Pages that link to "PNO-III-83-112, on 831102-03,airborne Iodine Releases Occurred Inside Containment,During SG Replacement Work. Whole Body Counting Will Be Performed to Evaluate Personal Uptakes.Two Regions Based Specialists Dispatched to Site"
Jump to navigation
Jump to search
The following pages link to PNO-III-83-112, on 831102-03,airborne Iodine Releases Occurred Inside Containment,During SG Replacement Work. Whole Body Counting Will Be Performed to Evaluate Personal Uptakes.Two Regions Based Specialists Dispatched to Site:
Displayed 34 items.
- ML20093D176 (← links)
- PNO-III-97-048, on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.States of Wi & Mn Will Be Informed of Info in Notification (← links)
- PNO-III-85-057, on 850712,9 Mm Rifle Fired While Being Handled by Security Guard in Auxiliary Bldg.Investigation Continuing.Security Officer Suspended Pending Investigation Results (← links)
- PNO-III-85-043, on 850530,control Rod F-12 Did Not Drop to Bottom of Core During Cold full-flow Control Rod Drop Test. on 850531,rod J-4 Stuck W/Primary Sys at 370 Degrees.Vessel Head Will Be Removed to Determine Why Rods Stuck (← links)
- PNO-III-85-064, on 850725,low Voltage Station Auxiliary Transformer Tripped,Causing Loss of Power to Safeguard Buses.Caused by Wet Pressure Relay (← links)
- PNO-III-80-039, on 800227,unit Shut Down Because of Tube Leakage in Steam Generator A.Leak Rate Was 1420 Gpd.Licensee Will Conduct Eddy Current Tests (← links)
- PNO-III-88-082, on 880919,licensee Suspended Site Access & & Tested for Drugs After Allegation from Outside Source Re Drug Use by Five Employees.Three Employees Tested Positive for Drugs (← links)
- ML20151X965 (← links)
- ML20151X427 (← links)
- PNO-III-97-059, on 970723,util Decided to Delay Planned Startup of Unit 2 to Replace Leaking Seal on B Rcp.Efforts Were Unsuccessful.Unit 1 Remains Shut Down as Util Focused Attention & Resources on Unit 2 Restart (← links)
- PNO-III-98-023, on 980305,unit 2 Completed TS-required Shutdown After Declaring CCW Sys Inoperable.While Shutdown, Licensee Plans to Conduct More Detailed Analysis of Postulated Failure (← links)
- ML20198Q373 (redirect page) (← links)
- PNO-III-83-112 (redirect page) (← links)
- PNO-III-83-103, on 831021,empty Sf Cast Arrived at West Valley,Ny from Point Beach Nuclear Plant,W/Three Small Areas of Contamination in Excess of Us DOT Limit of 22,000 Disintegrations Per Minute Per 100 Square Centimeters (← links)
- PNO-III-93-050, on 930901,power Supply to Plant Security Sys Failed,Causing Smoke to Fill Battery & Inverter Room. Power Was Restored to Security Sys from Alternate Power Source (← links)
- PNO-III-99-027, on 990514,Unit 1 Was Manually Tripped Due to Steam Leak from 4B Feedwater Heater.Nrc Resident Inspectors Monitored Activities in CR Following Reactor Trip & Monitoring Progress of Repair Work.Licensee Notified NRC (← links)
- PNO-III-97-094, on 971129,unit 1 Reactor Restarted.Unit Scheduled to Remain Online Until Routine Refueling Outage Planned for Early 1998 (← links)
- ML20249B542 (← links)
- ML20249B269 (← links)
- ML20249A174 (← links)
- ML20248L024 (← links)
- ML20248F135 (← links)
- ML20236X042 (← links)
- ML20236V334 (← links)
- PNO-III-87-132, on 871007,contract Worker Fainted During Work on Steam Generator B.Slight Contamination to Socks,Face & Hair Noted After Removal of Protective Clothing at Plant Prior to Transport to Hosp.Worker Decontaminated & Examined (← links)
- ML20216K155 (← links)
- PNO-III-97-072, on 970906,shutdown to Correct Potential Undervoltage Condition During Certain Accident Scenarios Occurred.State of Wi Will Be Notified.Info in Preliminary Notification Reviewed W/Licensee Mgt (← links)
- PNO-III-87-084A, on 870618,approx 235 Gallons of Unit 1 Water Discharged Into Lake Michigan Through Unit 2 Svc Water Discharge.Caused by Presence of Entrained Noble Gases. Calculations Verified by Resident Inspectors (← links)
- PNO-III-87-084, on 870619,approx 235 Gallons of Reactor Cooling Water Discharged Into Lake Michigan.Caused by Inadequate Opening of Valve in Letdown Sys.Circumstance of Release Under Review (← links)
- PNO-III-97-067, on 970813,Point Beach Unit 2 Reactor Restarted & on 970816,unit Began Generating Electricity at Ending ten-mouth Outage,Began on 961005.Licensee Issued News Release on Plant Restart.State of Wi Will Be Notified (← links)
- PNO-III-97-017A, on 970218,licensee Decision to Continue Unit 1 Outage for Extended Period Update Made.Nrc Continues to Closely Monitor Licensee Progress Toward Completing Improvement Initiatives & Preparing Units 2 & 1 for Restart (← links)
- PNO-III-97-017, on 970218,Unit Shut Down Because of Possible Problem W/Impeller of CCW Pump & Bearing Problem W/Sw Pump Motor.Unit 2 Shut Down for Refueling & SG Replacement. Resident Inspectors Have Been Monitoring Repair (← links)
- PNO-III-85-043A, on 850530,control Rods F-12 & J-4 Found Stuck During Insp.Caused by Split Pin & Broken Piece of Tube Being Lodged in Guide Tube.Guide Tube Inserts & Internals Will Be Removed & Inspected (← links)
- PNO-III-90-067, on 901003,small Unplanned Release of Noble Gases Occurred While Personnel Collecting Gas Sample from Vol Control Tank.Release Apparently Occurred as Result of Seal Failure on Gas Analyzer Sample Pump (← links)