radiation Monitoring Instrumentation
IP 71151-OR01
Occupational Exposure Control Effectiveness
IP 71151-PR01
RETS/ODCM Radiological Effluent
711111 B
- TMI REQUAL INSP WI P/F RESULTS
3
Licensed Operator Requalification Program
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION
3
IP 7111105T
Fire Protection [Triennial]
IP 7111105T
Fire Protection [Triennial}
EPEX
- EP EXERCISE EVALUATION
4
Exercise Evaluation
Emergency Action Level and Emergency Plan Changes
IP 71151-EP01
Drill/Exercise Performance
IP 71151-EP02
ERO Drill Participation
IP 71151-EPD3
Alert & Notification System
HP-71124
- RADWASTE
Radioactive Solid Waste Processing and Radioactive Material Handling. Storage, and Transportation
HP-71124
- INSTRUMENTS/REMP
Radiation Monitoring InstrUmentation
his report does not include INPO and OUTAGE activities.