- IR 05000250/1986016 (← links)
- PNO-II-85-112, on 851123,Limitorque Valve Motors Inside & Outside Containment Bldg Inspected After Util Determined That Some Motors May Not Be Environmentally Qualified.Unit Will Be Restarted.Insp of Unit 3 Motors Planned (← links)
- ML20137B944 (← links)
- IR 05000250/1985035 (← links)
- PNO-II-86-003, on 860107,unscheduled Shutdown Lasted Longer than 48 H Due to Damaged Steam Supply Stop Check Valve in Each Auxiliary Feedwater Sys Train.Remaining Valves Being Inspected (← links)
- IR 05000250/1997002 (← links)
- ML20136E515 (← links)
- ML20140B900 (← links)
- IR 05000250/1991033 (← links)
- IR 05000250/1991008 (← links)
- ML20138F671 (← links)
- IR 05000250/1991010 (← links)
- ML20134D456 (← links)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup (← links)
- IR 05000250/1985021 (← links)
- IR 05000250/1985019 (← links)
- IR 05000250/1985017 (← links)
- ML20132E615 (← links)
- IR 05000250/1985020 (← links)
- IR 05000520/2006010 (← links)
- ML20129K191 (← links)
- ML20129K171 (← links)
- ML20129E090 (← links)
- IR 05000250/1984041 (← links)
- ML20127G019 (← links)
- IR 05000250/1992033 (← links)
- ML20151X532 (← links)
- PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed (← links)
- ML20151U677 (← links)
- PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8 (← links)
- ML20196B892 (← links)
- ML20155G012 (← links)
- PNO-II-83-081, on 831012,FPL Took Unit Out Svc Because of Failure of One of Two Rhrps.Determined Rhrp Failure on 831011 Was Due to Short Circuit Caused by Water in Terminal Box Which Houses Pump Motor Leads (← links)
- PNO-II-84-039, on 840625,10 Gpm Primary Coolant Leak Inside Containment Bldg Caused Slight Increase in Pressure & Containment Radiation Levels.Reactor Placed in Cold Shutdown for Corrective Maint on Root Valve (← links)
- IR 05000250/1986023 (← links)
- ML20197B915 (← links)
- IR 05000250/1986013 (← links)
- ML20197A838 (← links)
- PNO-II-87-020, on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted (← links)
- IR 05000250/1986029 (← links)
- IR 05000250/1987011 (← links)
- PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613 (← links)
- ML20203D236 (← links)
- IR 05000250/1986030 (← links)
- ML20203C112 (← links)
- IR 05000250/1988015 (← links)
- ML20206H750 (← links)
- IR 05000250/1987006 (← links)
- ML20207T714 (← links)
- PNO-II-87-017, media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc (← links)